AID FOR TRADE CASE STORY: UK

Similar documents
AID FOR TRADE CASE STORY: UK

AID FOR TRADE CASE STORY: UK

AID FOR TRADE CASE STORY: UK

Coordinating Tripartite RCA in Africa COMESA, SADC, and EAC

Statement. Honourable Moiseraele M. Goya. Assistant Minister. Ministry of Investment, Trade and Industry

2.0 Transport Connectivity interventions in Zimbabwe Transit Policies: Infrastructure development

THE COMPLEXITY OF ONE-STOP BORDER CROSSING FOR SADC MEMBER STATES AND THE DELAYS ENCOUNTERED

Regional Integration and Inter- States Trade: the ESA OSBP Experience

Trade Facilitation in the COMESA-EAC-SADC Tripartite Free Trade Area

Seed Regional Harmonization: Country Case Studies and Regional Test Cases

PMAESA - AFRICAN PORTS/MARITIME CONFERENCE

EAC, COMESA SADC Tripartite Free Trade Area

Opening Statement by the Chairperson of the Committee of Ministers Responsible for Transport and Meteorology, Lilongwe, Malawi 3 rd November 2017

Global TFA Implementation CAI Meeting, FIATA SEPTEMBER 2018, Delhi

Analysing the Development Process for Infrastructure Projects in SADC

Regional Integration Update: Southern and Eastern Africa

CONSIDERING. 4. The challenges industry faces due to multiplicity of procedures in place in different SADC Member States with different requirements;

ADVERTISEMENT FOR CONSULTANCY

ACCELERATED PROGRAM FOR ECONOMIC INTEGRATION (APEI)

SADC Payment System Oversight Committee Report

Summary of Errors on TRALAC Chirundu OSBP Article

Why trade facilitation matters

NOTE TO THE MEMBERS OF THE EDF COMMITTEE. 1. Identification EDF allocation

INSIGHT I N S I D E THIS ISSUE. About the ECA-SA Office. Mission Statement. Status and Prospects for Economic Diversification in Southern Africa

THE IMPACT OF DIFFERENT TRANSPORT REGULATORY REGIMES ON TRANSPORT ACTIVITIES IN THE SADC REGION

Ninth WTO Ministerial Conference (Bali, Indonesia, 3-6 December 2013)

The EU's Assistance for Trade Facilitation WTO Donor Event. EuropeAid

TERMS OF REFERENCE Development of a SADC Simplified Trade Regime

Africa Trade Forum 2012

PRIVATE SECTOR INVOLVEMENT STRATEGY IN CUSTOMS MATTERS. May 2013

Facilitating Cross-Border Mobile Banking in Southern Africa

Paper series on transatlantic trade and development policy issues Analysis. August 30, 2011 Number 6. By Greg Gajewski

July 14-15, Venue: Savoy. Mr. Tim Masela - Chairperson of the Payment Systems Subcommittee,

Africa Week Concept Note. High-level Panel Discussion

Opening Opportunities: Kenya s Electronic Single Window Connects East Africa to Global Value Chains

ANNEXURE 3. SADC Protocol on Wildlife Conservation and Law Enforcement

Report of the 7 th Ordinary Meeting of the African Union Sub-Committee of Directors General of Customs. [final version]

#40 PARTNER COUNTRY QUESTIONNAIRE COMPLETE 1 / 16 PAGE 4: B.1) ABOUT YOU Q1: COUNTRY UGANDA

SADC TRADE RELATED FACILITY (TRF)

Investment Climate in the SADC Region

It is a great honour and privilege for me to be here in Namibia- Windhoek joining you in this auspicious gathering.

USAID and the WCO Trade Facilitation Conference. Opening Remarks by Dr Rob Davies, MP Minister of Trade and Industry Republic of South Africa

Regional industrialisation discourses in SADC and SACU lessons for the EAC? Sean Woolfrey Nairobi, 25 June 2013

Terms of Reference for a consultancy to undertake an assessment of current practices on poverty and inequalities measurement and profiles in SADC

ABSTRACT ACKNOWLEDGEMENTS

COMMUNIQUĖ SADC SUMMIT

Public Disclosure Copy

TERMS OF REFERENCE DEVELOP A SADC TRADE DEVELOPMENT AND TRADE PROMOTION FRAMEWORK. November 2017

The Impact of the Chirundu One Stop Border Post in Addressing Border Protectionist Challenges

PERFORMANCE OF REGIONAL INTEGRATION IN SOUTHERN AFRICA: SUCCESSES, CHALLENGES AND WAY

RERA Regulatory Principles

Namibia Trade Forum. Overview 13/07/2017. Economic opportunities for Namibia from closer regional integration. Regional Economic Integration

Regional Integration in ICT in SADC: An Overview

IMPROVEMENT OF TRAFFIC MANAGEMENT ALONG TRANSPORT CORRIDORS IN THE SADC REGION: THE BEIRA CORRIDOR AS A CASE STUDY

WINDHOEK DECLARATION A NEW PARTNERSHIP BETWEEN THE SOUTHERN AFRICAN DEVELOPMENT COMMUNITY AND THE INTERNATIONAL CORPORATING PARTNERS

Food and Agriculture Organisation of the United Nations (FAO) Consumer Unity and Trust Society (CUTS) International

HM Revenue & Customs/UK Border Agency. The UK Approach to Integrated Border Management

Promoting a Rights Based Labour Migration Governance Framework in SADC: Inputs and Outcomes by the ILO

Measures to avoid counterfeiting and Piracy A Regional Perspective

SADC Payment System World Bank Report. Dave C Mitchell Annual Regional Conference Centurion, South Africa September 2006

WTO TRADE FACILITATION

Start date: 9th July 2018

THE BUSINESS CLIMATE INDEX SURVEY 2008

TRADE FACILITATION MEETINGS AT MAJOR PORTS

WCO Capacity Building Support for Implementation of the WTO Agreement on Trade Facilitation

GUIDANCE NOTE: AMENDEMENT OF UGANDA WILDLIFE ACT NOVEMBER 2014 GUIDANCE NOTE

Regional Cross border Trade Stakeholder Dialogue Maputo, Mozambique 23rd -24th April 2013

Border Planning Group

Southern Africa. Recent Developments

COMMUNIQUE. Meeting of SADC Ministers Responsible for Water 29 th June 3 rd July 2015 Meikles Hotel, Harare, Zimbabwe

FRAMEWORK FOR ADVANCING TRANSATLANTIC ECONOMIC INTEGRATION BETWEEN THE EUROPEAN UNION AND THE UNITED STATES OF AMERICA

NEW PARTNERSHIP FOR AFRICA S DEVELOPMENT (NEPAD) MULTI-STAKEHOLDER DIALOGUE, JOHANNESBURG, SOUTH AFRICA, OCTOBER 2004

PARTNER COUNTRY QUESTIONNAIRE. Ministry / Organization: Phone Number:

REMARKS BY MS. PAULINA MBALA ELAGO, EXECUTIVE SECRETARY OF SACU 6 TH SACU SUMMIT GABORONE, REPUBLIC OF BOTSWANA

INTRODUCTORY REMARKS TO THE JOINT PORTFOLIO COMMITTEES ON BORDERLINE AND BORDER POST SECURITY ON BEHALF OF THE VARIOUS GOVERNMENT DEPARTMENTS

OUTCOME STATEMENT THE SOUTHERN AFRICAN WOMEN MEDIATORS SEMINAR (SAWMS)

Animal health products (also known as veterinary products ) includes veterinary drugs, vaccines, antibody products, and diagnostic tests.

