DEVIATIONS TO IS: (FIRST REVISION) SPECIFICATION FOR RAILWAY CARRIAG E FANS

Similar documents
SCOPE OF ACCREDITATION

ALUMINIUM ROLLERS MADE IN ITALY

Base for Stable Mounting an Eco Pedestal

38 Lucerna - LED 01E LED_AU_Lucerna.indd 38 27/12/16 10:39

SECTION DETENTION DOOR HARDWARE

Formal Interpretations/ Interprétation formelle

D.T.D Ministry of Defence Defence Procurement Agency, ADRP2 Abbey Wood Bristol BS34 8JH OBSOLESCENCE NOTICE

HVL Tests on a 0,6/1 kv LV cable, 4x300 mm 2, Al/XLPE/PVC

Klinger Manometer Serie 200

E Series Back Pull Out End Scution. Centrifugal Pump DIN 24255

RW-175 and RW-175-E SLEEVING

ROUNDO Section Bending Machines Type R-1 through R-21-S

Classification of Parts and Accessories in the Customs Tariff. In Brief

Faymonville Mega- Z- 4H- V- AT- A (2.74) Details. Mega-Z-4H-V-AT-A (2.74)

TECHNOLOGY FOR THE WELDER S WORLD. MIG/MAG CATALOG 4.1. MIG/MAG Welding Technology for all Metalworking Industries.

CITY OF DOUGLAS Contract Documents & Specifications for a New Specified Reel Grinder Douglas Community Club (Golf Course)

ROHACELL WF (dry condition) can be processed up to temperature of 130 C (266 F) and maximum pressure up to 0,7 MPa (100 PSI).

NM, NMS. Close Coupled Centrifugal Pumps with flanged connections. Construction. Applications. Operating conditions. Motor

BID RESPONSE LABEL THIS LABEL FOR USE WITH UNITED STATES POSTAL SERVICE DELIVERY RECONDITION MUFFIN MONSTER ELECTRIC (DATE): DEC.

DEPARTMENT OF CHIEF ELECTRICAL INSPECTOR, HARYANA. Application Forms

TENDER DOCUMENTS FOR

Standard pumps. Dimensions, weights Wilo-CronoLine-IL

Full Automatic Mounting Press

PUMP. Type EVM APPLICATIONS MATERIALS TECHNICAL DATA. Washing system Water treatment plants Reverse Osmosis system Some chemical applications

B-Series Section Overview. Ball Screw Cutaway. UNI-LIFT Ball Screw Actuators provide high. 34

POLISHING MATERIALS. z Introduction 380. z Polishing wheels 380. z Finimaster wheels 384. z Felt discs 385. z Compound sponges 388.

MIG/MAG Welding Torch MB 401 D / MB 501 D. liquid-cooled. ABICOR BINZEL. The right welding torch for every job!

An Urgent Bulletin from CSA Group

FLEXIBLE DUCT. Providing comfort to Australia

Sensyflow P. Thermal air-mass flowmeter for test rigs and quality assurance 10/ EN. Function and System Design

Full Automatic Mounting Press

2. Category : General. 3. Zone : Head Office. 4. Item : Miscellaneous. 5. Tender Date : 20/03/ Last Date of Submission : 10/04/2013

Case studies Vertical bearing GGG40 (GJS )

IWU PHYSICAL PLANT SAFETY PROGRAM

M-Series, Actuator Overview. Machine Screw Cutaway. UNI-LIFT Machine Screw Actuators offer precise. 12

Elevator and escalator electrical equipment CSA B / ASME A

INTUMESCENT PAINT PERFORMANCE TEST MICON INTUSAYF WB

ICC-ES APPLICATION FOR BUILDING PRODUCT LISTING REPORT FORM A

BID DOCUMENT SECTION I

Step drills And, with higher dimensional precision the drills will last considerably longer while maintaining the precise process tolerances.

grinding wheels 322 z Cloth z With centre hole z Combi z Convolute z Unitized z Spindle mounted

Conduit Entry System. At a Glance. FWS Assembly. 1. Fast and Easy Assembly. 2. Easy to Maintain. 3. Flexible

COMPETENCE IN PRECISION AND QUALITY STEP DRILLS

THE BRAITHWAITE BURN & JESSOP CONSTRUCTION COMPANY LIMITED (A Govt. of India Enterprise)

Issuing Authority. The supply of material shall be governed by Form-B of UPPCL alongwith following special conditions:-

