National Electric Power Regulatory Authority (Registrar Office)

Similar documents
National Electric Power Regulatory Authority (Wheeling of Electric Power) Regulations, 2015

ENERGY WHEELING AGREEMENT., 2014 (this "Agreement").

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY. Licensing (Generation) Rules

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY. Distribution Licensing Rules

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC)

PARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

MODEL POWER PURCHASE AGREEMENT BETWEEN JAMMU AND KASHMIR POWER DEVELOPMENT DEPARTMENT AND. M/s (IPP)

THE ELECTRICITY (AMENDMENT) BILL, 2014

EXTRAORDINARY PUBLISHED BY AUTHORITY ISLAMABAD, TUESDAY, JULY 29, PART II Statutory Notification (S.R.O) GOVERNMENT OF PAKISTAN

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX

RENEWABLE ENERGY INTERCONNECTION AGREEMENT

27. Ins. by Act 27 of Ins. by Act 27 0f Ins. by Act 41 of 1986 (w.e.f ) 30. Subs. by Act 27 of 1973.

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION

LICENSE AGREEMENT WITNESSETH

APPRENTICES ACT, 1961

An Act to provide for the development under the control of the Union of the rubber industry

TAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)

National Electric Power Regulatory Authority Licensing (Application and Modification Procedure) Regulations, 1999

NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014

The Central Excise Act, 1944

BELIZE ELECTRICITY ACT CHAPTER 221 REVISED EDITION 2000 SHOWING THE LAW AS AT 31ST DECEMBER, 2000

POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only)

Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016

(As approved by the General Body on January 27, 2016) R U L E S A N D R E G U L A T I O N S. c) Individual Members :

Queensland Competition Authority Annexure 1

CHAPTER 370 INVESTMENT SERVICES ACT

CENTRAL HUDSON GAS & ELECTRIC CORP. CONSOLIDATED BILL BILLING SERVICES AGREEMENT

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX

LAWS OF MALAYSIA RENEWABLE ENERGY ACT Act 725 ONLINE VERSION OF UPDATED TEXT OF REPRINT

DISTRIBUTION AND SUPPLY LICENCE

National Electric Power Regulatory Authority (NEPRA)

Oman Electricity Transmission Company S.A.O.C

ISLAMABAD, THURSDAY, DECEMBER 23, 2010

SUPPLEMENTAL AGREEMENT TO PROVIDE CONSOLIDATED BILLING SERVICE FOR COMPETITIVE ENERGY SUPPLIER

BELIZE TELECOMMUNICATIONS ACT CHAPTER 229 REVISED EDITION 2000 SHOWING THE LAW AS AT 31ST DECEMBER, 2000

Draft JSERC (Procedure, Terms & conditions for the Grant of Transmission licensee and other related matters) Regulations, 2018

Government Gazette Staatskoerant

SULTANATE OF OMAN POWER AND WATER PROCUREMENT LICENCE GRANTED TO

RADIATION PROTECTION ACT

THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7,

NIQ No.EL/PR/133A/NIQ-4/2014/2943 Andaman & Nicobar Administration Office of the Superintending Engineer Electricity Department, Port Blair

INTERNATIONAL CONVENTION ON MUTUAL ADMINISTRATIVE ASSISTANCE IN CUSTOMS MATTERS. Brussels 27 June, 2003

CONVENTION ESTABLISHING THE EUROPEAN TELECOMMUNICATIONS SATELLITE ORGANIZATION EUTELSAT

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004

SECTION #6 - REFERENCE #2. Standard Toronto Hydro Connection Agreements Terms of Conditions

THE UNITED REPUBLIC OF TANZANIA ACT SUPPLEMENT. to the Gazette of the United Republic of Tanzania No. 27 Vol 94 dated 5 th July, 2013

CHAPTER XIV CONVENTION ON THE INTERNATIONAL RECOGNITION OF RIGHTS IN AIRCRAFT SIGNED AT GENEVA ON 19TH JUNE, 1948 (THE GENEVA CONVENTION, 1948)

