SANITARY SEWERAGE SERVICE AGREEMENT Between MOUNT LAUREL TOWNSHIP MUNICIPAL UTILITES AUTHORITY And

Similar documents
SUBDIVISION IMPROVEMENT AGREEMENT. (Date of Subdivision Map Recordation: )

DEPOSIT AGREEMENT GUARANTEEING SITE PLAN IMPROVEMENTS WITH LETTER OF CREDIT

EXHIBIT "D" DEVELOPER AGREEMENT

CERTIFICATE. Final. Upon. Instructions: letterhead. Page 1 of 3. CDC Documents. Revised 1/22/2018

BOND FOR FAITHFUL PERFORMANCE

1. Developer is a(n) individual partnership corporation, doing business in Tarrant County, Texas, whose address is

APPENDIX V ESCROW BOND AGREEMENT

FINAL AGREEMENT FOR LAND DIVISION IMPROVEMENTS IN ACCORDANCE WITH THE TOWN OF WESTPORT CODE FOR TOWN OF WESTPORT, DANE COUNTY, WISCONSIN

BOND FOR FAITHFUL PERFORMANCE

STORMWATER UTILITY MAINTENANCE AGREEMENT

Water or Sewer Extension Deposit-Developer MI No. Agreement Type (01/2016) DS Project # EXTENSION DEPOSIT AGREEMENT

PERFORMANCE AND BOND AGREEMENT

SENATE, No. 667 STATE OF NEW JERSEY. 208th LEGISLATURE INTRODUCED FEBRUARY 23, 1998

DEPOSIT AGREEMENT FOR MAINTENANCE OF SITE PLAN IMPROVEMENTS WITH LETTER OF CREDIT

AGREEMENT WITH BUILDER THIS AGREEMENT MADE BETWEEN:

CITY OF NORTH LAS VEGAS 2250 Las Vegas Boulevard North, Suite 200, North Las Vegas, Nevada (702) Fax(702) TDD(800)

Administrative Report

JEFFERSON COUNTY Land Development SITE IMPROVEMENTS BONDING & BOND SURETY POLICY (Effective Date: September 2, 2010)

SUBDIVISION AGREEMENT

WITNESSETH: WHEREAS, on November 17, 2004, the Illinois General Assembly passed Public Act (hereinafter the Act ); and

DEVELOPER'S AGREEMENT FOR LOT 1, BLOCK 1, TRICARE 3RD ADDITION, HENNEPIN COUNTY, MINNESOTA

APPLICATION FOR 2019 SEWER AND WATER BUILDER S LICENSE

Chapter 132 STREETS AND SIDEWALKS. ARTICLE I Street Openings and Excavations

SUBDIVISION PUBLIC IMPROVEMENT PERFORMANCE AND MAINTENANCE SECURITY AGREEMENT

Section, Township N, Range E. Is project in MWRDGC combined sewer area Yes No. Basic Information (Required in all cases)...schedule A (Page 4 of 8)

AGREEMENT WITH BUILDER. NAME or COMPANY NAME: ADDRESS:

STREET VACATION PROCEDURE AND APPLICATION

SAMPLE PROPERTY AND LIABILITY INSURANCE BROKER SERVICES AGREEMENT BETWEEN SPOKANE AIRPORT AND

PRIVATE SEWAGE DISPOSAL SYSTEM ORDINANCE

FUNDAMENTAL PROVISIONS.

MUTUAL ACCESS AGREEMENT

TOHOPEKALIGA WATER AUTHORITY WATER, REUSE, AND WASTEWATER SYSTEM DEVELOPER'S SERVICE AGREEMENT

ROAD USE AGREEMENT. WHEREAS, Operator intends to engage in Natural Gas Activities at various locations in the Municipality; and

Chapter 18. Sewers and Sewage Disposal

EXTENDED VACATION OCCUPANCY AGREEMENT (For Recreational Vehicle Space)

