HPSEBL Form CS-1 (b) HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A STATE GOVERNMENT UNDERTAKING)

Similar documents
1. Regn. No. & date. 2. Existing Account No. (If any) To The Punjab State Power Corporation Limited,

~~. HPSEBL./ CE (Comm.)/S-4/Vol-Ill/ ,\.\ h 1- 'CO \Y Dated: a 5/D ~ /2P If::,

Application Form for New Connection

SEVENTEENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004.

Application Form for New Connection

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT)

West Bengal State Electricity Distribution Company Limited

Annexure 2 (See Clause 4.11) Application for Supply of Electricity at High Tension (to be submitted in 5 sets)

AGREEMENT FOR SUPPLY OF LT ENERGY

CONTENTS. 10. Release of connection vis-à-vis shortage of material 11. Supply of power to Local Bodies for Public Lighting. Instruction No.

Business Park Maintenance Service Pvt. Ltd.

TENDER FORM Controller of Stores, HIMACHAL PRADESH (INSTRUCTION TO TENDERERS)

Supply shall generally be given at the following voltages on the basis of contracted load:

4. PROCEDURE FOR RELEASE OF NEW CONNECTION AND MODIFICATION IN EXISTING CONNECTION

The Orissa Electricity (Duty) Act, 1961.

THE TAMIL NADU LIFTS RULES, (G.o.Ms.No.173, Energy (B1), 3rd November 1997)

AGREEMENT FOR SUPPLY OF HT ENERGY

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

ORISSA ELECTRICITY REGULATORY COMMISSION DISTRIBUTION (CONDITIONS OF SUPPLY) CODE, 2004

NET METERING CONNECTION AGREEMENT

DEPARTMENT OF CHIEF ELECTRICAL INSPECTOR, HARYANA. Application Forms

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)

Wyandotte Municipal Services

THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7,

Gujarat Electricity Regulatory Commission (GERC)

Agreement for H.V./ L.V. Consumer.

DISTRICT OF COLUMBIA LEVEL 1 INTERCONNECTION APPLICATION & AGREEMENT

WEST BENGAL INDUSTRIAL DEVELOPMENT CORPORATION LIMITED PROTITI, 23, Abanindranath Tagore Sarani (Camac Street), Kolkata TENDER DOCUMENT FOR

Sub: Checklist fortransfer on sale of Plot/booking of TDI Greens- Sonepat

F.No.III-129/2017-NZP/ Government of India National Zoological Park Mathura Road, New Delhi - 3

ANF 2A APPLICATION FORM FOR ISSUE / MODIFICATION IN IMPORTER EXPORTER CODE NUMBER (IEC)

ELECTRICITY SUPPLY CODE REGULATION 2011 (WITH 1 st & 2 nd AMENDMENT)

Application for IEX Membership

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA NOTIFICATION Shimla, the 21 st September, 2015

Office of the Principal Accountant General (Audit), Telangana, Hyderabad. Prl.AG(Audit)TS/Estate/ Date:

SECTION III. LIST OF ANNEXURES [ I TO XII ] [ PAGE 01 TO 20 ]

National Electric Power Regulatory Authority (Wheeling of Electric Power) Regulations, 2015

Application of New VSAT Equipment. Instruction for filling up documents related to New VSAT Equipment TM/TCM/PCM/ITCM Members.

SHORT TITLE, SCOPE EXTENT AND COMMENCEMENT

PROCEDURE FOR REGISTRATION OF RENEWABLE ENERGY GENERATION PROJECT BY CENTRAL AGENCY

SALES MANUAL INSTRUCTIONS PART-1 Revised up to

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Name. City: State: Zip Code: City: State: Zip Code: City: State: Zip Code: City: State: Zip Code:

HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED MANUAL OF PRACTICES FOR HANDLING CONSUMERS COMPLAINTS NOTIFICATON

The Himachal Pradesh Electricity Supply Code, 2009 CHAPTER - 1 GENERAL

DEPARTMENT OF LABOUR. Government Notice. R: October Electrical Installation Regulations, 1992

NOTIFICATION. The 8th May, [Electricity Supply Code and Related Matters Regulations, 2004 (First Amendment) 2007]

Application for REC Membership

Gujarat Electricity Regulatory Commission (GERC) Electricity Supply Code and Related Matters Regulations. Notification No.