BERMUDA ELECTRICITY ACT : 2

CHAPTER I: PRELIMINARY

CONSERVATION AREA SEASONAL CAMPING LICENCE APPLICATION

ASSAM ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018 NOTIFICATION

FEDERAL INVESTIGATION AGENCY

THE ENVIRONMENT (PROTECTION) ACT, 1986

CONVENTION ON DIPLOMATIC ASYLUM (CARACAS, 1954)

THE AIR (PREVENTION & CONTROL OF POLUTION) ACT, 1981 RELEVANT PROVISIONS AIR (PREVENTION & CONTROL OF POLLUTION) ACT, 1981

THE RUBBER ACT, 1947 ARRANGEMENT OF SECTIONS

CONTRACT FOR PROFESSIONAL SERVICES By and between TOWN OF JONESBORO And CHIEF FINANCIAL OFFICER And LOUISIANA LEGISLATIVE AUDITOR STATE OF LOUISIANA

Bhopal, Dated: 23rd July, 2004

Suo-Motu Petition No. 2/2018

PART I PRELIMINARY MATTERS

AGREEMENT FOR SUPPLY OF LT ENERGY

TELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE. [Company Name]... [Address]

Engineering Council of Namibia

North.West Frontier Province

FEDERAL INVESTIGATION AGENCY ACT, (Act No. VIII OF 1975) An Act to provide for the constitution of a Federal Investigation Agency

THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, (Made under section 45) ARRANGEMENT OF RULES

Act no. 50 of 29 June 1990: Act relating to the generation, conversion, transmission, trading, distribution and use of energy etc.

The Gazette of Pakistan

PERSONAL TRAINER LICENCE AGREEMENT

VIENNA CONVENTION ON CIVIL LIABILITY FOR NUCLEAR DAMAGE

LESOTHO ELECTRICITY AND WATER AUTHORITY

CHAPTER 73:01 ELECTRICITY ARRANGEMENT OF SECTIONS SECTION. PART I PRELIMINARY 1. Short title 2. Interpretation

(A Govt. of Maharashtra Undertaking) - CIN: U40109MH2005SGC153645

(1 May 2008 to date) ELECTRICITY REGULATION ACT 4 OF 2006

THE BURMA CODE. Published under the Authority of the Government of the Union of Burma

Bhopal dated 6th August, 2004

Article 11 of the Convention shall be deleted and replaced by the following:-

Index. 1. Introduction: Scope of the Guidelines Preparation for inviting bids Tariff Structure 6. 5.

ELECTRICITY GENERATION LICENCE GRANTED TO INSERT NAME HERE INSERT GEN REF NUMBER HERE

THIRD AMENDED AND RESTATED AGREEMENT FOR INDIGENT CARE SERVICES BETWEEN INDIAN RIVER COUNTY HOSPITAL DISTRICT AND INDIAN RIVER MEMORIAL HOSPITAL, INC.

THE ENERGY REGULATION ACT CHAPTER 436 OF THE LAWS OF ZAMBIA

THE BIHAR GOSHALA ACT,

BOARD OF GOVERNORS GENERAL CONFERENCE

The sugarcane Act, 1934

GOVERNMENT OF RAJASTHAN MINISTRY OF HEALTH & FAMILY WELFARE THE CLINICAL ESTABLISHMENTS REGISTRATION & REGISTRATION BILLL OF 2006.

THE APPRENTICES ACT, 1961

Mutual Aid and Assistance Agreement for Washington State for Intrastate Water/Wastewater Agency Response Network (WARN) As of: 04/13/09

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

Kerala Chit Funds Rules, 2012.

THE DANGEROUS MACHINES (REGULATION) ACT, 1983 ARRANGEMENT OF SECTIONS

THE GAZETTE OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

GUJARAT FISHERIES ACT, 2003

THE DISASTER MANAGEMENT BILL, 2005

The Electricity (Supply Services) Rules THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, (Made under section 45)

Bare Acts & Rules. Hello Good People! Free Downloadable Formats. LaLas

BOMBAY CITY (Inami and Special Tenures) ABOLITION AND MAHARASHTRA LAND REVENUE CODE (Amendment) ACT, 1969

The Orissa Electricity (Duty) Act, 1961.