CHAPTER Committee Substitute for House Bill No. 7019

CHAPTER XIV WATER AND SEWERS ARTICLE 1. WATER SERVICE

NAPA SANITATION DISTRICT

NON-STANDARD SERVICE CONTRACT

CONSTRUCTION LIEN CLAIM

LICENSE FOR USE OF DISTRICT FACILITIES FOR CONVEYANCE OF GROUNDWATER FROM CONSTRUCTION DEWATERING

( ) SAP Vendor: AGREEMENT FOR INSTALLATION OF UTILITY FACILITY ON STRUCTURE

CITY OF POST FALLS 408 SPOKANE STREET POST FALLS, IDAHO CONSTRUCTION IMPROVEMENT AGREEMENT

SHARED SERVICES NJSA 40A:65-1 et seq. GPANJ Educational Symposium March 23, 2017

RULES & REGULATIONS OF THE CUMBERLAND-FRANKLIN JOINT MUNICIPAL AUTHORITY

A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF HOLLYWOOD, FLORIDA, AUTHORIZING THE

THIS AGREEMENT made the (1) DATE day of (2) MONTH), 2013 THE CORPORATION OF THE CITY OF WELLAND. hereinafter called "the City"

COMMONWEALTH OF PENNSYLVANIA POSTING AUTHORITY EXCESS MAINTENANCE AGREEMENT

LICENSE AGREEMENT t;;+ -

WHEREAS, the Township has elected to exercise these redevelopment entity powers directly, as permitted by Section 4 of the Redevelopment Law; and

CHAPTER 31-3 REGULATIONS FOR SEWER SYSTEMS

Guarantor additionally represents and warrants to Obligee as

Upon motion by, seconded by, the following Ordinance was duly enacted, voting in favor of enactment, voting ORDINANCE

BOARD OF COUNTY COMMISSIONERS SARPY COUNTY, NEBRASKA

ORDINANCE NO

ORDINANCE NO

AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)

SAMPLES OF BILL OF SALE

INSTRUCTIONS INSPECTION, MAINTENANCE, & RIGHT-TO-DISCHARGE AGREEMENT FOR PRIVATE STORMWATER MANAGEMENT

PROPOSED ORDINANCE NO. XXXXX THE METROPOLITAN ST. LOUIS SEWER DISTRICT. Relating to:

WASHINGTON TOWNSHIP MUA REGULAR MEETING May 7, 2014

[HISTORY: Adopted by the Board of Health of the Township of Barnegat as Ord. No Amendments noted where applicable.

TIER 4 MUNICIPAL SOLID WASTE MANAGEMENT SERVICES AGREEMENT FOR THE PROVISION OF ACCEPTABLE SOLID WASTE AND ACCEPTABLE RECYCLABLES SERVICES

REIMBURSEMENT AGREEMENT FOR THE RUWAP RECYCLED PROJECT (AWT PHASE

LOGAN COUNTY HEALTH DISTRICT REGULATION 46: PLUMBING TABLE OF CONTENTS. Section 1 Title, Scope, Administration, Enforcement, and Page 2

MORRISON CREEK METROPOLITAN WATER AND SANITATION DISTRICT POLICY REGARDING IMPLEMENTATION OF VAULT PROGRAM AND LOT OWNER CONSENT AND AGREEMENT

EXHIBIT F-1 (I) FORM OF DESIGN-BUILD LETTER OF CREDIT VIRGINIA DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VA ATTN: [ ]

RULES AND REGULATIONS

TOWNSHIP OF WOOLWICH ORDINANCE NUMBER

SALES REPRESENTATION AGREEMENT. This Agreement, entered into as of this day of,20,by and between

BY-LAWS CANTERBURY WOODS OF PLAINFIELD HOMEOWNERS ASSOCIATION

COMMERCIAL SPACE LICENSE AGREEMENT

WHEREAS, the Jolly Lane Lift Station currently serves this area; and

SEWER SYSTEM FACILITIES 2,655 LF 437 LF

NOW THEREFORE it is hereby agreed between the District and the Customer as follows:

ASSURANCE OF PERFORMANCE AGREEMENT

BY-LAWS OF THE WOODED RIDGE TOWNHOUSE ASSOCIATION, INC.

