THE ROLE OF NGO S IN THE CONTEXT OF POST DISASTER HOUSING IN TURKEY

Similar documents
RELOCATION OR REBUILDING IN THE SAME AREA: AN IMPORTANT FACTOR FOR DECISION MAKING FOR POST- DISASTER HOUSING PROJECTS

EVALUATION AND COMPARISON OF POST-DISASTER HOUSING IN TURKEY; LESSONS FROM IKITELLI AND SENIRKENT

Trust And Networks In Climate Change

Emergency Relief Efforts of 2008 China Wenchuan Earthquake

DEVELOPING A MODEL FOR COMMUNITY INVOLVEMENT IN POST-DISASTER HOUSING PROGRAMMES

Issue brief. Current Context. Fact box Displacement and shelter in Haiti. Saving lives, changing minds.

ECUADOR AFTER THE EARTHQUAKE

CONCEPT PAPER: SUSTAINABLE SHELTER SOLUTIONS Internally Displaced Persons in Somalia

Dear Delegates, It is a pleasure to welcome you to the 2014 Montessori Model United Nations Conference.

POLICY BRIEF THE CHALLENGE DISASTER DISPLACEMENT AND DISASTER RISK REDUCTION ONE PERSON IS DISPLACED BY DISASTER EVERY SECOND

CESCR General Comment No. 4: The Right to Adequate Housing (Art. 11 (1) of the Covenant)

Mina Aryal Speaking at the Trade and Natural Disaster Symposium Thursday 26 April, Room W, WTO

Temporary housing after a natural disaster.

HLP GUIDANCE NOTE ON RELOCATION FOR SHELTER PARTNERS March Beyond shelter, the social and economic challenges of relocation

Resolution adopted by the General Assembly on 23 December [without reference to a Main Committee (A/69/L.49 and Add.1)]

Community-Based Poverty Monitoring of Tsunami-Affected Areas in Sri-Lanka

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Illegal Settlements of Urbanization in Turkey

COLLECTION AND ANALYSIS. IFRC perspective and responses to Natural Disasters and Population Displacement

DONOR REPORT JAPAN: THREE YEARS LATER

Habitat III Humanitarian crises and the city Engagement of the International Red Cross and Red Crescent Movement

Great East Japan Earthquake damage and local government relief

Migration after natural disasters, case study: the 2003 Bam earthquake

BUDGET REVISION No. 3 TO REGIONAL EMERGENCY OPERATION

Iraq Situation. Working environment. Total requirements: USD 281,384,443. The context. The needs

1/24/2018 Prime Minister s address at Asian Ministerial Conference on Disaster Risk Reduction

Background. Types of migration

FACTSHEET HAITI TWO YEARS ON

CONCEPT NOTE. The First Arab Regional Conference for Disaster Risk Reduction

HAITI S EARTHQUAKE DISASTER

TURKEY. In Brief. Operational developments

Statement by the United Nations High Commissioner of the Office for Human Rights

ANNEX. to the REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE EUROPEAN COUNCIL AND THE COUNCIL

Policy, Advocacy and Communication

From Survival to Thriving Communities

National implementations on human rights education in Turkey during the period : EDUCATION PROGRAMS WITHIN THE MINISTRY OF JUSTICE:

Meanwhile, some 10,250 of the most vulnerable recognized refugees were submitted for resettlement.

(8-26 July 2013) Bosnia and Herzegovina. 24 June Table of Contents. I. Background on Internal Displacement in Bosnia and Herzegovina...

Good morning! Ladies and Gentlemen, allow me to introduce myself. I am Masaya Takayama, President of the National Archives of Japan.

Summer School November Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK)

The Indian Ocean Tsunami Preliminary Field Report on Sri Lanka. Social Science Reconnaissance Team Members:

Executive Board of the United Nations Development Programme, the United Nations Population Fund and the United Nations Office for Project Services

Place making for displaced

LAW OF THE REPUBLIC OF INDONESIA NUMBER 24 OF 2007 CONCERNING DISASTER MANAGEMENT

Report TOT Regional Level Capacity Building for Professional on Implementation on SFDRR 5-9 December 2016

2015: 26 and. For this. will feed. migrants. level. decades

1.4. Emergencies in Africa

Statement of Research/Scholarly Accomplishments and Future Goals

General Assembly UNHCR ACTIVITIES FINANCED BY VOLUNTARY FUNDS: REPORT FOR AND PROPOSED PROGRAMMES AND BUDGET FOR 1995 PART III.

