All TSOs of the bidding zone border Italy NORD Slovenia (hereafter referred to as NORD SI), taking into account the following, Whereas

Similar documents
Proposal for nomination rules for Physical Transmission Rights for the bidding zone border(s) Italy NORD - Slovenia in accordance with Article 36 of

Proposal for nomination rules for Physical Transmission Rights for the bidding zone border Denmark 1 Denmark 2 in accordance with Article 36 of

Proposal for nomination rules for Physical Transmission Rights for the bidding zone border(s) between

Channel TSOs proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing

GB TSOs Day Ahead proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in

of 10 January 2018 HAVING REGARD to the Treaty on the Functioning of the European Union,

29 March ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe.

ACER ON THE CORE CAPACITY CALCULATION REGION TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR FALLBACK PROCEDURES. of27 September 2018

7 th REGIONAL ENERGY CONFERENCE Konstantin Konstantinov, CEO, IBEX

We appreciate your feedback

17 November Annex I. Page 1 of 11

(successfully verified by the Director of Markets of AEEGSI, as per Resolution of 7 February 2007, and as amended) Updated as 1 December 2016

Implementing Network Codes in the. Annex 32_14th MC. Energy Community Secretariat

9478/18 GW/st 1 DG E 2B

All TSOs proposal for the determination of LFC blocks for the Synchronous Area Continental Europe in accordance with Article 141(2) of the

ACER: A new Agency in a new EU landscape

Operating Agreement. to the Haidach Natural Gas Storage Facility GSA LLC Moscow, Russian Federation

Annex 2 OTC Registration Platform (PCE) Participation Agreement

ACER. of 14 November 2017 ON THE NOMINATED ELECTRICITY MARKET OPERATORS PROPOSAL FORHARMONISED MAXIMUM AND MINIMUM CLEARING PRICES FOR

Summary This guide explains the general concepts regarding the use of the e- Nominations website Version 3.1 Date 07/02/ e-nominations...

MARKET PARTICIPANT SERVICE AGREEMENT. This MARKET PARTICIPANT SERVICE AGREEMENT is dated this day of, 2013 and is entered into by and between:

PROCEDURE FOR REDEMPTION OF RENEWABLE ENERGY CERTIFICATE

REGULATORY FRAMEWORK. Regulatory framework 1-1. Network Code

RULE ON SUPPORT SCHEME. (On Support of Generation of Electricity from Renewable Energy Sources)

Nord Pool. XBID webinar, June 2018

Copy: H.E. MR. DAMIAN GJIKNURI MINISTER OF INFRASTRUCTURE AND ENERGY OF THE REPUBLIC OF ALBANIA

Articles of Association of the. International Non Profit Association (AISBL) European Network of Transmission System Operators for Gas ENTSOG

EXECUTION STANDARD TERMS FOR CLIENT CLEARING

SLOT CAPACITY AGREEMENT FOR THE REGASIFICATION AND STORAGE BUNDLED SERVICE

ACCESS Agreement. between. TAQA Gas Storage B.V. and. [(The Bank)] and. [(The Customer)]

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL

REGULATIONS. (Acts adopted under the EC Treaty/Euratom Treaty whose publication is obligatory)

CONSOLIDATED TRANSMISSION OWNERS AGREEMENT. RATE SCHEDULE FERC No. 42

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION

Shareholders' Meeting TERNA Rete Elettrica Nazionale Società per Azioni Rome April 27, 2017

Gross Bidding Agreement

Gas Storage Agreement the Inverse Storage (hereinafter referred to as the Agreement )

RULE ON LICENSING OF ENERGY ACTIVITIES IN KOSOVO

ANNEXES. to the PROPOSAL FOR A COUNCIL DECISION

1 e-nominations Parts of e-nominations Basic Principles The e-nominations homepage Global Position...

Gas Storage Agreement (hereinafter referred to as the Agreement )

EMIR PORTFOLIO RECONCILIATION, DISPUTE RESOLUTION AND DISCLOSURE. (2) (full legal name of company) (the Counterparty).

