November 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Governors of the States of Arizona, California, Colorado, Montana, Nevada, New Mexico, Oregon, Utah, Washington and Wyoming, Docket No.

November 12, 2004 VIA ELECTRONIC FILING

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

December 28, Via Electronic Filing

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

June 2, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

166 FERC 61,098 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC February 8, In Reply Refer To:

October 10, FERC Electric Tariff No. 7, Transmission Control Agreement

March 22, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

December 13, 2004 VIA ELECTRONIC FILING

March 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Southern California Edison Company ) Docket No.

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Lathrop Irrigation District ) Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

January 4, Filing of Service Agreement No Docket No. ER

March 27, Tariff Amendment to Modify Administrative Oversight of the Department of Market Monitoring

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Arizona Public Service Company, Docket No. ER , Agency Agreement

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

December 12, Filing of EIM Entity Agreement with the Salt River Project Agricultural Improvement and Power District

IS0 CALIFORNIA. February 2,2004

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. J.P. Morgan Ventures Energy ) Docket No. EL Corporation )

October 1, PJM Interconnection, L.L.C., Docket No. ER Default Allocation Assessment Clarifying Revisions

December 18, Filing of PSP Agreement with Placer County Water Agency

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Pacific Gas and Electric Company ) Docket No.

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

August 31, Generator Scheduling Agreement CAISO Service Agreement No Docket No. ER

April 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

June 9, Tariff Amendment to Modify Definition of Pre-RA Import Commitment

July 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

NorthWestern Energy requests an effective date of March 12, 2016, for the proposed revisions.

June 30, The CAISO submits the Amendment pursuant to Section 205 of the Federal Power Act, 16 U.S.C. 824d (2012).

PJM Interconnection, L.L.C. and Progress Energy Carolinas, Inc. Docket No. ER

March 24, Filing of CAISO Rate Schedule No. 89

main. July 6, 2017

May 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

Section GT&C, Awarding of Available and Planned Pipeline Capacity, Bid Procedures ( Section ). 2

The Atlantic Building 950 F Street, N. W. Washington, DC Fax: Direct Dial:

March 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

June 10, Filing of non-conforming Service Agreement No Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

April 10, Via etariff. Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Mailing Address: P.O. Box 1642 Houston, TX

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Vineyard Wind LLC ) Docket No. ER

July 10, Operating Agreement, CAISO Rate Schedule No. 94 Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

California lndependent System Operator Corporation Docket No. ER Compliance Filing

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

160 FERC 61,058 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

July 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C


A. Zonal Agreements and Termination of the GFA

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

November 10,2004. The Honorable Magalie R. Salas Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

129 FERC 61,075 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

AMENDED AND RESTATED TRANSMISSION CONTROL AGREEMENT. Among The California Independent System Operator Corporation and Transmission Owners

July 5, PJM Interconnection, L.L.C., Docket No. ER17- Amendment to Service Agreement No. 4597; Queue No. AB2-048

131 FERC 61,217 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C June 4, 2010

152 FERC 61,060 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON TECHNICAL CONFERENCE. (Issued July 20, 2015)

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southern California Edison Company ) Docket No.

124 FERC 61,004 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

March 31, Columbia Gulf Transmission, LLC. 700 Louisiana Street, Suite 700 Houston, TX

Pacific Gas end Eiecb'ic Company Docket Nos. ER , ER , ER , ER , ER , ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Berry Petroleum Company ) Docket No. ER _

MIDCONTINENT EXPRESS PIPELINE LLC

UNITED STATES OF AMERICA 94 FERC 61,141 FEDERAL ENERGY REGULATORY COMMISSION

The North American Electric Reliability Corporation ( NERC ) hereby submits the

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

PSEG Energy Resources & Trade LLC

UNITED STATES OF AMERICA105 FERC 61,307 FEDERAL ENERGY REGULATORY COMMISSION

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. United Water Conservation District Project No.

153 FERC 61,356 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING SERVICE AGREEMENT. (Issued December 29, 2015)

BISON PIPELINE LLC OPERATIONAL BALANCING AGREEMENT (For Use at Point(s) of Interconnection)

Transco submits the amendments for inclusion in Original Volume No. 1A of Transco s FERC Gas Tariff.

Re: Errata Filing for Joint Submittal of Motion for Leave to Respond and Response to Indicated LSEs Comments, Docket No. ER09-40S-000.

Order No. 587-Y Compliance Filing, Colorado Interstate Gas Company, L.L.C.; Docket No. RP19-

Tennessee Gas Pipeline Company, L.L.C. Orion Project Negotiated Rate and Non-Conforming Agreement Filing Docket Nos. RP and CP

December 18, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Kimberly D. Bose, Secretary

76 FR , 2011 WL (F.R.) Page 1 NOTICES DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission

March 22, Advice No U-904-G. Public Utilities Commission of the State of California. Subject: Submission of Long-Term Storage Contract

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) )

March 1, 2018 Advice Letter 5250-G

Transcription:

California Independent System Operator Corporation February 12, 2015 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System Operator Corporation Notice of Certificate of Concurrence Regarding Agua Caliente Solar LGIA Docket No. ER15-000 Dear Secretary Bose: The California Independent System Operator Corporation ( CAISO ) submits for filing a certificate of concurrence with respect to Amendment No. 2 to the Large Generator Interconnection Agreement ( LGIA ) among Agua Caliente Solar, LLC, Arizona Public Service Company ( APS ), Imperial Irrigation District ( IID ), San Diego Gas & Electric Company ( SDG&E ), and California Independent System Operator Corporation ( CAISO ) ( Amendment No. 2 ). 1 The CAISO respectfully requests that the Commission accept this certificate of concurrence effective as of October 21, 2014. I. Background On May 28, 2010, APS filed the original LGIA in Docket No. ER10-1376- 000 as APS Service Agreement No. 303, which the Commission accepted in a letter order dated July 7, 2010. Subsequently, on September 29, 2011, APS submitted Amendment No.1 to the LGIA in Docket No. ER11-4708-000, which was accepted by the Commission on November 4, 2011. Most recently APS 1 APS serves as the designated filer of the LGIA pursuant to the Joint Tariff Filing procedures outlined in Order No. 714. See Electronic Tariff Filings, Order No. 714, 124 FERC 61,270, at P 63 (2008) ( Order No. 714 ) (permitting joint filers to designate one entity to file a tariff and requiring non-designated entities to submit a certificate of concurrence).

The Honorable Kimberly D. Bose February 12, 2015 Page 2 submitted Amendment No. 2 to the Commission on November 20, 2014, and it was accepted by the Commission effective October 21, 2014. 2 Rather than filing a duplicate version of the LGIA under the CAISO tariff, the CAISO is submitting a concurrence tariff record. The concurrence tariff record is designated under the CASO tariff as Service Agreement No. 1566. II. Proposed Effective Date and General Request for Waivers The CAISO respectfully requests any waivers of the Commission s filing regulations necessary to establish an effective date of October 21, 2014 for its Certificate of Concurrence for the LGIA, consistent with the October 21, 2014 effective date that APS requested in its November 20, 2014 filing. III. Communications The CAISO requests that the following individuals be placed on the official service list for this proceeding: William H. Weaver Counsel California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 Tel: (916) 608-1225 Email: bweaver@caiso.com IV. Service The CAISO has served this filing on Agua Caliente Solar, LLC, APS, IID, SDG&E, the California Public Utilities Commission, and all parties to Docket No. ER15-452-000. In addition, the CAISO has posted a copy of this filing on its public website. V. Contents of Filing This filing includes the following: 1. This transmittal letter; 2 See Arizona Public Service Company, Letter Order Approving Amendment No. 2, Docket No. ER15-452-000 (January 13, 2015).

The Honorable Kimberly D. Bose February 12, 2015 Page 3 2. Attachment A - Certificate of Concurrence with Service Agreement No. 303 under APS s FERC Electric Tariff, Fourteenth Revised Volume No. 2 (the LGIA); and 3. Attachment B - Concurrence tariff record for the LGIA, designated as Service Agreement No. 1566 under the CAISO tariff and as Service Agreement No. 303 under APS s FERC Electric Tariff, Fourteenth Revised Volume No. 2. VI. Conclusion For the reasons stated above, the CAISO respectfully requests that the Commission (a) accept the Certificate of Concurrence of contained in this filing with an effective date of October 21, 2014 and (b) grant the waivers requested herein. Respectfully submitted, By: /s/ William H. Weaver Roger E. Collanton General Counsel Sidney L. Mannheim Assistant General Counsel William H. Weaver Counsel California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 Tel: (916) 608-1225 Email: bweaver@caiso.com

Attachment A Certificate of Concurrence Agua Caliente Solar Large Generator Interconnection Agreement California Independent System Operator Corporation

DocuSign Envelope ID: 4D682147-B34E-4E31-A46B-72FBEECE3946 CERTIFICATE OF CONCURRENCE This is to certify that the California Independent System Operator Corporation ( CAISO ) assents and concurs in the service agreement described below, which Arizona Public Service Company ( APS ) as designated filing company, has filed in its Open Access Transmission Tariff database. The CAISO hereby files this Certificate of Concurrence in lieu of filing the specified service agreement. APS s Service Agreement Adopted by Reference: Service Agreement No. 303 under APS FERC Open Access Transmission Tariff Volume No. 2 Description of Service Agreement Adopted by Reference: Standard Large Generator Interconnection Agreement among Agua Caliente Solar, LLC, APS, Imperial Irrigation District, San Diego Gas & Electric Company and CAISO, designated as APS Service Agreement No. 303 Tariff Program/Regulated Industry: FERC Federal Power Act (Traditional Cost of Service and Market-Based Rates) California Independent System Operator Corporation By its duly authorized official, Keith E. Casey Dated: February, 2015

Attachment B Concurrence Tariff Record Agua Caliente Solar Large Generator Interconnection Agreement California Independent System Operator Corporation

California Independent System Operator Corporation Service Agreement No. 1566 Large Generator Interconnection Agreement For the terms and conditions and rates of this service, please see the tariff document located as noted below: Joint Tariff Name/Description: Designated Filing Company: Designated Filing Utility Tariff Title: Designated Filing Utility Tariff Program: Designated Filing Utility Tariff Record Adopted by Reference (Tariff Record Description/Tariff Record Title): Large Generator Interconnection Agreement among Agua Caliente Solar, LLC, Arizona Public Service Company, Imperial Irrigation District, San Diego Gas & Electric Company, and the California Independent System Operator Corporation, designated as Arizona Public Service Company Service Agreement No. 303 Arizona Public Service Company Open Access Transmission Tariff FERC Federal Power Act (Traditional Cost of Service and Market-Based Rates) Large Generator Interconnection Agreement, Service Agreement No. 303, and all tariff records for which the designated tariff record is a direct or indirect parent record