September 3, 19. Sincerely, /s/ Chester Poslusny, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - I/Il

Similar documents
ACTION: License amendment application; notice of opportunity to comment, request a

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Southern Nuclear Operating Company, Inc.

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Exelon Generation Company, LLC

Official Record Copy

June 24, Corporation

Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2. ACTION: Intent to conduct scoping process and prepare environmental impact

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ]

NUCLEAR REGULATORY COMMISSION [NRC ] Qualification of Safety-Related Lead Storage Batteries for Nuclear Power Plants

NUCLEAR REGULATORY COMMISSION. [Docket Nos , , , ; NRC ]

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Southern Nuclear Operating Company, Inc.,

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Southern Nuclear Operating Company,

NUCLEAR REGULATORY COMMISSION [NRC ] Draft Letter to the Nuclear Energy Institute Regarding the Clarification of

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION

NUCLEAR REGULATORY COMMISSION [NRC ] Revision Probabilistic Risk Assessment and Severe Accident. Evaluation for New Reactors

NUCLEAR REGULATORY COMMISSION. [Docket Nos and EA ; NRC ] In the Matter of Energy Northwest; Columbia Generating Station

ttl SPILMAN THOMAS & BATTLE,.

======================================================================== Proposed Rules Federal Register

NUCLEAR REGULATORY COMMISSION. [Docket Nos , , , and ; NRC ] First Energy Corp. First Energy Solutions

UNITED STATES OF AMERICA U.S. NUCLEAR REGULATORY COMMISSION

NUCLEAR REGULATORY COMMISSION [NRC ] Instrumentation and Controls Guidance

March 1, Docket No DISTRIBUTION: Docket File NRC PDR L PDR ORB#3 Rdg FMiraglia PMKreutzer-3 DSells PMcKee LJHarmon SECY

NUCLEAR REGULATORY COMMISSION. 10 CFR Part 72 [NRC ] RIN 3150-AJ47. List of Approved Spent Fuel Storage Casks:

Via Electronic Filing

Pursuant to the NRC's rulemaking process, I'm writing to submit a petition for rulemaking.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

Docket Number: P

THOMAS~ April 19, Via Electronic Filing

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

Ch. 230 PACKAGING AND TRANSPORTATION CHAPTER 230. PACKAGING AND TRANSPORTATION OF RADIOACTIVE MATERIAL

Jne;gy. May 15, Re: Rulemaking Re Electric Safety Regulations, 52 PA. Code, Chapter 57 Docket No. L

UNITED STATES COURT OF APPEALS FOR THE NINTH CIRCUIT ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) Petition for Review

List of Approved Spent Fuel Storage Casks: NAC International, Inc., MAGNASTOR

CHAPTER 5. FORMAL PROCEEDINGS

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD ) ) ) ) ) ) )

DONALD G. KARPOWICH ATTORNEY-AT-LAW. P.C.

Enclosed please find for filing the Prehearing Memorandum of Columbia Gas of Pennsylvania, Inc. to be filed in the referenced proceeding.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

COMMONWEALTH OF PENNSYLVANIA PENNSYLVANIA PUBLIC UTILITY COMMISSION P.O. BOX 3265, HARRISBURG, PA August 30, 2013

COZEN vv O'CONNOR. David P. Zambito VIA E-FILE

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD. Before Administrative Judges:

~

8.130, 8.201, 8.235, 8.310, and 8.315, relating to General Applicability and Standards; Definitions;

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISION BEFORE THE COMMISSION

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION NOTICE OF HEARING FOR THE CUSTOMERS OF ALPENA POWER COMPANY

Pennsylvania State Senator Andrew E. Dinniman v. Sunoco Pipeline, L.P. Docket No. C

[NRC ] Mr. Joseph Quintanilla is a radiographer who was formerly employed by Quality

RE: Pennsylvania Public Utility Commission, Bureau of Investigation and Enforcement v. UGI Utilities, Inc. Docket No.