INDEX. Sr. No. Particulars Page No.

ASSAM ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION

ANDHRA PRADESH ELECTRICAL LICENSING REGULATIONS, (As amended up to ) NOTIFICATION

STANDARD OPERATING PROCEDURE INSPECTION

HOSTEL SECTION RE-TENDER PAPER. Hostel No. / 302 / TENDER. :08/01/2018 up to 5:00 p.m.

TENDER FORM. List of available documents for the premises at Rupayan R-10, 2nd floor, Nehru Enclave, Gomati Nagar, Lucknow, comprising of 3 BHK.

HARYANA ELECTRICITY REGULATORY COMMISSION. Notification. The 10th August, Electricity Supply Code. (1) recovery of electricity charges,

CHAPTER 1: GENERAL. 1.1 Short Title, Extent and Commencement

No.MePDCL/D(D)/T-383(B)/ /6 Dated 6 th December 2016 OFFICE ORDER

THE ENERGY ACT, (No. 12 of 2006)

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED

1. The Chief Engineer (OP).

Checklist for Incorporation of Company

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA

Sub: Application for obtaining possession /demarcation of plot No. Sector

CHECK LIST DULY FILLED IN TO BE ATTACHED WITH THE TENDER. 1 Whether Earnest Money is enclosed. Yes/No

CHENNAI METROPOLITAN WATER SUPPLY & SEWERAGE BOARD No.1, Pumping Station Road, Chintadripet, Chennai

TRANSMISSION AGREEMENT FOR CONNECTIVITY BETWEEN POWER GRID CORPORATION OF INDIA LIMITED AND (NAME OF STAGE-II CONNECTIVITY GRANTEE) AND

Jammu and Kashmir State Electricity Regulatory Commission

THE NATIONAL SMALL INDUSTRIES CORPORATION LIMITED.

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 20 PAUSH 1929(S) (NO. PATNA 27) PATNA, FRIDAY, 10TH JANUARY 2008

2 nd Call. Comprehensive maintenance contract of air Cooler installed in Central Excise, Hqrs. Nagpur for the Summer Season 2017.

CHECKLIST FOR TRANSMISSION OF SHARES

GOODS AND SERVICES TAX RULES, 2017 ASSESSMENT FORMATS

Brihan Mumbai Electric Supply & Transport Undertaking (Of the Municipal Corporation of Greater Mumbai)

NORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES

Local Authorities Act 23 of 1992 section 94(2)(a) read with section 94(1)

BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION. PETITION No. CP 02/17

NOTICE. MPERC (Establishment of Forum and Electricity Ombudsman for redressal of grievances of the consumers) Regulations, 2004

CHAPTER --- ASSESSMENT AND AUDIT

BOOKLET FOR ADDITION OF APPLICANT NAME

3. Full name of Applicant's father / husband 4. Status code of applicant (See serial no. 11 of the instructions) 5. Applicant's present address

Divisional Engineer, DIGITAL TRANSMISSION CENTER Southern Telecom Sub Region, 3 rd Floor, Telephone Bhavan, Saifabad, Hyderabad ,

GOVERNMENT OF KARNATAKA (Department of Agriculture)

OFFICE OF THE SUPERINTENDING ENGINEER ELECTRICITY TRANSMISSION CIRCLE U.P.POWER TRANSMISSION CORPORATION LIMITED DLW, BHIKHARIPUR VARANASI

REFERRED TO IN NOTE BEFORE THE RULE (IX) AND NOTE BELOW RULE 10.17)

FOR THE PURCHASE OF ELECTRIC SERVICE FROM EL PASO ELECTRIC COMPANY

ALFRED DUMA LOCAL MUNICIPALITY ELECTRICITY SUPPLY BYLAW

BHARAT HEAVY ELECTRICALS LIMITED,

THANE MUNICIPAL CORPORATION, THANE. RAJIV GANDHI MEDICAL COLLEGE & CHHATRAPATI SHIVAJI MAHARAJ HOSPITAL, KALWA. E-TENDERING

TENDER FOR PRINTING & SUPPLY OF 2000 NOS. OF 150 YEARS BALMER LAWRIE HISTORY BOOK TENDER REF. NO. ADMIN / 150 YEARS TENDER NO.

