MSC Standard Setting Procedure

Similar documents
Fisheries and Aquaculture Standards Revision Process Procedures Contents

The Development and Revision of FSC Normative Documents FSC-PRO V3-1 EN

FSC PROCEDURE. THE DEVELOPMENT AND APPROVAL OF FSC SOCIAL AND ENVIRONMENTAL INTERNATIONAL STANDARDS FSC-PRO (Version 2-0) EN

The Initiative for Responsible Mining Assurance (IRMA)

NATIONAL POLICY GUIDANCE FOR PROXY ADVISORY FIRMS

December IFRS Foundation. Constitution. Effective from 1 December 2016

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL

Rules of Procedure. Effective: May 4, 2016

Japan-EU EPA (SPS) (Non-Paper) Article 1: Objectives

Wageningen, 12 July Subject: Response to your letter dated 5 April 2016

Procurement Oversight and Procurement Review Committees

IASB and IFRS Interpretations Committee Due Process Handbook

PRINCIPLES GOVERNING IPCC WORK

ReliabilityFirst Corporation Reliability Standards Development Procedure Version 4

Introduction. Standard Processes Manual VERSION 3.0: Effective: June 26,

ASEAN Guidelines for Harmonisation of Standards

February IFRS Foundation. IASB and IFRS Interpretations Committee. Due Process Handbook. Approved by the Trustees January 2013

Due Process Handbook. June IFRS Foundation. Approved by the Trustees January 2013

North American Electric Reliability Corporation (NERC) Rules of Procedure Effective in Manitoba April 1, 2012

ANSI Essential Requirements: Due process requirements for American National Standards

CHAPTER 6 SANITARY AND PHYTOSANITARY MEASURES ARTICLE 6.1. Scope

Introduction to this edition

Working Group Charter

BICSI Standards Program Regulations

ANSI Essential Requirements: Due process requirements for American National Standards

Non-broadcast Complaint Handling Procedures

VICTORIA UNIVERSITY ANIMAL ETHICS COMMITTEE. Terms of Reference And Operating Procedures

The APA is mandated to develop the modalities and procedures for the effective operation of the committee, to be adopted by CMA1.

RULES OF PROCEDURE. The Scientific Committees on. Consumer Safety (SCCS) Health and Environmental Risks (SCHER)

CHAPTER 6 TECHNICAL REGULATIONS, STANDARDS AND CONFORMITY ASSESSMENT PROCEDURES. Article 1: Definitions

2. Rules of Procedure (supplementing the Terms of Reference)

AUDIT REPORT. Audit on the Follow-up and Close-out of Non-compliances - Sea-Fisheries Protection Authority

Guidelines on self-regulation measures concluded by industry under the Ecodesign Directive 2009/125/EC

IAF/ILAC Multi-Lateral Mutual Recognition Arrangements (Arrangements): Requirements and Procedures for Evaluation of a Regional Group

TERMS OF REFERENCE REMUNERATION COMMITTEE OF THE BOARD

ASCE Rules for Standards Committees

EU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL. Chapter on Sanitary and Phytosanitary Measures

"Body" means a governmental, international or non-profit organisation. ***

Euroclear Central Securities Depository (CSD) User Committees Terms of Reference (incorporating internal governance practice & procedures)

Operating Procedures B65 Committee

Internal Regulations. Table of Contents

Rules, Procedures and Mechanisms Applicable to Processes under the Cartagena Protocol on Biosafety

Dalrymple Bay Coal Terminal User Group

Key Considerations for Implementing Bodies and Oversight Actors

WTO TRADE FACILITATION NEGOTIATIONS SUPPORT GUIDE

Ericsson Position on Questionnaire on the Future Patent System in Europe

Policies and Procedures for the Development and Maintenance of Climbing Wall Association Standards

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY

FISHERY MANAGEMENT PLANS 5/28/2009

INTERNATIONAL PARTNERSHIP AGAINST CORRUPTION IN SPORT ( IPACS )

Advisory Committee Terms of Reference

ACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016

FISHERY MANAGEMENT PLANS DRAFT REVISION 4/14/2009

EU Mercosur negotiations. Chapter on Sanitary and Phytosanitary Measures. Draft consolidated text ARTICLE 1 OBJECTIVES

1.2 Explanatory notes not forming part of the JAR text appear in an smaller typeface. Subheadings are in italic typeface.