Resolution adopted by the General Assembly on 13 December [without reference to a Main Committee (A/68/L.25 and Add.1)]

PREPARATORY STAKEHOLDER ANALYSIS World Humanitarian Summit Regional Consultation for the Pacific

(No. 280) (Approved November 30, 1998) AN ACT

Resilience, Conflict and Humanitarian Diplomacy

CITIES IN CRISIS CONSULTATIONS - Gaziantep, Turkey

CHAPTER EIGHT: IMPLICATIONS AND LESSONS LEARNED FOR MEGACITIES

2015 Environmental Emergencies Forum. Lessons from environmental peacebuilding for humanitarians

Migration after Natural Disasters, Case Study: The 2003 Bam Earthquake.

Third year commemoration of the Haiti earthquake: Highlights of EU support to the country

Afghanistan. Working environment. Total requirements: USD 54,347,491. The context

IOM Fact Sheet Haiti Earthquake Displacement and Shelter Strategy

Logical Framework Planning Matrix: Armenian Red Cross Disaster Management Programme/Population Movement Project

Afghanistan. Operational highlights. Persons of concern

LAW OF THE REPUBLIC OF INDONESIA NUMBER 24 OF 2007 CONCERNING DISASTER MANAGEMENT

IOM TURKEY REFUGEE RESPONSE OPERATIONS

Disaster Resilience Samples

HUMANITARIAN. Health 9 Coordination 10. Shelter 7 WASH 6. Not specified 40 OECD/DAC

Revision of Turkey transitional interim country strategic plan

SYRIA CRISIS HUMANITARIAN RELIEF OPERATION

Returnees and Refugees Afghanistan and Neighbouring Countries

Gramalote, Colombia: A displaced community in transition

A PRECARIOUS EXISTENCE: THE SHELTER SITUATION OF REFUGEES FROM SYRIA IN NEIGHBOURING COUNTRIES

INCIDENT WEST SUMATRA EARTHQUAKE, INDONESIA, SEPTEMBER 30, 2009

Currently, four main factors tend to aggravate the problem of squatting in Jamaica:

OFFICIAL STATEMENT BY H.E. LÜTFİ ELVAN, MINISTER OF DEVELOPMENT OF THE REPUBLIC OF TURKEY

Planning figures. Afghanistan 2,600 2,600 2,600 2,600 2,600 2,600 Asylum-seekers Somalia Various

1. Introduction Scope of this Policy Rights-based Approach Humanitarian Principles Humanitarian Standards...

Resolution adopted by the General Assembly on 8 December [without reference to a Main Committee (A/71/L.33 and Add.1)]

Testimony of Samuel A. Worthington President & CEO, InterAction. House Committee on Foreign Affairs, Subcommittee on the Western Hemisphere

CANADIAN HUMANITARIAN ASSISTANCE FUND The Humanitarian Coalition and Global Affairs Canada respond quickly to smaller emergencies 2015 ANNUAL REPORT

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references. Turkey IPA/2018/ Total cost EU Contribution

PROTECTION CLUSTER CONTINGENCY PLAN

Aleksandra Kazmierczak The 5th Nordic Conference on Climate Adaptation 24 October 2018 Addressing social vulnerability to climate change in Europe

15th Asia and the Pacific Regional Meeting Kyoto, Japan, 4 7 December 2011

Situation in Haiti one year after the earthquake: humanitarian aid and reconstruction

Haiti Earthquake UN assessment Special Representative of the Secretary-General Edmond Mulet

SAVING LIVES, CHANGING MINDS

Sri Lanka. Pakistan Myanmar Various Refugees

BEYOND EMERGENCY RELIEF IN HAITI JANUARY 2011

WELCommon A community center

Internally displaced personsreturntotheir homes in the Swat Valley, Pakistan, in a Government-organized return programme.