SECTION 2 REGULATIONS

MODEL POWER PURCHASE AGREEMENT BETWEEN JAMMU AND KASHMIR POWER DEVELOPMENT DEPARTMENT AND. M/s (IPP)

FORMAL UNDERTAKING. Date: Day Month Year. Company Name: Company Address: Postcode: Telephone Number: Web-Site: Twitter: Facebook: Nature of Business:

REGISTERED CONSUMERS GRIEVANCES REDRESSAL FORUM AT KASUMPTI SHIMLA-9 No. CGRF/Comp. No. 1453/1/17/005

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION

POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only)

ORDINANCE NO An ordinance to adopt an Electrical Code for Jefferson County, Alabama.

TAMIL NADU ELECTRICITY REGULATORY COMMISSION

Transcription:

Wattage Wattage HPSEBL Form CS-1 (b) HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A STATE GOVERNMENT UNDERTAKING) Application and Agreement Form for other than Domestic Electricity Connection. Application Connection Date of Receipt Signature of HPSEBL Official (Note:- The applicant should hand over this A&A form to local office of HPSEBL in the area in which the supply is required along-with a non-judicial stamp paper of Rs. 10/- dully crosses with words Agreement for supply of Electricity/Power on stamp paper) The Assistant Engineer/Assistant Executive Engineer/Executive Engineer, Electrical Sub- Division, HPSEBL Limited, Sub:- Application and agreement for new connection/revision of load or CD/change of name for other than domestic electric connection. A) Particulars of Applicant/Consumer & premises i) Name of applicant... iv) S/o, D/o, W/o...age... PAN Adhaar No(optional).. Mobile Tel. No.. v) Email. Number of shifts v The wiring work will be/has been carried out by (Name of licensed contractor/wireman)... Full Address of Premises where connection is required: House /Plot Village /Town/City Floor No District Landmark Pin Code Sector/Colony/Street Whether MC/NP/TCP area (Y/N) Description of premises [ No of rooms, floors, other area where supply of to be given] B) Details of load/class of application etc. i) Schedule of energy consuming apparatus to be connected: Description of apparatus Lamps, Tubes etc. Fans Heaters and Refrigerators etc. Motors h. p. each KW 1-Ø 3-Ø 1-Ø 3-Ø 1 2 3 4 5 6 7 8 9 10 11 12 [In case of Extension in load, the existing & additional Load is to be indicated separately] Connected load() of above installation (4+7+11+12)... kilowatts Existing () Addl./New (). Contract demand(kva) of above installation[ Mandatory for all Single Part Tariff as well as two part Tariff] (kva) Existing Contract Demand.(kVA) + Addl Contract Demand..(kVA) iv) Voltage at which supply would be preferred...kv v) Purpose for which connection is required.. (NDNC/Commercial/SIP/LIPS/MIP/IDWPS/BS/SLS/TMS/RT) Details of other connections existing in the name of the applicant a) Account.b) K. No. c) Category of supply... P.T.O.

[2]-CS-1(b) v PAC details[ applicable only in case the new/additional Contract demand is more than 100 kva] v) Class of Application: Letter No.. dated Load ().. Contract Demand(kVA). (a) A new connection:... (b) An extension to my/our existing installation (connection A/C..) (c) A re-connection (the previous consumers' name is... and his connection A/c is...) (d) A change of name/title from Shri...Connection A/C... (e) Change of Supply voltage for existing connection A/C No. (f) Other(please mention) Approximate date from which connection is required... C) I/We do hereby solemnly affirm /declare and agree as under:- i) That I/We am/are the legal owner(s)/occupier of house/plot/premises mentioned at Sl. A(v above ( hereinafter referred to as ( The Premises ), in support of which the applicant(s) has enclosed proof of occupancy/ownership. That I/We have applied to Himachal Pradesh State Electricity Board Ltd. (HPSEB Ltd.) ( The Licensee ) for electricity connection at the above mentioned premises for the purpose mentioned in the Application and Agreement Form and I /We agree to take supply of electricity for the aforementioned purpose only. I/we hereby agree to take from the Himachal Pradesh State Electricity Board Limited (hereinafter referred to as the supplier) at the premises stated above, a supply of electrical energy not exceeding the connected load & contract demand of my/our installation as noted above and I/we hereby further agree to pay for the said supply in accordance with the relevant tariff and also to pay for all such other charges as may become due by me/us to the supplier from time to time at rates laid down in the Schedule of Tariff and Schedule of General & Service charges notified by the HPERC and I/we further agree that I/we will, if and when required by the supplier to do so, lodge with the local office of the HPSEBL a deposit calculated as per HPERC (Security Deposit) Regulations, 2005 & HPERC(Recovery of Expenditure for Supply of Electricity), Regulations 2012, its amendments from time to time and any other charges which may become due from time to time And I/we hereby declare that the HPERC regulations & supply Code, conditions of supply, tariff order, General & Service charges have been perused by/read to me/us and I/we agree to be bound by them. iv) That I/We undertake to accept and abide by the provisions of Electricity Act,2003, all applicable laws, conditions of supply, General Conditions of Tariff and Schedule of Tariff, Supply Code, rules, regulations including Safety Regulations by CEA, orders, Directives, Notifications issued and enforced under applicable laws by HPERC/CEA/Govt. of India/Govt. of HP and any other instructions/circulars issued by HPSEB Ltd. from time to time, and as amended from time to time, for equitable and efficient distribution of electric energy. These are also available on website of HPSEBL and HPERC i.e. www.hpseb.com & www.hperc.og. v) I/we hereby agree that I/we shall accept any restrictions imposed by the Licensee in order to comply with the regulations made by the Authority under section 53 of the Electricity Act 2003 and any terms restricting the liability of the Licensee for economic loss resulting from negligence of the consumer, as per clause 3.7.1 of the Electricity Supply Code 2009 and its amendments by HPERC from time to time. I/we hereby agree that I/We shall abide by CEA(Measures related to Safety and electrical Supply) Regulations,2010 & its amendments, HPSEBL Electrical Safety Manual and General Safety Instructions, Electricity Rules under Electrical Act & its amendments, CEA( Safety Requirements for Construction, Operation and Maintenance of Electrical Plants and Electrical Lines) Regualtions,2011. v I/We hereby agree that I/We shall abide by the power cut restrictions/peak load hours restrictions. v That monthly average power factor of installation in the above mentioned premises shall not be less that 0.9, failing which we shall be liable for payment of power factor surcharge and other penalty as per Tariff Order/Supply Code. ix) That I/we undertake to build up the load to the extent of load sanctioned/sanctioned Contract demand within period of two months from the date of readiness of HPSEB Ltd. failing which I/We shall pay charges as per Himachal Pradesh Electricity Supply Code,2009 and its amendments issued from time to time. Contd. 3/-

[3]-CS-1(b) x) That I/We undertake to accept and abide Directives, Notifications issued and enforced under applicable laws by HPERC/CEA/Govt. of India/Govt. of HP and any other instructions/circulars issued by HPSEB Ltd. from time to time, and as amended from time to time, for equitable and efficient distribution of electric energy. xi) That I/we undertake HPSEBL to disconnect the supply of electricity without issuing any notice for disconnection, in case some reference or observation of contravention of any of the bye laws of any statutory authority/ Central/ State Government Department is received, by HPSEBL. x That I/we shall be solely held responsible for contravention, if any, of Act/ Law of any statutory authority/ Central/ State Government Department and HPSEBL shall not be made party on any omission/ contravention by me/ us. Any loss on this account shall be my/ our liability. x That I/We undertake to indemnify the licensee against any loss accrued to the Licensee if the declaration/undertaking furnished by me/us prove to be false/incorrect or are unfulfilled. I/We further undertake to indemnify the licensee of any harm/loss to the Licensee s property for any loss/harm to any third party on account of any fault in the electric work at my /our premises. Further, applicant agrees that if there is any harm/loss to the property of the Licensee, due to the fault of the electrical network within the premises of the Applicant, all the liabilities shall have to be borne by the applicant. xiv) That I/We undertake to indemnify the Licensee against all proceedings, claims, demands, costs, damages, and expenses that the Licensee may incur due to providing the electricity connection at my/our premises. xv) That the Licensee shall have the right to supply electricity to other consumers from the service line or apparatus installed on my/our premises as per Supply Code/HPERC Regulations. x That the industry/trade for which electricity connection is being applied has not been declared to be obnoxious, hazardous/pollutant by any Government agency and that no court orders are being infringed by grant of applied electricity connection at the Applicant s premises. In case, at a later date it is found otherwise, then electricity supply would immediately be disconnected by the Licensee without any reference/notice to the Applicant. xv That grant of the applied electricity connection will not confer any legal right for regularization of building/land use in respect to the electricity connection provided at the Applicant s premises. Further, it shall also not confer any right in favour of Applicant to have permanent electricity connection. xv That the applicant would allow clear and unencumbered access to all authorized officials of the Licensee to the premises of the Applicant for the purpose of meter reading, maintenance, inspection, checking, testing etc. xix) That I/We have clearly understood that if the above statements/information prove to be false or incorrect or on receipt of a reference from concerned statutory authority/ law enforcing agency regarding sealing/demolition/vacation of the premises the electricity connection can be disconnected and the meter /service line can be removed by HPSEB Ltd. without any further notice to me. This agreement for the connection shall be effective from the date the connection is released and shall remain effective till such time as it is either replaced by fresh agreement or it is terminated as per provisions of H.P. Electricity Supply Code. Date: - - /- -/- - - -/ Signature of Applicant Signature of Witness Name of witness...a/c... Address of Witness... Signature on behalf of HPSEBL Name & Designation. (To be signed by load sanctioning authority) Note: The consumer who intends to apply for Net Metering, the application shall be made on Form-1 and agreement shall be executed on Form-2 of HPERC(Rooftop Solar PV Grid Interactive Systems based on Net Metering)Regulations,2012. The agreement executed on Form-2 shall be supplementary to the agreement on A& A form. P.T.O

Name of Consumer: [4]-CS-1(b) (FOR OFFICE USE ONLY)- Other than Domestic Connection 1. a) Standard Supply Voltage... Volts b) Availed Supply Voltage.. c) Metering Voltage. 2. Name of Feeding Sub-Station.. 3. Category applicable as per Tariff Order... 4. Details of Amount deposited by the applicant:- a) Security deposit Sr. i) b) Normative IDC Sr. i) Amount Receipt Dated Purpose[New load/addl. CD/Load/revision of security based on average tariff] Amount Receipt Dated Purpose[New load/addl. CD/Load/revision of security based on average tariff] c) Cost of Service line/estimate i) Amount(Rs) Receipt. Dt. Sr. i) Amount Receipt Dated Purpose[New load/addl. CD/Load/revision of security based on average tariff] 5. Accepted/Sanctioned/ Recommended[ Please Tick ] Signatures. Comments/recommendations Designation AAE/AE/AEE Dated:. 6. Sanctioned /Recommended[ Please Tick ] Signatures Comments/recommendations Designation Sr.EE/ASE Dated: 7. Sanctioned/ recommended [ Please Tick ] Signatures. Comments/recommendations Designation SE/Dy.CE Dated:. 8. Sanctioned Signatures Feeding arrangement sanctioned Designation CE Dated:..

