FORM A: BID (See B9)

Similar documents
FORM A: PROPOSAL (See B11) 1. Contract Title TRANSIT BUS MAINTENANCE AND REPAIR GARAGE EXPANSION DESIGN BUILD PROJECT

FORM A: BID (See B9) 1. Contract Title 2015 WATERMAIN RENEWALS CONTRACT NO.3

FORM A: BID (See B9)

FORM A: BID (See B8) 1. Contract Title FERRY ROAD RIVERBEND COMBINED SEWER RELIEF CONTRACT NO. 2

Contract for St. Johns County School Board Osceola Elementary School Classroom Expansion

Proposal for Bidding Purposes

ASPHALT PAVING CONTRACT L TENDER FORM. Tender Submitted By: Bid Bond $ or Certified Cheque $

Special Provisions. Special Instructions to Bidders. Instructions to Bidders. General Conditions

Proposal for Bidding Purposes

Sunnyside Valley Irrigation District

CONTRACT AND BOND FORMS FOR

<CONTRACT TITLE> <Hwy No.> CONTRACT FORMS 1. CONTRACT FORMS 1.1 CONTRACT

CITY OF NORTH LAS VEGAS BID PROPOSAL., (hereinafter called Bidder)* a *, organized and existing under the laws of the State of

Yurok Tribe Planning and Community Development Klamath, California. Yurok Justice Center Bid Documents EXHIBIT B: BID FORM

CITY OF RICHMOND PERFORMANCE BOND

Proposal for Bidding Purposes

BUILDING PERMIT PERFORMANCE AND MAINTENANCE BOND (Owner and/or Contractor Form)

FORM OF AGREEMENT BETWEEN CONSTRUCTOR AND OWNER

EXHIBIT WARRANTY BOND. (Address), hereinafter called Principal, and

Invitation to Bid. FUNDING: The project shall be funded entirely with County funds, and shall be governed by strict guidelines for use of funds.

F O R M OF P R O P O S A L

CITY OF PETALUMA. POST OFFICE Box 61 PETALUMA, CA ADDENDUM NO. 1. AIRPORT PREVENTIVE MAINTENANCE RAMP CRACK SEAL City Project No.

AGREEMENT 4 pages. SPECIFICATION 1 page. LABOR & MATERIALS 4 pages. PERFORMANCE BOND 4 pages

Cherokee County Board of Commissioners

12-Inch Water Line Replacement Across Panther Branch SJRA Project No. WDPR N001 SECTION PROPOSAL FORM

Construction, respecting the replacement of the entrance stairs of City Hall, in the City of

Proposal for Bidding Purposes

APPENDIX B SURETY BOND FORM CASH BOND FORM LETTER OF CREDIT CERTIFICATE OF DEPOSIT

TOWN OF LABRADOR CITY FORM OF TENDER TLC RESIDENTIAL GARBAGE COLLECTION CONTRACT TENDER OF ADDRESS TELEPHONE NUMBER

QUOTE DOCUMENTS FOR CALLANAN GYM FLOOR REPLACEMENT center Street. Des Moines, Iowa QUOTE # Q7088

PERFORMANCE BOND. Date Bond Executed: Effective Date: Type of Organization: (Insert individual, joint venture, partnership, or corporation )

CONTRACT. This agreement, made and entered into this day of, 2013, in Reno, Nevada, by and between the City of Reno, hereinafter called the City, and

QUOTE DOCUMENTS FOR KING PARKING EXPANSION Forest Avenue. Des Moines, Iowa QUOTE # Q6747. Owner

SURETY BOND GUARANTEEING PAYMENT

EXHIBIT F-1 (I) FORM OF DESIGN-BUILD LETTER OF CREDIT VIRGINIA DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VA ATTN: [ ]

MAINTENANCE & WARRANTY BOND. Carroll County Board of Commissioners 423 College Street, Carrollton, Georgia, 30117

