Technical Committee on Single Burner Boilers Date: March 10, 2010 To: Technical Committee on Single Burner Boilers From: Denise Beach, Staff Liaison/Senior Engineer Re: Agenda Package April ROC Teleconference/ Live Meeting Enclosed is the agenda package for the April 6, 2010 web/teleconference for the Report on Comments (ROC) meeting. Please ensure that you have reviewed the comments in advance, not only for technical merit, but also if you believe there are any other committees to which duplicate comments should be sent. The agenda and comments will be posted on the committee webpage. Some items to have available for the meeting include: Agenda packet with comments; your copy of the NFPA 85 Fall 2010 Report on Proposals; your copy of NFPA 85; any previous copies of NFPA 85 you may wish to reference. Optional items that are sometimes useful include previous ROP/ROCs if handy. If you have any questions or comments, please feel free to reach me at (617) 984-7501 or by e-mail at dbeach@nfpa.org. You can reach the SBB TC Chair, John Eibl at (615) 847-6383 or by e-mail at john.j.eibl@usa.dupont.com. Live Meeting Web Access. TC Members should have received a separate email with instructions on connecting through the web. If you do not have the email, please follow these steps to connect to the meeting: 1. Copy this address and paste into your web browser: https://www.livemeeting.com/cc/nfpa/join 2. Copy and paste the required information: Meeting ID: KSM6TF Entry Code: MNK2tF"gM Location: https://www.livemeeting.com/cc/nfpa 3. Dial the conferencing service directly, and enter the participant code shown below: Toll-free: +1-8773202367 Toll: +1-8773202367 Participant Code: 1959301
Technical Committee on Single Burner Boilers AGENDA Via Teleconference April 6, 2010 1. Chair s welcome, call to order, and opening remarks at 1:00 p.m. EDT. 2. Roll call of Committee Members and Guests 3. Approval of Minutes from the June 24, 2009 ROP teleconference. See E-Committee web page to view. 4. Staff Liaison Report A. Committee membership update (For the period May 1, 2009 March 5, 2010) Name Category Change Date S. Vickery U (Alternate to D. Dressel) Resignation 07/22/2009 William Rucki M (Alternate to Appointment 08/05/2009 T. Jablkowski) W. S. Matz M (Principal) Appointment 10/27/2009 G. Raney M (Alternate to W.S. Matz) Change from P to A 10/27/2009 (Total Voting Members 15; M=40%, SE=27%, U=20%; I=13%) B. Revision Cycle Review and timeline (Attachment A) 5. Old Business 6. New Business A. Review BCS-SBB Committee Scope and Document Scope (Attachment B) B. Review of public comments (see enclosed Acrobat file) C. Creation of Committee Comments (See Attachment C for TCC Notes) i. Continuous Trend Display The TCC instructed the BCS-FUN and BCS-SBB Technical Committees to establish a task group to reconsider Proposals 85-51 (20), 85-52 (65), and 85-53 (CP401) for the Report on Comments phase. The BCS-SBB TC should review the action taken by the Fundamentals TC at their ROC meeting March 17-18. ii. Flue gas analyzers The TCC instructed the BCS-MBB and BCS-SBB Technical Committees to consider adopting the language of Proposal 85-126 (54) for consistency throughout the document. iii. Other Committee Comments 7. BCS-MBB Aluminum Material Task Group (Attachment D) 8. Other Items? 9. Date/Location of Next Meeting. (NFPA 85 is currently on a 4-year revision cycle.) 10. Adjournment.
ATTACHMENT A: ROP AGENDA NFPA 85 Revision Cycle Fall 2010 NFPA 85 F2010 (last cycle F06) [BCS-AAC] Intent to enter cycle January 9, 2009 Proposal Closing May 8, 2009 (May 29 orig date) ROP Published and Posted December 28, 2009 Comment Closing March 5, 2010 ROC Published and Posted August 27, 2010 ROC TC Meetings (between March 5 and April 9, 2010) FUN ROC (Tampa) 2 days March 18-19, 2010 HRS ROC (Orlando) 2 days March 25-26, 2010 MBB ROC (Tempe) 2 days March 30-31, 2010 FBB ROC teleconference/live Meeting April 5, 2010 PFS ROC teleconference/live Meeting April 2, 2010 SBB ROC teleconference/live Meeting April 6, 2010 STO ROC teleconference/live Meeting April 2, 2010 TCC ROC (Barberton, OH, tentative) June 2-3, 2010 Intent to make motion (ITMAM) closing October 22, 2010 Issuance of standard - NO controversy January 28, 2011 (publ. bit later) NFPA WSCE Meeting with NITMAM June 4-9, 2011 Issuance of Standard with controversy July 29, 2011 (published bit later)