Sr. Checklist for Other than Domestic Consumers/Applicants[CS-1(b)] Description Please Tick A) General i) Application and Agreement Form (A&A Form) duly completed and signed by the applicant. Test Report duly filled and signed by licensed Electrical Contractor. Crossed Non-Judicial Stamp paper of Rs.10/- attached with A&A form iv) Valid Power Availability Certificate issued by HPSEBL (in case contract demand for new and additional load of more than 100 kva) v) Brief Project report [In case of industrial connection] Process Flow[In case of industrial connection] v Copy of Certificate of registration in case of Companies/Firms etc. B) Identity/Ownership i) Identity Proof ( any one of the documents given below) PAN Adhaar Card Driving License Passport Voter ID Card Proof of Ownership outside TCP/MC/NP/ other ULB areas ( any one of the documents given below) Revenue Papers for Land/Building/premises Sale Deed Lease Deed Proof of Ownership outside TCP/MC/NP/ other ULB areas NOC from TCP/MC/NP/other ULBs C) Authorized Signatory [In case of Companies only] Resolution of Board of Directors for authorized signatory on behalf of company D) Charges to be deposited [Ref. HPERC Regulations 419/2012, HPERC Security Deposit Regulations, 2005] and their amendments from time to time. i) Initial Security Normative IDC Cost of Service Line or Departmental Charges as the case may be. Cut here.. ACKNOWLEDGEMENT HPSEB Ltd. Date Name of Applicant Tariff Category Application Load() (Signature of Authorized person of HPSEBL)

From To HPSEBL Form CS-10( Page-1) HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A STATE GOVERNMENT UNDERTAKING) WIRING CONTRACTOR'S TEST REPORT AND HPSEBL'S INSTALLATION TEST ORDER Name and Address of Premises where connection is required: Name of Applicant Address Description of Premises.. (Wiring Contractor) Name and Address:... License No... Dated --/--/---- Valid up to --/--/----. The AE/AEE/EE/ ESD, HPSEBL. REPORT We hereby inform that Electrical Installation at the premises belonging to the above consumer, as detailed on page 2(backside) is now ready for your engineer to test and connect up with your mains. The installation was tested by me/us on... (date) and the insulation resistance was as shown at page 2. Dated: / / / Wiring Contractor's signature... HPSEBL S INSTALLATION TEST ORDER (A) The Junior Engineer/ Addl. A.E, Electrical Section, HPSEBL Please test the installation detailed on pages 2, fill in columns 18 to 22 and report as below. It may, however, be ensured that the intimation regarding the date on which you intend to visit the consumer s premises for the above said purpose is given to the consumer or his representative well in advance, so as to enable him to be present at the time of Inspection. Also please ensure that for any subsequent visit for testing of the said installation necessitated by the consumer on the previous visit or due to defective installation, the consumer is asked to pay the requisite charges as per the schedule of general & service charges and receipt /date vide which the charges are paid by him is quoted in the report. Assistant Engineer /Assistant Executive Engineer Dated. (B) REPORT (1) Above installation was tested by me on (date)..in the presence of consumer (or his representative) and the insulation Results were as shown on page 2. The following defects were found in the installation. i) Whether Insulation Resistance Satisfactory Other Defects, if any (a). (b) (c) (2) (a) The above installation was tested by me on my first visit. OR (b) The installation was tested by me on my subsequent visit for which the consumer deposited the amount of Rs.as per the schedule of general & service charges vide Receipt No.Date Signature of Consumer Name( in case of representative): Dated: / / / Signature Junior Engineer/Addl. A.E. Dated: / / / P.T.O.

of Circuits (left to Right) on Distribution Board Size of Conductor connected load of each circuit (in ) After connecting any After connecting any & earth & earth Earth Resistance(in Ohms)]In case of Medium, HT&EHT installations SCHEDULE OF ENERGY CONSUMING APPARATUS TO BE CONNECTED HPSEBL Form CS-10( Page-2) Description Lamps / Tubes Etc. Fans, Heaters, Cookers, Refrigerators etc. Watts each Motors h.p/ each 1-Ø 3-Ø 1-Ø 3-Ø INSULATION RESISTANCE [MEGA-OHMS] Wiring Contractor s Test HPSEBL Test 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 1 2 3 4 5 And so on.. Load verified for..() The Size of connecting wires Meter Board & Dated Signatures of the Dated Signature of Verifying Officer/Official Distribution Boards.Wiring Contractor.. Name & Designation of Verifying Officer/Official..