GOVERNANCE AND CIVIL SOCIETY

Context and State of play in the EPAs Negotiations in the SADC Region

FCFASA FIVE YEAR BUSINESS PLAN

DRAFT PROTOCOL ON THE FACILITATION OF MOVEMENT OF PERSONS

1. Improving Customer Service

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA134. Project Name. Region Country Sector(s)

TECHNICAL ASSISTANCE COMPLETION REPORT 1 Division: CWRD AFRM

SOUTHERN AFRICAN DEVELOPMENT COMMUNITY EUROPEAN UNION ECONOMIC PARTNERSHIP AGREEMENT

Trade Facilitation and Security

COMESA Presentation to the Global RCPs Meeting, October 2015 Cairo, Egypt

AU REVIEW AND ASSISTANCE CONFERENCE ON THE IMPLEMENTATION OF UN SECURITY COUNCIL RESOLUTION 1540 (2004) IN AFRICA CONCLUSIONS

Guidelines for Application of Road Opening Authorization and Procedure for Road Opening Works

Draft Proposal on SADC Mechanisms for Engagement with Non-State Actors

Africa Regional Empowerment and Accountability Programme. Empowerment matters

INTERNATIONAL ANTI-FRAUD EFFORTS: THE ISSUES OF BORDERLESS FRAUD FRAUD AND CORRUPTION IN AFRICA

SAIIA-KAS MIGRATION CONFERENCE: MAPPING MIGRATION IN COMESA

TD/B/54/CRP.1 Distr.: Restricted 18 July 2007

ANNELINE MORGAN SENIOR TECHNICAL ADVISOR: STI SADC SECRETARIAT

SADC Trade, Industry and Investment Review 2003

BETWEEN THE MINISTER OF HEALTH AND LONG-TERM CARE AND THE CHIROPODY REVIEW COMMITTEE AND COLLEGE OF CHIROPODISTS OF ONTARIO

Summary of Deliberations. Meeting of the SADC Technical Committee on Certification and Accreditation (TCCA)

Collaborative Border Management: A New Approach to an Old Problem

ASSEMBLY OF THE AFRICAN UNION Nineteenth Ordinary Session July 2012 Addis Ababa, ETHIOPIA Assembly/AU/11(XIX) Original: English

Transcription:

AID FOR TRADE CASE STORY UK Improving Service Delivery and Reducing Clearing Times at Beitbridge Border Post Date of submission: 31 st January 2011 Region: Country: Type: Author: Contact Details: Eastern and Southern Africa ESA Region Programme TradeMark Southern Africa PO Box 317, Persequor Park, Pretoria 0020, South Africa info@trademarksa.org 1 AID FOR TRADE CASE STORY: UK

Improving Service Delivery and Reducing Clearing Times at Beitbridge Border Post Table of Contents Executive Summary 1. Issues Addressed 2. Objectives Pursued 3. Design and Implementation 4. Problems Encountered 5. Factors for Success/Failure 6. Results Achieved 7. Lessons Learned 8. Conclusion (applicability to other programs) Executive Summary The border post at Beitbridge is an extremely important border on the North South Corridor, with significant numbers of trucks and passenger vehicles going to and from the South African ports and, to a lesser extent, Maputo, and countries to the north such as Zimbabwe, Zambia, DR Congo and Malawi. There are also instances in which the land route to the north, into Tanzania and even into Sudan, has been used in preference to the sea route. It is one border post that experiences extreme forms of traffic congestion at peak periods. Beitbridge was identified by the COMESA, EAC and SADC Tripartite as the main border post requiring serious attention to alleviate congestion, after having worked on Chirundu. Since May 2009 a number of stakeholders workshops have been convened by the COMESA-EAC-SADC Tripartite, supported by the DFID-financed TradeMark Southern Africa (and prior to this the Regional Trade Facilitation Programme) to determine how transaction costs can be reduced through reducing clearance times and improving service delivery, leading to the design of the Beitbridge Efficiency Management System (BBEMS). The objective of the BBEMS is to reduce congestion, increase operational efficiency, reduce waiting times and lower of transaction costs at the border crossing. This programme is part of a wider COMESA-EAC-SADC Tripartite work programme seeking to enhance regional economic integration through improved trade performance and trade facilitation. After further consultations between South Africa and Zimbabwe, institutional structures were established and a draft memorandum of understanding and a work programme were prepared. However, owning to a number of factors, progress in implementing the BBEMS has been extremely slow and the problems of excessing congestion, clearance delays and inefficient service delivery persist at Beitbridge border post, lowering the efficiency of the whole North-South Corridor. 1. Issues Addressed The Beitbridge border post, on the North South Corridor, is an extremely important border crossing between South Africa and Zimbabwe. The border crossing handles significant numbers of trucks, averaging about 470 per day and about 800 passenger vehicles per day going to and from the South African ports and, to a lesser extent, Maputo, and countries to the north such as Zimbabwe, Zambia, DR Congo and Malawi. There are also occasions 1