REPORT OF THE NUCLEAR REGULATION SUBCOMMITTEE

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD. Before Administrative Judges:

NUCLEAR REGULATORY COMMISSION. 10 CFR Part 72 [NRC ] RIN 3150-AK05. List of Approved Spent Fuel Storage Casks: TN Americas LLC,

April 15,2011. Peoples Natural Gas Purchased Gas Cost Section 1307(f) Filing

c}(eori & rnscak LLF February 12, 2016 VIA ELECTRONIC FILING

June 2, Rosemary Chiavetta, Secretary Pa. Public Utility Commission P.O. Box 3265 Harrisburg PA

Pennsylvania Public Utility Commission v. United Water Pennsylvania Inc.; Docket No. R

) In the Matter of ) ) LOUISIANA ENERGY SERVICES, L.P. ) Docket No ML ) (National Enrichment Facility ) ) CLI MEMORANDUM AND ORDER

ORAL ARGUMENT NOT YET SCHEDULED IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

COMMONWEALTH OF PENNSYLVANIA PENNSYLVANIA PUBLIC UTILITY COMMISSION P.O. BOX 3265, HARRISBURG, PA September 27, 2013

THE COUNTY OF CHESTER

October 21, 2005 RE: APPLICATION /INVESTIGATION

s~wc%-o I -0I~ F7 EDO Principal Correspondence Control FROM: DUE: 03/08/11 EDO CONTROL: G DOC DT: 12/21/10 FINAL REPLY: Senator John Barrasso

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION. Before the Commission

October 13,2011. VIA HAND DELIVERY c/5 m Rosemary Chiavetta, Secretary 3 fri c-> o m Pennsylvania Public Utility Commission

Final Signed Programmatic Agreement

HOLL & ASSOCIATES Attorneys Af Law A PROFESSIONAL CORPORATION P.O. BOX SOUTH BROAD STREET LANSDALE, PENNSYLVANIA 19446

July 7, Quality and Vendor Branch 2 Division of Construction Inspection & Operational Programs Office of New Reactors

Case 1:16-cv TSC Document 9 Filed 09/20/16 Page 1 of 6 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA ) ) ) ) ) ) ) ) )

i O Rosemary Chiavetta, Secretary Pennsylvania Public Utility Commission ^ P.O. Box 3265 Harrisburg, PA c:

GILLARD, BAUER, MAZRUM, FLORIP, SMIGELSKI & GULDEN. June 15, Alpena Power Company Energy Waste Reduction Reconciliation Case No.

John R. Evans v. FirstEnergy Solutions Corp.; Docket No. P ; PRELIMINARY OBJECTION OF FIRSTENERGY SOLUTIONS CORP.

5107 leesburg Pike, Suite 2000 Falls Church, Virginia Date of this notice: 12/31/2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD. Before Administrative Judges:

IN THE COMMONWEALTH COURT OF PENNSYLVANIA. [NAME OF PETITIONER] Petitioner. COMMONWEALTH OF PENNSYLVANIA, DEPARTMENT OF PUBLIC WELFARE, Respondent

December 28, Via Electronic Filing

ci(eori c3z fl1sck LLP July 29, 2015 Rosemary Chiavetta, Secretary Pennsylvania Public Utility Commission P. 0. Box 3265 Harrisburg, PA

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

of representing AWG, and in support thereof would show the Court as follows:

UNITED STATES COURT OF APPEALS DISTRICT OF COLUMBIA CIRCUIT

m (1) Agency: IRRC Number: cj/i5 % % Department of State, Bureau of Professional and Occupational Affairs, State Board of Landscape Architects

These rules shall be known as the Local Rules for Columbia and Montour Counties, the 26 th Judicial District, and shall be cited as L.R. No.

27 38 ctober 23, 2014

UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF NEW YORK. v. CIVIL ACTION No. Defendants. December 30, 2009

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Enclosure 6. NRC Pu~lic Outreach and Stakeholder Input. ADAMS Accession No: ML 13301A738

BEFORE THE TENNESSEE REGULATORY AUTHORITY NASHVILLE, TENNESSEE. May 5, 2015 ORDER GRANTING CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY

May 14, Enclosed for electronic filing is the Revised Settlement Agreement. Also enclosed is the Proof of Service.

UNITED STATES OF AMERICA BEFORE THE NUCLEAR REGULATORY COMMISSION

Raiders Law. September 10, 2018

Ch. 491 PRACTICE AND PROCEDURE 67 ARTICLE V. GENERAL PROCEDURES

STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS PUBLIC SERVICE COMMISSION

Notification of Amendment to Decommissioning Trust Agreement Vermont Yankee Nuclear Power Station Docket No & License No.

September 8, Dear Ms. Kale:

UPPER CHICHESTER TOWNSHIP ZONING HEARING BOARD P.O. BOX 2187 UPPER CHICHESTER, PA (610)

SAUL EWING Attorneys at Law A Dtlawao up

The information below describes how a person may participate in this case.