Did Cash for Work Programs Promote Recovery from the March 2011 Disasters?

Final Report. Comprehensive Tsunami Disaster Prevention Training Course

KEY HLP PRINCIPLES FOR SHELTER PARTNERS March 2014

Russian Federation. Operational highlights. Persons of concern

of the Dominican Republic, Cuba, and Puerto Rico. It destroyed the land, the

Capitalising on Post Disaster Adaptive Resilience for Recovery

ROLE OF PEACEBUILDING IN CONTEXT OF ECONOMIC SECURITY

Critical Response to The Tsunami Legacy Report: Presenting the True Facts about the Aceh Reconstruction Process

Dr. Moosa Elayah Dr. Bilqis Abu-Osba

Transcription:

Building resilience achieving effective post-disaster reconstruction i-rec 2008 THE ROLE OF NGO S IN THE CONTEXT OF POST DISASTER HOUSING IN TURKEY Hakan Arslan, Istanbul Technical University Email: arslanhaka@itu.edu.tr Alper Ünlü, Istanbul Technical University Email: aunlu@itu.edu.tr Abstract Disasters had great affects on the region and community that they occurred physically, socially, economically and psychologically. The community sometimes uses most of its capacity to overcome the situation and sustain their pre disaster daily life. The most important problem revealed after the emergency phase is especially to meet the shelter needs of the affected population. After 1999 Earthquakes in Turkey during the rehabilitation phase temporary houses were built for the victims in a short time to 1 2 year period basis which were planned by the central government. The time extended to 3 year and beyond because of the permanent housing site expropriation problems. At the end of the 2002 the home owners moved to their permanent houses. Even tough some of the temporary housing sites were demolished some is still in use. Most of the users of these houses were tenants and low income families. This situation clearly shows the lack of organization for the tenants and low income families after the earthquake. This study analyzes the role of the NGO s established after the earthquake in order to defend the rights of the tenants, low income families and disabled peoples tenure in Turkey. The local and national associations (Earthquake victims association, Blue Crescent association, Accessible Life association, Foundation for Supporting the Women s Work association) roles are evaluated according to their relation with central and local government and their location in the national organizational scheme. Overall the actual position of these NGO s stated in 8 year reconstruction process after the earthquake. The weak and strong part of these organizations and their sustainability processes are evaluated for long term as well. Keywords: Post Disaster Housing, NGO, Community Participation Introduction Disasters are events which occur within some specified periods of time and spaces, and threat a society or a relatively self-sufficient part of a society with major unwanted consequences. They are unavoidable events coming in unexpected times. However, settings of pre and post disaster activities have important roles in reducing the future

hazard risks in disaster prone areas (Tercan, 2001). The number, type and losses from disasters are increasing worldwide. Not only is the number of natural and manmade disasters increasing but the cost in property human life. For natural disasters worldwide, the annual economic losses averaged $4,9 billion in the 1960 s, $15,1 billion in the 1980 s and $75,9 billion annualy in the 1990 s (Siembieda et al, 2002). However, disasters create also technological, societal and environmental issues. According to the conditions occurred on post-disaster period, the major issue is usually defined as re-building the physical environment by emphasizing housing in the recovery programs. For all ages the humanity tends to have a shelter to settle down and continue to improve their standards. Therefore, this basic attitude is generally seen at the afterwards of a catastrophic event; sheltering is a necessity to provide safety conditions, reduce the tensions and maintain community s security with protection from climate conditions and sanitation problems. It is also important for human dignity and to sustain family and community life as far as possible in difficult circumstances (Shelter Project, 2004). Shelter problem after the disasters are generally followed by four overlapping phases; 1. Spontaneous Shelter (first 72 hours) - to provide an interim, safe haven while the situation stabilizes 2. Emergency Shelter (first 60 days) - to provide emergency shelter and feeding to displaced population requiring shelter. 3. Interim Housing (first year and beyond) - to provide temporary housing - safe and secure shelter, water, power, and heating - to displaced disaster victims while efforts are underway to make permanent repairs to dwellings, or to find other suitable permanent housing. 4. Permanent Housing - to provide long-term, permanent housing solutions for disaster victims (HRWG, 1998). Research Questions The research is trying to define the role of the NGO s in post disaster housing activities and evaluates the process according to following questions; What is the role of the NGO s in the disaster management system in Turkey? What is the actual position of post disaster housing from the point view of NGO s in Turkey? What are the strong and vulnerable parts of the NGO s in Turkey? How can they achieve more accelerated and sustainable housing reconstruction? Research Methods This study analyzes the role of the NGO s established after the earthquake in order to defend the rights of the tenants, disabled peoples and low income families tenure in Turkey. The SWOT analysis technique used to evaluate the risks and opportunities for the NGO S involved in acquiring the housing rights of victims groups; disabled peoples, 2