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.5 Dynamic Scheduling Agreement for Scheduling Coordinators

Disclaimer This text is an unofficial translation and may not be used as a basis for solving any dispute

STATUTORY INSTRUMENTS. S.I. No. 333 of 2011 EUROPEAN COMMUNITIES (ELECTRONIC COMMUNICATIONS NETWORKS AND SERVICES) (FRAMEWORK) REGULATIONS 2011

Rules for alternative dispute resolution procedures

Assistance to the Ministry of Economy for the transposition of Directives 2009/72/EC & 2009/73/EC into the national legislation

Gross Bidding Agreement

REVISION SHEET FOR STORAGE SERVICE RULES

SHORT-TERM REGASIFICATION AGREEMENT

Opinion 3/2019 concerning the Questions and Answers on the interplay between the Clinical Trials Regulation (CTR) and the General Data Protection

Procedure and upcoming tools for simplification. The European Investigation Order

MONITORING OF COMPLIANCE IN REGIONAL MARKET OPERATIONS AND DISPUTE SETTLEMENTS IN MACEDONIA

RULES OF REGISTRATION AND MAINTENANCE OF LEGAL ENTITY IDENTIFIERS BY KRAJOWY DEPOZYT PAPIERÓW WARTOŚCIOWYCH S.A. (KDPW) Chapter 1 GENERAL PROVISIONS

COMMISSION DELEGATED REGULATION (EU) /... of

AMENDED AND RESTATED TRANSMISSION CONTROL AGREEMENT. Among The California Independent System Operator Corporation and Transmission Owners

IMPORTANT NOTICE IMPORTANT

CITY OF RIVERSIDE FERC Electric Tariff Volume 1 First Revised Sheet No. 1 CITY OF RIVERSIDE, CALIFORNIA FERC ELECTRIC TARIFF

REGULATORY APPROXIMATION ARTICLE 1. Scope

North American Energy Standards Board Standards Development Process

SLOT CAPACITY AGREEMENT

ATM ACCESS AUSTRALIA LIMITED ATM ACCESS CODE

1 PROCEDURE GOVERNING INTERNAL DEALING. Procedure governing internal dealing

TERMS OF REFERENCE OEB REGULATORY AFFAIRS STANDING COMMITTEE AND INDUSTRY AFFAIRS STANDING COMMITTEE

UBS LIMITED MEMBERSHIP AGREEMENT FOR THE UBS MULTILATERAL TRADING FACILITY (UBS MTF)

CUSTODY AGREEMENT Member State Member States Representative ECC Party Parties Effective Date Contracting Member States Service Contract Whereas

PARTICIPATING GENERATOR AGREEMENT (PGA)

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.3 Net Scheduled Participating Generator Agreement

EUROPEAN UNION. Brussels, 3 February 2006 (OR. en) 2005/0182 (COD) PE-CONS 3677/05 COPEN 200 TELECOM 151 CODEC 1206 OC 981

PROTOCOL CONCERNING THE ACCESSION OF GEORGIA TO THE TREATY ESTABLISHING THE ENERGY COMMUNITY

MISO Rate Schedule 30 MISO RATE SCHEDULES ITC Midwest Joint Pricing Zone Revenue Allocation Agreement

COMMISSION DELEGATED REGULATION (EU)

Council of the European Union Brussels, 7 August 2014 (OR. en) Mr Uwe CORSEPIUS, Secretary-General of the Council of the European Union

REGULATION (EU) No 649/2012 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 4 July 2012 concerning the export and import of hazardous chemicals

Northern Tier Transmission Group

2.2 The following shall be recorded for each Call relevant to the Interconnect Services in Service Schedules 1 and 4:

Procedures and Process for Development of ISO Rules and Filing of ISO Rules with the Alberta Utilities Commission

(a) Unless otherwise expressly stated to the contrary, terms used herein shall bear the following meanings:

Official Rules: Baby of the Year 2018

IN-TANK LNG SALES AND ANCILLARY REGASIFICATION SERVICE AGREEMENT. between. Terminale GNL Adriatico S.r.l. (as Seller or Operating Company ) and

NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012

Guidelines On the application of C6 and C7 of Annex 1 of MiFID II

ECC Report 194. Extra-Territorial Use of E.164 Numbers. 17 April 2013

ASSAM ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018 NOTIFICATION

FORM OF TITLE TRANSFER SERVICE AGREEMENT AGREEMENT FOR TITLE TRANSFER SERVICE UNDER TOLL SCHEDULE TTS VECTOR PIPELINE LIMITED PARTNERSHIP

.VERSICHERUNG. Eligibility Requirements Dispute Resolution Policy (ERDRP) for.versicherung Domain Names

Official Rules: MVP OF THE YEAR 2017

ODR REGULATION FIVE - COLUMN DOCUMENT

Business Day: means a working day as defined by the Provider in its Supplemental Rules.

Regulation) one of the purposes of the Agency for the Cooperation of. Agency) is to assist the regulatory authorities in exercising, at

Introduction. Standard Processes Manual VERSION 3.0: Effective: June 26,


MIGA SANCTIONS PROCEDURES ARTICLE I

CHAPTER 14 CONSULTATIONS AND DISPUTE SETTLEMENT. Article 1: Definitions

Official Journal of the European Union L 334/25

Vittoria Assicurazioni S.p.A. Company By-Laws

North American Electric Reliability Corporation (NERC) Rules of Procedure Effective in Manitoba April 1, 2012

TECHNICAL GUIDELINES FOR THE DATA COLLECTION

Clearing Membership Agreement

dotberlin GmbH & Co. KG

Transcription:

Proposal for nomination rules for Physical Transmission Rights for the bidding zone border Italy NORD Slovenia in accordance with Article 36 of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on [date of approval] DISCLAIMER This document is released on behalf of the transmission system operators ( TSOs ) of the bidding zone border Italy NORD Slovenia solely for the purpose of public consultation on their proposal for nomination rules for Physical Transmission Right for the bidding zone border Italy NORD-Slovenia in accordance with Article 36 of Commission Regulation (EU) No 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation ( FCA Regulation ). This version of the Proposal is a draft proposal and does not constitute a firm, binding or definitive TSOs position on the content.

All TSOs of the bidding zone border Italy NORD Slovenia (hereafter referred to as NORD SI), taking into account the following, Whereas (1) This document is the common proposal developed by the Transmission System Operators of the bidding zone border Italy NORD - Slovenia (hereafter referred to as TSOs) for Nomination Rules for physical transmission rights (hereafter referred to as the Proposal) in accordance with Article 36 of Commission Regulation (EU) 2016/1719 establishing a guideline on (hereafter referred to as the FCA Regulation). (2) Article 31 of the FCA Regulation foresees that long-term cross-zonal capacity shall be allocated to market participants in the form of physical transmission rights pursuant to the UIOSI principle or in the form of FTRs options or FTRs obligations. This Proposal only applies to the physical transmission rights acquired in forward capacity allocation. It lays down the rules for Nomination of physical transmission rights for the bidding zone border NORD-SI. (3) In accordance with Article 36(2) of the FCA Regulation, this Proposal is subject to consultation. Article 6 of the FCA Regulation requires that proposals submitted at bilateral or at multilateral level shall be consulted at least by the Member States concerned and that the consultation shall last for a period not less than one month. Accordingly, this Proposal was consulted from [ ] June 2017 until [ ] July 2017. (4) This Proposal is submitted for the approval of all National Regulatory Authorities (hereafter referred to as the NRAs) of the bidding zone border NORD-SI. (5) TSOs on the bidding zone border NORD-SI consider that the FCA Regulation allows the submission of this Proposal on bidding zone border level, since proposals for Nomination Rules for electricity exchange schedules between bidding zones are not listed in Article 4 of the FCA Regulation. They acknowledge that Article 36(3) of the FCA Regulation requires all TSOs to progressively harmonise the Nomination Rules on all bidding zone borders on which physical transmission rights are applied. TSOs therefore undertake to progressively examine the potential and the need for harmonisation of these rules, taking into account their technical nature. (6) This Proposal contributes to the achievement of the objectives of Article 3 of the FCA Regulation. In particular, this Proposal serves the aim of promoting effective long-term cross-zonal trade with long-term hedging opportunities for market participants giving a transparent framework for the Nomination Rules for Physical Trasmission Rights. (7) This Proposal contributes to the provision of non-discriminatory access to long-term cross-zonal capacity by detailing the process of nominating the physical transmission rights already allocated in the long-term auctions (or the process of transferring that right in accordance with Article 44 of the FCA Regulation). (8) Furthermore, this Proposal ensures fair and non-discriminatory treatment of all affected parties, as it sets rules to be applied by all parties. Before being approved, the rules detailed in this Proposal are subject to public consultation in accordance with Article 6 of the FCA Regulation. (9) Regarding the objective of transparency and reliability of information on forward capacity allocation, this Proposal includes provisions on the necessary exchange of information between the holder of the transmission rights and the nomination platform for executing the Nomination. (10) In conclusion, this Proposal contributes to the general objectives of the FCA Regulation to the benefit of all market participants and electricity end consumers. SUBMIT THE FOLLOWING PROPOSAL TO ALL REGULATORY AUTHORITIES OF THE BIDDING ZONE BORDER NORD-SI: 2