Pennsylvania s Still-Lagging Economic Growth

REPORT OF THE NUCLEAR REGULATION COMMITTEE

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C

Transcription:

September 3, 19 Mr. Robert G. Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101 SUBJECT: NOTICE OF CONSIDERATION OF ISSUANCE OF AN AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING, SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 (TAC NO. M95527) Dear Mr. Byram: Enclosed is a copy of the subject notice for your information. This notice relates to your application dated May 28, 1996, as supplemented by letter dated July 25, 1996, regarding a revision to the Minimum Critical Power Ratio safety limit values, and methodology to support the use of lead use assemblies. This notice has been publication. Docket No. 50-387 forwarded to the Office of the Federal Register for Sincerely, /s/ Chester Poslusny, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - I/Il Office of Nuclear Reactor Regulation Enclosure: cc w/encl: Notice See next page DISTRIBUTION Docket File PUBLIC PDI-2 Reading SVarga JZwolinski JStolz CPoslusny MO'Brien OGC ACRS WPasciak, RGN--I [OFFICE Po P01-2/PM PD 1-20 NAME Mq'Vr n CPoslusny:rb JStolz DATE ji//96 /h/96 _/_7_/96 A 4'M CENTER COPY UrrlLIML KRECRU CUOY UULUMLI NAML: SU9bb2l.INU 9609110058 PDR ADOCK P 960903 05000387 PDR

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20566-0001 Mr. Robert G. Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101 September 3, 1996 SUBJECT: NOTICE OF CONSIDERATION OF ISSUANCE OF AN AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING, SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 (TAC NO. M95527) Dear Mr. Byram: Enclosed is a copy of the subject notice for your information. This notice relates to your application dated May 28, 1996, as supplemented by letter dated July 25, 1996, regarding a revision to the Minimum Critical Power Ratio safety limit values, and methodology to support the use of lead use assemblies. This notice has been forwarded to the Office of the Federal Register for publication. Sincerely, Docket No. 50-387 Chester Poslusny, 7enior Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Enclosure: cc w/encl: Notice See next page

I Mr. Robert G. Byram Pennsylvania Power & Light Company Susquehanna Steam Electric Station, Units I & 2 I cc: Jay Silberg, Esq. Shaw, Pittman, Potts & Trowbridge 2300 N Street N.W. Washington, D.C. 20037 Bryan A. Snapp, Esq. Assistant Corporate Counsel Pennsylvania Power & Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J. M. Kenny Licensing Group Supervisor Pennsylvania Power & Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mrs. Maitri Banerjee Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O. Box 35 Berwick, Pennsylvania 18603-0035 Mr. William P. Dornsife, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P. 0. Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc. 212 Locust Street P.O. Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Vice President-Nuclear Operations Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1, Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Engineering Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Chairman Board of Supervisors 738 East Third Street Berwick, PA 18603

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION SUSOUEHANNA STEAM ELECTRIC STATION, UNIT 1 DOCKET NO. 50-387 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE. CONSIDERATION DETERMINATION. PROPOSED NO SIGNIFICANT HAZARDS AND OPPORTUNITY FOR A HEARING The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License No. NPF-14 issued to Pennsylvania Power and Light Company (the licensee) for operation of the Susquehanna Steam Electric Station, Unit 1, located in Luzerne County, Pennsyl vani a. The proposed amendment would revise the Minimum Critical Power Ratio safety limit values, adding two references to reflect the use of the ANF-B Critical Power Ratio Correlation and to reflect the use of the ABB Combustion Engineering licensing methodology, with a modification to the associated Bases. Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. The Commission has made a proposed determination that the amendment request involves no significant hazards consideration. Under the Commission's regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously 9609110062 960903 PDR ADOCK 05000387 P PDR

i - 2 evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated. The change to the ANFB correlation and corresponding MCPR Safety Limits does not physically change the plant systems, structures, or components. Thus, the probability of occurrence of an event evaluated in the SAR (Safety Analysis Report] is not increased. The acceptance criterion for the MCPR Safety Limit (i.e., 99.9% of the fuel rods expected to avoid boiling transition) is not changed. Only the methodology used to demonstrate compliance is changed. Therefore, the consequences of anticipated operational occurrence (which must show the Safety Limit is not violated) are not changed. Adding the reference of CENPD-300-P, "Reference Safety Report for Boiling Water Reactor Reload Fuel," to the list of references in Unit 1 Technical Specifications will allow the use of the ABB methodology to calculate the operating limits for the four Lead Use Assemblies which are of different mechanical design from the Siemens 9x9-2 fu~l. The use of this ABB methodology will ensure that the applicable safety limits of the safety analysis are met for the four LUAs [Lead Use Assemblies]. Results of incorporating this change will not significantly increase the probability or the consequences of an accident previously evaluated. 2. The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated. As stated above, this methodology change does not impact the acceptance criterion for the MCPR Safety Limits and does not physically change the plant safety, structures, or components. Since no changes to the physical plant are being made, this change does not create the possibility of a new event not previously evaluated in the SAR. The incorporation of this change will allow the use of the ABB methodology to be referenced as the methodology to show that all applicable limits of the safety analysis are met by the four ABB LUAs. Therefore, the incorporation of this change will not create