Review of the Operation of the SPS Agreement DRAFT FOR DISCUSSION

TERMS OF REFERENCE. Contracting Authority. 1.0 Beneficiaries. 1.1 Relevant Background SADC EPA

Midwest Reliability Organization

UNICE COMMENTS ON NON-TARIFF BARRIERS TO TRADE: TECHNICAL BARRIERS TO TRADE

Policies and Procedures for Standards Development for the IEEE Cloud Computing Standards Committee. Date of Submittal: 08 July 2016

Checklist for a Consortium Agreement for ICT PSP projects

Conditions of Offer For the Provision of an Offer to Supply Goods

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL. FRCC-RE-STD-001 Effective Date: Month Day, Year Version: 1

IMCA HOLDINGS LIMITED

TekSavvy Solutions Inc.

INTERNATIONAL CO-ORDINATING COMMITTEE OF NATIONAL INSTITUTIONS FOR THE PROMOTION AND PROTECTION OF HUMAN RIGHTS (ICC)

Policies and Procedures for Standards Development for the Industrial Electronics Society (IES) Standards Committee. Date of Submittal: August

AUDIT, RISK AND COMPLIANCE COMMITTEE CHARTER

REGULAR PROCESS FOR THE GLOBAL REPORTING AND ASSESSMENT OF THE STATE OF THE MARINE ENVIRONMENT, INCLUDING SOCIO-ECONOMIC ISSUES

Chapter 2. Mandate, Information Sources and Method of Work

SCHOTT Purchasing Terms and Conditions

CONSULTATIVE COUNCIL OF EUROPEAN PROSECUTORS (CCPE)

CHAPTER 5 SANITARY AND PHYTOSANITARY MEASURES. Article 1: Definitions

Guideline on Applying for Exemption or Filing of a Notice of Exemption. December 14, 2011

Seeking an Amendment to an Environmental Assessment Certificate. Guidance for Certificate Holders

Rules of procedure for the expert group on health systems performance assessment. Amended, February 2017

GOVERNANCE MANUAL FOR COUNTRY COORDINATING MECHANISM (CCM), BHUTAN THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA

1. Introduction. 2. Updates since July Update SBP Governance Transition Process November 2017

Draft IPSASB Due Process and Working Procedures. 1. To discuss and agree the draft IPSASB Due Process and Working Procedures.

PDA STANDARDS DEVELOPMENT PROGRAM Policies and Procedures

VIRK - Västsvenska Immaterialrättsklubben

Bank of Ireland Group plc. Group Remuneration Committee. Terms of Reference

Sample DRT Procedures and Guidelines

October Food and. Agricultura. Organization of the United Nations COUNCIL. Hundred and Forty-eighth Session. Rome, 2-6 December 2013

SOP TITLE: Procedures Governing Standards Development SOP NO.: 2-100

Standards Manual. Issue Three

SERC Regional Standards Development Procedure Exhibit C to the Amended and Restated Regional Entity Delegation Agreement between

SECRETARIAL STANDARD ON MINUTES (SS-5)

DEPARTMENT OF HOMELAND SECURITY. 8 CFR Parts 204 and 216. CIS No ; DHS Docket No. USCIS RIN 1615-AC11

EFFECTIVENESS REVIEW OF COUNCIL REPORT ON INTERVIEWS WITH COUNCIL MEMBERS AND ATTENDANCE AT CHAIR S ADVISORY GROUP AND COUNCIL MEETINGS

THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA

CHAPTER FIVE SANITARY AND PHYTOSANITARY MEASURES

MULTILATERAL TRADE NEGOTIATIONS THE URUGUAY ROUND

ASSESSMENT AND REVIEW OF THE EFFECTIVENESS OF THE PROTOCOL (ARTICLE

Bipartisan Congressional Trade Priorities and Accountability Act of 2015: Section-by-Section Summary

Consultation Paper. Draft Regulatory Technical Standards on Resolution Colleges under Article 88(7) of Directive 2014/59/EU EBA/CP/2014/46

Introduction to WTO and the SPS Agreement. Anneke Hamilton Agriculture and Commodities Division 12 September 2013 SADC Workshop, South Africa