BOND AGREEMENT CERTIFICATE OF OCCUPANCY - CASH ONLY COMPLETION OF PUBLIC OR PRIVATE IMPROVEMENTS

RESOLUTION # BOROUGH OF HIGH BRIDGE COUNTY OF HUNTERDON STATE OF NEW JERSEY SHARED SERVICES AGREEMENT BY AND BETWEEN

ARTICLE XI ENFORCEMENT, PERMITS, VIOLATIONS & PENALTIES

ALABAMA PUBLIC SERVICE COMMISSION ADMINISTRATIVE CODE CHAPTER 770-X-9 WASTEWATER MANAGEMENT ENTITY RULES TABLE OF CONTENTS

The Joint Powers Authority Manual

FIRST INDEMNITY OF AMERICA INSURANCE COMPANY INDEMNITY AGREEMENT

WEST BOYLSTON MUNICIPAL LIGHTING PLANT 4 Crescent Street, West Boylston, Massachusetts Telephone (508) Fax (508)

AMENDED AND RESTATED REDEVELOPMENT AGREEMENT BY AND BETWEEN. BOROUGH OF FLEMINGTON as Redevelopment Entity AND

Request For Proposals Hwy 124 E ADA Door Opener Hallsville City Hall

ST. MARY'S COUNTY, MARYLAND PUBLIC WORKS AGREEMENT FOR CONTINUED MAINTENANCE AND REPAIR

RULES AND REGULATIONS FOR FURNISHING WATER SERVICE IN THE SERVICE AREA OF THE DOVVNINGTOWN MUNICIPAL WATER AUTHORITY CHESTER COUNTY, PENNSYLVANIA

BYLAWS OF THE VILLAGE AT PILOT MILL HOMEOWNERS ASSOCIATION, INC. ARTICLE I

CONTRACT. This agreement, made and entered into this day of, 2013, in Reno, Nevada, by and between the City of Reno, hereinafter called the City, and

ORDINANCE NO. 906 AN ORDINANCE AMENDING THE ATHENS MUNICIPAL CODE BY REVISING CHAPTER 2 OF TITLE 16 IN ITS ENTIRETY.

OVERLAND HILLS POINT SUBDIVISION AGREEMENT

FIRST READING: SECOND READING: PUBLISHED: PASSED: TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION

BYLAWS TYLER WOODS HOMEOWNERS ASSOCIATION ARTICLE I

INSTRUCTIONS FOR APPLICATION FOR FIBER OPTIC CABLE LICENSE

AGREEMENT FOR THE CONSTRUCTION OF SANITARY FACILITIES IN THE MUNICIPALITY OF MURRYSVILLE WESTMORELAND COUNTY, PENNSYLVANIA

CITY OF KENT, OHIO ZONING CODE CHAPTER 1107 CONDITIONAL ZONING CERTIFICATES AND SPECIALLY PERMITTED USES Page

Hillsborough Municipal Utilities Authority Rate Resolution Page 1

ATHENS-CLARKE COUNTY BUILDING RELOCATION PERMIT APPLICATION

BUCKS COUNTY WATER AND SEWER AUTHORITY RESERVATION OF CAPACITY AGREEMENT. THIS AGREEMENT, made this day of, 201, by and between the

Transcription:

Mailing Address-1201 South Church Street Mount Laurel, NJ 08054 Engineering Office: 81 Elbo Lane Mount Laurel, NJ 08054-9641 Phone: (856) 722-5900 ext. 117 Email: engineering@mltmua.com Fax: (856) 235-0816 FORM S-2 SANITARY SEWERAGE SERVICE AGREEMENT Between MOUNT LAUREL TOWNSHIP MUNICIPAL UTILITES AUTHORITY And WHEREAS, the Mount Laurel Township Municipal Utilities Authority (hereinafter MLTMUA ), 1201 South Church Street, Mount Laurel, New Jersey, is a public body created by the governing body of the Township of Mount Laurel pursuant to the Authority of N.J.S.A. 40:14B-1 et seq.; and WHEREAS, the MLTMUA is charged, inter alia, with the responsibility for the maintenance, operation and improvement of works for the collection, treatment, and disposal of sewage within the Township of Mount Laurel; and WHEREAS (Name of Applicant) (Hereinafter Applicant/Developer ) has its address or principal place of business at: ; and WHEREAS, the Applicant/Developer is the legal or beneficial owner of real property within the Township of Mount Laurel described by the following Address and Block and Lot numbers of the Official Tax Map of the Township of Mount Laurel: S-2 Page 1