I - 3 the possibility of a new or different kind of accident from any accident previously evaluated. 3. The proposed change does not involve a significant reduction in a margin of safety. A cycle specific MCPR Safety Limit analysis was performed by SPC (Siemens Power Corporation]. The analysis used NRC approved methods described in the SPC report: ANF-524(P)(A), Revision 2 and Supplement 1, Revision 2. The MCPR Safety Limit value is calculated such that at least 99.9% of the fuel rods are expect to avoid boiling transition during normal operation or anticipated operational occurrences. Both the existing analysis using XN-3 and the new analysis using ANFB utilize NRC approved methods to accomplish this same objective. Therefore, the change to ANFB based Safety Limit does not involve a significant reduction in a margin of safety. The use of the ABB methodology will not result in a change in safety margin, but will ensure that the safety margin is maintained with the insertion of the four ABB LUAs in the Unit 1 Cycle 10 core. Therefore, the incorporation of these changes will have no impact ony current safety margins, nor will they involve a significant reduction in the margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendment until the expiration of the 30-day notice period. However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission

-4 may issue the license amendment before the expiration of the 30-day notice period, provided that its final determination is that the amendment involves no significant hazards consideration. all public and State comments received. The final determination will consider Should the Commission take this action, it will publish in the FEDERAL REGISTER a notice of issuance and provide for opportunity for a hearing after issuance. The Commission expects that the need to take this action will occur very infrequently. Written comments may be submitted by mail to the Chief, Rules Review and Directives Branch, Division of Freedom of Information and Publications Services, Office of Admifiistration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and should cite the publication date and page number of this FEDERAL REGISTER notice. Written comments may also be delivered to Room 6D22, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Copies of written comments received may be examined at the NRC Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC. The filing of requests for hearing and petitions for leave to intervene is discussed below. By October 9, 1996, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene. Requests for a hearing and a petition for leave to intervene shall be filed in accordance

A1 with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2. Interested persons should consult a current copy of 10 CFR 2.714 which is available at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, and at the local public document room located at the Osterhout Free Library, Reference Department, 71 South Franklin Street, Wilkes-Barre, PA 18701. If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or an Atomic Safety and Licensing Board, designated by the Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order. As required by 10 CFR 2.714, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors: (1) the nature of the petitioner's right under the Act to be made party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may be entered in the proceeding on the petitioner's interest. The petition should also identify the specific aspect(s) of the subject matter of the proceeding as to which petitioner wishes to intervene. Any person who has filed a petition for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to 15 days prior to the first prehearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.

4-6 Not later than 15 days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner shall provide a brief explanation of the bases of the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to establish those facts or expert opinion. Petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner who fails to file such a supplement which satisfies these requirements with respect to at least one contention will not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine witnesses. If a hearing is requested, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held.

-7- If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment. A request for a hearing or a petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Docketing and Services Branch, or may be delivered to the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, by the above date. Where petitions are filed during the last 10 days of the notice period, it is requested that the petitioner promptly so inform the Commission by a toll-free telephone call to Restern Union at 1-(800) 248-5100 (in Missouri 1-(800) 342 6700). The Western Union operator should be given Datagram Identification Number N1023 and the following message addressed to John F. Stolz: petitioner's name and telephone number, date petition was mailed, plant name, and publication date and page number of this FEDERAL REGISTER notice. A copy of the petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and to Jay Silberg, Esquire, Shaw, Pittman, Potts and Trowbridge, 2300 N Street NW., Washington, DC 20037, attorney for the licensee. Nontimely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be

4-8 entertained absent a determination by the Commission, the presiding officer or the presiding Atomic Safety and Licensing Board that the petition and/or request should be granted based upon a balancing of the factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d). For further details with respect to this action, see the application for amendment dated May 28, 1996, as supplemented by letter dated July 25, 1996, which is available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, and at the local public document room located at the Osterhout Free Library, Reference Department, 71 South Franklin Street, Wilkes-Barre, PA 18701. Dated at Rockville, Maryland, this 3rd day of September 1996. FOR THE NUCLEAR REGULATORY COMMISSION Chester Poslusny, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation