CHENNAI METROPOLITAN WATER SUPPLY & SEWERAGE BOARD No.1, Pumping Station Road, Chintadripet, Chennai

Similar documents
CHENNAI METROPOLITAN WATER SUPPLY & SEWERAGE BOARD No.1,Pumping Station Road, Chintadripet, Chennai

CHECKLIST FOR APPROVAL OF BUILDING PLAN

APPLICATION FOR REGULARISATION OF UNAUTHORISEDLY CONSTRUCTED BUILDING /BUILDING CONSTRUCTED IN DEVIATION OF THE SANCTIONED PLAN /SURYAPET MUNICIPALITY

ORDINANCE NO. 169 BODEGA BAY PUBLIC UTILITY DISTRICT

Hillsborough Municipal Utilities Authority Rate Resolution Page 1

The Orissa Electricity (Duty) Act, 1961.

A Bylaw to establish rates and charges for the use of the City of Port Coquitlam Sanitary Sewerage System.

COSMOS INFRAESTATE PVT. LTD.

TENDER FORM. List of available documents for the premises at Rupayan R-10, 2nd floor, Nehru Enclave, Gomati Nagar, Lucknow, comprising of 3 BHK.

I, son / wife of Sh., aged years, resident of House No., Sector, Chandigarh, do hereby solemnly affirm and declare as under :-

No. HCA-II / 22/ 2016 DATED: 5th October TENDER DOCUMENT

Building permit fee, completion fees, temporary structures permit fees and calculations thereof:

BODEGA BAY PUBLIC UTILITY DISTRICT

v Street AP HOUSING BOARD COLONY vi Locality AP HOUSING BOARD COLONY Yes Yes

THE CORPORATION OF THE CITY OF GRAND FORKS

TENDER NOTICE (NIT NO: CDFD/ENGG/HVAC/WORKS/ /05)

Application for IEX Membership

ABSTRACT. G.O.(Ms) No.234 Dated: The appended Notification shall be published in the next issue of the Tamil Nadu Government Gazette.

Following documents are required to be submitted in the case original registrant died and claim to be transfer in the name of legal heir.

APPENDIX 1. Form for first application to erect, re-erect, demolish or to make material alteration in a building

BHAGWAN MAHAVIR HOSPITAL H-4/5, GURU HARKISHAN MARG, PITAMPURA DELHI Phone: Fax:

1. Regn. No. & date. 2. Existing Account No. (If any) To The Punjab State Power Corporation Limited,

Annexure A FORM OF COMPLAINT(TO BE LODGED ) WITH THE BANKING OMBUDSMAN

TENDER FOR PROVIDING CONSULTANCY SERVICES FOR MASTER PLAN FOR THE ESTABLISHMENT OF MEDICAL DEVICES PROJECT AT THONNAKKAL, THIRUVANANTHAPURAM

By-Law No. 11. Trade Waste

Brihan Mumbai Electric Supply & Transport Undertaking (Of the Municipal Corporation of Greater Mumbai)

CHECKLIST FOR TRANSMISSION OF SHARES

1 P a g e. To be generated automatically by the E-procurement portal of the Govt. of Punjab.

THANE MUNICIPAL CORPORATION, THANE. RAJIV GANDHI MEDICAL COLLEGE & CHHATRAPATI SHIVAJI MAHARAJ HOSPITAL, KALWA. E-TENDERING

APPLICATION FORM FOR INTERNET BANKING (FOR CORPORATE)

Application for REC Membership

Central Water Authority (Water Supply for Non-Domestic Purposes) Regulations 1992

Checklist for Incorporation of Company

The Planning Authority (Levy of infrastructure and amenities charges) Rules, 2007.

INDIAN MARITIME UNIVERSITY (A Central University) Ministry of Shipping, Govt. Of India EAST COAST ROAD, UTHANDI CHENNAI TENDER FOR

(I) FOR BUILDING PLAN APPROVAL A) CHECKLIST FOR APPLYING OF BUILDINGS PLAN APPROVAL ON INDIVIDUAL RESIDENTIAL PLOTS

CONSOLIDATED. Sewer Utility Bylaw No. 1600, List of Amendments. Consolidated for Convenience Only

ORDINANCE NO

F.No.III-129/2017-NZP/ Government of India National Zoological Park Mathura Road, New Delhi - 3

BANGALORE MEDICAL COLLEGE AND RESEARCH INSTITUTE SUPER SPECIALITY HOSPITAL (PMSSY) VICTORIA HOSPITAL CAMPUS, BANGALORE

FORM J. REQUEST LETTER FOR ISSUANCE OF DUPLICATE SHARE CERTIFICATE (Transmission of shares) From: (Name, Address & ID of Legal heir)

Application Form for New Connection

ADMINISTRATIVE TRAINING INSTITUTE GOVERNMENT OF WEST BENGAL FC-BLOCK, SALT LAKE CITY, SECTOR-III, KOLKATA NOTICE INVITING TENDER

WATER AND SEWER ORDINANCE

BOOKLET FOR ADDITION OF APPLICANT NAME

UPDATED AS ON DECEMBER 4, Guidelines for Remisier Registration

NOTICE INVITING TENDER

MUTUAL FUNDS Aditya Birla Sun Life Mutual Fund

Bowen Island Municipality. Snug Cove Sewer Regulation Bylaw No. 46, 2002

National Textile Corporation Ltd

WEB UPDATE 28 JUN 18 AFNHB MEERUT PROJECT OFFER OF POSSESSION OF TOWERS A & G

Village of Suamico. Chapter 9 SEWER UTILITY

New Bank Mandate Details with Attestation from Bank Branch Manager

Sub: Application for obtaining possession /demarcation of plot No. Sector

THE BANKING OMBUDSMAN SCHEME 2006 (including May 24, 2007 Amendments) NOTIFICATION. Ref.RPCD.BOS.No. 441 / / December 26, 2005

CHAPTER XIV WATER AND SEWERS ARTICLE 1. WATER SERVICE

STANDARD OPERATING PROCEDURE INSPECTION

BID DOCUMENT SECTION I

Business Park Maintenance Service Pvt. Ltd.

APPLICATION FOR DECEASED CLAIM (To be used when account has nomination or is a joint account with survivor clause)

TENDER FORM Controller of Stores, HIMACHAL PRADESH (INSTRUCTION TO TENDERERS)

PART I GOVERNMENT OF PUNJAB

TENDER FORM FOR SHOPS AT ESIC COLONY, SECTOR-56, NOIDA (U.P.)

CHECK LIST DULY FILLED IN TO BE ATTACHED WITH THE TENDER. 1 Whether Earnest Money is enclosed. Yes/No

GENERAL TERMS AND CONDITIONS OF TENDER

RSAC:P/TC:2019:06 Dated : Short Term Tender Notice

SANITARY SEWERAGE SERVICE AGREEMENT Between MOUNT LAUREL TOWNSHIP MUNICIPAL UTILITES AUTHORITY And

Bharat Sanchar Nigam Limited (A Govt. of India Enterprise) Southern Telecom Region (An ISO 9001:2000 Organization) BID DOCUMENT

NOTICE. 1. To consider and if thought fit, to pass, with or without modification(s), the following

Application Form for New Connection

CHAPTER 196 WATER AND SEWERAGE CORPORATION WATER SUPPLY RULES

CHAPTER 18 SEWERS AND SEWAGE DISPOSAL PART 1 PUBLIC SANITARY SEWER COLLECTION SYSTEM

LICENSE OF OCCUPATION

FORM NO. 15CA. Name of Remitter (Person responsible For making payment u/s 195 of IT Act, 1961)

Maharashtra Electricity Regulatory Commission, Mumbai.

PUBLISHED IN THE GAZETTE OF INDIA (PART II SECTION 3, SUB SECTION (ii) DATED 30 TH DECEMBER, 1983)*

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT)

REGULATION OF THE SANITARY SEWER DISTRICT OF WAUKEE, IOWA, PROVISIONS FOR SEWER RENTAL AND REGULATION CONNECTIONS WITH THE CITY SANITARY SEWER SYSTEM.

SECTION III. LIST OF ANNEXURES [ I TO XII ] [ PAGE 01 TO 20 ]

OFFICE OF THE CHIEF ELECTORAL OFFICER, HARYANA 30-BAYS BUILDING (3 rd FLOOR), SECTOR 17-B, CHANDIGARH TENDER DOCUMENT. For


No. 29/01/2013-OM&C Government of India Planning Commission

dezpkjh jkt; chek fuxe Employees' State Insurance Corporation

No.KFL/381/98/OT-178 October 19, 2018 TENDER FOR SUPPLY OF CALENDARS

AGRICULTURAL PRODUCE MARKETING COMMITTEE (Market Of National Importance) New Office Complex, NFM- Ph.-II, Sarai Pipal Thalla, Azadpur, Delhi-33.

