RESETTLEMENT AND MASS TRANSIT IN COLOMBIA LESSONS LEARNED

Similar documents
ASIAN DEVELOPMENT BANK

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

Resettlement Policy Framework

Gramalote, Colombia: A displaced community in transition

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples

THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

EBRD Performance Requirement 5

Climate and environmental changes have effects on the human population in its entirety when

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia)

y Fomento Municipal (FUNDACOMUN);

Helpdesk Research Report: Policies on Displacement and Resettlement

Inter-American Development Bank. Operational Policy on Indigenous Peoples

Disaster mitigation in landslide and flood prone areas of Bogota Colombia

Involuntary Resettlement Due Diligence Report

Resettlement in Urban Transport Planning. Learning session Friday March 30, 2007, Transport Forum, Washington, DC

Indonesia: Enhanced Water Security Investment Project

BAHIA INTEGRATED URBAN DEVELOPMENT PROJECT Involuntary Resettlement Plan Alagados VI Executive Summary

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014)

MINISTRY OF COMMERCE, TRADE AND INDUSTRY

India: Delhi Meerut Regional Rapid Transit System Project

HLP GUIDANCE NOTE ON RELOCATION FOR SHELTER PARTNERS March Beyond shelter, the social and economic challenges of relocation

Regulations of the Audit, Compliance and Related Party Transactions Committee of Siemens Gamesa Renewable Energy, S.A.

Performance Standard 5 Land Acquisition and Involuntary Resettlement

GUIDELINE 13: Relocate and evacuate migrants when needed

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives

Bangladesh: Urban Public and Environmental Health Sector Development Program

IAIA Special Symposium Resettlement and Livelihoods October Ted Pollett

REPORT 2015/011 INTERNAL AUDIT DIVISION. Audit of the operations in Colombia for the Office of the United Nations High Commissioner for Refugees

GUIDELINE 8: Build capacity and learn lessons for emergency response and post-crisis action

Guidelines for Articles of Association of Listed Companies (Revised in 2014) Table of Contents

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement

CHAPTER House Bill No. 7009

SYNOPSIS Mainstreaming Gender in Urban Renewal Projects

POLICY SEA: CONCEPTUAL MODEL AND OPERATIONAL GUIDANCE FOR APPLYING STRATEGIC ENVIRONMENTAL ASSESSMENT IN SECTOR REFORM EXECUTIVE SUMMARY

Involuntary Resettlement Due Diligence Report

Country Chapters - UNHCR Resettlement Handbook COUNTRY CHAPTER URU URUGUAY BY THE GOVERNMENT OF. August 2011, revised July 2016 Uruguay Page 1

Key Considerations for Implementing Bodies and Oversight Actors

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report

Neath Port Talbot County Borough Council. and. NPT Homes Limited SHARED LETTINGS POLICY

Gender Equality and Development

Involuntary Resettlement Due Diligence Report

Annex VIII LAW OF THE REPUBLIC OF KAZAKHSTAN

B. Resolution concerning employment and decent work for peace and resilience.

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

NATIONAL POLICY GUIDANCE FOR PROXY ADVISORY FIRMS

PREPARATORY STAKEHOLDER ANALYSIS World Humanitarian Summit Regional Consultation for the Pacific

SRI: Local Government Enhancement Project

MON: Urban Development Sector Project Bulgan Subproject

MEMORANDUM OF UNDERSTANDING. between THE INTER-AMERICAN DEVELOPMENT BANK. and THE INTERNATIONAL LABOUR ORGANIZATION.

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework

CONCEPT PAPER: SUSTAINABLE SHELTER SOLUTIONS Internally Displaced Persons in Somalia

1. About Eastern Partnership Civil Society Facility project:

15-1. Provisional Record

SPAIN S PERSPECTIVE ON MIGRATION & DEVELOPMENT: MIGRATION POLICIES

Justice ACCOUNTABILITY STATEMENT

Summary of the Indigenous Peoples' Consultation with the Asian Development Bank, November 27 th 2007

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

Development Assistance for Refugees (DAR) for. Uganda Self Reliance Strategy. Way Forward. Report on Mission to Uganda 14 to 20 September 2003

Involuntary Resettlement Due Diligence Report

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 2 Feedback Summary

Clarifications to this call for applications are presented at the end of this document

PRELIMINARY REPORT ON THE PRESIDENTIAL ELECTION IN COLOMBIA

Guidance Note 5 Land Acquisition and Involuntary Resettlement

IOE-ANDI Submission to the 2013 Regional Forum on Business and Human Rights for Latin America and the Caribbean August 2013, Medellín Colombia