low income families and tenants. A SWOT Analysis looks at an institution s strengths, weaknesses, opportunities and threats. SWOT Analysis aims to reveal the competitive advantages of the institution as well as analyse its prospects for sales and profitability and prepare the institution for problems which may arise, allowing for the development of contingency plans. An analysis of the institution s strengths and weaknesses is an internal examination. It is usually based on an analysis of facts and assumptions about the institution on research findings. The opportunity and threat analysis is carried out by examining external factors, eg. Economic, technologic, politic or socia-cultural trends, and internal factors, eg. determination of the sources and capacity of the institution (Table 1). The local associations (Earthquake victims association, Blue Crescent association, Accessible Life association, Foundation for Supporting the Women s Work association) roles are evaluated according to their relation with central and local government. Interviews were made with the NGO s representatives. They were evaluated in the light of their actual position for housing conditions. The future projections were scrutinized in the context of sustainability as well. Table1. Situation Analysis - SWOT Approach Positive Negative Internal Strong Points Weak Points External Opportunities (Future perspective) Threats Post disaster Housing Problem in Turkey On August 17, 1999 and again on November 12th of the same year, earthquakes measuring 7.4 and 7.2 on the Richter scale, respectively, hit Turkey in areas East of Istanbul. The first earthquake occurred at approximately 3:01 AM on August 17, 1999 near the town of Gölcük ( Kocaeli Province ) and rocked the Marmara Region of Turkey. In 12 November 1999 the devastating earthquake with 7, 2 magnitudes occurred in Duzce province. Approximately 43000 buildings were damaged. Generally 84 % of the damages occurred to the houses and % 16 of them to the work places. Also 980 people died and 38939 were injured (Duzce Governorship, 2002). The number of houses and offices that were damaged in the earthquakes were 25.113. Among them, 16.666 were houses and 3.837 were offices. The Turkish government, along with local and international agencies and NGOs, responded immediately to the emergency with the provision of temporary shelters, food, health care, counselling and other social services. More than 130 tent cities, with over 100,000 tents were initially set up to provide survivors with emergency shelter and thousands of temporary prefabricated homes were constructed within one year. The General Directorate of Construction Affairs is responsible for survey, design, construction and rehabilitation activities to be carried out in disaster areas, taking the necessary measures regarding the implementation of development plans and infrastructure projects of new settlements to be built following the disasters, as well as monitoring of the construction works and provision of technical assistance for these services (www.bayindirlik.gov.tr, 2008). 3