GENERATOR INTERCONNECTION & OPERATING AGREEMENT FOR CATEGORY 3-5 PROJECTS WITH AGGREGATE GENERATOR OUTPUT. OF GREATER THAN 150 kw

Transcription:

National Electric Power Regulatory Authority (Registrar Office) No. NEPRA/TRF-WEPR-2016/ June 13, 2016 Subject: NOTIFICATION (SRO 549(1)12016 DATED 13-06-2016) REGARDING NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (WHEELING OF ELECTRIC POWER)REGULATIONS, 2016 Enclosed please find herewith a copy of Notification (SRO. 549(1)/2016 dated 13-06-2016) regarding "NEPRA (Wheeling of Electric Power) Regulations, 2016" 2. This is for information and record please End: As Above (Iftakhar Ah Khan) Deputy Registrar 1. SA(Tech.). 2. SA(Tariff- I ) 3. SA(CAD) 4. DG(M&E) 5. Consultant (Hydropower) 6. DG(C&I). 7. Director (Licensing) 8. Director (CAD) 9. J.A(LLP) 10. LAIKIE1 11. LA(Legislation) 12. LA(Licensing) 13. DD(IT) [Please post the above SRO at NEPRA's website for licensees, stakeholders and the interested parties.] 14. Mr. Khalid Rashid. AR 15. MLKizytanA1LEarsulia [To scan and send the subject SRO uploading on NEPRA's website.] information of the to IT Section for CC 1. Chairman 2. Vice Chairman/Member (Tariff) 3. Member (Licensing)/ (M&E) 4. Member (CA)

TO BE PUBLISHED IN THE GAZETTE OF PAKISTAN EXTRA ORDINARY, PART-II National Electric Power Regulatory Authority (NEPRA) s- tf.1)/1_0 6 NOTIFICATION S.R.O.. In exercise of the powers conferred by Section 47 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997, the National Electric Power Regulatory Authority, in order to facilitate wheeling of power is pleased to make the following regulations, namely:- 1. Title and Commencement.- (1) These regulations may be called the National Electric Power Regulatory Authority (Wheeling of Electric Power) Regulations, 2016. (2) They shall come into force at once. e NI' Islamabad, the day of, 2016 (3) These regulations shall be applicable in respect of wheeling services bytransmission Licensees/DISCOs. 2. Definitions.-(1) In these regulations, unless there is anything repugnant in the subject or context: (i) (ii) (iii) (iv) (v) "Act" means Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997; "Applicable Documents" means the rules and regulation issued in pursuance of the Act by the Authority, from time to time, the generation, transmission and distribution licenses, the Grid and Distribution Codes and any documents, instruments, approvals, directions or authorizations issued or granted by the Authority in exercise of its powers under the Act and any document in each case of a binding nature applicable to the licensee; "Applicant" means a generation company desirous of obtaining wheeling services from Transmission Licensees/DISCOs; "Authority" means the National Electric Power Regulatory Authority constituted under Section 3 of the Act; "Bulk Power Consumer" means a consumer who purchases or receives electric power, at one premises, in an amount of one megawatt or more or in such other amount and voltage level and with such other characteristics as the Authority may determine and the Authority may determine different amounts and voltage levels and with such other characteristics for different areas. Page 1 of 10