FORM 31 LABOUR AND MATERIAL PAYMENT BOND UNDER SECTION 85.1 OF THE ACT Construction Act

RIGHT-OF-WAY PERMIT SUBMITTAL REQUIREMENTS CHECKLIST

FORM 32 PERFORMANCE BOND UNDER SECTION 85.1 OF THE ACT Construction Act

ATTACHMENT NO. 1 BIDDER S PROPOSAL ACKNOWLEDGEMENT

INSTRUCTIONS FOR SCHOOL APPLICATION

CITY OF DANIA BEACH, FLORIDA ADDENDUM #5 REQUEST FOR PROPOSALS FOR CITYWIDE PUMP STATIONS SUPERVISORY CONTROL AND DATA ACQUISITION ( SCADA ) SYSTEM

ALABAMA A&M UNIVERSITY Carter and Chambers Fire Alarm System(s) A. Project Identification: New Fire Alarm system(s) Carter/Chambers

(A) PROVIDE A SURETY BOND NOT TO EXCEED 15% ABOVE AGGREGATED PRIZE VALUE (B) WRITE A CHECK TO OFFICE OF LOTTERY AND CHARITABLE GAMES

PROPOSAL BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 610 First Edition, 2015 Design-Build Institute of America Washington, D.C.

EXHIBIT CONSTRUCTION CONTRACT BOND

Coastal Carolina University Ingle Residence Hall Renovations

RECEIVED AT WHICH TIME BIDS

[1] TWO [2] PASSPORT SIZE [2X2] PHOTOGRAPHS OF THE APPLICANT [NO SUBSTITUTES].

The Corporation of The Township of Lanark Highlands. TENDER #PW Resurfacing Lavant Mill Road

BID: Escanaba WWTP Digester Roof Restoration

E&S PERFORMANCE BOND

INSTRUCTIONS TO TENDERERS

CONTRACT DOCUMENTS SPECIFICATIONS. for RAILROAD AVE. AND MAIN STREET TRAFFIC SIGNAL UPGRADE CITY OF FORT MORGAN, COLORADO.

PERFORMANCE BOND. Surety Bond No. STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF

Alaska Railroad Corporation

September 16, 2016 CCTA Contract No. 427 Caltrans Contract No. 04-4H1604 Balfour Interchange Project

JEFFERSON COUNTY Land Development SITE IMPROVEMENTS BONDING & BOND SURETY POLICY (Effective Date: September 2, 2010)

ALASKA MORTGAGE LICENSEE SURETY BOND

Bid Addendum #1 Bid # 13/14-01FA: Furniture and Equipment Bid Issued March 19, 2014

REQUEST FOR BID # JAIL WATER SOFTENER SYSTEM

CERTIFICATE. Final. Upon. Instructions: letterhead. Page 1 of 3. CDC Documents. Revised 1/22/2018

I-11 BOULDER CITY BYPASS DESIGN-BUILD PROJECT FINAL REQUEST FOR PROPOSALS NO A INSTRUCTIONS TO PROPOSERS EXHIBIT E PRICE PROPOSAL FORMS

CITY OF OLATHE. Please type or print. PROPERTY OWNER NAME (PERMIT HOLDER): OWNER AGENT: ADDRESS: CITY: STATE: ZIP:

REQUEST FOR BID # TIRE DISPOSAL SERVICES

Financial Information

FORM OF POWER OF ATTORNEY FOR JOINT VENTURE

ON-CALL EMERGENCY CONSTRUCTION CONTRACT AGREEMENT IN THE CITY OF CALABASAS, CALIFORNIA

STAATSKOERANT, 3 APRIL 2012 GOVERNMENT NOTICE DEPARTMENT OF POLICE SECOND-HAND GOODS ACT, 2009 REGULATIONS FOR DEALERS AND RECYCLERS

LUCAS COUNTY SANITARY ENGINEER BUILDING SEWERS AND CONNECTIONS RULES AND REGULATIONS

NORTH TEXAS MUNICIPAL WATER DISTRICT

BOND FOR FAITHFUL PERFORMANCE

*INSTRUCTIONS* TO BONDING COMPANY FOR EXECUTION OF THE 2015 SEWAGE TREATMENT SYSTEM INSTALLER, SERVICE PROVIDER, AND SEPTAGE HAULER REGISTRATION BOND

PUBLIC WORKS DEPARTMENT POLICE DEPARTMENT UNDER FREEWAY PARKING LOT IMPROVEMENTS PROJECT NO. PW1621

Proposal must provide warranty for all material and construction. See the specifications on the building.