The government s strategy of solving the housing deficiency and housing need emerged after the earthquakes was to conduct a few mass housing projects and to provide housing credits with low interest rates. But these were only for those who were the owners of damaged/badly damaged/collapsed houses and/or offices. In other words people who were house owners considered as the main targets of all the projects conducted by the state. These people as property owners were called Hak Sahibi (Holder of a Right those who have the right of making claims for the state funds, credits) (Yarar, 2005). According to the 4th article of the regulation about Assessment of Holder of a Right of Law. No.7269, one is eligible to own a new, government built permanent residence after a disaster if his/her house is demolished or heavily damaged in such a way that it cannot be accommodated anymore. Moreover, owners of houses, which are located on the land that is going to be expropriated for the relocation of people, are also classified as beneficiaries. In other words there were three main principles that underlined the government s schemes of solving housing deficiency that has increased tremendously after the disaster with the criteria of; being house owner, houses should be badly damaged or collapsed capable of paying the credit fees which were relatively small (Demirel, 2005). This situation clearly shows the lack of organization for the tenants and low income families after the earthquake. The Turkish Government launched the construction of permanent houses to be provided to all home-owners who can prove that they lost a home as a result of the earthquakes. However, vulnerable segments of the population who were affected by the quakes but living in rented houses continued to fall through the social welfare. The role of the local government in housing is very limited. The local government had only one member in central government decision makers. So the post disaster housing process excluded the local government and the community participation by means of NGO s becomes nearly impossible. Despite this facts in opportunity window period where the central government open to new approaches of housing The Blue Crescent which is a national and international NGO acquired a chance for housing with the help and political initiatives of the local municipality. But the other Ngo s were newly organised and missed the period and nearly after 8 year from the earthquake and with long struggles have just provided the housing land. The Role of Ngo s in Disaster Management System in Turkey The body current law in Turkey s emergency management situation is generally focused on post disaster efforts. However different ministries and institutions are responsible for different types of disasters (ITU DMC, 2002). After the disaster the local representative of the central government where the event occurred is responsible for all emergency interventions and aids (Table 2). The explicit characteristic of this system is that all the responsibilities and authority are collected in the central government or its local representatives (Ozerdem and Jacoby, 2006). Besides, the local government is not presented institutionally but functioned hierarchically as a sub unit of the governorship. So the role and activity of the local government in emergency situation is restricted. 4

Table 2.The Disaster Management Hierarchy in Turkey (Sengezer and Kansu, 2001) National Level Prime Minister, Related Ministers, Red Crescent President, representative of military staff Province Level Governor, Related province directors, Mayor, Representative of Red Crescent, province military staff Citizen Level To form crisis centre in post disaster phase and make decisions by a large majority Meet by the invitation of governor, work according to 24 hour principle and convey the post disaster needs to the central government (The Ministry of The Publıc Works and Settlement) Have responsibilities which were arranged by legal regulations. Very limited and indirect participation to post disaster processes The disaster management system in Turkey is highly centralized where many of the works are in the responsibility of the central government. Ministry of Public Works and the Ministry of Reconstruction and Settlement plays an important role in relation with the disaster management and reconstruction. From the point view of NGO s it can be pointed out that; after the disaster the affected community continuously must not be seen as helpless citizens who wait for aid instead they can be seen as productive and decision maker citizens who can rebuild community life. But there is a lack of politics that does not give opportunities for organizing social milieu. Consequently socio-psychological collapse and social behaviour erosion occurred (The Chamber of Architects of Turkey, 2000). The Evaluation of the Ngo s (SWOT Analysis) Four NGO s (Table 3) are evaluated and analysed according to SWOT analysis method that covers strengths, weaknesses, opportunities and threatens. Strengths Altough most of the NGO s are newly established all (more or less) have improvements as acquiring land for housing, construction of the houses, etc. Some have finished the construction process and some could only acquire land from the central government. The NGO s create public awareness in the community about the vulnerable parts such as disabled peoples, low income families, etc. Sometimes this awareness forms public opinion (e.g. DEPDER, Earthquake victim s association, conduct 60.000 sign for support to their rights). 5

Table3. The Focus group, reconstruction activities and existing positions of the selected NGO s NGO Year (Establishment) Focus Group Facilities Housing Projects Existing Position DEPDER (Earthquake victim s 1999 Tenant Disaster victims who lives in; -slums Secure and safe shelters and Housing rights for t he tenants Self aided housing 1 housing cooperative established Negotiation for land allocation and low credit association) -cheap houses -gecekondu KEDV (Foundation for Supporting the Women s Work FSWW) 1986 Low income women Improve quality of life -Governance -Housing& reconstruction -Economic initiatives and sustainability -Child care 4 housing cooperative established Participatory planning and housing Negotiation for land allocation and low credit UYD (Accessible Life Association) 2000 Small or landless peasants -low income disabled people -children Community based rehabilitation Mass housing projects for disabled people 25 housing unit and social centre Acquired land and find finance for the housing project -women IBC (International Blue Crescent) 1999 Improve the life s of most disadvanta ged section Civil Society and Development Relief and rehabilitation Housing reconstruction and rural development Health Education and training Housing and reconstruction community centre beyciler assisted self help project 168 housing unit 75 tenants 71 temporary house resident 22 tent resident Finished in 20 months 6