TENDER FOR PRINTING & SUPPLY OF 2000 NOS. OF 150 YEARS BALMER LAWRIE HISTORY BOOK TENDER REF. NO. ADMIN / 150 YEARS TENDER NO.

OFFICE OF THE SUPERINTENDING ENGINEER ELECTRICITY TRANSMISSION CIRCLE U.P.POWER TRANSMISSION CORPORATION LIMITED DLW, BHIKHARIPUR VARANASI

Annexure A TENTATIVE NO OF VACNCIES* (Qualifications/ Experience) POST

ADANI ELECTRICITY MUMBAI LIMITED

REQUEST FOR PROPOSAL For Food Plaza for Leasing

TENDER DOCUMENT FOR APPOINTMENT OF SUB-LICENSEE TO SET UP & OPERATE MILK STALLS AT RAILWAY STATIONS IN THE STATE OF ODISHA

NOTIFICATION. GOVERNMENT OF SINDH HOUSING & TOWNPLANNING DEPARTMENT Karachi, dated: October, 29, 2002 S NO. REGULATION NO.

Supporting Documents required in case of No Nomination

ANNEXURE I. In this procedure, unless there is anything repugnant in the subject or context:

GOVT OF ASSAM OFFICE OF THE JOINT DIRECTOR OF HEALTH SERVICES cum MEMBER SECRETARY, DISTRICT HEALTH SOCIETY, KAMRUP AMINGAON, GUWAHATI-31

Subject: Sale of wood of Subabul and Eucalyptus trees from the NFL s premises at Vijaipur.

CHAPTER 1 ADMINISTRATION

PEC LIMITED (A Govt. Of India Enterprise) HANSALAYA, 15-BARAKHAMBA ROAD, NEW DELHI

Annexure 2 (See Clause 4.11) Application for Supply of Electricity at High Tension (to be submitted in 5 sets)

Nagpur - Pooja Palace 401B TENDER NO TENDER FORM. Background:

Transcription:

CHENNAI METROPOLITAN WATER SUPPLY & SEWERAGE BOARD No.1, Pumping Station Road, Chintadripet, Chennai - 600 002. APPLICATION FOR WATER / SEWER CONNECTION To THE AREA ENGINEER Water Application No. 1) Name and Address of the Applicant Sewer Application No. Type of Building OFFICE PURPOSE ONLY Date of Registration / / 201 a. Legal status of the Applicant Owner Lessee Power of Attorney Others (mention specifically) b. Name and Address of the owner (if the applicant is not the owner) c. Contact Details Phone : Mobile : Email : 2) Address of the Premises for which water / sewer connections sought a) Whether the connection is for New Building Yes No b) Whether the connection is for Modified Building Yes No c) Whether Alteration to existing water/sewer connection Yes No 3) a) Whether Rainwater Harvesting structure provided Yes No b) Whether Diaphragm Chamber structure provided Yes No 4) Metro Water Area / Depot No. / CMC No. by Corporation Corporation Zone Division No. Annual value fixed as per CMC No. / Local Authority 5) Calculation of equivalent dwelling units and connection charges: / _ / _ / _ Zone / Ward No. / Bill No. / Sub No. Sl. No. Utlity of the Building Area per dwelling unit (in Sq.m.) Built-up Area (Sq.m.) Equivalent dwelling units (in nos.)* Rate per dwelling Unit (in ) Amount (in ) Water Sewer Water Sewer 1. Residential Independent houses (i) upto 500 sq.ft. Upto 46.47 1 100 100 (46.47 sq.m.) 2. (ii) upto G+1 Above 46.47 1 5000 5000 Upto 100 (iii) upto G+1 Above 100 7500 7500 Upto 200 All other residential buildings/flats (Buildings having G+2 and above and flats) All other Buildings / Flats Upto 200 7500 7500 3. Non Residental** Category - A 100 7500 7500 Category - B 50 7500 7500 Category - C 25 7500 7500 4. Mixed use of buildings (partly residential and partly commercial etc.) 5. Residential Upto 200 7500 7500 Commercial As per Sl.No. 3 7500 7500 above Reconnection of service connections disconnected for non-payment of tax and charges / Shifting / Renewal of existing connection Irrespective of built up area and category for single connection Reconnection / Shifting / Renewal 1 7500 7500 Total in 6) *To be filled in by the Applicant ** Please see the guidelines No. 2 for relevant category Amount Payable : Connection charges (as calculated above) for water Connection charges (as calculated above) for sewer Advance tax wherever applicable (as per para 3 of guidelines) Meter testing charges (as per para 4 of guidelines) Deposit Amount for Water Deposit Amount for Sewer Caution Deposit for Temporary Water/Sewer Connection Penalty (Reconnection/Unauthorised Connection) Total Amount