Vacancy Announcement (VA) No

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014

Summer School November Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK)

Clause 49 of the Listing Agreement -Analysis of important changes

Decree on Compensation and Resettlement Management in Development Projects

DEPARTMENT OF PUBLIC WORKS

THE CONGRESS OF COLOMBIA DECREES: TITLE I. THE DISPLACED AND THE RESPONSIBILITY OF THE STATE

The Influence of Conflict Research on the Design of the Piloting Community Approaches in Conflict Situation Project

REGULATION ON INTERNAL COMPLAINTS HANDLING PROCESS

STAKEHOLDER ENGAGEMENT IN PLANNING AND IMPLEMENTATION OF RESETTLEMENT AND LIVELIHOOD RESTORATION

CHAPTER Committee Substitute for House Bill No. 823

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ZIMBABWE NATIONAL WATER PROJECT APPROVED ON JANUARY 29, 2016 REPUBLIC OF ZIMBABWE

UNDAF Results Matrix Sri Lanka

Conference of the States Parties to the United Nations Convention against Corruption

FILE COPY RP238. Water Sector Restructuring Project Ghana Resettlement Training Plan. Volume 2. Ghana Water Company Ltd. 9P2503

DFS FURNITURE PLC. (the Company ) REMUNERATION COMMITTEE TERMS OF REFERENCE

Workshop on Regional Consultative Processes April 2005, Geneva

Diversity of Cultural Expressions

Strategic plan

NEVADA GEOGRAPHIC INFORMATION SOCIETY BYLAWS. Approved by NGIS Board October 12, 2018 Approved by NGIS Membership October 18, 2018

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

EURO LATIN-AMERICAN DIALOGUE ON SOCIAL COHESION AND LOCAL PUBLIC POLICY BOGOTA AGENDA 2012

SOCIAL CHARTER OF THE AMERICAS. (Adopted at the second plenary session, held on June 4, 2012, and reviewed by the Style Committee)

Action Fiche for Syria. 1. IDENTIFICATION Engaging Youth, phase II (ENPI/2011/ ) Total cost EU contribution: EUR 7,300,000

BUILDING NATIONAL CAPACITIES FOR LABOUR MIGRATION MANAGEMENT IN SIERRA LEONE

AMENDMENT OF THE OPERATING PLAN EASO GREECE PHASE II Ref.1

UN SYSTEMWIDE GUIDELINES ON SAFER CITIES AND HUMAN SETTLEMENTS I. INTRODUCTION

TERMS OF REFERENCE NATIONAL CONSULTANT ILO/UNHCR JOINT PROJECT

GREECE RESPONSE CAPACITY ASSESSMENT SMS WORKING GROUP: EMERGENCY PREPAREDNESS DRAFT GUIDELINES FOR GREECE MAINLAND

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Background. RESETTLEMENT AND MASS TRANSIT IN COLOMBIA LESSONS LEARNED Authors: Carlos Alberto Molina Prieto Senior Social Development Specialist Mauricio Cuellar Montoya Senior Transport Specialist October 12, 2017 In response to the poor quality of the transport service and after the initial success of Bogota s BRT system (Transmilenio), the Government of Colombia structured the National Urban Transport Program (NTUP) through the implementation of transport systems in the main cities of the country. The program scope contemplated: i) support for the construction of BRT infrastructure, including stations, portals, pedestrian bridges and the generation and adaptation of public space, and (ii) transformation of the relationship between the Government and the transport companies, including the remodeling of their business structure from affiliate companies into concessionaries that would provide a service, in order to eliminate the so called penny war. Public Disclosure Authorized BRT station and articulated bus Interior view of the station The proposed scheme defined that the infrastructure would be financed with public resources, with a contribution from the National Government up to 70%, given that fleet and operation expenses were borne by private operators. For the development of the projects, each participating city created an entity in charge of the planning, construction, contracting and control of the operation 1 (Implementing Agency). The entities created are presented in the following table: 1 In Bogotá the Urban Development Institute (IDU) has been in charge of the construction of infrastructure, and in Medellín, Metro Company has been in charge of the acquisition of vehicles and their operation. 1