CITY OF GIG HARBOR MAINTENANCE BOND for ENCROACHMENT PERMIT City Project EN #: Surety Bond No.: DATE POSTED: PROJECT COMPLETION DATE:

NAPA SANITATION DISTRICT

PUBLIC WORKS DEPARTMENT DELLA STREET SANITARY SEWER REHABILITATION PROJECT NO. M17025

PAYMENT BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 625 First Edition, 2015 Design-Build Institute of America Washington, D.C.

BID FORM FOR CONSTRUCTION CONTRACTS

VILLAGE OF ALERT BAY

C. Public-private partnership construction contracts. (a) Definitions for purposes of this section: (1) Construction contract.

SAMPLE SUBCONTRACTOR S PAYMENT BOND FOR DESIGN-BUILD PROJECTS. Document No. 635 First Edition, 2015 Design-Build Institute of America Washington, D.C.

BOND FOR FAITHFUL PERFORMANCE

*INSTRUCTIONS* TO BONDING COMPANY FOR EXECUTION OF THE 2017 SEWAGE TREATMENT SYSTEM INSTALLER, SERVICE PROVIDER, AND SEPTAGE HAULER REGISTRATION BOND

SAMPLE SERVICING AGREEMENT. THIS AGREEMENT made in duplicate this day of, 20, Between:

ABC UNIFIED SCHOOL DISTRICT Notice Calling for Bids ABC-1325 E-Rate Equipment INSTRUCTIONS FOR BIDDERS

WEST VIRGINIA STATE TAX DEPARTMENT Revenue Division SAMPLE COLLECTION AGENCY BOND. (1) That we, (Principal): (2) Address:

PERFORMANCE BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 620 First Edition, 2015 Design-Build Institute of America Washington, D.C.

TABLE OF CONTENTS DEFINITION NOTICE INVITING BIDS INSTRUCTIONS TO BIDDERS PROPOSAL BID PROPOSAL Part 1 NON-COLLUSION AFFIDAVIT Part 1 UNIT PRICE LIST

THIS CONTRACT is executed as of this day of, 2017, effective as of October 1, 2017 (the Effective Date ), by and between the CITY OF

AUCTIONEER S LICENSE INSTRUCTIONS You can now apply on line at the Department of Business Regulation website:

RUSSELL VOLUNTEER FIRE DEPARTMENT AND TOWN OF RUSSELL AGREEMENT

Tiffany Strine SECRETARY Sealed Proposals will be received on or before 8:30 A.M. on the above Letting Date West Canal Road TIME

PART A BID SUBMISSION

SPECIFICATIONS FOR THE TRANSPORTATION AND DISPOSAL OF MUNICIPAL SEWAGE SLUDGE CAKE

Administrative Report

Newark Unified School District 5715 Musick Ave., Newark, California Telephone (510) ; FAX (510)

RULES OF DEPARTMENT OF REVENUE VEHICLE SERVICES DIVISION CHAPTER TITLE BONDS TABLE OF CONTENTS

Guidelines for Submittals for Land Disturbance Permits

Transcription:

Bid Opportunity No. 448-207 Addendu 3 Page of Teplate Version: C207037 - C BCivil FORM A: BID (See B9). Contract Title BRADY ROAD RESOURCE MANAGEMENT FACILITY (BRRMF) DISPOSAL CELL CONSTRUCTION AND LEACHATE COLLECTION AND STORAGE TANKS 2. Bidder Nae of Bidder Usual Business Nae of Bidder as it appears on Invoice (if different fro above) Street City Province Postal Code Eail Address of Bidder Facsiile Nuber (Mailing address if different) Street or P.O. Box City Province Postal Code GST Registration Nuber (if applicable) (Choose one) The Bidder is: a sole proprietor a partnership a corporation carrying on business under the above nae. 3. Contact Person The Bidder hereby authorizes the following contact person to represent the Bidder for purposes of the Bid. Contact Person Title Telephone Nuber Facsiile Nuber 4. Definitions All capitalized ters used in the Contract shall have the eanings ascribed to the in the General Conditions.