WHEREAS, the Applicant/Developer has received conceptual approval for connection of the units enumerated on the attached S-1Application to the MLTMUA sanitary sewerage service. NOW, THEREFORE, IT IS HEREBY AGREED, CONTRACTED AND STIPULATED between the MLTMUA and the Applicant/Developer as follows: 1. CONTINGENT UPON APPROVAL AND AVAILABILITY. The parties hereto fully understand that the United States Environmental Protection Agency and the New Jersey Department of Environmental Protection may exercise jurisdiction over sewer services and from time to time may promulgate rules and regulations affecting said services. The parties hereto agree that their respective obligations under the terms of this Agreement shall be contingent upon the MLTMUA receiving all necessary approvals from the aforesaid agencies to provide said services. In the event that the MLTMUA is prohibited from providing, offering or extending said services to the Applicant/Developer the obligation of the MLTMUA to provide, offer or extend such services to Applicant/Developer shall be suspended until such time as the MLTMUA shall receive authorization. The MLTMUA reserves the right to refuse acceptance of conditional approvals from this agency if the conditions set forth are detrimental to the overall operation of the Authority. FUTHER, Applicant/Developer expressly understands that this Agreement and the obligations imposed upon the MLTMUA herein for sanitary sewer services are contingent upon the MLTMUA having the capacity at its sanitary sewerage treatment facilities at the time this service agreement is executed, taking into consideration any sanitary sewer service agreements and requests for sanitary sewer permits with or from other Applicant/Developers which are completed and fully paid. The MLTMUA shall be obligated to provide service to the Applicant/Developer as soon as it is permitted or as soon as the capacity is available, taking into consideration any prior service agreements and requests for sanitary sewerage permits with other Applicants/Developers which have been completed and fully paid at the time the capacity is available. However, availability will be reviewed at the time of S-3 approval in the event that this project fails to proceed to approval in a timely manner. S-2 Page 2

The MLTMUA shall seek approval from the aforementioned state or federal agency on behalf of the Applicant/Developer. Applications should be prepared by the Applicant/Developer and submitted with the appropriate sewer connection fees. Capacity is not reserved until connection fees are paid. 2. MLTMUA RULES AND REGULATIONS AND SPECIFICATIONS FOR CONSTRUCTION. The Applicant/Developer agrees to abide by the Rules and Regulations promulgated by the MLTMUA as well as the Specifications for construction as they are in existence now and as they may be modified from time to time. Applicant/Developer acknowledges that said Rules, Regulations and Specifications have been made available to Applicant/Developer prior to signing this Agreement and that said Rules, Regulations and Specifications are satisfactory to Applicant/Developer. 3. ENGINEERING PLANS FOR SYSTEMS AND FACILITIES. For the purposes of this Agreement systems and facilities shall be defined to include all mains, force mains, pumping stations and any and all related appurtenances. Conceptual engineering plans, having been approved by the MLTMUA upon the advice of its consulting engineers, shall be redrafted into construction plans and re-submitted for final construction plan approval (S-3). The sanitary sewer system and facilities shall be constructed in strict accordance with the final approved plan and all other rules, regulations and specifications of the MLTMUA as applicable. 4. CONNECTION FEES. Connection fees, if applicable, shall be paid as follows: a). Prior to the submittal of the State Application (TWA) b). Prior to issuance of the Sanitary Sewer Connection Permit (if TWA is not required) Connection fees are subject to reassessment at the current rate at the time of building permit release. No discharge into our sanitary sewer system will be approved until as-built plans of supporting infrastructure have been submitted and construction approved. 5. REQUEST FOR SANITARY SEWER PERMITS. Upon final approval of construction plans the Applicant/Developer shall be entitled to submit an Application for Sanitary Sewer Connection (S-4) for any or all units. Connections will not be approved until a Permit to Construct has been issued, and the following has been submitted: a). Payment of Sanitary Sewer connection fees b). A signed Sanitary Sewer Service Agreement (S-2) S-2 Page 3