Table 1 Implementing Agencies Cities Impementing Entinty City Metroplús Medellín, Metropolitan Area Transmetro Barranquilla, Metropolitan Area Transcaribe Cartagena Megabús Pereira, Metropolitan Area Metrolinea Bucaramanga, Metropolitan Area Metrocali Cali TRANSMILENIO Bogotá Source: own elaboration. In 2003, the Government of Colombia requested the Bank's technical and financial support to carry out this program. To date, four Bank loans have been provided in the amount of US$ 1 trillion. Other multilateral organizations such as IADB and CAF have also participated with different loans. Subsequently, additional seven medium-sized cities were included in the program, spanning between 300,000 and 600,000 inhabitants, in which infrastructure investments of smaller scale were projected and where segregated BRT systems are not yet required. This document aims to show the development of social and resettlement policies implemented under this program. Big challenges were overcome, given the urban interventions in consolidated areas with great impact in economic activities and private properties. The document focuses on the consultation process and grievance redress mechanism established in the program; implementation of the resettlement safeguards and its impact; and lessons learned and conclusions. 2. The consultation process and grievance redress mechanism The first contact of the project with the community is through the consultation and socialization process, which for NUTP was carried out at different levels and at different times. At the city level, the preparation of a Municipal Development Plan is included in the constitution of the National Policy (Article 339). The Article also includes citizen engagement and accountability as the basis for the participation process. This first and more general consultation was on the BRT projects in which civil society participated in the formulation and socialization through the Territorial Planning Councils (CTP). The identification of land properties affectations and the preparation of resettlement plans, which were formulated through consultation and and participation processes emerged at the second level. During the formulation phase of the resettlement plans, meetings were held with the affected parties owners, landlords, tenants, etc. socializing in each case a differentiated solution according to the situation. Meetings with the stakeholders also took place to inform and present the different programs that are part of the resettlement plans (chambers of commerce, guilds, universities, community and civil society organizations also participated in these meetings). The 2

result of this dialogue was reflected in the adjustments made to the different plans, and, when necessary, in the creation of new programs. On the other hand, from the formulation to the culmination of the resettlement, a grievance redress mechanism (GRM) was implemented in order to manage petitions, queries, complaints and suggestions that was based on the Right of Petition, harnessed in the Constitutional normative. The regulation stipulates a maximum of 10 days as a deadlines for the management of community requests. This GRM is based on instruments including: i) field service office, to approach the citizen, ii) reception of queries and complaints through the webpage of the Implementing Entities, by telephone or directly at their office, and iii) periodic home visits (at least twice a month) to maintain fluid communication and resolve concerns before they become a formal grievance. This mechanism, which extends to all the population located within the area of influence during the construction period, enabled management of queries and complaints in its initial stage. The mechanism fostered a climate of trust and an effective communication channel throughout the process. Finally, for each of the resettlement plans, a completion document of the process was prepared, in which all the queries and complaints were verified, checking that all were responded and ensuring compliance. Table 2 Implementing Agencies GRM Number of queries and complaints received during the construction period (Accumulated) Number of queries and complaints successfully solved (Accumulated) Verification method Main reason (s) for complaints received during project execution Megabús 538 Metroplus 6242 Transmetro 1368 Transcaribe 3032 Metrolinea 795 TOTAL 11975 100% of those received in the works were solved. 11975 grievance attended and solved. Closing records for each of the sections and acts of receipt of work to the satisfaction of the community. Closing of streets or accesses, Damage or affectation of properties by the works, Nonconformities for road contingency plans, Procedures for payment of compensations, purchase of properties. The table shows a high number of queries and complaints received and processed. The scheme of linking the construction contractor in this activity shows positive results and allows for rigorous 3

monitoring. To date, none of the Implementing Agencies have had legal processes opened related to the GRM, indicating a complete and satisfactory management. 3. Safeguards and Instruments Since the preparation of the first loan, the WB triggered the involuntary resettlement safeguard (OP 4.12), envisioning that major land acquisition, resettlement of population and relocation of public space occupants (PSO) was likely. The instruments built for the project included both the World Bank s and local regulations, and the different institutional actors had active participation in their formulation. All documents were published and consulted, especially resettlement plans with the affected population. World Bank National Planning Department DNP Ministry of Transport MoT Implementing Agencies Municipalities Table 3 Policy Instruments from international to local management Operational Policy OP 4.12 Resettlement Safeguard Resettlement Policy Framework for BRT - Colombia Guidelines for the implementation of Land Acquisition and Resettlement Plans Guidelines for the preparation of Public Space Occupants Plan (PSOP) Guidelines for the calculation of economic reimbursement in land acquisition and resettlement processes Resettlement Plans with No Objection from the WB Management Resolution of economic reimbursements Resettlement Committee Legal framework Source: own elaboration In general, the layout of works for the BRT projects pass through the cities historic centers, affecting established businesses, families with vulnerable elderly adults, properties in rent, public space occupants (PSO), among others. In addition, they cross urban areas, including vulnerable populations and, in some cases, formal and informal housing and businesses, with a heterogeneous and complex effect that can lead to: ruptures in the social fabric, internal family conflicts, affectations and changes to existing uses, interruption of revenue from economic activities, uncertainty, and initial rejection. All this identifies the need to create spaces for dialogue and participation, creation of channels and spaces for conflict resolution, and interdisciplinary view on involuntary resettlement. 4

This complexity involved the preparation of different resettlement plans for homogeneous sections according to the schedule of works, which multiplied the number of plans as seen in the following table. Table 4 Resettlement Plans (RP) by Implementing Agency Implementing Entity Number of RP Status Finished Execution Metroplus 9 6 3 Transcaribe 3 3 0 Transmetro 3 3 0 Megabús 3 3 0 Metrolinea 7 7 0 Metrosabanas 2 0 2 SIVA 2 1 1 TOTAL 29 23 6 Source: own elaboration Note: Two additional Resettlement Plans for Neiva (Transfederal) / Sincelejo (Metrosabanas) and Valledupar (SIVA) are expected. 4. Resettlement As a public work, resettlement for BRT projects is involuntary and forced, and unlike other forms of resettlement, such as high risk or armed conflict, it can be planned and managed. Given that the Government is causing the resettlement, the possibility of participation, planning and discussion is high. In addition, it does not generate the overwhelming feelings of a natural disaster or an armed conflict situation, where the dialog with the "guilty party" is usually tough. Table 5 Modalities of involuntary resettlement Forced Natural disasters Armed conflict Compulsory Public work Source: own elaboration. The number of properties to be acquired versus the number of social units (SU) 2 identified are basic indicators for the planning, follow-up and monitoring of the process. The acquisition of properties will be more complex depending on whether the property is affected partially or totally. The first is more demanding in terms of impact assessment, functional reconstruction of the 2 Social Unit: "people or group of people, with or without consanguinity links, that have been associated to meet their needs on a permanent basis. They may be natural or legal persons" Guidelines of the Ministry of Transport - MT (2005, p. 4) 5

property and professional accompaniment needed. For instance, Metroplús (Medellin) implemented a mixed mode for specific cases, acquiring all the construction but only the affected part of the property, an approach that allowed the owners to benefit directly from the urban transformation and the transportation system. In terms of Social Units, Households SU (owners and possessors), economic SU (formal and informal), socioeconomic SU (the sum of the two previous ones), landlord SU and tenant SU were typified. The total number of properties acquired for the BRT projects (first three loans) was 2,799 and the number of identified SU (excluding landlords and tenants) amounted to 4,187. Resettlement progress for these SU is 100%. Table 6 Total or partial land acquisition by Implementing Agency Implementing Private properties Entity TOTAL PARTIAL MIXED Metroplús 1074 415 64 Transcaribe 98 334 NA Transmetro 115 404 NA Megabús 153 52 NA Metrolinea 65 25 NA TOTAL 1505 1230 64 Source: own elaboration (data till December 2013) Note: it does not include the properties acquired with the fourth loan, under implementation. Vulnerable works and housing (before construction) Finished resettlement and construction 4.1. Public space occupants (PSO) 6

Public space occupants (PSO) are a special chapter since, except for Bogota and Medellin, the cities did not have public policies in this regard. Guidelines for this type of resettlement were developed together with the Ministry of Transport, emphasizing in the formalization, economic reconversion, training and financing of their transition to formality. The process was especially instructive in Cartagena (Transcaribe), the city with the highest number of PSO, but also the one that deployed greater efforts and finally left greater lessons learned. In all cases, people have been successfully transferred and without conflict. Tabla 7 PSO identification and progress of the solution provided by Implementing Agency Implementing Entity PSO Estado del traslado Temporal Definitive Metroplús 294 49 245 Transcaribe 1260 620 640 Transmetro 459 169 290 Megabús 46 0 46 Metrolinea 142 142 0 TOTAL 2201 980 1221 Source: own elaboration (data till December 2013) Public space occupied and public space recovered in Cartagena (Basurto and Av. Venezuela) 5. Safeguards Pedagogy When implementing projects with safeguards, one of the initial difficulties is the search for experienced social professionals. This was the case of the BRT projects in Colombia, where except for Bogota and Medellín, the cities were unaware of this issue and the social staff hired by the Implementing Entities did not have the specific experience in safeguards. The strategy adopted 7