Bid Opportunity No. 448-207 Addendu 3 Page 2 of Teplate Version: C207037 - C BCivil 5. Offer The Bidder hereby offers to perfor the Work in accordance with the Contract for the Total Bid Price, in Canadian funds, set out on For B: Prices, appended hereto. 6. Bid Security (Choose one) In accordance with B3., the Bidder encloses bid security in the for of: a bid bond (For G: Bid Bond and Agreeent to Bond) an irrevocable standby letter of credit (For G2: Irrevocable Standby Letter of Credit and Undertaking) a certified cheque or draft and agrees that it shall be held by the City in accordance with the Contract. 7. Execution of Contract The Bidder agrees to execute and return the Contract no later than seven (7) Calendar Days after receipt of the Contract, in the anner specified in C4. 8. Coenceent of the Work The Bidder agrees that no Work shall coence until he/she is in receipt of a letter of intent fro the Award Authority authorizing the coenceent of the Work. 9. Contract The Bidder agrees that the Bid Opportunity in its entirety shall be deeed to be incorporated in and to for a part of this offer notwithstanding that not all parts thereof are necessarily attached to or accopany this Bid. 0. Addenda The Bidder certifies that the following addenda have been received and agrees that they shall be deeed to for a part of the Contract: No. Dated. Tie This offer shall be open for acceptance, binding and irrevocable for a period of ninety (90) Calendar Days following the Subission Deadline.

Bid Opportunity No. 448-207 Addendu 3 Page 3 of Teplate Version: C207037 - C BCivil 2. Signatures The Bidder or the Bidder s authorized official or officials have signed this day of, 20. Signature of Bidder or Bidder s Authorized Official or Officials (Print here nae and official capacity of individual whose signature appears above) (Print here nae and official capacity of individual whose signature appears above)

Bid Opportunity No. 448-207 Addendu 3 Page 4 of Teplate Version: C207037 - C BCivil FORM B (R2): PRICES (See B0) BRADY ROAD RESOURCE MANAGEMENT FACILITY (BRRMF) DISPOSAL CELL CONSTRUCTION AND LEACHATE COLLECTION AND STORAGE TANKS PRICES ITEM DESCRIPTION NO. SPEC. REF. APPROX. QUANTITY PRICE AMOUNT GENERAL REQUIREMENTS. Site Developent and Restoration E4 L.S..2 Construction Survey 07300 L.S. 2 CELL 3 CONSTRUCTION 2. Cell Excavation Excavation and Stockpiling 32333.0 3 2.2 Geotextiles Non-woven Geotextile - Cushion 3329.0 2 Non-woven Geotextile - Filter 3329.0 2 2.3 Geoebrane HDPE Liner, 60 MIL (Sooth) 3329.02 2 HDPE Liner, 60 MIL (Textured) 3329.02 2 i GCL to bridge Cell 30 and Cell 3 liner 2.4 Engineered Clay Liner 3329.02 2 Recopacted Clay (50 ) 3329.03 2 2.5 Cell Late Collection Syste Granular Drainage Blanket 32333.02 2 Perforated Pipe 402700 i Cleanout Riser Pipe 402700 ea iv) Corrugated HDPE Vertical Manhole 402700 ea 3 3.A 3.A. LEACHATE COLLECTION SYSTEM Area A - Manhole # to Manhole #2 Gravity Late Pipe 200 DR HDPE with trenchless Installation (in 2.5 depth of cover, supply and install) Supply and Installation of 200 HDPE anhole c/w Frae and Cover 9,000 7,500 7,500 2,000 5,500 750 7,500 6,700 20 420