c). A map showing the location of service lines d). Filed easements/easement agreements as required during S-3 approval process. e). Performance Bonds. Prior to the commencement of any construction, the Applicant/Developer shall post with the MLTMUA a performance bond with corporate surety authorized to do business in the State of New Jersey, in the amount of One Hundred Twenty Percent (120%) of the estimated cost of the systems and facilities to be constructed under the terms of this Agreement. The estimated cost shall be prepared by the MLTMUA, upon the advice of its consulting engineer. Performance bonds shall be posted in its entirety unless approval is given by the MLTMUA to post by sections. f). Signed Building Permit Release Form 6. APPROVAL TO CONSTRUCT SEWER INFRASTRUCTURE. The following items are required to be submitted and approved/accepted prior to Approval to Construct Sewer Infrastructure: a.) Construction plan approved b.) Applicable governmental approvals c.) Easements and easement agreements d.) Cost reimbursement the private party who constructs sewer main line extensions with private funds shall be entitled to reimbursement of the costs of construction. e.) Post inspection escrow which is calculated at 5% of the engineer s estimate. f.) Payment of connection fees. g.) Approval of applicable Commercial/Industrial Discharge Applications (CID) h.) Other requirements specific to the project. b). CONSTRUCTION. The Applicant/Developer shall construct and install, at no cost to the MLTMUA, all off-site and all on-site sanitary sewer systems and facilities, including mains, force mains, pumping stations and any and all related appurtenances which are necessary to extend service from the existing sanitary sewer system and facilities of the MLTMUA to the units for which application for service has been made under this Agreement. All construction shall be in accordance with the Rules, Regulations and Specifications of the MLTMUA and the engineering plans submitted by Applicant/Developer and approved by the MLTMUA. c). INSPECTION. The MLTMUA or its consulting engineers shall inspect the construction of S-2 Page 4

the aforesaid sanitary sewer systems and facilities to determine whether said systems and facilities are being constructed in the agreed manner. The MLTMUA shall inform Applicant/Developer of any improper construction or of any deviation from the approved plans or MLTMUA Rules, Regulations and Specifications. Applicant/Developer shall thereafter correct any defects or deficiencies. The MLTMUA shall be under no obligation, notwithstanding any other paragraph in this Agreement to the contrary, to provide sanitary sewer service to the Applicant/Developer if said systems and facilities are not built in accordance with the approved construction plans and the MLTMUA Rules, Regulations and Specifications. The cost of all inspections shall be borne by the Applicant/Developer. 8. SUBMISSION FOR ACCEPTANCE. After construction has been completed, and deemed by the MLTMUA and its consulting engineer acceptable for public use, the Applicant/Developer shall request in writing that the MLTMUA accept the systems and facilities constructed pursuant to this Agreement. The Applicant/Developer shall, at the time of the request, submit to the MLTMUA the following supporting documents, which shall be prepared at the expense of the Applicant/Developer and shall be fully signed by the Applicant/Developer and attested to either by a Notary public or an attorney at law of the State of New Jersey. The failure of the Applicant/Developer to submit the required documents, to properly execute it and/or to have proper attestation will result in the MLTMUA refusing to accept the systems and facilities constructed pursuant to this Agreement. The documents to be submitted by the Applicant/Developer are as follows: A. A document dedicating all sewer systems and facilities including mains, force mains, pump stations and any and all related appurtenances except laterals to the MLTMUA. B. Deed for all necessary titles or easements to lands necessary for the maintenance or operation of the sanitary sewer system and facilities including easements for extensions of mains to adjacent properties. C. A two-year maintenance bond in the amount of fifteen percent (15%) of the total construction cost as determined by the MLTMUA to cover costs of repair for any latent defects discovered during the two-year period. D. As-built drawing and GIS as-built submitted of the sewer system and facilities including the location of sewer clean outs shall be provided to accurately locate and identify all structures, S-2 Page 5