Single Pole Cam-Type Connectors

Kit Potentiometer Rotational Analog Displacement Sensor

An Urgent Bulletin from CSA Group

SLANT BED CNC TURNING CENTER

Formal Interpretations/ Interprétation formelle

2015 SOM Ballot Number 1. No/No Vote. Sponsored by Technical Section 3a

MATERIAL AND EQUIPMENT STANDARD FOR HOOKS, SHACKLES, EYE BOLTS AND CHAINS FIRST EDITION FEBRUARY 2005

VELA round suspended T5 direct/indirect

UTS. UTS : Your first choice in waterproof connectors! Description. IP68/IP69K - Plastic connector

DIAPHRAGM VACUUM PUMPS AND COMPRESSORS

Invitation to Bid. Subject: Procurement of Diesel Generators Ref: ITB/KRT/10/038

PPG Series High Precision Gearbox. Datasheet

Other variations which are not mentioned in this document are on demand (if possible).

Fort Collins Amendments to the 2009 International Mechanical Code

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

Ref No: N Date: May 25, 2005

Last Date of submission of Tender: up to A.M.

Fiber Distribution Frame Splice Module Accessory Kit Installation Instructions

NEMA Standards Publication TF (R2000, R2005) Coated Electrical Sleeving

BALMER LAWRIE & CO. LTD., SBU LEATHER CHEMICALS 32, MANALI, CHENNAI 68. (Regd. Office: 21, Netaji Subhas Road, Kolkata )

CD-1 (502) 1304 Hornby Street By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law) Effective April 19, 2011

LEVELTEC ENGINEERING PTY LTD

Efficient-Tec International LLC.

Diamond and CBN tools Overview

PIPING, VALVES AND JOINTS

Novax. Axial flow fans Standard and hot smoke

Novenco Axial Flow Fans. Novax St andard and hot Smoke

Razor Blade 26D-28D Razor Blade 28C

Formal Interpretations/ Interprétation formelle

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FIRE RESISTING (INSULATING) FILING CABINETS ACCORDING TO IS : 2007

BRAZIL EXAMINATION GUIDELINES of Patent Applications Industrial Property Journal No.2241, December 17, 2013

NOTICE TO ALL CONSULTING ENGINEERING FIRMS

444SC Encl 4X4X4 SC N1 Enclosure. Features. Material, Color, and Finish. Dimensions and Weight. Long Description

DÖRRIES SCHARMANN ECOSPEED HSK-A63/80 STARRAG WERKZEUGAUFNAHMEN TOOL HOLDERS HSK A63/80.

Features Material Acrylic Electrocoated Over Wash and Phosphate Undercoat 16 Gauge Steel

SUPREME COURT OF INDIA Admn. Material(P&S) Tilak Marg, New Delhi

A C O R N 4 1 S E R I E S S T A I N L E S S S T E E L R A N G E A mm Straight Lever on concealed bearing rose A4103.

STANDARD PROCEDURE INSTRUCTION

Data sheet: Wilo-CronoNorm-NL 80/200-3/4

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

GOVERNMENT OF TRIPURA EDUCATION DEPATRTMENT TRIPURA INSTITUTE OF TECHNOLOGY, NARSINGARH, TRIPURA (WEST) SHORT NOTICE INVITING TENDER

ORDINANCE NO AN ORDINANCE TO BE KNOWN AS THE HERNANDO COUNTY,MECHANICAL CODE: PROVIDING FOR THE ADOPTION OF THE I-

CHAPTER 16. EXCAVATIONS AND ARTIFICIAL POOLS. 1. Article I. Excavations.

Issuing Authority. The supply of material shall be governed by Form-B of UPPCL alongwith following special conditions:-

Commercial/Industrial. Single Pole Devices. Industrial Grade Connectors for Temporary and Semi-Permanent Power Distribution Applications

STANDARDS ACT CHAPTER 496 SUBSIDIARY LEGISLATION

Downlights. The right solution for a wide variety in applications

NM, NMD: Close Coupled Centrifugal Pumps with threaded ports

GEAR PUMPS. Displacement from 10 to 100 ccm Pressure up to 290 bar Speed from 350 to 3200 RPM

PART C: REQUEST FOR PROPOSAL (RFP)

Aditya Electronics & Electrical

BIDDING DOCUMENTS (PROCUREMENT OF GOODS)


DAS Series Submersible Waste Water and Sewage Pumps

NK End-suction centrifugal pumps

Transcription:

Page 1 of 7 Effective from 20.06.2003 ANNEXURE H WITH AMENDMENT NO.1 OF ANNEXURE H (Revised in December, 2002) with amendment No.1 DEVIATIONS TO IS: 6680-1992 (FIRST REVISION) SPECIFICATION FOR RAILWAY CARRIAGE FANS Details of deviations: 1. Page 2, Clause 8.2 The clause 8.2 shall be read as under Stampings Laminated core shall be used in the construction of fan motors. The stampings used for laminated yoke and armature core shall be made from electrical steel sheets (See IS: 648-1980, IS: 649-1963) and IS: 3024-1965). 2. Page 2, fig.1a, Page No.3, Fig.1B Grease catcher for 400mm, 300mm and 225mm fan. Grease catcher outer dia shall be read as under: In 400mm, 300mm and 225 mm sweep, RC fan grease catcher outer dia shall be 46 mm. 3. Fig.3, Page 4 The following note shall be added as Note 4 after the existing note 3 under figure 3 for fixed type fan. Note 4: The body can be alternatively fabricated from MS sheet as per ICF s Drg. No. ICF/SK-7-6-095 (Alt. D ), against Railway/Production Units specific requirements. 4. Page 5 Heading for fig.4 shall be read as under: Dimensions for fixed type motor of 400 mm, 300 mm and 225 mm sweep bracket type fan. 1. Page 5, Clause 8.6, Bearings Delete words of approved make in the first line of clause 8.6 and add the followings after first sentence. The ball bearings of the following make shall be used for all types of fans. i) SKF

Page 2 of 7 Effective from 20.06.2003 ANNEXURE H WITH AMENDMENT NO.1 OF NBC iii) FAG Any other indigenous make of bearing of good quality proposed to be used for trial by manufacturers can be used with the prior approval of RDSO. 6. Page 8. Fig. 9 Presently, 7 holes are made in the base of swivelling type fan for mounting. Four additional holes drilled so far are not required. Hence, only 3 holes similar to those of fixed type of fans shall be drilled for mounting of the swivelling type of the fans. 7. Page 8, Clause 8.8 Brushes and brush holders Substitute the following for the existing last sentence of clause 8.8: The following grades of carbon brushed as approved by RDSO shall be used for 110 V dc and 24 V dc carriage fans. Grades of the carbon brushed EG3 L16 (I) E55 (I) Firm s name Assam Carbon Electro Carbonium, Bangalore 8. Page 9. Clause 8.10 Connector, Connecting lead and insulating Bushes. Substitute the following in lieu of the existing clause 8.10:1-8.10.1 : A connector of Fibre Glass Reinforced Plastic manufactured from sheet moulding compound (SMC) of 25% Fibre glass content, self extinguishing grade conforming to RDSO s Drawing s No. SKEL-4296 shall be provided. The connector shall be mounted in the ceiling of the coach and shall be supplied separately with the fan for fixed type fans only. However for swiveling type fans, connector will continue to be supplied with the fans. 9. Page 9. Clause 8.11 Field coil Substitute the existing clause by sub-clauses 8.11.1, 8.11.2 & 8.11.3 8.11.1 24V DC Fans shall be supplied with Aluminium field coils and in that case an anodized plate marked Aluminium shall be provided. 8.11.2 : 110V DC fans shall be supplied with copper field coils. 8.11.3 The copper polysterimide enamelled round winding wires. Class 180 used for field and armature coils shall conform to IS specification No.: 13730 (Part 8)-1996. 10. Page 11. Clause 10 The following shall be added after sub clause 10.2: 10.3: Insulating Materials All the insulating materials used for armature and field coils shall be of ISI quality conforming to the relevant specifications and test conditions specified for class 155 insulating materials. 10.4: Insulating varnish:

The fan s motor shall be well treated with the insulating varnish of Class 155 conforming to relevant IS preferably in vacuum impregnation plant to achieve an insulating value of 20 mega-ohm. The baking of varnish shall be done in an air-circulating oven. 11. Page 11. Clause 11 Speed regulators Clause 11.1, 11.2, 11.3, 11.4 and 11.5 shall be substituted as follows: Page 3 of 7 Effective from 20.06.2003 ANNEXURE H WITH AMENDMENT NO.1 OF IS :6680 FOR RAILWA Y CARRIAGE FANS 11.1 All fans shall be supplied without speed regulators 12. Page 11. Clause 9 The following sub-clause as sub-clause 9.2 shall be added after sub-clause 9.1: Sub-clause 9.2 a) Colour scheme: (i) 24V, dc Black fans (ii) 110V, ac/dc fans Smoke-Grey (iii) 140V, ac fans Smoke-Grey b) The fan base, gimble rings, motors, body and regulator box of 110 V ac dc fans shall be finished with Smoke-Grey color to Color Code No. 692 of IS: 5-1978 and enamel paints conforming to IS: 151-1985. c) The other parts of the fan viz. blade, guard and regulator faceplate including handle shall have no change in finish i.e. they shall be finished with oxidized copper conforming to IS: 1378-1987 and a coating of lacquer shall be applied on the oxidized copper surface conforming to IS: 349-1981. 13 Page 12, Fig.14 (225 mm sweep bracket type fan) dimensions shall be read as under : Screw length 28 mm in place of 18 mm 14. Page 14. Fig.16 Brush Holder for Carriage Fan Following note as Note 3 for fig. 16 may be added as under: Note 3-A 15 mm. long PVC sleeve be provided on the brush holder box (part 2) for 110V dc fans. 15. The dimensions mentioned in enclosed drg. No. RDSO/PE/SK/TL/0026-2002 (Rev 0 ) will supersede the respective dimensions mentioned in Page no. 13 figure no. 15 for Bracket for Bracket type fan and page no. 12 figure no 14 for Base for bracket type fan. 16. Page 17, Fig-19- The spring washer outer dia shall be 9.6 mm and inner dia 6.4 m. 17. Page 19. Table 1: Performance Data (Clause 16.1) Replace existing data under Table-I by the followings; S. No. Parameter dc fans ac fans 400mm 300mm 225mm 400mm 300mm 225 mm

1. Minimum air 50 37 20 65 30 14 delivery in cubic meter per minute 2. Maximum electrical 32 25 19 60 40 28 power input in Watts Page 4 of 7 Effective from 20.06.2003 ANNEXURE H WITH AMENDMENT NO.1 OF 3. Maximum Weight in Kg. 15 14.5 13 15 14.5 13 4. Minimum service value 2.0* 1.80* 1.35* 1.1 0.75 0.6 in cubic meter per 1.8** 1.65** 1.20** minute per watt. * for prototype tests ** for acceptance tests. 18. Page 19. Clause 17.2 Clause 17.2 shall be deleted from the specification 19. Page 19, Clause 18.3 Existing clause may be replaced by the followings: Additional information that the manufacturer may be requested to supply in Annexure B for AC and DC fans separately. Page 20. Clause 19.1.2 for Acceptance tests The following acceptance test shall be added: h) Service value test 20. Page 20. Clause 19.1.2 A sub clause 19.1.2.2 shall be added as under after sub clause 19.1.2.1:- However for Air delivery and Service value test, 2 fans for lot size up to 100, 4 fans for lot size above 100 and up to 200 and 6 fans for lot size above 200 will be selected at random from the lot 21. Page 20. clause 19.1.4-limits of error in electrical instruments: Substitute the following for the existing first sentence of the clause: The measuring instruments like ammeter, voltmeter, and wattmeter shall be of accuracy class 0.5 and calibrated upto date for both type and acceptance test. 22. Page 22 -.Add sub-clause 19.2.6 after clause 19.2.5. 19.2.6 Service value test: The service value will be calculated. This value is the ratio of air delivery in cubic meter per minute obtained in air delivery test to power input in watt obtained in electrical input test for fans sampled as per sub-clause 19.1.2.2. 23. Page 23. Clause 19.11.2-Insulation Resistance test (Routine Test) Substitute 20 mega-ohms in place of 2 mega-ohms in the third line. 24. Page 25. Annexure-B i) Existing description against item (g) of sub-clause B-1 to be replaced by the following: Class and details of winding wire and insulating material. ii) The following two sub-clauses as (s) & (t) shall be added after the Sub-clause (r)

(s) Addresses of the suppliers of raw materials used. (t) Details of quality control measures being exercised for purchase of raw materials and fan components including in-house testing arrangement, details of the tests being conducted in any Government recognized labs, test certificates, visual checking and rejection records of the raw materials and fan components. Page 5 of 7 Effective from 20.06.2003 ANNEXURE H WITH AMENDMENT NO.1 OF 25. In Annexure D of Clause 19.1.2.1 criteria for conformity in third line D3 after the word tests following line may be added. except air delivery test and service value test. 26. Type test shall be repeated for all type of sweep ac/dc fans every two years for revalidation of design. In case, failure rate is high of any particular firm, the type test can be repeated earlier. 27. Infrastructure (Essential facilities, required for manufacturing quality Railway Carriage Fans) enclosed at (Appendix-1) 28. The following additional clause will be added after clause 19.11.2 20.0 Optional Clauses The following optional clauses are being added for placement orders for carriage fans with improved design features. 20.1 The Blade shall be made of fire retardant Polypropylene material with injection moulding process. It shall have adequate mechanical strength. The blade material shall have the following properties. Grade : FRPP HOMO Polymer chlorinated Deflection temperature under load at 18.5 kg/sq.cm deg.c 60 Flammability UL 94-V0 Tensile strength ASTM D638 mpa 34 Flexural strength ASTM D790 mpa 44 Elongation at break ASTM D 658 28 20.2 Powder coating shall be done on fan body (outside and inside) guard and Blade. The thickness of coating shall be not less than 60 microns. The powder is not required for fan blades made of fire retardant poly propylene material. 20.3 The deep drawn design for fan body made from M S Sheet as per RDSO Drg. RDSO/PE/SK/TL/0025 2002 (Rev.0), Alt.2 against Railway Production Units/Railways specific requirements.