DECLARATION OF THE APPLICANT I/We have taken note of the contents of all guidelines and instructions. As per the item No.11 (a) of the guidelines, I/We have made proper rainwater-harvesting arrangements and will maintain the same properly. As per the Item No.11 (b) of the guidelines, I/We have constructed proper Diaphragm chamber arrangement and will maintain the same properly. I/We know that sewerage system is meant only for conveying liquid Toilet waste. I/We therefore hereby undertake that I/We shall not discharge solid/kitchen waste into the sewer system and in case of violation, Metro water will disconnect my sewer line. I/We hereby undertake to promptly report the additional charges to CMWSS Board in case of any change in use of the building and in built-up area. l/we declare that this is a new building constructed by demolishing the old building and the old water/sewer connection were already disconnected (for demolished building only). I/We declare that I have paid arrears of Water / Sewerage Tax and charges payable to Board. I/We agree to pay penalty in case of default as indicated in the guidelines and instructions mentioned in the application form. I/We agree to forego the connections and all the charges paid in the event of any objections raised by Corporation of Chennai/CMDA. I/We am/are aware of the tariff structure for Water / Sewerage Tax and charges of the Board and abide by the Rules and Regulations of CMWSS Board. Place: Date: Signature and name of the applicant. OFFICE PURPOSE ONLY The following has to be ensured before effecting New Connection / Re-Connection / Renewal / Shifting :- 1) Requirement of Completion Certificate as per circular instructions in force. 2) The payment of Full Infrastructure Development Charges in case of Special / Multi - Storeyed Buildings. 3) The payment of Water / Sewerage Tax and Charges for the Old CMC Number. 4) The payment of Unpaid / Under Paid Infrastructure Development Charges, Connection Charges etc., if any. Remarks, if any : Signature of A. E. / J. E. (REGN.)

GUIDELINES / INSTRUCTIONS TO THE APPLICANTS 1. a) Applicants are requested to read the application form thoroughly before filling the application. b) While measuring the area of the building for calculating the number of dwelling units, the covered car parking, covered portico, covered staircase, Head rooms etc. should be taken into account. However, Open to Sky (OTS) portion need not be included. c) In case of flats/apartments, equivalent dwellings should be calculated for each flat/apartment based on SI.No.2 in the table. d) In respect of mixed use buildings (Buildings having domestic and commercial) separate details should be furnished for the area occupied for residential and non-residential purpose and total amount payable should be worked out while calculating equivalent dwelling unit. For this purpose applicant should furnish the details of flats/apartments under residential category and other categories separately. e) For residential building having commercial utility also it can be considered as fully commercial when the total built up area is equal to or within one equal unit, under respective classification A or B or C whichever is applicable. Illustration: 90 sq.m. built up area having both residential and commercial use, then, it will be calculated as one unit of commercial unit. 2. NON-RESIDENTIAL: In respect of non-residential/commercial buildings the connection charges will be computed based on Equivalent dwelling Units basis the term to be reckoned as detailed below. CATEGORY A : Offices, Hospitals without inpatient facilities, Educational Institutions without Boarding and Lodging,Temples,Churches,Mosques, guest houses, shopping / commercial complexes, Cinema Theatres, Factories with or without toilets, consulting room of all kinds and similar type of buildings, every 100 sq.m of built up area or part thereof, is calculated as one dwelling unit. Illustration: If the area is 170 Sq.m then the total area is divided by 100 Sq.m. and calculated as two dwelling units. CATEGORY B : Hotels, Restaurant, Educational Institutions with Hostels, Lodging Houses, Marriage Hall, Hospitals with Lab & Diagnostic facilities only and without inpatient facility and any other buildings of similar natures, every 50 sq.m of built up area or part thereof is calculated as one dwelling unit. Illustration: If the area is 170 sq.m. then the total area is divided by 50 Sq.m. and calculated as four dwelling units. CATEGORY C :Hospital with inpatient facilities, every 25 sq.m. of built up area or part thereof is calculated as one dwelling unit. Illustration: If the area is 170 Sq.m then the total area is divided by 25 Sq.m. and calculated as seven dwelling units. 3. Applicant has to pay 3,000/- per equivalent dwelling unit as advance tax if the building is not assessed for water and sewerage tax. 4. All buildings shall be given metered connection with bore size given below except residential buildings seeking hand pump connection and Meter testing charges has to be paid on the following basis: SI. No Equivalent Dwelling Units Bore size for water connection (in mm) Size of sewer connection (in mm) Meter testing charges () 1 Upto 6 15 100 100 2 7 to 20 20 150 200 3 21 to 40 25 150 300 4 41 to 70 32 150/250 400 5 Above 70 40 250 500 5. Applicant has to supply material for road portion work and has to pay extra road cut charges if it is newly laid road, since the connection charges includes only single road cut restoration charges. In case of water connection, the applicant should use MDPE pipes. 6. a) Only one water connection will be provided for group of flats housed in one block. b) While paying water/sewer charges the Flat Owners/Associations have to pay the required charges considering each Flat/Apartment as a separate consumer as per respective category even though a single water connection is given for the multi-storeyed buildings. c) In case some of the flats are not occupied, the promoter/flat owners association has to pay water/sewer charges till the flats are occupied by the owners or sold by the promoter. In Multi-Storeyed buildings whether all the flats are occupied or not water/sewer charges have to be paid for all the flats from the date of effecting connection by the Promoter/Flat Owners Association. 7. Payment of connection charges can be made at Canara Bank Branch located at No.1, Pumping Station Road, Chintadripet, Chennai - 600 002 at Metrowater Head Office only.

8. The filled up application form along with receipt for the payment for the connection charges and necessary enclosures must be registered at the registration counter of CMWSSB Head Office at No.1, Pumping station Road, Chintadripet, Chennai - 600 002 in person before 3.00 p.m. on all working days or by post. Applicants are requested to get the acknowledgement from the registration counter on submission of application. 9. Applications can be obtained at free of cost at all the Metro water Depot offices, Area offices and Head office. Application can be downloaded from the Board s Web site www.chennaimetrowater.tn.nic.in 10. Connection will be sanctioned, pending inspection based on the voluntary declaration of information furnished by the applicant. 11. a) Water/Sewer connection shall be effected only to the buildings which have proper rainwater harvesting arrangements. b) Water and sewer connections shall be effected to Hotels, Marriage Halls, Cattle yards, Educational institutions, Hospitals with Laboratory and Diagnostic facilities, Hospitals with inpatient facilities, Hostels, Guest Houses, Cinema Theatres, Factories and Restaurants including Canteens, any building/premises housing any of the above facilities provided they have a proper Diaphragm chamber to arrest the solid waste/kitchen waste. 12. CMWSSB has dispensed with the system of licensed plumbers for submission of water/sewer applications. The proposal in the application can be self certified by the applicant. 13. If the information about the category and the area of the building furnished by the applicant is found to be wrong, the applicant has to pay two times of the difference amount additionally. 14. If any addition or deviation or alteration and change in usage of building is made in future, it should be informed to Metrowater for regularization within three months time, failing which connections will be disconnected. In such cases while availing the fresh connection, penalty will be levied along with fresh connection charges (Two times the regularisation charges). 15. At the time of connection, if the vital informations (i.e., production of copy of forgery documents) furnished by the applicant are found to be wrong, no connection will be effected and all the charges already paid by the applicant will be forfeited. 16. The following documents are to be attached along with the application (Enclosures) i) True copy of plans sanctioned by CMDA/Corporation of Chennai/Local Authority. ii) iii) iv) Copy of Notice issued for assessment of property with floor wise assessment details. Copies of acknowledged letters seeking assessment of property tax, water and sewerage tax (If not assessed) a) Drawings showing internal plumbing work and connection to public water/sewerage main with length, nature of Road portion such as mud/platform, Tar Bitumen / WBM etc., signed by owner/applicant. b)the applicants seeking water and sewer connection for Residential Independent House upto 500 sq.ft., need not enclose the drawing showing internal plumbing works etc. but built up area statement to be furnished with applicant s signature (specimen copy enclosed). v) Registration No. of sewer application with copy of the challan for having paid the connection charges if already sewerage facilities availed. vi) vii) viii) ix) a) Proof of having paid taxes / charges up to date (photocopy to be enclosed) b) For address proof, the copy of Ration card should be enclosed by the applicants seeking sewer/water connection for the residential independent house upto 500 sq.ft. c) The acknowledged copies of letters seeking assessment for tax from Corporation of Chennai/Local Authority and CMWSSB should be enclosed by the applicants seeking water connection for the Residential Independent House upto 500 sq.ft. Advance tax need not be paid by these applicants. True copy of Completion certificate issued by the CMDA/Corporation of Chennai wherever applicable. Proof of having paid Infrastructure Development charges to CMWSSB whereever applicable (photo copy to be enclosed) Area of floor wise details for each dwellings / flats / apartments (to be enclosed in a separate sheet). x) a) An Indemnity Bond in the specimen copy attached to be enclosed on a Non-Judicial Stamp Paper of 20/- incorporating the conditions and the same to be attested by the Notary Public. xi) b) In the case of applicants having residential independent house upto 500 sq.ft. area, an undertaking letter incorporating the conditions should be enclosed (specimen copy enclosed) instead of Indemnity Bond on a Non-judicial stamp paper of 20/-. Two Copies of Infrastructure Development Charges calculation sheet signed by the owner in applicable cases Signature, name and address of the applicant

STATEMENT OF INFORMATION ABOUT THE CATEGORY AND AREA OF THE BUILDING 1. The following details are to be furnished by the applicant under self certificate as per Clause 12 of Guidelines/Instructions to the applicants 2. As per Clause 16 (ix) of Guidelines/Instructions to the applicants, the applicant has to enclose Floor Wise Area Details for each dwellings/ flats/ apartments (to be enclosed in a separate sheet) 3. Be aware of Clause 13 of Guidelines/Instructions to the applicants which read as If the information about the category and the area of the building furnished by the applicant is found to be wrong, the applicant has to pay two times of the difference amount additionally while furnishing statement of information about the category and area of the building. a. Name of Applicant : b. Site Address : c. Type of Building : G / G+1 / G+2 / S+1 / S+2 / S+3 / d. Building Use : Residental / Commercial / Mixed Use e. Common Utility Area : in Sq.M. f. Planning Permission No. : Dated CMDA Letter No. : g. Completion Certificate No. : Dated (As per Clause 1(b) of Guidelines/Instructions to the applicants, only the portion of Open To Sky (OTS) need not be included, while measuring the area of the building for calculating the number of dwelling units) Signature and Name of the Applicant (P.T.O.)

h) If the building is Residential category SI. No. Floor Name Flat No. Area in Sq. M. Distributed common Utility Area to the Flat in Sq. M. Total Area of Flat in Sq. M. No. of equivalent dwelling units TOTAL If necessary additional sheets can be used for this tabular statement and each page to be signed by the applicant. i) If the building is Commercial category SI. No. Floor Name Area utility for category (in Sq. M.) Distributed common utility area to the each category in Sq. M. Total Area of Category in Sq. M. No. of equivalent dwelling units A B C A B C A B C A B C Total No. of equivalent dwelling units TOTAL If necessary additional sheets can be used for this tabular statement and each page to be signed by the applicant. j) If the building is Mixed Use category, use tables in h and i and state the no of equivalent dwelling units as below: Total No of Residential equivalent dwelling units : Total No of Commercial equivalent dwelling units : Total No of equivalent dwelling units : Signature and Name of the Applicant

WORKING SHEET FOR COMPUTATION OF INFRASTRUCTURE DEVELOPMENT CHARGES SELF DECLARATION BY THE APPLICANT AREA : DEPOT : TYPE OF BUILDING : NAME OF THE APPLICANT : SITE ADDRESS : Sl. No. DESCRIPTION BUILT UP AREA IN SQ.M REMARKS 1 FLOOR WISE AREA 2 HEAD ROOM 3 LIFT MACHINE ROOM 4 OVER HEAD TANK 5 COVERED CAR PARKING 6 SUMP 7 SEWER CHAMBERS 8 COMPOUND WALL 9 RAINWATER HARVESTING ARRANGEMENT 10 METER CHAMBER 11 DIAPHRAGM CHAMBER 12 OTHERS IF ANY 13 TOTAL BUILT UP AREA IN SQ.M AMOUNT PAYABLE TOWARDS 14 INFRASTRUCTURE DEVELOPMENT CHARGES (AT THE RATE OF 110/- PER SQ.M FOR THE TOTAL BUILT UP AREA) Say 15 IDC AMOUNT ALREADY PAID 16 BALANCE IDC AMOUNT TO BE PAID I/WE HEREBY UNDERTAKE TO MAKE ADDITIONAL PAYMENT OF INFRASTRUCTURE DEVELOPMENT CHARGES TO CMWSSB, IF ON INSPECTION BY AUTHORITIES, THE TOTAL BUILT UP AREA IS FOUND TO BE MORE THAN THAT DECLARED BY ME / US. I. D. C. AMOUNT IN RS. NAME OF THE BANK : D. D. NO. DATE: SIGNATURE AND NAME OF THE APPLICANT A. E. / J. E. (REGN.) (P.T.O.)

