UNITED STATES OF AMERICA 118 FERC 62,141 FEDERAL ENERGY REGULATORY COMMISSION

Similar documents
UNITED STATES OF AMERICA 118 FERC 62,144 FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA 118 FERC 62,159 FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA 134 FERC 62,197 FEDERAL ENERGY REGULATORY COMMISSION. Clean River Power 15, LLC Project No

129 FERC 62,208 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. KW Sackheim Development Project No

Admiralty Inlet Pilot Tidal Project FERC No Appendix H. Adaptive Management Framework

CUSHMAN PROJECT FERC Project No Settlement Agreement for the Cushman Project

National Oceanic and Atmospheric Administration. Resource Agency Procedures for Conditions and Prescriptions in Hydropower

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION STATE OF WASHINGTON DEPARTMENT OF FISH & WILDLIFE S MOTION TO INTERVENE

APPENDIX 4: "Template" Implementing Agreement

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT

Routing the Alaska Pipeline Project through the Tetlin National Wildlife Refuge What responsibilities do agencies have under ANILCA?

DOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters

Subject: Opinion on Whether Trinity River Record of Decision is a Rule

Water Resources Committee/Board of Directors. Frances Mizuno, Interim Executive Director

Case 2:07-cv RSL Document 51 Filed 11/09/17 Page 1 of 12

MEMORANDUM OF AGREEMENT between the Environmental Protection Agency, the Department of the Interior, and the Department of Commerce

U.S. ARMY CORPS OF ENGINEERS REGULATORY DIVISION WILMINGTON DISTRICT

SETTLEMENT AGREEMENT CONCERNING THE RELICENSING OF THE PELTON ROUND BUTTE HYDROELECTRIC PROJECT FERC PROJECT NO AMONG

MEMORANDUM OF UNDERSTANDING. Among

RECENT DEVELOPMENTS IN HYDROELECTRIC REGULATION. David R. Poe and Seth T. Lucia

TITLE II--DEVELOPMENT OF SOLAR AND WIND ENERGY ON PUBLIC LAND

Independent Scientific Advisory Board

MEMORANDUM OF AGREEMENT. between. the Environmental Protection Agency, the Department of the Interior, and the Department of Commerce

3.2 Assignments and Assumptions of Responsibilities to Comply with Federal Environmental laws Other Than NEPA

Conservation Congress v. U.S. Forest Service

Endangered and Threatened Wildlife and Plants; Revision of the Regulations for

33 CFR Part 320 General Regulatory Policies

Riparian Ecosystems, Volume 2: Management Recommendations Futurewise Comments

EPA-Funded What s Upstream? Advocacy Campaign Did Not Violate Lobbying Prohibitions

Case 2:17-cv MJP Document 21 Filed 01/17/18 Page 1 of 10

UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF CALIFORNIA

Re: Clearwater Creek Hydroelectric Project, FERC Project No

SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT NO. 1

104 FERC 61,108 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 2. (Docket No. PL ; Order No.

136 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING TARIFF REVISIONS. (Issued July 1, 2011)

Karuk Tribe of California v. United States Forest Service

No UNITED STATES COURT OF APPEALS FOR THE NINTH CIRCUIT

Power Marketing Administrations: Background and Current Issues

Case 9:17-cv DLC Document 251 Filed 08/30/18 Page 1 of 6 UNITED STATES DISTRICT COURT DISTRICT OF MONTANA, MISSOULA DIVISION

133 FERC 61,214 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation

One Hundred Fourteenth Congress of the United States of America

I. SPECIAL CONDITIONS:

OFF-LICENSE SETTLEMENT AGREEMENT BETWEEN PUBLIC UTILITY DISTRICT NO. 1 OF PEND OREILLE COUNTY, WASHINGTON, AND THE KALISPEL TRIBE OF INDIANS

SUBCHAPTER A SUBCHAPTER B [RESERVED] SUBCHAPTER C ENDANGERED SPECIES EXEMPTION PROCESS

NOTE IN RE AMERICAN RIVERS AND IDAHO RIVERS UNITED

By the authority vested in me as President by the Constitution and the laws of the United States of America, I hereby direct the following:

BEFORE THE UNITED STATES FEDERAL ENERGY REGULATORY COMMISSION

Case 0:16-cv WPD Document 34 Entered on FLSD Docket 01/22/2017 Page 1 of 10 UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF FLORIDA

Public Notice ISSUED:

Escondido Mutual Water Co. v. La Jolla Band of Mission Indians, 466 U.S. 765 (1984)

Informational Report 1 March 2015

Columbia River Treaty Review

Michael B. Wigmore Direct Phone: Direct Fax: January 14, 2009 VIA HAND DELIVERY

Case 2:10-cv TSZ Document 174 Filed 08/13/14 Page 1 of 14 THE HONORABLE THOMAS S. ZILLY

Amended Settlement Agreement. Box Canyon Hydroelectric Project FERC No. 2042

131 FERC 61,039 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Notice No Closing Date: June 30, 2016

Case 2:07-cv RSL Document 50 Filed 05/21/14 Page 1 of 7 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE

Karuk Tribe of California v. United States Forest Service

documented and communicated to the respective Agencies' incident command systems and firstline supervisors as soon as possible.

RECLAMATION PROJECTS AUTHORIZATION AND ADJUSTMENT ACT OF 1992 TITLE XVIII -- GRAND CANYON PROTECTION SECTION SHORT TITLE.

INTERAGENCY COOPERATION

SKAGIT COUNTY BOARD OF COMMISSIONERS

Case 2:17-sp RSM Document 69 Filed 11/13/18 Page 1 of 8 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE NO.

Appendix L Authorization

Case 3:16-cv SI Document 74 Filed 03/21/18 Page 1 of 22

Camp Far West Hydroelectric Project

8-7. Communications and Legislation Committee. Board of Directors. 4/9/2019 Board Meeting. Subject. Executive Summary. Details

CRS Issue Brief for Congress

Case 2:09-sp RSM Document 285 Filed 01/26/15 Page 1 of 6

October 19, 2012 GENERAL MEMORANDUM Department of Justice Issues Policy on Eagle Feathers

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

No IN THE SUPREME COURT OF THE UNITED STATES LUMMI NATION, ET AL., PETITIONERS SAMISH INDIAN TRIBE, ET AL.

December 22, 2016 GENERAL MEMORANDUM HUD Establishes Tribal Intergovernmental Advisory Committee; Seeks Nominations

Federal Power Act as Amended By the Energy Policy Act of 2005

Public Notice. Notice No. CELRP-OP 15-LOP1 Expiration Date: March 11, 2020

130 FERC 61,051 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING RELIABILITY STANDARD. (Issued January 21, 2010)

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. United Water Conservation District Project No.

THE AMERICAN LAW INSTITUTE Continuing Legal Education Environmental Law 2017

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

Department of the Army Regional General Permit

Case 2:05-sp RSM Document 193 Filed 10/25/12 Page 1 of 11

Case 9:08-cv DMM Document 65 Entered on FLSD Docket 11/18/2008 Page 1 of 6

THE PACIFIC MARINE FISHERIES COMPACT

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF MONTANA MISSOULA DIVISION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

1824 Gibbons vs. Ogden. The Supreme Court clearly arms the principle that commerce" for purposes of the Commerce Clause includes navigation.

No. 174 Page 1 of No An act relating to improving the siting of energy projects. (S.260)

IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF NORTH CAROLINA. No.

CHAPTER 25B. Change of Owner, Operator, or Guarantor for Certain Oil and Gas Facilities

165 FERC 61,016 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING TARIFF REVISIONS. (Issued October 12, 2018)

Clean Water Act Section 401: Background and Issues

Scott Bulgrin, Pueblo of Sandia

DOCKET NO. D CP-4 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters

In This Issue: INDIAN WATER RIGHT NEGOTIATIONS INTERIOR S CONSIDERATIONS WHEN APPOINTING FEDERAL NEGOTIATION TEAMS.