when the land route to the north, into Tanzania and even into Sudan, have been used in preference to the sea route. The key issues affecting traffic in both directions are: long waiting times before clearance, congestion on the border, inefficient service delivery and higher costs of transactions. A situation analysis carried out in August 2009 indicated that the waiting time at the border was about 33 hours for south-bound traffic while for north bound traffic waiting time was about 45 hours. It was estimated that the cost associated with this waiting time was about US$29.3 million for south bound and US$35 million for north bound traffic per year. These transaction costs could be greatly reduced if the border post was revamped to improve its operational efficiency and effectiveness. To improve the operational efficiency of the border crossing, trade facilitation measures, trade related infrastructure, improvements in other physical infrastructure such as roads, bridge, parking and inspection bays, offices and housing facilities, human resource capacities and information communication and technology systems needed to be addressed. 2. Objectives Pursued The overall objective of the BBEMS programme is to enhance regional economic integration through improved trade performance and trade facilitation along the North South Corridor. The specific objectives of the BBEMS are to: a) reduce congestion at the border crossing; b) enhance operational efficiency; c) reduce waiting times; and d) lower transaction costs at the border. 3. Design and Implementation The programme design and implementation are based on constant consultations amongst stakeholders and between the two countries and the border control agencies. The SADC Secretariat plays a co-ordination role under the programme on behalf of the COMESA-EAC- SADC Tripartite while government officials from the two countries work under an institutional framework that brings together all border control agencies and the private sector operators as follows: a) Joint Border Operations Committee: This committee is based at Beitbridge and deals with day-to-day operational issues and existed prior to the initial stakeholder meeting. It was formalised by the meeting and should meet regularly and provide inputs into the Task Team. b) Task Team: The Task Team, comprising key stakeholders representing both public and private sectors, is responsible for all aspects and functions relating to the design and implementation of the Border Efficiency Management System Programme. It is tasked with the development and facilitation of the adoption of a variety of trade facilitation instruments aimed at improving service delivery at the border post covering customs; immigration; plant, animal and human health; food safety; security; border infrastructure and facilities; etc. c) Steering Committee: The Steering Committee is responsible for policy and overall programme leadership and direction, including monitoring and evaluation. It comprises Senior Officials at the level of Director General or Permanent Secretary of Departments or Ministries or their designated representatives. 2