paving surfaces, property lines, easements, mains, valves, force mains, etc., and associated material, size, elevation and location for future reference. 9. ACCEPTANCE. The MLTMUA shall determine whether said systems are constructed in accordance with the approved plans and the MLTMUA Rules, Regulations and Specifications and shall determine whether all supporting documents are in order. If all construction and submissions are approved, the MLTMUA shall adopt a Resolution accepting the systems and facilities as constructed. All dedications, deeds, easements, bonds and as-built drawings shall be formally recorded or processed as required. All costs shall be paid by the Applicant/Developer. 10. SPECIAL CONDITIONS OF ISSUED PERMITS. It is expressly understood by the Applicant/Developer that a MUA sewer permit (S-4), which is issued for any unit, shall be valid for a period of one (1) year from the date of issuance. Upon the date of physical connection or if after one (1) year construction is not complete, but physical connection has been made to the main, the MLTMUA shall charge and Applicant/Developer agrees to pay, sewer service charges for the service connected. In the event that physical connection is not made within the one (1) year period, the authority reserves the right to void the permit. The Applicant/Developer hereby agrees that in the event that the permit is voided the MLTMUA shall retain twenty percent (20%) of the connection fee paid for each expired permit as a charge for reservation of capacity and loss of service revenue. It is hereby stipulated and agreed that said charge is reasonable in amount and is to be considered as liquidated damages, and not as a penalty. The parties agree that actual damages would be difficult to calculate and stipulate that this amount is reasonable as liquidated damages. The balance of the connection fee paid for the expired permit shall be returned to the Applicant/Developer by the MLTMUA. Applicant/Developer may file a new request for permit at any time thereafter. Approval will be subject to review if more than two (2) years have lapsed. 11. FEE SCHEDULE. Applicant/Developer shall pay to the MLTMUA the following fees: A. An application fee in the amount as indicated shall be paid at the submission of the Application for Conceptual Approval of Sanitary Sewer (S-1). B. Review escrow fees shall be posted at the time of submission of the Application for Conceptual Approval of Sanitary Sewer (S-1) as stipulated in the application. Review escrow closeout will proceed after the Authority has granted final approval of the S-2 Page 6

construction plans. Any unused portion of the review escrow fee will be refunded upon written request from the Applicant/Developer. C. An application fee in the amount as indicated shall be paid at the time of submission of the Application for Final Approval of Sanitary Sewer Construction Plans (S-3). D. Inspection escrow fees, if required, shall be posted prior to the commencement of any construction. In the event that the escrow fund is depleted or is deficit, the Applicant/Developer shall post additional escrow funds with the MLTMUA in an amount to be agreed upon by both the Applicant/Developer and the MLTMUA. In the interim, work will cease except for required health or safety inspections. Inspection escrow close out will proceed after all improvements have been approved. The Applicant/Developer shall send a written notice by certified mail to the Authority that the application or improvements are complete. The professional will render a final bill to the Authority within 30 days of receipt of the Applicant/Developer s request. Within 45 days of receipt of the final bill, the Authority will render a final accounting to the Applicant/Developer of the uses to which the deposit was applied. Any funds remaining will be refunded to the Applicant/Developer along with the final accounting. E. Escrow Statements shall be sent on a quarterly basis to the Applicant/Developer if monthly charges are less than $1,000.00. If escrow charges are greater than $1,000.00, escrow statements will be sent on a monthly basis. 12. USE OF FACILITIES. The MLTMUA shall be permitted the free and uninterrupted use of all sanitary sewer systems and facilities constructed and installed by Applicant/Developer during the periods prior to final acceptance by the MLTMUA. 13. INDEMNIFICATION. The Applicant/Developer agrees to indemnify and hold the MLTMUA harmless from any and all liability in connection with the sanitary sewer systems, facilities and appurtenances which are being constructed pursuant to this Agreement including, but not limited to, any and all claims that may be made by the Applicant/Developer or any other party relating to a pro rata or other contribution toward S-2 Page 7

the construction cost of the system, facilities and appurtenances built by the Applicant/Developer in accordance with the terms of this agreement. IN WITNESS WHEREOF, THE PARTIES HERETO HAVE CAUSED THESE PRESENTS TO BE SIGNED BY THEIR DULY AUTHORIZED OFFICER THIS DAY OF,20 BY: Signature of Applicant/Developer ATTEST Notary S-2 Page 8