Policies and Procedures for Standards Development for the IEEE Communication Society/Green ICT Standards Committee (COM/GreenICT-SC)

TRADE AND SUSTAINABLE DEVELOPMENT

AMERICAN IRON AND STEEL INSTITUTE PROCEDURES FOR ANSI-APPROVED STANDARDS FOR COLD-FORMED STEEL DESIGN AND CONSTRUCTION

Transcription:

MSC Standard Setting Procedure Review and revision of existing MSC international Standards and the development of any new MSC international Standards Version 5.0, 5 July 2018

Document history Version Effective date Description of amendment Affected section/page 1.0 25 May 2007 New document N/A 2.0 1 March 2011 Revision to comply with latest ISEAL requirements Significant revision, please request Version 1 for full details of revision 3.0 22 January 2013 Minor changes and copyedits Various 4.0 8 July 2016 Revision to comply with the latest ISEAL requirements Significant revision, please request Version 3 for full details of revision 4.1 29 November 2016 Minor copy edits Various 5.0 5 July 2018 Clarification of review frequency, and incorporation of Board policy on making changes to standards Various Copyright notice The Marine Stewardship Council MSC Standard Setting Procedure and its content is the copyright of Marine Stewardship Council - Marine Stewardship Council 2018. All rights reserved. The official language of this procedure is English. The definitive version is maintained on the MSC website (www.msc.org). Any discrepancy between copies, versions or translations shall be resolved by reference to the definitive English version. The MSC prohibits any modification of part or all of the contents in any form. Marine Stewardship Council Marine House 1 Snow Hill London EC1A 2DH United Kingdom Phone: + 44 (0) 20 7246 8900 Fax: + 44 (0) 20 7246 8901 Email: standards@msc.org Page 2 of 11

Table of Contents 1 Purpose and scope... 4 2 Definitions... 4 3 References... 4 4 Internal governance and roles... 4 5 Proposals to develop new or review and revise existing MSC Standards... 5 6 Preparation... 6 7 Drafting the new or revised Standard... 7 8 Feasibility testing... 7 9 Public consultation... 7 10 Decision-making... 8 11 Standard availability and content... 9 12 Implementation timeframes... 10 13 Publication and record keeping... 10 14 Making non-substantive changes... 10 15 Review of the Standard Setting Procedure... 11 Page 3 of 11

1 Purpose and scope 1.1 This document specifies the procedure to be followed by the MSC for the review and revision of existing MSC Standards and the development of any new MSC Standards. 1.2 The purpose of this procedure is to ensure the credibility of all MSC Standards, by incorporating the values of transparency, participation and fairness into the processes for their development, and through compliance with international best practice for standards development. 2 Definitions 2.1 Consensus: General agreement, characterised by the absence of sustained opposition to substantial issues by an important part of the concerned interests and by a process seeking to take into account the views of interested parties, particularly those directly affected, and to reconcile any conflicting arguments. Please note, consensus need not imply unanimity. 2.2 Stakeholder: Any person or group concerned with or directly affected by a Standard. 2.3 Standard: Document that provides, for common and repeated use, rules, guidelines and/or defines the specifications of a set of products, related processes and/or production methods, with which compliance is not mandatory. For the purpose of this Standard Setting Procedure, this document shall be followed when reviewing and revising the MSC Fisheries and Chain of Custody Standards and developing new MSC international Standards. 3 References 3.1 Standards and Guidelines ISEAL Standard Setting Code v6.0 FAO Guidelines for Ecolabelling of Fish and Fishery Products from Marine Capture Fisheries GSSI Benchmarking Tool v1.0 3.2 MSC procedures *Available upon request MSC Complaints Procedure MSC Policy Development Procedure* MSC Consultation Procedure* MSC Translation Procedure* MSC TAB Terms of Reference* MSC STAC Terms of Reference* MSC Board of Trustees Articles of Association* 4 Internal governance and roles 4.1 The following groups are involved in the standard setting process and fulfil the roles described: a. The MSC Board of Trustees (Board) take the decision to develop new Standards, review existing ones and take the final decision on whether to adopt new or revised Standards. Page 4 of 11

b. The Technical Advisory Board (TAB) develop, review and approve the technical content of a Standard, approving drafts for consultation and testing plans, and may set up Working Groups to provide technical input on specific components of a Standard. c. The Stakeholder Advisory Council (STAC) advise the TAB and the Board on the views of stakeholders and the impact of new and proposed revisions to Standards on different interest sectors, and may set up Working Groups to provide guidance on specific components of a Standard. d. The MSC Executive (MSC) conducts ongoing review of the Science and Standards Issue Log and acts on the direction of the Board to lead the development, review and revision of Standards including coordination of the process and content development. 5 Proposals to develop new or review and revise existing MSC Standards 5.1 Proposals to develop a new Standard or comments relating to the need for revision of an existing one may be submitted by any interested party at any time. 5.1.1 All proposals and comments received shall be recorded centrally in the Science and Standards Issue Log and considered per 5.5 and 5.6. 5.2 A review shall commence not later than five years (Fisheries Standards) or three years (Chain of Custody Standards) following the release of the current version. 5.2.1 Where a review earlier than three years following the release of the current version is proposed, which may result in revision before the next scheduled release, the Board shall use the Early Review Methodology contained in the MSC Policy Development Procedure to determine whether to proceed with early review. a. Revision resulting from the early review shall not affect the schedule for the formal scheduled review. 5.3 Proposals to develop a new Standard or review and revise an existing one shall follow this procedure. 5.4 The decision to revise an existing Standard or develop a new Standard rests with the Board of Trustees, and the decision shall be informed by a review of the need for such revision or development. 5.4.1 The Board should consult the TAB and the STAC in arriving at this decision. 5.4.2 The Board shall define the scope of any new or revised Standard. 5.5 In reviewing whether a Standard needs to be revised or not, the Board shall consider the Standard s continued relevance and effectiveness in meeting the scope defined by the Board. The Board will ultimately make the decision on whether there is sufficient evidence to make changes to requirements and will typically require that both 5.6.a.i and 5.6.a.ii below are satisfied. 5.6 A decision to revise an existing Standard or develop a new Standard should consider, inter alia: a. For Fisheries Standards, whether new scientific knowledge and management best practice changes as stipulated below have occurred: i. There is improved scientific understanding, with widespread scientific support, to demonstrate that a change in the performance requirement is necessary to Page 5 of 11

ii. achieve the intentions of our Principles, and more broadly the FAO Code of Conduct upon which our Principles are based. There is improved fishery management best practice, with growing support in fishery management and policy circles, that is accepted as being required and appropriate to achieve the FAO Code of Conduct, and by implication our Principles. b. For all Standards: i. Stakeholder and/or internal MSC feedback requesting a revision. ii. Whether legislation that might affect the Standard has changed. iii. Whether monitoring and evaluation data on Standard performance indicates changes in effectiveness or relevance of a Standard. iv. Any other significant change in the fishery and seafood supply chain industries which indicate that the effectiveness of a Standard has changed. 5.7 The decision to revise an existing Standard or develop a new Standard and a summary of discussions leading to the decision shall be made publicly available. 6 Preparation 6.1 Terms of Reference (ToR) for the Standard development shall be drafted or updated including: a. Objectives of the new Standard or revisions to existing Standards. b. How the objectives contribute to the MSC mission. c. An up-to-date list of key stakeholders based on the scope of the Standard and its intended outcomes. d. Work plan, including timelines. e. Decision-making process. f. Proposed scope, including intended geographical scope of the Standard. g. Justification of the need for the new Standard or revision to the existing Standard, considering other relevant standards in the sector. h. Clear social and environmental outcomes that the Standard seeks to achieve. i. An assessment of risks associated with implementing the Standard, and how to mitigate these. j. MSC contact points. k. Opportunities for input. 6.2 Information on the MSC s intention to develop a new Standard or revise an existing Standard, including the draft ToR and an invitation to participate, shall be circulated to ISEAL and other known standard setters in the relevant sector for comments. 6.3 The ToR shall then be presented to the TAB and STAC for review and comment, prior to the decision by the Board to develop or revise the Standard. 6.4 The decision to develop an MSC international Standard along with the approved ToR shall be officially announced and made publicly available on the MSC website and Program Improvements website. Page 6 of 11

6.5 The MSC website and Program Improvements website shall be updated at least every six months regarding the status of the outputs outlined under 6.1. 6.6 The MSC Complaints Procedure shall be followed when complaints relating to procedural matters are received by the MSC. 6.7 Complaints about the content of the Standard shall be treated as feedback on the standard, and recorded in the Science and Standards Issue Log and reviewed in accordance with this procedure. 6.8 The MSC Translation Procedure shall be referred to when translating documents for consultations, and for all draft and final Standards, if applicable. 7 Drafting the new or revised Standard 7.1 Drafts shall be produced of the Standard both prior to and following stakeholder feedback, including justification of the proposed changes, and an assessment of risks and impact of each change. 7.1.1 Where applicable, the draft Standard should be validated with respect to the FAO s minimum requirements for sustainable fisheries to ensure that the Standard: a. Does not contain criteria of no relevance to sustainable fisheries. b. Would not cause unnecessary barriers to trade. c. Would not mislead the consumer. 7.2 All proposed draft or revised Standards shall be presented to the TAB or a TAB Working Group (TABWG) as delegated by the TAB prior to public consultation. 7.3 Once endorsed by the TAB, proposed draft Standards shall be put to public consultation following the MSC Consultation Procedure. 8 Feasibility testing 8.1 The MSC shall develop a plan to test the impact and applicability of a new Standard or revision to an existing Standard. 8.1.1 The MSC should seek advice from the STAC and the TAB prior to finalising its plans for testing. 8.2 The plan should be developed with the following objectives: a. Validating if the presumed outcomes of the Standard can be achieved. b. Testing the Standard s feasibility, applicability, and auditability. 8.3 A report summarising the results from testing shall be made publicly available on the MSC website as part of subsequent consultation materials. 8.4 Testing should be conducted prior to the final consultation opportunity. 9 Public consultation 9.1 The MSC Consultation Procedure shall be followed when carrying out a consultation. 9.2 Consultations shall be open to all stakeholders. Page 7 of 11

9.3 Key stakeholders shall be proactively contacted to contribute to the consultation, in particular those who are typically under-represented such as small producers and developing country stakeholders, and those who will be directly affected or disadvantaged by any change. 9.4 Organisations that have developed related standards shall be encouraged to participate, and this engagement shall be documented. 9.5 There shall be two rounds of public consultation for developing new Standards. 9.5.1 The first round of consultation shall seek input from stakeholders on the draft Standard. 9.5.2 The first consultation period shall last at least 60 days. 9.5.3 The second consultation period shall last at least 30 days. 9.5.4 The second round of public consultation shall give stakeholders the opportunity to provide feedback on how their comments were taken into account and to gather further input on substantive unresolved issues. 9.6 There shall be at least one round of public consultation for revising existing Standards, with a second round required if: a. Substantive changes have been made since the first draft, or b. There are substantive unresolved issues, or c. Feedback from the first round was insufficient. 9.6.1 The duration of first and second consultations on a revision of an existing Standard shall be 60 days and, if required, at least 30 days, respectively. 9.6.2 Proposals shall be presented to the TAB for decision, and any decision to reduce or remove the second round of consultation shall be justified in writing. 9.7 Where substantive, unresolved issues persist after two consultation rounds, or where insufficient feedback was received, the MSC shall carry out additional rounds of consultation as necessary. 9.8 After each consultation, a synopsis should be prepared including a summary of the comments received and details of how these have been taken into account. 9.8.1 Original unattributed comments shall be appended to the synopsis. 9.8.2 Comments may be grouped by interest sector of the contributor, but individual or group names shall never be included. 9.8.3 Commercially sensitive and defamatory comments shall be removed. 9.8.4 The synopsis shall be made publicly available, and sent to all stakeholders who submitted comments. 10 Decision-making 10.1 On completion of the preceding steps, a final draft of the Standard shall be prepared by the MSC and circulated to the STAC and the TAB. 10.2 The STAC shall provide advice on the general suitability of the proposed Standard to satisfy the Board s agreed scope of the Standard. This advice shall reflect the views of the group of stakeholders. Consensus, while desirable, is not required. Page 8 of 11

10.3 The TAB shall approve the final version of the Standard and refer it to the Board for decision. 10.3.1 The TAB shall provide a technical recommendation to the Board that the Standard or revisions to the Standard meet the Board s agreed scope of the Standard and comply with the criteria in 5.6. Consensus is expected. 10.4 Where consensus has not been reached within the STAC or the TAB, the Board shall review the advice from the STAC, recommendations from the TAB and the stated objectives of the Standard or revisions to the Standard, and agree any additional action to be taken by the MSC Executive prior to approving the Standard. 10.4.1 Information relating to any additional actions shall be made publicly available. 10.5 Formal adoption of a draft Standard shall rest with the Board following recommendation from the TAB. Consensus within the Board is desired. However, in cases where consensus cannot be reached, the Board should follow a voting mechanism for making decisions. 10.5.1 The Board shall follow the rules set out in the Articles of Association under Proceedings at General Meetings and Votes of Members when formally adopting a draft Standard. 10.6 A summary of the discussions by the Board to arrive at the decision to endorse a draft Standard shall be made publicly available. 11 Standard availability and content 11.1 Once the final draft Standard receives the approval of the Board, the MSC shall promptly: a. Inform stakeholders of the new or revised Standard and implementation timeframe, in particular certification bodies and, where feasible, other stakeholders. b. Publish the approved Standard on the MSC website. 11.2 The MSC shall endeavour to provide hard copies of Standards and other related materials upon request at as low a cost as possible. 11.3 All approved MSC Standards shall include: a. A definition of the scope to which the Standard applies. b. Clear and explicit objectives of the Standard. c. The language of publication and a note that in case of inconsistency between versions, reference shall default to the official language version, which is English. d. The formal status of the Standard, including its stage of development (draft, final, etc.), its version number, who approved it, and the date of publication. e. The effective date of the Standard. f. MSC contact information where requests for clarification and general feedback can be sent. g. Indicative date that the need for a revision to the Standard will be reviewed. 11.4 In defining the content of the Standard, consideration shall be given to regulatory requirements and market needs as well as scientific and technological developments. Page 9 of 11

11.5 The Standard should avoid language and structure that may create ambiguities in interpretation. Consistent interpretation will be sought by setting criteria that are clear, objective, and verifiable. 11.6 The Standard shall be expressed in terms of a combination of process, management, and performance criteria, rather than design or descriptive characteristics. To this end, the Standard shall only include criteria that contribute to the achievement of the stated objectives. 11.7 The Standard shall not favour a particular technology or patented item. 11.8 Requirements that may facilitate assessment of conformity with a Standard shall be presented separately from technical, process, or management requirements. 11.9 The Standard shall attribute or cite all original intellectual sources of content. 11.10 Guidance to the Standard sufficient to ensure consistent application shall be produced either as part of the Standard document or in a separate document. 12 Implementation timeframes 12.1 Fisheries certificate holders shall be given a period of at least three years to come into compliance with any revised Standards. 12.2 Fisheries that have announced their initial assessment shall be assessed against the most recent Standard in effect at the time of announcement. 12.3 Chain of Custody certificate holders shall be given a period of at least six months to come into compliance with any revised Standards. 13 Publication and record keeping 13.1 All records related to standard development activities shall be kept for at least five years and be made available on request, including: a. Policies and procedures guiding the standard setting activity. b. Lists of stakeholders contacted. c. Stakeholders involved at each stage of the process. d. Comments received and a synopsis of how those comments were taken into account. e. All draft and final versions of the Standard. 14 Making non-substantive changes 14.1 Non-substantive changes such as typographical errors, formatting, or organisation of the document and minor inconsistencies within the Standard may be corrected with the approval of the Science and Standards Director. 14.2 Non-substantive changes involving clarification of language should be submitted to the TAB for consideration and decision. 14.3 The updated Standard shall be finalised, clearly identifying the changes made, version number and date, and shall be posted on the MSC website. Page 10 of 11

14.4 The release of the revised Standard shall be communicated to users, specifically conformity assessment bodies, certificate holders, and other known stakeholders. 15 Review of the Standard Setting Procedure 15.1 The MSC shall conduct a review of this procedure at least every three years, or before the next review of an MSC Standard, whichever is sooner. 15.2 The review should be based on best practices and in consultation with the MSC governance bodies. 15.3 Once reviewed, the MSC Standard Setting Procedure shall be made available on the MSC website. 15.4 Comments on this procedure are welcome and should be sent to standards@msc.org. Comments received will be taken into consideration during the next review of this procedure. End of Procedure Page 11 of 11