PPL Montana, LLC ) Project No. P NorthWestern Corporation)

UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT TACOMA

Variance Information Sheet Pursuant to Skagit County Code Chapter Visit: for detailed information

Page M.1 APPENDIX M NOAA ADMINISTRATIVE ORDER

1990 WL (D.Hawai'i) activity in certain designated areas utilized by humpback whales and green sea turtles.

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

Transcription:

UNITED STATES OF AMERICA 118 FERC 62,141 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Snohomish County, Project No. 12698-000 Washington ORDER ISSUING PRELIMINARY PERMIT (Issued February 22, 2007) On June 15, 2006, Public Utility District No. 1 of Snohomish County, Washington (Snohomish) filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), 1 to study the feasibility of the Guemes Channel Tidal Energy Project. The proposed project would be located in Guemes Channel in the Strait of Juan de Fuca, in Skagit County, Washington. The proposed project would consist of 166 Tidal In-Stream Energy Conversion (TISEC) devices having a total installed capacity of 3.5 megawatts (MW), a proposed underwater transmission line, and appurtenant facilities. The project is estimated to have an annual generation of 28.5 gigawatt-hours per-year, which would be sold to a local utility. Background The Commission issued public notice of the application on July 3, 2006. Timely motions to intervene were filed by the Washington Department of Ecology (WDE), the Washington Department of Fish and Wildlife (WDFW), the Washington Department of Natural Resources (WDNR), the Whidbey Environmental Action Network (WEAN), the Tulalip Tribes of Washington (Tulalip Tribes), the Swinomish Indian Tribal Community (Swinomish Tribe), and the Sauk-Suiattle Indian Tribe (Sauk-Suiattle Tribe). 2 Late motions to intervene were filed by the National Oceanic and Atmospheric Administration s National Marine Fisheries Service (NMFS) on September 14, 2006, and the City of Anacortes (Anacortes) on September 22, 2006, and were granted by Commission notice on November 16, 2006. Comments were filed by the U.S. Department of the Interior (Interior), the U.S. Army Corps of Engineers (Corps), Senator Jay Inslee, and Senator Rick Larsen. None of the commenters or intervenors opposes issuance of a permit to Snohomish. The WDFW, WDNR, Swinomish Tribe, Sauk-Suiattle Tribe, and NMFS intervened to be parties to the proceeding. The WDE states that only it can represent its interests in this 1 16 U.S.C. 797(f) (2000). 2 Because these motions were timely and unopposed, they were granted 15 days after they were filed. See 18 C.F.R. 385.214(c) (2006).

Project No. 12698-000 2 proceeding, and that issuance of a preliminary permit for the project may impact water quality (therefore requiring a water quality certification) if test units are installed. The WEAN states that the proposed project may adversely affect or degrade the environmental and aesthetic resources of the project area, which will result in degradation of the opportunities afforded by those resources to WEAN members. The Tulalip Tribes state that they are not adequately represented by any other party, and that the proposed project has the potential to affect marine mammals, anadromous fish, cultural resources, and its rights under several federal treaties. Interior, while not raising any specific issues, notes generally that, while it is supportive of the development of environmentally sound alternative energy technologies, the project has the potential to adversely impact resources of interest to Interior. Interior requests that the permittee be required to consult with the U.S. Fish and Wildlife Service (FWS) and other relevant agencies during the permit term, that the Commission issue the permit for the proposed studies for no more than 4 test units, that the Commission initiate consultation with the FWS pursuant to the Endangered Species Act (ESA) because activities under the permit could affect threatened or endangered species, and that Snohomish conduct a cumulative impact analysis for all seven of its proposed projects. The Corps requests that Snohomish consult with them throughout the term of the permit. Both Senator Inslee and Senator Larsen supported the application. On February 1, 2007, staff requested that Snohomish provide additional information pertaining to the technology considered for use at the project. Snohomish provided the additional information on February 5, 2007. Discussion Section 4(f) of the FPA authorizes the Commission to issue preliminary permits for the purpose of enabling prospective applicants for a hydropower license to secure the data and perform the acts required by FPA section 9, 3 which in turn sets forth the material that must accompany an application for license. The purpose of a preliminary permit is to preserve the right of the permit holder to have the first priority in applying for a license for the project that is being studied. 4 Because a permit is issued only to allow the permit holder to investigate the feasibility of a project while the permittee conducts investigations and secures necessary data 3 16 U.S.C. 802 (2000). 4 See, e.g., Mt. Hope Waterpower Project LLP, 116 FERC 61,232 at P 4 (2006) ( The purpose of a preliminary permit is to encourage hydroelectric development by affording its holder priority of application (i.e., guaranteed first-to-file status) with respect to the filing of development applications for the affected site. )

