ADR in FIDIC Contracts and the Cyprus perspective

Similar documents
1) ICC ADR proceedings are flexible and party-controlled to the greatest extent possible.

THE ICC S NEW DISPUTE BOARD RULES. CARROLL S DORGAN Jones Day Paris

SUPERIOR COURT OF CALIFORNIA COUNTY OF MERCED. Alternative Dispute Resolution (ADR) Information Guide

Security of payment under FIDIC contracts: more secure, for now

FIDIC SUITE OF CONTRACTS 2017 NEW DISPUTE RESOLUTION REGIMES 21 March 2018

Arbitral tribunals; Decisions; Dispute adjudication boards; Enforcement; FIDIC forms of contract; Jurisdiction; Singapore

ALTERNATIVE DISPUTE RESOLUTION (ADR) INFORMATION PACKAGE

The Gap in Sub-Clause 20.7 of The 1999 FIDIC Contracts for Major Works

Dispute Board Rules. in force as from 1 September Standard ICC Dispute Board Clauses. Model Dispute Board Member Agreement

Subj: USE OF BINDING ARBITRATION FOR CONTRACT CONTROVERSIES

FIDIC contracts Claims and disputes under international construction contracts. Claims and dispute resolution procedures under FIDIC contracts

Multi-Tier Dispute Resolution Clauses Definition and Examples

Comparing Mediation, Arbitration and Litigation

Dispute Resolution in Romania - Before and After Accession to the European Union

Below are standard clauses for use by parties who wish to set up and operate a dispute board under the Rules contained in this booklet.

Construction Industry Arbitration Rules and Mediation Procedures (Including Procedures for Large, Complex Construction Disputes)

ALTERNATIVE DISPUTE RESOLUTION (ADR) PROCEDURES

Statute of limitation in FIDIC contracts concluded in the public procurement procedures

IMechE Seminar Arbitration & Engineering

Arbitration Law of Canada: Practice and Procedure

COMPARISON TABLE OF DISPUTE BOARD RULES

Chapter 36 Mediation and Arbitration 2015 EDITION

Alternate Dispute Resolution

Given the ongoing changes in accounting, Alternative Dispute Resolution for Accounting and Related Services Disputes DEPT

!"#$%&'()'#*+%&"*,(-,.(/&0"1#(2345(6(7*8$9'0',#":'(;*&'#(

ALTERNATIVE DISPUTE RESOLUTION A HANDY GUIDE

Contract Disputes Act of 1978 (Federal Acquisition Regulation - Subpart 33.2)

DAAB and Dispute Resolution Under the 2017 FIDIC Forms of Contract

The Changing Landscape of Construction Dispute Resolution in Hong Kong: Opportunities for QS?

Co-authored by: Christina Hioureas Nicolas Tsardellis Argyro Angastinioti

Evolution of dispute resolution under the FIDIC Red Book. Bill Smith, Partner 10 May 2018

Palestinian Legislative Council Proposed Arbitration Law

I Won t See You in Court: Arbitration Options for Hospitals

Printable Lesson Materials

CLIENT FEE DISPUTE ARBITRATION DOCUMENTS

Alternative Dispute Resolution (ADR) In Chapter 36 of his Final Report Jackson LJ wrote:

A guide to civil litigation and arbitration in Hong Kong, from a Mainland perspective

USEFUL FOR THE PARTIES AND THOSE WHO PRACTICE ARBITRATION

Arbitration & Litigation Tutorial. Assistant Professor Monika Prusinowska Winter term 2015/2016

Financial Dispute Resolution Service (FDRS)

WHISTLE BLOWING POLICY

ARBITRATION RULES. Arbitration Rules Archive. 1. Agreement of Parties

Dealing with Conflicts in Project Management

C.R.S (2011) This part 3 shall be known and may be cited as the "Dispute Resolution Act".

ADR USERS GUIDE 2012

ADR COMMITTEE Chair: Anthony Hussey Vice-Chair: William Aylmer

Consumer Guide to the Legal Fee Arbitration Program

Streamlined Arbitration Rules and Procedures

ADR CODE OF PROCEDURE

ARBITRATION & CONCILIATION ACT AND MEDIATION

Return form to: THE FLORIDA BAR Fee Arbitration Program 651 East Jefferson Street Tallahassee, FL

Dispute Resolution Service. Guide to Arbitration Clauses

ADR in P.R. China. Zheng Rungao

Strategic Considerations for Business Lawyers: Resolving Disputes through ADR or Litigation