Weaknesses The actual problems are not well defined. The NGOs dont have a criticising view for their efforts. People are only aware of their personal needs and seeking for individual solutions. The potentials of women is decreased because of the man focused family structure. The land allocation can be delayed and by politic approach. Some new cooperatives established for housing needs of the peoples who are not disaster victim can achieve land allocation in one year whereas the disaster victims NGO can achieve in 4 year period. The NGO s are not strong enough to defense and show their rights to mass media. There is a general financement problem for the housing projects. The credit possibility are very restricted (e.g. UYD (Accessible Life Association) find financial support from an international NGO) Yarar (2005) stated that NGOs are facing the debate about the relationship with the politics. So the NGO s must be careful in defending their rights as non governmental and non political organisation. They could force the politics but not be the part of a political view. DEPDER (Earthquake victim s association) is too much criticised by the public as it is tend to be percepted as a political figure by the community. Opportunities The efforts of community should be canalized to form and improve civil community spirit that covers voluntary participation. Local government could be open to new projects and encouraged to assist the land demand. So the collobarative works can be organised by the contribution of local government. Because the reconstructed housing sites will also effect the city plan and has long term consequences. The participation methods could be defined in national legal system in order to improve the community participation in different levels and for different genders, groups such as women, disabled and elderly peoples in an equal way due to their physical and psychological position. The experience of NGO s could be used for better design of housing provision systems. Threatens During the reconstruction process some of the NGO do not have a solution productive approachs and the members oriented to the NGO leader s to overcome all situations. The legal constraints are very important in and give no chance for acceleration of neither community nor citizen participation. 7

After the rehabilitation period the central government is not eager to give part in reconstruction process to the NGO s as the interest of the national mass media decreases. The post disaster housing need are evaluated as normal housing problem. But the emergency of the situation and psychologhy of the affected people must be taken into consideration and a selection chance for the disaster affected people could be given for also supporting the psycho-social reconstruction of the region. The sustaibality of the NGO s are in risc. Some of the NGO find solution to their problems by individual relations and some of the NGO s member number decreased too much which can cause not to sustain their activities. Long time state aids (nearly 2 year) prevent people to be organised and struggling for their rights in reconstruction phase. Research Results This study clearly found out below lessons; Opportunity Window is very important in solving legal constraints and planning issues in post disaster reconstruction. The first months beyond to first year of the disaster can be used to boost the reconstruction activities by making pressure on politicians and/or local governments. Altough there are very limited examples such as Beyciler Houses in Turkey, the case clearly shows that without legislations it is difficult to design and implement Ngo and community based solutions for post disaster housing. Civil initiatives achieved working together and constitute new organizations to help affected people in disaster region. Still, the existing level of work is inadequate in the name of civil initiatives especially in collaboration with governmental organizations. The role of the Local government (Municipality) can be increased to a pivotal role for accelerating colloborative housing projects with the NGO s. The post disaster housing reconstruction need an overall (whole) design and planning approach which covers all vulnerable parts of the disaster affected community. But all the NGO s in the case had different housing projects. They do not have an upper level plan to adjust. So this situation affects long term social and physical reconstruction. Discussion and Conclusions The role of the NGO s can be designated as in Table 4 in order to accelerate the physical and social reconstruction of the affected region. The short term and long term targets must be defined for adjust the sources. 8