Bid Opportunity No. 448-207 Addendu 3 Page 5 of Teplate Version: C207037 - C BCivil FORM B (R2): PRICES (See B0) BRADY ROAD RESOURCE MANAGEMENT FACILITY (BRRMF) DISPOSAL CELL CONSTRUCTION AND LEACHATE COLLECTION AND STORAGE TANKS PRICES ITEM DESCRIPTION NO. Supply and Installation of HDPE i Late Transit Gravity Pipe Cleanout Area B - Manhole #2 to Manhole 3.B #3 SPEC. REF. APPROX. QUANTITY PRICE AMOUNT 3.B. i iv) 3.B.2 Gravity Late Pipe 200 DR HDPE with trenchless Installation (in 2.5 depth of cover) 300 DR HDPE Encaseent Pipe Supply and Installation of 200 HDPE anhole c/w Frae and Cover Supply and Installation of HDPE Late Transit Gravity Pipe Cleanout Copressed Air Syste Trench Installation of 75 HDPE, DR for copressed air. Trenchless Installation of 200 DR HDPE Encaseent Pipe 227 227 575 22 2 3 560 20 i Marker Post for Manhole E 6 3.B.3 Mechanical Coponents Manhole MH02 Pneuatic Late Pup (P-3) Cell 3 Sup Pneuatic Late Pup (P-4) 3.C Area C Late Storage Tank 32200.0 ea 32200.0 ea 8 3.C. Road Works Excavation CW 30 3 Subgrade Copaction CW 30 2 i Separation Geotextile Fabric (For Civil Works) E8 2 iv) Supply and Installation of Geogrid CW 335 2 v) v v 3.C.2 50 of 9 Crushed Base Material 450 of 50 Sub-Base Course Material 850 of 00 Sub-Base Course Material Drainage Works CW 30 3 CW 30 CW 30 tonne tonne,200 2,340 2,340,70 80,680 4,752

Bid Opportunity No. 448-207 Addendu 3 Page 6 of Teplate Version: C207037 - C BCivil FORM B (R2): PRICES (See B0) BRADY ROAD RESOURCE MANAGEMENT FACILITY (BRRMF) DISPOSAL CELL CONSTRUCTION AND LEACHATE COLLECTION AND STORAGE TANKS PRICES ITEM DESCRIPTION NO. 250 SS Schedule 40S (Installation of drainage pipe in a trench) 250 SS Schedule 40S (Installation of drainage pipe in a trench with insulation) Supply and Installation of 250 i diaeter Flexible Expansion Joint Supply and Installation of 900 iv) Concrete Catch Basin at Truck Loading Pad, c/w Frae and Cover Supply and Installation of Flexible v) Expansion Joints, 250 diaeter EBBA Iron Flex Tend 40F20 Supply and Installation of 250 v diaeter SS Gate Valve Supply and Installation of 200 v CSP culvert (2.8) c/w Polyer Coating Supply and Installation of 600 vi CSP culvert (2.8) c/w Polyer Coating Reinforced Concrete Pad for 3.C.3 Late Truck 30.0 x 8.0 Concrete Pad c/w Concrete Curb Base Preparation for Late 3.C.4 Tanks and Secondary Containent SPEC. REF. E7 APPROX. QUANTITY 0 E7 20 E7 CW 230 E7 E7 CW 360 CW 360 CW 330 2 Excavation E0 3 i Supply and Installation of of 50 Copacted Base Course Material Supply and Installation of 2 of 50 Copacted Sub-Base Course Material E0 E0 Tonne tonne iv) Subgrade Preparation E0 2 v) 3.C.5 3.C.6 Supply and Installation of Geotextile (For Civil Works) Copressed Air Syste Trench Installation of 75 HDPE, DR for copressed air. Trenchless Installation of 200 DR HDPE Encaseent Pipe Mechanical Coponents Late Tank, Secondary Containent, Foundations (TK-, TK-2) E8 2 227 227 33563 ls 2 2 30 26 300,500,400 3,000,000,000 70 62 PRICE AMOUNT