during the first NUTP loan was an intensive process of training in safeguards, resettlement and dissemination of project instruments through local and, in some cases, regional workshops. Subsequently, annual workshops were held with all NUTP participating cities, to share experiences, lessons learned and unresolved challenges, which allowed to strengthen links and cross-cutting networks among social, legal and technical professionals. This strategy became so strong that nowadays, in the execution of the fourth loan and with the inclusion of the intermediate cities in the program, these workshops are scheduled twice a year and they allow the sharing of experiences and learning not only with those cities with WB financing, but also with the five cities financed by IADB and CAF. Sharing these achievements and difficulties among the 15 cities participating in the Colombia NUTP can be one of the most enriching experiences for the professionals involved and for the communities, that receive a more accurate assistance in resolving resettlement problems. 6. Results of Resettlement Plans As a tool for the verification and evaluation of the resettlement process, closing documents for the resettlement plans were implemented, corresponding to post-resettlement or land acquisition monitoring. To date there are 23 closing documents for the same number of completed resettlement plans. For the preparation of these documents, which were reviewed by the Ministry of Transport, the following topics were considered, among others: i) updated situation of all social units registered; ii) monitoring of the differentiated solution applied and verification of its implementation, iii) monitoring of the payment system to establish that all payments for land, constructions or any type of compensation have been made, iv) monitoring of the scope and progress of each program in each resettlement plan. In cases of vulnerable social units, visit to the new location were also carried out to verify compliance with the agreement. These closing documents, as the name implies, helped to identify the completion of the plans or the situations to be resolved. However, since the BRT program is still being implemented, there is no final evaluation of the results. Some indicators of success are the absence of lawsuits filed by those affected, the timely progress of works, and the absence of social conflicts around resettlement. In addition, in many of the cities where transportation systems are implemented, municipalities have observed resettlement as a good practice and have involved, to a greater or lesser extent, programs and methodologies used in this project. 7. The Social Cost 8

One of the most frequent discussions when it comes to implementing resettlement is the cost or overburden of social teams and the compensation values to be paid. The following tables show, first, the cost of the project vs. cost of land acquisition, and second, a breakdown of the compensation value. Compensations are a marginal cost and the value of the properties, although very important in the project, do not exceed 10% in most cases. Table 9 Percentage ratio between compensation, properties acquired and total value of works by city Implementing agencies Total value of economic compensations % Total value of land and property acquisition % Total value of the project Metroplus Medellín 3,734,441,827 0.997 33,642,412,866 8.98 374,621,765,954 Metroplus Envigado 1,112,992,872 0.666 15,470,315,821 9.25 167,226,392,535 Metroplus -Itagüí 1,392,280,030 0.768 16,386,411,372 9.04 181,217,900,000 Transcaribe 2,911,808,662 0.748 74,611,418,607 19.15 389,519,460,772 Transmetro 2,294,836,400 0.492 32,933,202,814 7.05 466,881,038,603 Megabús 2,119,401,112 0.985 17,435,475,041 8.11 215,059,439,795 Metrolinea 1,111,088,681 0.217 30,285,437,016 5.90 513,070,057,000 TOTAL 14,676,849,584 0.636 20,764,673,537 9.57 2,307,596,054,659 Source: own elaboration (data till December 2013) Table 10 Percentage ratio between types of economic compensation Procedures Transfer Rent Transfer of economic activity Housing replacement Additional acknowledgements 3,479,973,000 548,171,000 1,645,273,000 5,914,419,000 762,721,000 1,891,178,000 Source: own elaboration (data till December 2013) Note: some values are approximate. 8. Conclusions The role of the WB and the activation of safeguards is decisive for adequate social interventions regarding resettlement. Considering that Colombia does not have explicit rules on resettlement, only projects financed by multilateral banks internalize resettlement within projects. The Resettlement Policy Framework has been adopted by the Ministry of Transport for all multilateral-funded projects, a decision that is on the right track to implement a public policy. The interdisciplinary approach is key for resettlement. It is still necessary to intensify the search for methodologies that allow a better articulation between disciplines, treated with equal hierarchy, and a horizontal dialogue with the communities. 9

Economic compensations are correlated with "the involuntary", key issue in a resettlement policy. It is required that the projects contemplate these items in their execution. Valuation methods of the goods to be acquired, even if they are in line with the WB policy, still depart from a dominant position of the State, where the citizen turned into a "seller" is a passive subject with few opportunities to discuss transaction values. Impact mitigation has spread to the reestablishment of law, an approach that may allow a better understanding of resettlement, beyond a mere commercial transaction. 10