B. Considerations Regarding So-Called Boilerplate Clauses in Cross-Border Commercial Transactions

Fee Dispute Resolution Program

Commercial Arbitration Rules and Mediation Procedures (Including Procedures for Large, Complex Commercial Disputes)

Superior Court of California, County of San Francisco Alternative Dispute Resolution Program Information Package

The Construction Specifications Institute

New Expert Rules launched by the ICC

The legal justification for the enforcement of a binding DAB decision under the FIDIC 1999 Red Book

PUBLISHED AS A PUBLIC SERVICE BY THE OFFICE OF DISCIPLINARY COUNSEL

A Guide to Residential Real Property Arbitration

Arbitration & Litigation Tutorial. Assistant Professor Monika Prusinowska Winter term 2014/2015

SEMINOLE TRIBE OF FLORIDA

LAW DIVISION, CIVIL PART COMPLEMENTARY DISPUTE RESOLUTION (CDR) PROGRAMS RESOLVING CIVIL CASES WITHOUT A TRIAL

IMPRESS CIArb Arbitration Scheme Guidance

Conduct of Arbitral Proceedings:

AN OUNCE OF PREVENTION IS WORTH A POUND OF CURE - Benjamin Franklin. Gordon L. Jaynes 24 May 2018

Products of the Mind Require Special Handling:

MARYLAND RULES OF PROCEDURE TITLE 17 ALTERNATIVE DISPUTE RESOLUTION CHAPTER 100 GENERAL PROVISIONS

New AAA Rules Provide Straightforward Guidelines for Appeals

English Law, UK Courts and UK Legal Services after Brexit

Notes. Can a Mediated Settlement Become an Enforceable Arbitration Award?

Charter. Energy & Water Ombudsman (NSW) Limited. March 2012 and subsequent amendments

MODEL CLAUSES FOR ALTERNATIVE DISPUTE RESOLUTION

Chapter 10. A Note on Dispute Boards. Chapter 10

Chapter 36 Mediation and Arbitration 2013 EDITION Declaration of purpose of ORS to

Fundamentals of Civil Litigation in Federal Court

U.S. Mediation Qualification Training. Course Review

The Labour Relations Agency Arbitration Scheme. Guide to the Scheme

COMPREHENSIVE JAMS COMPREHENSIVE ARBITRATION RULES & PROCEDURES

USING DISPUTES BOARDS THE ROMANIAN EXPERIENCE ON DISPUTE BOARDS

24 Criteria for the Recognition of Inventors and the Procedure to Settle Disputes about the Recognition of Inventors

THE ARBITRATION IN THE HUNGARIAN LAW

LIMITATIONS AND CONSTRAINTS IMPOSED BY ROMANIAN LAW ON FIDIC CONDITIONS OF CONTRACT A CONTRACTOR S DILEMMA WHILE PERFORMING PUBLIC WORKS IN ROMANIA

Japan. Country Q&A Japan. Hiroyuki Tezuka and Masako Yajima, Nishimura & Partners. Country Q&A COURTS GENERAL AND GOVERNING LAW

CPR Arbitration Appeal Procedure and Commentary

SINGAPORE INTERNATIONAL ARBITRATION CENTRE (SIAC)

R U L E S of the Court of Arbitration at the Centre for Mediation and Arbitration of Transport Sp. z o.o. (ltd) in Warsaw

Terms of Reference ( TOR ).

RULES GOVERNING ALTERNATIVE DISPUTE RESOLUTION

Litigation Avoidance

SOUTHERN GLAZER S WINE AND SPIRITS, LLC. EMPLOYMENT ARBITRATION POLICY

ALTERNATIVE DISPUTE RESOLUTION INFORMATION PACKAGE Effective July 2, Instructions to Plaintiff / Cross-Complainant

JAMS International Arbitration Rules & Procedures

The Arbitration Act, 1992

The ABTA Arbitration Scheme Rules

THE NEW ENGINEERING CONTRACT FOURTH EDITION (NEC4)

2017 REVIEW OF THE FREEDOM OF INFORMATION AND PROTECTION OF PRIVACY ACT (FIPPA) COMMENTS FROM MANITOBA OMBUDSMAN

Transcription:

ADR in FIDIC Contracts and the Cyprus perspective Alternative Dispute Resolution (ADR) in the Construction Industry: History Advantages and Disadvantages 1

Eur. Ing. Platonas Stylianou B.Eng. (Hons), MSc, MCS, MICE, CEng, FCIArb. C.E.O. of Platonas Stylianou & Associates, Civil and Structural Engineers L.L.C Nicosia, Cyprus e-mail: pstylianou@pstylianou.com 2

Introduction The dispute resolution in the construction industry includes a series of procedures, aimed at settling any kind of dispute that may arise between the parties involved (consultants, client, contractor, appointed subcontractors). The importance, therefore, is not only to prevent any dispute regardless of the circumstances, but rather to prevent reaching the point of no return, where a number of issues have accumulated, and where the situation is so dysfunctional that a Dispute has become unavoidable. 3

Depends a lot on personality Avoid trouble Hide from dispute Dispute oriented Alternative Dispute Resolution (ADR) in the Construction Industry: History Advantages and Disadvantages Avoidance of disputes Be proactive by risk assessment and risk management Be more careful Produce better drawings, details and specifications Use the correct contract type Understand the terms of the Contract used Understand your obligations BE FAIR 4

Avoidance of disputes in general In general, dispute avoidance is important for two reasons. Firstly, it allows [us] to resolve issues as they arrive before they escalate into a dispute, therefore saving a considerable amount of time and money. Secondly, avoiding disputes is crucial to the maintenance of good working relationships between the different parties involved, such working relationships being most often destroyed by the confrontational nature of litigation or arbitration. 5

What are Alternative Dispute Resolution (ADR)? Generally ADR are procedures for resolving disputes between parties out of Court. The ever-increasing difficulty of quick justice any where in the world, has led legal circles, the construction industry, and not only, to seek out compromise and out-of-court dispute resolution methods, which are characterized as alternative dispute resolutions (ADR). The various known alternative ways / methods for resolving disputes, except the arbitration are among others: a) Arbitration b) Mediation c) Negotiation d) Adjudication e) Conciliation f) Mini Trial g) Arb- Med, Med- Arb h) Ombudsman 6

The resolution of Disputes In many cases, however, disputes do arise, due to the inability of the parties to tackle their problems and to handle disagreements effectively. Once a dispute comes about and there is no way to go back, the question thus becomes: How can the dispute be resolved properly? It is now well established that court proceedings or arbitration can have an even more destructive effect on already deteriorated relationships, and can superficially resolve a dispute on the surface, without really curing it. Therefore, exploring other dispute resolution mechanisms can be necessary to resolve all aspects of the dispute, and to maintain good business relationships between the parties. 7

The construction sector While dispute avoidance techniques have been developed in diverse areas, the sector in which such techniques are most advanced is the construction sector. A major cause of construction project failures is the lack of early stage planning and communication about what to do when disagreements arise. Today, construction and engineering disputes account for the largest share of the caseload at the ICC Court, amounting to a quarter of all cases received in 2015. In times of crisis, disputes in the construction sector will tend to further increase due to the change of circumstances and uncertainty affecting businesses. In view of this fact, risk assessment and risk allocation techniques, as well as dispute avoidance mechanisms, have steadily developed and flourished as problem solving methods in the construction sector. 8

Avoiding disputes at the contract phase At the contract phase, dispute avoidance lies in the drafting of efficient and well-thought-out contractual provisions. As put forward by Nael Bunni, Contractual problems generally result from a combination of uncertainty and limited ability of people to think of future problems that may arise from the possible meaning of what they had written. To that end, lawyers and consultants/ experts need to pay particular attention to: The choice of law to govern the contract; The conduct of a risk-analysis on a clause-by-clause basis; The careful drafting of any amendments to the general conditions; and The incorporation of effective contract administration procedures. 9

Avoiding disputes at the execution phase Moving on to the avoidance of disputes at the execution phase, the International Federation of Consulting Engineers (FIDIC) was the first organisation to introduce contract administration procedures in its standard forms of construction contracts. Dispute Boards (DBs) The 1996 Supplement to the Red Book, published by FIDIC (dealing with Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer) established the Dispute Adjudication Board (DAB) as a way to avoid the development of issues into disputes during the course of the construction project. Later on, the Yellow Book (dealing with the Conditions of Contract for Plant and Design-Build Contracts) and the Silver Book (dealing with the Conditions of Contract for Engineering, Procurement and Construction/Turnkey Projects) provided for the option of an ad hoc DAB, constituted to decide a single issue, after which its appointment would normally expire. Since then, several other institutions have developed rules concerning dispute boards, whether for DABs or Dispute Review Boards (DRBs). These include the ICC, the Institution of Civil Engineers -ICE, the Chartered Institute of Arbitrators. 10

An innovative approach during the London Olympic Games An innovative approach for the avoidance of disputes was adopted during the London 2012 Olympic Games. At the commencement of the project, two panels were created, one being dedicated to the prevention of disputes, and the other to the resolution of disputes which could not be prevented. Although the system was not publicized, the result is said to have been very successful, with only few disputes which had to be adjudicated, and none of them went to Arbitration or Court. 11

Negotiations: It is the most common method of settling disputes, in which the Parties are attempting to solve the difference between themselves. Carried out everyday by everybody Techniques used will probably be linked with their conflict personality type 12

Conciliation: It is a purely private way of settling disputes, at the initiative of the Parties. It is a similar method to mediation, but the third person can propose solutions. Unlike mediation, where the Ombudsman does not propose solutions but helps the parties to come to an end on their own. In both cases, the solution is not binding, unless there is a specific agreement (explicit) to indicate otherwise. Conciliator like mediator uses their skills to lower tension, improve communication, identify key issues, explore potential solutions. Conciliator will try to conciliate by seeking concessions from the parties. 13

Adjudication Legal process by which a neutral person the Arbitrator, reviews arguments and gives his / her decision, which becomes binding unless the dissatisfying party takes the case to arbitration and the decision is overturned by the Arbitrators Award. However until the decision of the arbitrator the parties have to comply with the decision of the adjudicator. A private, concise way of hearing the case which, in a short time (predetermined), the Adjudicator must complete the proceedings. The decision may be binding but not final, since the Parties may not accept it by sending within a reasonable time a Notice of Dissatisfaction. 14

Neutral evaluation/expert opinion Parties sit down with the neutral evaluator who will listen to the parties and give his opinion based on his own technical knowledge and expertise. 15

Mediation In mediation, the mediator (a neutral person) assists the parties to come to a mutually acceptable resolution of their dispute. The parties may meet altogether in the same room, or often stay in separate offices and the mediator moves back and forth between the parties. Unlike a judge at a trial or an arbitrator at an arbitration hearing, the mediator does not decide how to resolve the dispute. 16

The parties themselves decide how to resolve or settle their own dispute. The parties work together to come to a mutually acceptable compromise that satisfies everyone, instead of working against each other. Mediation often leads to better communication between the parties. This can be particularly important when parties have a continuing relationship with each other, such as neighbors or colleagues or businesses. It can also be effective where personal feelings are getting in the way of a resolution and a professional mediator can be brought in to act as a go-between. Mediation normally gives the parties a chance to express their concerns in a voluntary, confidential process while working towards a resolution and compromise. Mediation can provide the greatest level of flexibility for parties. This type of resolution is particularly helpful in high stakes litigation when a run away jury could break a business. Mediation is one of the most "friendly" approaches to settling disputes and, if necessary, in many respects the most effective, provided that the parties to the dispute are genuinely interested in settling their disputes and have the power to take the necessary decisions in this direction. The final solution must be a result of the free choice of the parties involved in the dispute and constitutes a private agreement. 17

DAB, DRB, CDB and now DAAB Dispute Adjudication Boards Dispute Review Boards Combined Dispute Boards Dispute Avoidance Adjudication Boards ( Dec 2017) 18

Ombudsman These are new ways of resolving disputes that arise because of the EU regulation, such as the Government Schemes. The Aim of the scheme is to resolve disputes with particular organizations or about particular services. Usually a formal complain procedure. They hear disputes from the public make their investigation and give decision Examples- Commissioner for Administration, the housing Ombudsman, the Consumer Ombudsman, the Financial Commissioner, the Independent Complaint Review etc., which are independent bodies with personal and functional independence and will operate ex officio or after a signed petition. 19

Mini Trial: Alternative Dispute Resolution (ADR) in the Construction Industry: History Advantages and Disadvantages Private resolution procedure before high-level executives, headed by a neutral third party. 20

More flexibility. Alternative Dispute Resolution (ADR) in the Construction Industry: History Advantages and Disadvantages Advantages of ADR The parties have far more flexibility to select what procedural and discovery rules will apply to their dispute (they can choose to apply relevant industry standards, domestic law, the law of a foreign country, etc.). Select your own Arbitrator, Adjudicator or Mediator. The parties can often select the arbitrator or mediator that will hear their case, typically selecting someone with expertise in the substantive field involved in the dispute. The arbitrator (or panel members) does not need to be an attorney. In this way the focus can be on the substantive issues involved rather than on technical procedural rules. In normal litigation, the parties cannot select the judge, and the judge and/or jury may often need expert witnesses to explain complex issues. The greater the expertise of the arbitrator, the less time that needs to be spent bringing him up to speed. 21

A jury isnot involved. Juries are unpredictable and often damage awards are based solely on whether they like the parties or are upset at one party because of some piece of evidence such as a photo that inflames the passion of the jury. Juries have awarded claimants damages that are well above what they would have received through alternative dispute resolution; and they have also done the opposite. Expenses are reduced. Internationally it was discovered that attorneys and expert witnesses are very expensive. Alternative dispute resolution offers the benefit of getting the issue resolved quicker than would occur at trial and that means less fees incurred by all parties. 22

ADR is speedy. Trials are lengthy, and in many states and counties it could take years to have a case heard by a judge or jury. Appeals can then last several months after that. With arbitration, if the parties agree the evidence can be submitted by documents only rather than by testimony presented through witnesses. ADR can be scheduled by the parties and the panelist and be very quick and effective. The results can be kept confidential. The parties can agree that information disclosed during negotiations or arbitration hearings cannot be used later even if litigation ensues. The final outcome can also be made private if the parties so stipulate and agree. On the other hand, most trials and related proceedings are open to the public and the press. 23

Party participation. ADR permits more participation by the litigants. ADR allows the parties the opportunity to tell their side of the story and have more control over the outcome than normal trials overseen by a judge. Many parties desire the opportunity to speak their piece and tell their side of the story in their own words rather than just through lawyers. Cooperation. ADR allows the parties to work together with the mediator or other person in charge, to resolve the dispute and come to a mutually acceptable remedy. Less stress. ADR is often less stressful than strict, expensive and lengthy litigation. Most people have reported a high degree of satisfaction with ADR. Conclusion. Because of these advantages, many parties choose ADR (either adjudication, mediation or arbitration) to resolve disputes instead of litigation. It is not uncommon even after a lawsuit has been filed for the court to refer the dispute to an Arbitration or ADR. ADR has also been used in some countries to resolve disputes even after trial, while an appeal is pending. 24

Disadvantages of ADR There isnoguaranteed resolution. Alternative Dispute Resolution (ADR) in the Construction Industry: History Advantages and Disadvantages With the exception of arbitration, alternative dispute resolution processes do not always lead to a resolution. That means it is possible that you could invest the time and money in trying to resolve the dispute out-of-court and still end up having to proceed with litigation and trial before a judge or jury. However, you will certainly better understand the other side s position! ADR Decisions are not final and binding. With the exception of Arbitration ADR decisions are not final. With very few exceptions, the decision of an Arbitrator cannot be appealed, with fraud or misconduct being an obvious exception. Another ground for setting aside an award is if the arbitrator s decision exceeded the scope of the arbitration clause or agreement. Decisions of a court, on the other hand, usually can be appealed for a variety of legal grounds and for numerous alleged procedural errors. 25

Limits on Arbitration Awards. Arbitrators can mainly resolve disputes that involve money, or time, or decide on the quality of the final material. For example, Arbitrators generally cannot change title to real property. Discovery limitations. Some of the procedural safeguards designed to protect parties in court, may not be present in ADR, which make it difficult to obtain evidence from the other party. Fee for the ADR. The mediator or arbitrator or any ADR person, charges a fee for his or her services. Depending on the Institutional or Ad-Hoc procedure selected, the fees can be substantial. A judge on the other hand, charges no fees for his services. 26

May have no choice. Often the contract in dispute contains a broadly worded mandatory arbitration clause. Most Construction Contracts and many lease agreements and employment contracts, for example, contain mandatory arbitration provisions, as do operating agreements and other types of business contracts. Unless both parties waive arbitration, most countries will compel arbitration at the request of any party. 27

Conclusion The role of education in promoting dispute avoidance and ADR I will conclude my presentation by underlining the key role that education and training play in promoting access to justice through dispute resolution methods. Aristotle said that Education is an ornament in prosperity and a refuge in adversity. It is crucial that professionals of dispute resolution, constantly educate themselves, which proves to be essential in times of adversity. By educating ourselves, we learn to adapt and to apply different methods; but we also stimulate our minds to welcome innovation. 28

29

Comparisons Litigation Arbitration Mediation Adjudication Negotiation Not voluntary? Voluntary? voluntary Voluntary? Voluntary Final and Binding, subject to appeal Final and Binding, subject to very limited appeal If agreement, can be enforceable as contract Final but not Binding, (NoD) If agreement, can be enforceable as contract Formal, rigid rules Based on rules, if chosen by the parties or if Institutional Informal Informal? Informal Standard procedure. Opportunity for each party to present proofs and arguments; focused on past events Set procedure. Opportunity for each party to present proofs and arguments; focused on past events Freedom of procedure Set procedure in short time Freedom of procedure Outcome: imposed decision, supported by reasons. Outcome: imposed decision, supported by reasoned Award. Outcome: mutually acceptable agreement sought Outcome: Decision Outcome: mutually acceptable agreement sought Public Private Private Private Private 30

Thank you for your attention. 31