Project No. 12698-000 3 to determine the feasibility of the proposed project and to prepare a license application, it grants no land-disturbing or other property rights. 5 6 As noted, a preliminary permit does not authorize a permittee to undertake any construction or to enter onto lands owned by others. Therefore, Interior s impression that the Commission might allow the placement of test units under the preliminary permit is misplaced. Placement of test units is not authorized by the issuance of a permit pursuant to the FPA; however, such activities would be subject to other federal and state laws. As discussed below, the Commission expects the permittee to engage in prefiling consultation, including consultation with FWS during the permit term. While the Commission expects the permittee to investigate whether endangered species might be affected by the proposed project and to discuss such matters in its prefiling consultation, it would be premature for the Commission to begin ESA consultation with FWS prior to a development application being filed. Before that time, there would be no proposed federal action regarding which to consult. On February 15, 2007, the Commission issued a notice of inquiry seeking comments on how it should treat applications for preliminary permits to study hydropower projects involving proposals to utilize wave, current, and instream new technology methods. 7 In the notice of inquiry, the Commission poses three possible alternatives and states that, pending the outcome of the notice of inquiry proceeding, it is adopting in the interim a strict scrutiny approach. Under that approach, the Commission will process new technology preliminary permit applications with a view toward limiting the boundaries of the permits to prevent sitebanking and to promote competition. Further, to ensure that permit holders are actively pursuing project exploration, the Commission will carefully scrutinize the reports that permit holders are required to file on a semi-annual basis, 8 and would, where sufficient progress was 5 Thus, a permit holder can only enter lands it does not own with the permission of the landholder, and is required to obtain whatever environmental permits federal, state, and local authorities may require before conducting any studies. See, e.g., Three Mile Falls Hydro, LLC, 102 FERC 61,301 at P 6 (2003); see also Town of Summersville, W.Va. v. FERC, 780 F.2d 1034 (D.C. Cir. 1986) (discussing nature of preliminary permits). 6 Issuance of this preliminary permit is thus not a major federal action significantly affecting the quality of the human environment. 7 See Preliminary Permits for Wave, Current, and Instream New Technology Hydropower Projects, Notice of Inquiry and Interim Statement of Policy, 118 FERC 61, (2007). 8 As a standard condition in all preliminary permits, the Commission requires the permit holder to file progress reports every six months.

Project No. 12698-000 4 not shown, consider canceling the permit. Stricter scrutiny could entail requirements such as reports on public outreach and agency consultation, development of study plans, and deadlines for filing a Notice of Intent to file a license application and a Pre-Application Document. During the course of the permit, the Commission expects that the permittee will carry out prefiling consultation and study development leading to the possible development of a license application. The prefiling process begins with preparation of a Notice of Intent (NOI) and Pre-Application Document (PAD) pursuant to Sections 5.5 and 5.6 of the Commission s Regulations. 9 The permittee must use the Integrated Licensing Process unless the Commission grants a request to use an alternative process (Alternative or Traditional Licensing Process). Such a request must accompany the NOI and PAD and set forth specific information justifying the request. 10 Should the permittee file a development application, notice of the application will be published, and interested persons and agencies will have an opportunity to intervene and to present their views concerning the project and the effects of its construction and operation. Under the interim policy, this permit will include conditions to closely monitor the progress of the permittee s activities. In addition to the six-month progress reports required of permittees, this permit will also require the permittee to file, within 45 days of the effective date, a schedule of activities to be carried out under the permit and target dates for completion of these activities. At a minimum, this should include the filing of the NOI and PAD within one year of permit issuance, along with any request to use the traditional or alternative licensing process. The PAD must also include the time frame for consulting with federal, state, and local agencies, tribes, non-governmental organizations, and any other interested entities; and a preliminary list of issues identified and necessary studies related to these issues. If the periodic progress reports required by Article 4 of this permit do not show significant progress, or if the permittee fails to comply with any other conditions, the permit may be cancelled. A preliminary permit is not transferable. The named permittee is the only party entitled to the priority of the application for license afforded by this preliminary permit. In order to invoke permit-based priority in any subsequent licensing competition, the named permittee must file an application for license as the sole applicant, thereby evidencing its intent to be the sole licensee and to hold all proprietary rights necessary to construct, operate, and maintain the proposed project. Should any other parties intend to hold during the term of any license issued any of these proprietary rights necessary for project purposes, they must be included as joint applicants in any application for license filed. In such an instance, where 9 18 C.F.R. 5.5 and 5.6 (2006). 10 See 18 C.F.R. 5.3 (2006).