(vi) "Committed Capacity" means electrical power, expressed in MW that the Wheeler of Power is authorized by Authority to disperse to Transmission Licensee/DISCO as part of the Wheeler of Power's Second-tier Supply Business; (vii) "Connection Agreement" means an agreement between a generator and a DISCO/Transmission licensee to connect to DISCO and/or transmission licensee'snetworkas the case may be, in terms of Connection Agreement as specified in Schedule-II as set out in Annexure; (viii) "DISCO" means a person engaged in the distribution of electric power and licensed by the Authority to this effect; (ix) "Distribution Code" means the Distribution Code prepared by the DISCOs with the approval of the Authority; (x) (xi) "Distribution System" means the distribution facilities situated within the Service Territory owned or operated by the DISCO for distribution of electric power including, without limitation, electric lines or circuits, electric plant, meters, interconnection facilities or other facilities operating at the distribution voltage, and shall also include any other electric lines, circuits, transformers, sub-stations, electric plant, interconnection facilities or other facilities determined by the Authority as forming part of the distribution system, whether or not operating at the distribution voltage. "Entry Point(s)"means the physical point(s) where Input Energy from the facility is delivered by the supplierto as agreed by the parties. (xii) "Exit Point(s)" means the physical point or points where the actual Output Energy exits the Transmission or Distribution system, as agreed by the parties and the relevant BPC. (xiii) "Force Majeure Event" shall mean any event or circumstance or a combination of events or circumstances (including the effects thereof) that is beyond the reasonable control of a person and materially and adversely affects the performance by such affected person of its obligations provided that such material and adverse effect could not have been prevented, overcome or remedied in whole or in part by the affected person by exercise of care and diligence. Force Majeure Events shall include the following events and circumstances provided that event or circumstance is limited to the following: (a) (b) (c) (d) (e) riot, war, acts of terrorism; ionising radiation or radio activity from any nuclear fuel or from any nuclear waste; pressure waves caused by aircraft or other aerial devices travelling at sonic or supersonic speeds; earthquakes, flood, fire or other physical natural disaster, but excluding weather conditions regardless of severity; and strikes or industrial disputes at a national level, which affect an essential portion of the works but excluding any industrial dispute which is specific to the performance of the works or this contract. (xiv) "Generation Company" means a person engaged in the generation of electric power and licensed by the Authority to this effect; (xv) "Grid Code" means the Grid Code prepared by the National Grid Company with the approval of the Authority. 4 Page 2 of 10

(xvi) "Input Energy" means the electrical energy, expressed in kwh, that is delivered to the Entry Point(s) of Transmission Licensee or DISCO for purposes of onward transport by respectivetransmission Licensee or DISCO to the Exit Point(s), as measured by the Wheeling Meter(s). (xvii) "Transmission Licensee" meansholder of Transmission Licence granted by the Authority. (xviii) "Output Energy"means the electrical energy, expressed in kwh, that Transmission Licensee or DISCO is obliged to transport to Exit Point(s) of the Transmission Licensee or DISCO, as measured by the Wheeling Meter(s). (xix) "Scheduled Outage" means a planned interruption of Transmission Licensee or DISCO's ability to accept delivery of electrical energy generated by the generation facility of the Wheeler of Power at the Entry Point or its ability to transport the same to any Exit Point, testing, preventive maintenance, corrective maintenance, repairs, replacement or improvement of the Transmission or Distribution system. (xx) "Unscheduled Outage" means an interruption or delay in Transmission Licensee or DISCO's ability to accept delivery of electrical energy generated by the generation facility of the Wheeler of Power at the Entry Point or its ability to transport the same to any Exit Point that is not a result of a Schedule Outage or a Force Majeure Event; (xxi) "Wheeling" or "Wheeling Services" means the use of the Transmission or/and Distribution system(s) of the respectivetransmission Licensee(s)/DISCO(s) for the transport of electric power. (xxii) "Wheeling Agreement" means the agreement between the Wheeler of Power and DISCO(s) orthe agreement between the wheeler of power and DISCO(s)/Transmission licensees or the agreement between wheeler of power and transmission licensee(s), for Wheeling Services in accordance with Schedule-I as set out in Annexure. (xxiii) "Wheeling Charges" means the charges for Wheeling of Power as approved by the Authority. (xxiv) "Wheeler of Power" means an Applicant whose application for wheeling has been accepted by the Transmission Licensee or/and DISCO as the case may be; and (xxv) "Wheeling Meters" means meters having such technical specification as may be specified by the Transmission Licensee or DISCO, installed at Entry and Exit Point of respective Transmission Licensee/DISCO to measure the electrical power entering and exiting the that Transmission Licensee or DISCO network. (2) Words and expressions used but not defined in these regulations shall have the same meaning as in the Act and the rules and regulations framed thereunder. 3. Open Access.- (1) Every Transmission Licensee and DISCO shall offer nondiscriminatory open access to its respective Transmission or Distribution system andinter-connection services to the Applicants who are either connected or intend to be connected to the Transmission or Distribution system of the Transmission Licensee or DISCO. Page 3 of 10