*********** Page 6 of 7 Effective from 20.06.2003 ANNEXURE H WITH AMENDMENT NO.1 OF Infrastructure (Essential facilities required for manufacturing quality Raillway Carriage Fans.) Machinery and Plants: 1. Capstan / Turret lathe equivalent to HERBERT 4 for accurate machining of i) Motor body and frame ii) Positioning and centering of shaft. 2. Centre Lathe machine 6 ft for machining CI (Cast Iron) yoke 3. Centre Lathe machine 4 ft for skimming and polishiing the commutator in finished Armature. 4. Milling machine 5. Shaping machine Appendix 1 6. Cylindrical grinding machine suitable for grinding the journal of the Shaft and OD of rotor/armature. 7. Surface grinding machine. 8. Tool and cutter centre grinding machine (for sharpening of the milling / grinding cutters etc.) 9. Hydraulic press for pressing of armature and stator. 10. Tapping machine. 11. Drilling machine-1 inch 12. Drilling machne ¾ inch 13. Vacuum Pressure Impregnation plant of adequate capacity with pre-heating arrangement and necessary control panel, vacuum pump and compressor to maintain required pressure and temperature.

Page 7 of 7 Effective from 20.06.2003 ANNEXURE H WITH AMENDMENT NO.1 OF 14. Coil winding machine with counter. 15. Armature winding machine with counter. 16. Drying / braking oven with the arrangement air circulation. 17. Spray painting machine 18. Stand-by power supply : Diesel-generating set Minimum 5 KVA capacity. 19. Stabilizer for conducting air-delivery test at stabilzed power supply. 20. Various sizes of gauges viz. Slip gauges, dial gauges, vernier calipers, micrometer etc. 21. Go/no-go gauges employed in process and stage inspection of each machined components/sub-assemblies, assemblies. 22. Blade angle adjustment gauge 23. Welding machine. Essential List of Test Equipments 1. Tachometer 2. Voltmeter 0.5% accuracy (d.c.) 3. Ammeter 0.5% accuracy (d.c.) 4. High voltage tester 5. Digital micro-ohms meter of 0.5% accuracy 6. Stop watch 7. Vane types anemometers 100-mm dial. 8. 500 Volt dc meggar 9. stroboscope

Page 7 of 7 Effective from 20.06.2003 ANNEXURE H WITH AMENDMENT NO.1 OF 10. Rock well hardness tester. 11. The firm should have up to date calibration certificate for measuring instruments. 12. Noise level measuring meter(db meter) 13. Test panel or conducting power-input test. 14. Wattmeter, multimeter, digital thermometer. 15. Air-delivery test chamber and mounting stand for fixing the fan at required height. 16. Frequency meter 17. Power factor meter.

Page 6 of 9 Effective from 20.06.2003 ANNEXURE H WITH AMENDMENT NO.1 OF 27. Infrastructure (Essential facilities, required for manufacturing quality Railway Carriage Fans) enclosed at (Appendix-1) 28. The following additional clause will be added after clause 19.11.2 20.0 Optional Clauses The following optional clauses are being added for placement orders for carriage fans with improved design features. 20.1 The Blade shall be made of fire retardant Polypropylene material with injection moulding process. It shall have adequate mechanical strength. The blade material shall have the following properties. Grade : FRPP HOMO Polymer chlorinated Deflection temperature under load at 18.5 kg/sq.cm deg.c 60 Flammability UL 94-V0 Tensile strength ASTM D638 mpa 34 Flexural strength ASTM D790 mpa 44 Elongation at break ASTM D 658 28 20.2 Powder coating shall be done on fan body (outside and inside) guard and Blade. The thickness of coating shall be not less than 60 microns. The powder coating is not required for fan blades made of fire retardant poly propylene material. 20.3 The deep drawn design for fan body made from M S Sheet as per RDSO Drg. RDSO/PE/SK/TL/0025 2002 (Rev.0), Alt.2 against Railway Production Units/Railways specific requirements. ***********