d) Ministerial Committee: The Ministerial Committee provides political leadership and guidance the BBEMS. The Committee is still to be formally constituted and is expected to work closely with the Ministerial Committee of the North South Corridor given the critical importance of Beitbridge to the Corridor. The institutional structure is as follows: SOUTH AFRICA (TO BE ADVISED) MINISTERIAL COMMITTEE ZIMBABWE MIN OF REGIONAL INTEGRATION STEERING COMMITTEE TASK TEAM PROCEDURES ICT INFRASTRUCTURE / FACILITIES Note: The structures inside boxes demarcated by broken borders are yet to be established. The BBMES work programme, which is anchored in the COMESA-EAC-SADC Tripartite work programme, and supported by the DFID-financed TradeMark Southern Africa Programme, consists of activities which, when implemented, will result in: - Finalisation of the MoU between Zimbabwe and South Africa and its signature; - Effective and timely sharing of information among all relevant stakeholders at national and regional levels; - Development of a blueprint for an integrated standard operating procedure (SOP) manual covering procedures of all border agencies of both countries; - Adoption and implementation of common simplified and harmonised border control procedures, including carrying out joint controls by officers from both countries and the development and implementation of integrated computerised systems to enhance operational efficiency; - Improved physical infrastructure at the border post, such as roads, parking facilities, inspection bays, office space, housing, bridge, etc so as to improve operations at the border and reduce the time taken to cross the border; and - The establishment of a one stop border post. While programme implementation has been very slow, it remains relevant such that if implementation commences, there will be an improvement on reducing transaction costs and waiting times at the border. 3

4. Problems Encountered The implementation of the programme has been faced with a number of challenges mainly arising from the lack of a formal mandate from Cabinet level for one of the countries. Other challenges faced have been: - throughout 2010 South Africa put more emphasis on facilitating movement of people (World Cup Soccer fans) through the border post rather than prioritising movement of freight; - an outstanding Mutual Assistance Agreement which the South African Revenue Services and the Zimbabwe Revenue Authority had negotiated which became a condition for signature before the main Memorandum of Understanding (MoU) on the BBEMS could be finalised; and - a lengthy delay for the clearance of the main MoU through both countries legal and regulatory systems. The above issues have led to a delay in the implementation of the Task Team work programme. The degree of engagement on the BBEMS between the two countries has been weak and needs to be improved. The border is open for twenty-four hours but the freight forwarding and clearing agencies do not work twenty-four hours a day thus exacerbating waiting time for commercial traffic. 5. Factors for Success/Failure While programme implementation is significantly behind schedule, some of the challenges highlighted above have now been addressed. It is understood that the Customs to Customs Mutual Assistance Agreement has been signed which should pave the way for a deeper level of collaboration and sharing of information between border agencies. The mandate to engage in discussions on Beitbridge to improve its efficiency has also been given to the relevant country which again should facilitate movement on the work programme. The Joint Border Operations Committee has continued meeting and exchanging views on border issues since its formation. The lead border agencies are satisfied that it is doing its work and is managing to resolve some of the problems faced at the border crossing. It has been reported that each side of the border is working on harmonising their operational manuals with a view to streamlining them and conducting joint inspections in order to reduce the clearance time. 6. Results Achieved No clear results have been achieved as yet as the implementation of the work programme is still at an early stage. The conclusion and signing of the MoU should result in closer working relations between the two countries and tangible benefits and results should be see in 2011. Both Governments have now come to understand the critical nature of the border crossing and the need to improve the infrastructure at the border and, as a result, there are a number of projects and activities, such as the consideration of building a new bridge across the Limpopo River, which would reduce traffic congestion, and major improvements in physical infrastructure on the Zimbabwean side. 7. Lessons Learned One of the main lessons that can be learned from the slow finalisation and implementation of the BBEMS is that there needs to be strong commitment and leadership from the highest 4

levels of government if procedures at border posts are to be simplified and harmonised. Without this commitment there will be a lack of engagement and co-operation between border agencies, both on different sides of the border and on the same side of the border, and the status quo will be maintained. Change management is critical and this needs support from the highest political and technical levels. In addition, it is clear from this programme that constant consultations with all stakeholders are important in order to synchronise work activities and times and a full sharing of information across the border by all agencies is absolutely necessary to avoid wasteful duplication of procedures and inspections. 8. Conclusion Implementation of the Beitbridge Border Efficiency Management System is still at an early stage, despite the fact that it was launched in May 2009, and considerable effort is still required from the two countries working together towards a common goal for it to be successful. If implemented, the work programme has the potential to bring remarkable changes and improvement on service delivery at the border through reducing transaction costs for traders. 5