(2) EveryTransmission Licensee and DISCO shall prepare and maintain a detailed report of the electric power capacity of its respective Transmission or Distribution system. Such information or any other relevant information shall be available on the website of the every Transmission Licensee and DISCO and provided to the potential Applicant within 14 days upon its request regarding the area where the Wheeling Services are intended to be availed. (3) Every Transmission Licensee and DISCO shall ensure that with the addition of a new Wheeler ofelectric Power, quality of service of the existing users or Wheelers of Electric Power are not adversely affected. 4. Dedicated Transmission/Distribution Facilities. (1) Notwithstanding anything contained in Regulation 3, where technically not feasible to avail Wheeling Services on existing Transmission or Distribution system of a Transmission Licensee or DISCO, as the case may be, a generation company may construct a dedicated Transmission or Distribution system from its own expense to supply electrical power to its authorized BPC(s). SuchDistribution system shall be handed over todiscofor ownership, maintenance and operation. However, the cost incurred by the generation company for setting up suchtransmission or Distribution systemwill be recovered by the generation company through the Wheeling Charges. (2) The Transmission Licensee and DISCO shall not connect such dedicated Transmission or Distribution system to its other Transmission or Distribution network without the consent of Generation Company. 5. Application Process for Wheeling of Power. (1)Wheeling may be availed by generation companies who are already connected with a Transmission Licensee or DISCOsystem or those who have yet to establish connection with a Transmission Licensee ordisco system. (2) An Applicant desirous of obtaining Wheeling Services shall submit an application to the concerned Transmission Licensee or DISCO accompanied by nonrefundable application fee as determined by the Transmission Licensee or DISCO and shall include the following details: a) Proposed geographical location of the Applicant; b) Quantum of power to be wheeled; c) Entry Point(s)and Exit Point(s) of power; d) The proposed buyers of the Applicant, their consent and the Power Purchase Agreement if available; e) Proposed commencement date of the Wheeling and the duration thereof; and f) Any other necessary details as may be required by Transmission Licensee or DISCO. (3) The Transmission Licensee or DISCO shall acknowledge the receipt of the application withinthree (3) days of the receipt of the application if the same is complete and contains the requisite information for processing the application: Provided that any application which is incomplete or is not accompanied by the required information shall be returned within three (3) days of filing thereof identifying in writing the deficiencies in the application and the Applicant shall be given a reasonable time to re submit the application. V Page 4 of 10

(4) The application if found satisfactory shall be accepted by Transmission Licensee or DISCOwithin 10days of acknowledgement of receipt thereof: Provided that no application shall be accepted unless it fulfills all the requirements regarding interconnection as required under the Distribution Code and Grid Code; Provided further that where the Applicant seeking wheeling is not connected with Transmission Licensee or DISCO system, an application for such connection shall be filed with Transmission Licensee or DISCO in terms of Distribution and Grid Codes and both parties shall enter into a Connection Agreement in this regard. (5) An Applicant whose application has been accepted shall be required to submit a bank guarantee upto 100 US$ per MW. 6. Rejection of Application for Wheeling of Power. The application for wheeling may be rejected by the Transmission Licensee or DISCO subject to conditions laid down in Regulation5. Provided that in case the Transmission Licensee/DISCO intends to reject the application, shall seek approval of the Authority and decision of the Authority shall be final in this regard. 7. Wheeling Agreement. (1) The Applicant shall enter into a Wheeling Agreement with the Transmission Licensee(s) or/and DISCO(s) as the case may be within thirty (30) days of the acceptance of the Applicationand a copy thereof shall be submitted to the Authority within seven (7) days of execution of the Wheeling Agreement. (2) The Wheeler of Power shall have option of renewal afterexpiration of the original term of the Wheeling Agreement. 8. Failure to commence Wheeling. (1)The Transmission Licensee or DISCO shall reserve a slot for the Wheeler of Power for 18 months from the date of acceptance of the application for commencement of Wheeling operation. (2) The failure of Wheeler of Power to commence Wheeling will result in cancellation of Wheeling Agreement and the Transmission Licensee and/or DISCO as the case may be, shall be discharged of obligation to provide Wheeling Services unless specifically permitted by the Transmission Licensee/DISCO for the reasons to be recorded in writing under intimation to the Authority. 9. Wheeling Charges. The Transmission Licensee or DISCO shall charge the Wheeler of Power only those charges as per the Schedule-III as set out in the Annexure. 10. Metering Requirement. (1) The Wheeling Meters shall be installed at the Entry and Exit Points of the Transmission or/and Distribution system of the respective Transmission Licensee(s)/DISCO(s) as the case may be. (2) The Wheeler of Power and its Bulk Power Consumer(s) shall be responsible to procure andinstall meters at the Entry Point and Exit Point of Transmission Licensee or/and DISCO respectively. Page 5 of 10 Osk

(3) Wheeler of Power, Transmission Licensee/DISCO and BPC shall be liable for tampering of meter by any of their employees working in the course of employment. 11. Banked Energy.- (1) Where Transmission Licensee or DISCO fails to transport Input Energy to an Exit Point of Transmission Licensee or DISCO in terms of wheeling instructions in that month or a BPC is unable to accept delivery of Output Energy at Exit Point of Transmission Licensee or DISCO in that month such banked electrical energy shall be delivered to the Exit Point of Transmission Licensee or DISCO, requested by the Wheeler of Power within the time period as mutually agreed by the parties in the Wheeling Agreement. (2) A Transmission Licensee or a DISCOas the case may be, shall be liable to pay Liquidated Damages to the Wheeler of Power for its failure to transport Input Energy to Exit Point(s) of its respective Transmission/Distribution system. (3) In case a Transmission Licensee or a DISCO fails to deliver the banked energy to Exit Point(s) of that Transmission Licensee or DISCO within time period as requested by the Wheeler of Power, the Transmission Licensee or DISCO regardless of any liquidated damages under sub-clause (2) above shall also be liable to pay the Liquidated Damages for such failure. 12. Optional Sale.- On request of the Transmission Licensee or DISCO, the Wheeler of Power may have option (but not the obligation) to sellthe banked energy to the Transmission Licensee or DISCO.Upon exercise of this option by the Wheeler of Power; the Transmission Licensee or DISCO shallpay for such banked energy at such rate approved by the Authority. Provided that the Wheeling Charges shall not be applicable for sale of any banked energy to the Transmission Licensee or DISCO. 13. Shortfall.- (1) In the event of failureof the Wheeler of Power, except a Force Majeure Event, to deliver the Input Energy as stated in the wheeling instructions already notified to Transmission Licensee or DISCO in that month, such Transmission Licensee or DISCO shall be entitled to receive Liquidated Damages from the Wheeler of Power for any such shortfall. (2) For any shortfall in the Committed Capacity that the Wheeler of Power is unable to deliver to Transmission Licensee or DISCO, the Transmission Licensee ordisco may opt to continue to supply to the relevant Bulk Power Consumer(s)for such shortfallof power on request of Wheeler of Powerand shall invoice the Wheeler of Power at the tariff approved by the Authority. 14. Overdrawing.- Where a Bulk Power Consumer draws electrical power in excess of Output Energy at Exit Point(s) of the Transmission Licensee or DISCO, the Wheeler of Power shallpay to Transmission Licensee or DISCO according to tariff determined by the Authority. 15. Liquidated Damages.-(1)The amount of liquidated damages payable for failure of the Transmission Licensee or DISCOas the case may be, to transport the Input Energy under these regulations shall consist ofthe actual loss suffered by the Wheeler of Power. Page,eof 10

(2) The amount of liquidated damages payable for failure of the Wheeler of Power todeliver the Input Energy under these regulations shall consist of the actual loss suffered by Transmission Licensee or DISCO as the case may be. 16. Set-off. The Transmission Licensee/DISCO and the Wheeler of Power shall have the right to set off any amounts due and payable by it to the other party under theseregulations against any and all amounts due and payable to it by the other party under theseregulations andsuch rights of set-off shall relate only to amounts that are then due and payable to and by a party and are undisputed or have been resolved in terms of Regulation 20. 17. Second-tier Supply Authorization.- (1) The Wheeler of Power shall only be permitted to supply the power to Bulk Power Consumers under second-tier supply authorization from the Authority as provided under the NEPRA Licensing (Generation) Rules, 2000. (2) The relationship between the Bulk Power Consumer and the Wheeler of Power shall be governed under their Power Purchase Agreement. Provided that the power purchase agreement shall not contain a clause to restrain a Bulk Power Consumer from purchasing power from any other source, including atransmission Licensee or DISCO. (3) The Wheeler of Power shall providetransmission Licensee/DISCO a copy of the Power Purchase Agreement entered into with its BPC(s). 18. Power of the Authority to give directions, instructions and guidelines.-for carrying out the purposes of these regulations, the Authority may issue directions, instructions and guidelines to the Wheeler of Power, the Transmission Licensee and thedisco in the form and manner determined by the Authority, which shall be complied with by the Wheeler of Power, the Transmission Licensee and the DISCO. 19. Power to require information.-the Authority may, at any time, by notice in writing require the Wheeler of Power, the Transmission Licensee and the DISCO, generally or in particular to furnish it within the time specified therein or such further time as the Authority may allow, with any statement or information and without prejudice to the generality of the foregoing power, may call for information, at such intervals as the Authority may deem necessary. 20. Resolution of disputes.-any dispute or disagreement of Wheeler of Power, BPC, Transmission Licensee and the DISCO relating to any matter arising out of, or in connection with, the activities covered under theseregulations shall be submitted for decision to the Authority. 21. Penalty for failure, refusal to comply with, or contravention with any provision of the regulations.-if any party fails or refuses to comply with, or contravenes any of the provisions of these regulations or any direction or order passed by the Authority under these regulations or knowingly or willfully authorizes or permit such failure, refusal or contravention, it shall, be punishable with a fine which may extend to 100 million rupeesen C-11/ No. NEPRA/NCC-01 / (Syed Safeer Hussain) c)c. Registrar Page 7 of 10

ANNEXURE SCHEDULE-I [See Regulation 2 (1) (xix)] "Wheeling Agreement" The Agreement shall have following base minimum provisions: (a) Detailed Description of parties along with addresses and authorized representatives (b) Effective Date and Term (c) Interconnection work (d) Transport of energy (e) Conditions with respect to shortfall in the committed capacity (f) Provisions related to transfer of title and ownership of the Input Energy (g) Arrangement related to metering (h) Procedure related to meter reading, attendance (i) Provisions related to tampering, testing of meters, use of check meters, matters related to inaccuracies (j) Provisions related to costs and expenses associated with the repair, testing, commissioning, calibration and recalibration of meters (k) Use of system payments (I) Invoicing and payments (m) Arrangement in case of failure to transport (n) Payment dispute (o) Treatment of banked Energy (p) Operational provisions including but not limited to manner and form of wheeling notice and revised wheeling notice (q) Provisions ensuring compliance of the regulations (r) Establishment and manner of functioning of the coordination committees (s) Notice of Force Majeure Events (t) Representation and Warranties (u) Provisions related to events of default (v) Termination notice (w) Remedies upon termination and obligations upon termination (x) Liquidated Damages (y) Restriction on Assignment (z) Relation and arrangement with third party contractors and financiers (aa) Provisions related to notices and service address (bb) Procedure of amendment to the Agreement (cc) methodology of calculation of use of system charges (dd) list and detailed particulars of Bulk Power Consumers Page 8 of 10 3k

SCHEDULE-II [See Regulation 2 (1) (vi)] "Connection Agreement" DISCO * Evaluate the Application Preliminary Evaluation NTDC Evaluation with respect to Grid Code APPLICANT Prepare Intention Application Comments Submit Intention Application to NTDC and DISCO Provide Additional Information if Required Offer for connection lay Final Evaluation of Application Submit Formal Application for Connection Prepare Negotiation Negotiation Prepare Negotiation * Connection Agreement Comments on Metering and Protection Connection Agreement Make Connection a. Page 9 0110

SCHEDULE-III [See Regulation 9] "Wheeling Charges" Wheeling Charges shall be the wheeling charges approved by the Authority in the tariff petition of relevant Transmission Licensee/DISCOand notified by the Authority. Page 10 of 10 a