Bid Opportunity No. 448-207 Addendu 3 Page 7 of Teplate Version: C207037 - C BCivil FORM B (R2): PRICES (See B0) BRADY ROAD RESOURCE MANAGEMENT FACILITY (BRRMF) DISPOSAL CELL CONSTRUCTION AND LEACHATE COLLECTION AND STORAGE TANKS PRICES ITEM DESCRIPTION NO. i Process Piping and Valves Late Loadout Pup (P-) SPEC. REF. 227, 23075 32 2 00.02 iv) Tank Mixer (M-) 33563.0 ea v) Packaged Air Copressor and Receiver (C-, AR-) ea 22500 ea v Air Dryer (AD-) 22500 ea v Dry Air Receiver (AR-2) 22500 ea vi Air Flow Controller (FC-) 22500 ea ix) Manhole MH03 Pneuatic Late Pup (P-2) 32200.0 ea x) Pup Lifting Davit (H-) 4000 ea 3.C.7 3.C.8 3.C.9 Electrical/Autoation Late Tank Electrical/Autoation Maintenance Building Cash Allowance: MB Hydro contribution costs to bring the service to the Late tank DIV 26, DIV 40 DIV 26, DIV 40 L.S. L.S. APPROX. QUANTITY 30 PRICE AMOUNT DIV 26 0,000.00 TOTAL BID PRICE (GST extra) (in figures) $ Nae of Bidder

Bid Opportunity No. 448-207 Addendu 3 Page 8 of Teplate Version: C207037 - C BCivil KNOW ALL MEN BY THESE PRESENTS THAT FORM G: BID BOND AND AGREEMENT TO BOND (Page of 2) (See B3) BID BOND (hereinafter called the "Principal") and (hereinafter called the "Surety"), are held and firly bound unto THE CITY OF WINNIPEG (hereinafter called the "Obligee") in the su of ten percent (0%) of the Total Bid Price set out in the Bid hereinafter described, for the payent of which su the Principal and Surety bind theselves, their heirs, executors, adinistrators, successors and assigns, jointly and severally, firly by these presents. WHEREAS the Principal has subitted a Bid to the Obligee for BID OPPORTY NO. 448-207 Addendu 3 BRADY ROAD RESOURCE MANAGEMENT FACILITY (BRRMF) DISPOSAL CELL CONSTRUCTION AND LEACHATE COLLECTION AND STORAGE TANKS as ore fully set out in the Bid Opportunity. NOW THEREFORE the condition of this obligation is such that if the Bid of the Principal is not accepted, or if said Bid is accepted and the Principal, in accordance with the ters of the Bid, enters into a Contract with the said Obligee and furnishes the required perforance security for guaranteeing the faithful perforance of the Contract, this obligation shall be void, but otherwise shall reain in full force and effect. IN WITNESS WHEREOF the Principal and Surety have signed and sealed this bond the day of, 20. SIGNED AND SEALED in the presence of: (Nae of Principal) (Witness as to Principal if no seal) Per: Per: (Seal) (Nae of Surety) By: (Attorney-in-Fact) (Seal)