OFFICE PURPOSE ONLY AMOUNT PAID DETAILS OF INFRASTRUCTURE DEVELOPMENT CHARGES SL. NO. DESCRIPTION AMOUNT PAID () CHALLAN NO. (or) IDC REGISTER SL. NO. DATE 1 IDC AMOUNT PAID AT C.M.D.A. 2 IDC AMOUNT PAID AT C.M.D.A. 3 IDC AMOUNT PAID AT C.M.W.S.S BOARD (UNPAID / UNDER PAID) 4 IDC AMOUNT PAID AT C.M.W.S.S. BOARD 5 IDC AMOUNT PAID AT C.M.W.S.S. BOARD TOTAL IDC AMOUNT PAID INCHARGE (l.d.c. REGISTER) A. E. / J.E. (REGN.) NOTE FOR AREA ENGINEER: It is requested to verify the total built up area declared by the applicant. If total built up area exceeds, the applicant be informed with the details of excess built up area and short fall amount of IDC and further applicant be advised to make payment of balance Infrastructure Development Charges to Board by obtaining a challan from Registration wing. The copy of communication sent to the applicant in this regard may be sent to E.E.(A.O.B.M.). The connection shall be effected only after making the payment of full Infrastucture Development Charges payable to the Board by the applicant. A. E. E. / REGN. E. E. (A.O.B.M.)

WORKING SHEET FOR COMPUTATION OF INFRASTRUCTURE DEVELOPMENT CHARGES SELF DECLARATION BY THE APPLICANT AREA : DEPOT : TYPE OF BUILDING : NAME OF THE APPLICANT : SITE ADDRESS : Sl. No. DESCRIPTION BUILT UP AREA IN SQ.M REMARKS 1 FLOOR WISE AREA 2 HEAD ROOM 3 LIFT MACHINE ROOM 4 OVER HEAD TANK 5 COVERED CAR PARKING 6 SUMP 7 SEWER CHAMBERS 8 COMPOUND WALL 9 RAINWATER HARVESTING ARRANGEMENT 10 METER CHAMBER 11 DIAPHRAGM CHAMBER 12 OTHERS IF ANY 13 TOTAL BUILT UP AREA IN SQ.M AMOUNT PAYABLE TOWARDS 14 INFRASTRUCTURE DEVELOPMENT CHARGES (AT THE RATE OF 110/- PER SQ.M FOR THE TOTAL BUILT UP AREA) Say 15 IDC AMOUNT ALREADY PAID 16 BALANCE IDC AMOUNT TO BE PAID I/WE HEREBY UNDERTAKE TO MAKE ADDITIONAL PAYMENT OF INFRASTRUCTURE DEVELOPMENT CHARGES TO CMWSSB, IF ON INSPECTION BY AUTHORITIES, THE TOTAL BUILT UP AREA IS FOUND TO BE MORE THAN THAT DECLARED BY ME / US. I. D. C. AMOUNT IN RS. NAME OF THE BANK : D. D. NO. DATE: SIGNATURE AND NAME OF THE APPLICANT A. E. / J. E. (REGN.) (P.T.O.)