Project No. 12698-000 5 parties other than the permittee are added as joint applicants for license, the joint application will not be eligible for any permit-based priority. 11 The Director orders: (A) A preliminary permit is issued for the Guemes Channel Tidal Energy Project to the Public Utility District No. 1 of Snohomish County, Washington, for a period effective the first day of the month in which this permit is issued, and ending either 36 months from the effective date or on the date that a development application submitted by the permittee has been accepted for filing, whichever occurs first. (B) This preliminary permit is subject to the terms and conditions of Part I of the Federal Power Act and related regulations. The permit is also subject to Articles 1 through 4, set forth in the attached standard form P-1. (C) The permittee, in addition to the six-month progress reports required under Article 4, shall file the following: Within 45 days of the effective date of the permit, a schedule of activities proposed by the permittee during the three-year permit term, leading to the filing of a development application. At a minimum, this shall include filing, within one year of the effective date of this permit, a notice of intent to file a license application (NOI) and pre-application document (PAD), accompanied by, if desired, a request to use the Traditional Licensing Process or Alternative Licensing Process. The PAD shall include a time frame for consulting with federal, state, and local agencies, tribes, non-governmental organizations, and any other interested entities; and for developing and filing a preliminary list of issues identified and studies related to these issues needed to develop a license application. (D) This order is issued under authority delegated to the Director and constitutes final agency action. Requests for rehearing by the Commission may be filed within 30 days from the date of issuance of this order, pursuant to 18 C.F.R. 385.713. William Guey-Lee Chief, Engineering and Jurisdiction Branch Division of Hydropower Administration and Compliance 11 See City of Fayetteville, 16 FERC 61,209 (1981).

Project No. 12698-000 6 Form P-1 (Revised March 2000) FEDERAL ENERGY REGULATORY COMMISSION TERMS AND CONDITIONS OF PRELIMINARY PERMIT Article 1. The purpose of the permit is to maintain priority of application for a license during the term of the permit while the Permittee conducts investigations and secures data necessary to determine the feasibility of the proposed project and, if said project is found to be feasible, prepares an acceptable application for license. In the course of whatever field studies the Permittee undertakes, the Permittee shall at the all times exercise appropriate measures to prevent irreparable damage to the environment of the proposed project. All test sites shall be restored as closely as possible to their original condition and to the satisfaction of the Commission s authorized representative or, where federal lands are affected, to the satisfaction of the agency administering such lands. Article 2. The permit is not transferable and may, after notice and opportunity for hearing, be canceled by order of the Commission upon failure of the Permittee to prosecute diligently the activities for which a permit is issued, or for any other good cause shown. Article 3. The priority granted under the permit shall be lost if the permit is canceled pursuant to Article 2 of this permit, or if the Permittee fails, on or before the expiration date of the permit, to file with the Commission an application for license for the proposed project in conformity with the Commission s rules and regulations then in effect. Article 4. At the close of each six-month period from the effective date of this permit, the Permittee shall file four copies of a progress report with the Secretary, Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426; and shall serve a copy on the interveners in this proceeding. The report shall describe, for that report period, the nature and timing of what the Permittee has done under the pre-filing requirements of 18 CFR sections 4.38 and 5 and other applicable regulations; and, where studies require access to and use of land not owned by the Permittee, the status of the Permittee s efforts to obtain permission.