Table4. The General Approach of Ngo s on Post Disaster Activities NGO S MISSION Short Term Need Long Term Need Rehabilitation: Distribution of urgent needs (tents, foods, etc.) Reconstruction and rebuilding: physical reconstruction (house and social centres, etc ) POST DISASTER ACTIVITIES Slow down function and turned back to their routine Keep their presence active in reconstruction activities Short time is not sustainable for the community after the immediate and rehabilitation phase (1 year or beyond) Struggle for sustainable communities for future disasters Disaster management system of a country is very important for the NGO s because it is not only restricted the institutions capacity but also prevent them for rapid actions. The research clearly shows long term planning is crucial for acquiring reliable solutions to post disaster housing. The community is ready for new challenges in the aftermath (first to 6 month) of the disaster. By the time passes (one year or beyond) the concern of the community and media decreases and it becomes too hard to find solutions and get results. References Yarar, B. (2005) Civil Struggle for the Housing Right After the Earthquake: A Case study on the Dep Der in Duzce, The 7th European Sociological Association Conference, "Rethinking Inequalities", Poland. Ozerdem, A. and Jacoby, T. (2006) Disaster Management and Civil Society: Earthquake Relief in Japan, Turkey and India, I.B. TAURUS. Demirel, S. (2005) Production of Space in the Post Earthquake Region: Three Cases from Duzce, Unpublished Master Thesis, METU, Ankara, Turkey. Ozerdem A., Jacoby T, 2006, Dısaster Management and Civil Society: Earthquake Relief in Japan, Turkey and Indıa, I.B. TAURUS. Şengezer B., Kansu H., 2001, Kapsamlı Afet Yönetimi, YTÜ Yayınevi. Mimarlık Dergisi (2000) Sayı 295, sf. 23 Geçen Bir Yılın Ardından, Mimarlar odası İstanbul büyük kent şubesi afet komitesi. Tercan, B. (2001) Post Earthquake Relocation Process in Yalova. Unpublished master s thesis, METU, Ankara. Siembieda, W., Bruce, B. and Ken, T. (2002) Disaster Recovery, A Global Planning Perspectives in Interplan. Chicago, Illinois: International Division of the American Planning Association, Issue No. 69. Draft Report of the Housing Recovery Working Group (1998) A Housıng Recovery Strategy, For a New Madrıd Earthquake, A FEMA / Federal - CUSEC Initiative. Shelter Project (2004) Transitional Settlement, Displaced Populations, The Martin Centre for Architectural and Urban Studies department of Architecture, University of Cambridge. www.shelterproject.org. ITU Disaster Management Center (2002) Ulusal Acil Durum Yönetimi Modeli Geliştirilmesi Projesi, ITU Press. Duzce Governorship Public Relation Director, 2002. New City New Life, Duzce. http://www.bayindirlik.gov.tr/english/birimdetay (Acessed at 15.12.2007) 9

Authors Biography Hakan Arslan studied architecture at Faculty of Architecture, Trakya University (TU) between 1994 1998 and completed her master's degree program in architecture Gebze Instıtute of High Technology (GIHT) with the thesis Study of Temporary Housing Planning, Organisation, Production Phases and Research of Re-Use Potentials After Usage; Example of Duzce Province in 2004. He still works as a research assistant at Istanbul Technical University. His major areas of interest are Postdisaster Reconstruction, Place Attachment, Socio-spatial aspects of Disasters, Temporary and permanent housing reconstruction, Life Cycle Assessment. He is studying about socio spatial aspects of post disaster reconstruction for Ph. D. in I.T.U. Dr. Alper ÜnIü graduated from the Faculty of Architecture, Istanbul Technical University (ITU) in 1979. He completed his master's degree in 1980 and won an award and scholarship from the "Aga Khan Award for Architecture" in 1983. He undertook research between 1984-1985 at the School of Architecture and Urban Planning, the University of Wisconsin, Milwaukee, USA. He completed his Ph. D. at ITU in 1987. He taught architectural design and visual communication at the undergraduate level and he taught environment-behaviour theories, built environment, and culture classes at the postgraduate level at ITU, between 1987 1991. He joined the College of Architecture and Planning, King Faisal University, Saudi Arabia, in 1991. His major areas of interest are environment-behaviour theories, perception, space syntax, and vernacular architecture. Currently, he is a professor at ITU, Faculty of Architecture and supervises architectural design studio at the undergraduate level and theoretical courses mainly concentrated on environment-behaviour and culture issues at the postgraduate level. He is now the administrator of ITU Disaster Management Centre. 10