OFFICE PURPOSE ONLY AMOUNT PAID DETAILS OF INFRASTRUCTURE DEVELOPMENT CHARGES SL. NO. DESCRIPTION AMOUNT PAID () CHALLAN NO. (or) IDC REGISTER SL. NO. DATE 1 IDC AMOUNT PAID AT C.M.D.A. 2 IDC AMOUNT PAID AT C.M.D.A. 3 IDC AMOUNT PAID AT C.M.W.S.S BOARD (UNPAID / UNDER PAID) 4 IDC AMOUNT PAID AT C.M.W.S.S. BOARD 5 IDC AMOUNT PAID AT C.M.W.S.S. BOARD TOTAL IDC AMOUNT PAID INCHARGE (l.d.c. REGISTER) A. E. / J.E. (REGN.) NOTE FOR AREA ENGINEER: It is requested to verify the total built up area declared by the applicant. If total built up area exceeds, the applicant be informed with the details of excess built up area and short fall amount of IDC and further applicant be advised to make payment of balance Infrastructure Development Charges to Board by obtaining a challan from Registration wing. The copy of communication sent to the applicant in this regard may be sent to E.E.(A.O.B.M.). The connection shall be effected only after making the payment of full Infrastucture Development Charges payable to the Board by the applicant. A. E. E. / REGN. E. E. (A.O.B.M.)

DECLARATION FOR RAIN WATER HARVESTING From To The Area Engineer - CMWSS Board, Chennai - 600 Sir, I/We have completed the Rain Water Harvesting Structure recently in my/our building address stated above. I/We assure that I/We will maintain the structure in good working condition always. Yours faithfully,

MODEL Letter to Revenue Department, Corporation of Chennai From Area : Div : To Sir, The Revenue Officer, Zone - Corporation of Chennai, Chennai - 600 I have a property located at...... Chennai. I am applying for water/sewer connection for the above property. Hence, I request to assess my property to levy tax. Yours faithfully, --------------------------------------------------------------------------------------------------------------------------------------------------- MODEL Letter to Finance Department, CMWSS Board From Area : Div : To The Finance Director, CMWSS Board, No.1, Pumping Station Road, Chintadripet, Chennai - 600 002. Sir, I have a property located at...... Chennai. I am applying for water/sewer connection for the above property. I have requested the Corporation of Chennai to assess my property. Hence, I request to levy water/sewerage tax at CMWSS Board for the above property. Yours faithfully,

INDEMNITY BOND I/We... have constructed a building at...... do hereby indemnify the CMWSS Board, Chennai and do hereby solemnly affirm and I/We sincerely state as follows are true and correct: 1. That I/We have applied for water and sewer connection under in Area... Division No... for the above said premises of mine/ours based on assessment order or approved plan with completion certificate if applicable from the competent authority. 2. If I /We commence additional construction by producing approved building plans, I / We agree to pay sewerage charges and water consumption charges in commercial tariff as claimed for temporary connection conditions till the completion of the building construction and after that I/We agree to regularize the additional construction and applicable connection charges will be paid by me/us depending upon the nature of the building for regularizing the connection. 3. In case of making any additional construction in future, I/we will follow the rules and regulations of CMWSS Board and same will be reported to CMWSS Board and applicable connection charges will be paid to the Board through an application with mandatory condition like assessment/approved plan with completion certificate wherever applicable. For any lapse in doing so, I agree to disconnect my/our premises water and sewer connections at my/our own cost and agree to forego the water and sewer connection and connenction charges. 4. I/We agree to inform CMWSS Board in case of change of utility for regularization within three months time, failing which I/We agree to disconnect water and sewer connection at our own cost. I/We agree to pay two times the regularization connection charges along with reconnection charges while availing reconnection. 5. In the event of any objections raised by the Corporation of Chennai or CMDA, regarding the construction of the above building, I/We agree to disconnect the water and sewer connection at my/our own cost. 6. I/We further declare that I/We am/are aware of tariff structure of the board. 7. I/We will pay water/sewer taxes and charges promptly. 8. Availing water/sewer connection is not my right and agree to forego the water and sewer connections and connection charges for any lapse in payment of water/sewerage tax and charges for the premises and I/we agree to disconnect the water and sewer connection at my own cost. 9. In case of disconnection I/we agree to pay the necessary re-connection charges. 10. I/We will pay Infrastructure Development Charges to CMWSSB on demand. 11. Myself/Ourselves and my/our successors in interest shall abide by the aforesaid declaration of this Deed of Indemnity. 12. There is no sewer line in my/our street. In future, If the sewer line is laid, then I/We will agree to avail the sewer connection at my/our own cost within a month from the date of funtioning of sewer line, failing which I will agree to disconnect the water line at my/our own cost. 13. The facts stated above are true and correct. Notary Public Signature of the applicant: Witnesses (Name and Address) 1. 2.