Bid Opportunity No. 448-207 Addendu 3 Page 9 of Teplate Version: C207037 - C BCivil FORM G: BID BOND AND AGREEMENT TO BOND (Page 2 of 2) (See B3) AGREEMENT TO BOND (to be attached to and to for part of Bid Bond) The Surety on the attached Bid Bond hereby undertakes and agrees with THE CITY OF WINNIPEG to becoe bound as Surety for the Principal, of (Nae of Bidder) (Place) the Bidder to you on, 20 for BID OPPORTY NO. 448-207 Addendu 3 BRADY ROAD RESOURCE MANAGEMENT FACILITY (BRRMF) DISPOSAL CELL CONSTRUCTION AND LEACHATE COLLECTION AND STORAGE TANKS in an aount equal to fifty percent (50%) of the Contract Price for the due and proper perforance of the Work shown and described in the Bid Opportunity, if our Principal's Bid is accepted by you, such Perforance Bond to be aintained and continue in full force and effect until the expiration of the warranty period. The Perforance Bond shall be in the for specified in the Bid Opportunity. It is a condition that this Agreeent to Bond shall becoe null and void if the Perforance Bond entioned above is not required fro our Principal within ninety (90) Calendar Days following the Subission Deadline. AND IT IS HEREBY DECLARED AND AGREED that the Surety shall be liable as Principal, and that nothing of any kind or atter whatsoever that will not discharge the Principal shall operate as a discharge or release of liability of the Surety, any law or usage relating to the liability of Sureties to the contrary notwithstanding. SIGNED AND SEALED this day of, 20. (Nae of Surety) By: (Attorney-in-Fact) (Seal)

Bid Opportunity No. 448-207 Addendu 3 Page 0 of Teplate Version: C207037 - C BCivil FORM G2: IRREVOCABLE STANDBY LETTER OF CREDIT AND UNDERTAKING (BID SECURITY) (Page of 2) (See B3) (Date) The City of Winnipeg Corporate Finance Departent Materials Manageent Division 85 King Street, Main Floor Winnipeg MB R3B J RE: BID SECURITY - BID OPPORTY NO. 448-207 Addendu 3 BRADY ROAD RESOURCE MANAGEMENT FACILITY (BRRMF) DISPOSAL CELL CONSTRUCTION AND LEACHATE COLLECTION AND STORAGE TANKS Pursuant to the request of and for the account of our custoer,, (Nae of Bidder) (Address of Bidder) WE HEREBY ESTABLISH in your favour our irrevocable Standby Letter of Credit for a su not exceeding in the aggregate Canadian dollars. This Standby Letter of Credit ay be drawn on by you at any tie and fro tie to tie upon written deand for payent ade upon us by you. It is understood that we are obligated under this Standby Letter of Credit for the payent of onies only and we hereby agree that we shall honour your deand for payent without inquiring whether you have a right as between yourself and our custoer to ake such deand and without recognizing any clai of our custoer or objection by the custoer to payent by us. The aount of this Standby Letter of Credit ay be reduced fro tie to tie only by aounts drawn upon it by you or by foral notice in writing given to us by you if you desire such reduction or are willing that it be ade. Partial drawings are peritted. We engage with you that all deands for payent ade within the ters and currency of this Standby Letter of Credit will be duly honoured if presented to us at: (Address) and we confir and hereby undertake to ensure that all deands for payent will be duly honoured by us.

Bid Opportunity No. 448-207 Addendu 3 Page of Teplate Version: C207037 - C BCivil FORM G2: IRREVOCABLE STANDBY LETTER OF CREDIT AND UNDERTAKING (BID SECURITY) (Page 2 of 2) (See B3) All deands for payent shall specifically state that they are drawn under this Standby Letter of Credit. This Standby Letter of Credit will expire on October 5, 207. if our custoer s Bid is not accepted, and if accepted, when our custoer has entered into a Contract with you and has furnished the required perforance security for guaranteeing the faithful perforance of the Contract. This Standby Letter of Credit ay not be revoked or aended without your prior written approval. WE HEREBY UNDERTAKE and agree to provide in your favour an irrevocable Standby Letter of Credit in an aount equal to fifty percent (50%) of the Contract Price for the due and proper perforance of the Work shown and described in the Bid Opportunity, if our custoer's Bid is accepted by you. Such Standby Letter of Credit shall be aintained and continue in full force and effect until the expiration of the warranty period. The Standby Letter of Credit shall be in the for specified in the Bid Opportunity. This credit is subject to the Unifor Custos and Practice for Docuentary Credit (2007 Revision), International Chaber of Coerce Publication Nuber 600. (Nae of bank or financial institution) Per: (Authorized Signing Officer) Per: (Authorized Signing Officer)