TITLE 1 General provisions Article 1 Subject matter and scope 1. This document describes the provisions governing Nomination Rules on the bidding zone border NORD-SI in terms of: - Entitlement of a physical transmission rights holder to nominate electricity Exchange Schedules; - Minimum technical requirement to nominate; - Description of the nomination process; - Nomination timings; - Format and communication 2. This document only contains rules and provision related to the Nomination of yearly and monthly physical transmission rights. 3. Forward capacity allocation on the bidding zone border NORD-SI takes place through joint explicit allocation of physical transmission rights through auctions in accordance with harmonised allocation rules for long-term transmission rights developed as per Article 51 of the FCA Regulation (hereafter Allocation Rules) and the proposal for design of Long Term Transmission Rights in accordance with Article 31 of the FCA Regulation (hereafter Long Term Rights Design). 4. This Proposal contains the terms and conditions for the Nomination of long-term physical transmission rights on the bidding zone border NORD - SI. 5. In accordance with the FCA Regulation, the Allocation Rules and Long Term Rights Design, this Proposal shall bind the holders of physical transmission rights, their counterparties where applicable, and eligible parties acting on their behalf. Article 2 Definitions and interpretation 1. Capitalised terms used in this nomination rules Proposal shall have the meaning given to them in Article 2 of Regulation (EC) 714/2009, Article 2 of Regulation (EC) 2013/543, Article 2 of Regulation (EC) 2015/1222, Article 2 of Directive 2009/72/EC, Regulation (EU) 2016/1719 and in the applicable harmonised allocation rules for long-term transmission rights. 2. In addition, the following definitions shall apply: (a) ECAN means the ENTSO-E standard protocol for Capacity Allocation and Nomination system (b) GCT means Gate Closure Time (c) HTTPS means HyperText Transfer Protocol over Secure Socket Layer (d) ICMR means the congestion management rules on the Italian interconnection, pursuant to art. 7 of annex A of the deliberation by the Italian Authority for Electricity and Gas arg/elt 162/1 published on the web site of TERNA 3

(e) PTRs means physical transmission rights as defined in the Allocation Rules and Long Term Rights Design (f) ELES means ELES, d.o.o., the Slovenian system operator; (g) TERNA means TERNA S.p.A. Rete Elettrica Nazionale, the Italian system operator; (h) XML means the Extensible Markup Language Article 3 Effective date and application This Proposal shall enter into force in accordance with the applicable national regulatory regimes. The rules described in this Proposal shall apply on the earliest possible date following the approval of the respective NRAs in accordance with Article 4 of the FCA Regulation. This date will be published by TSOs of the bidding zone border NORD - SI on their website. TITLE 2 Nomination rules Article 4 Entitlement to nominate electricity Exchange Schedules 1. In order to Nominate physical transmission rights to TERNA, the holders of PTRs and/or their counterparties and eligible parties acting on their behalf must be a signer of a injection and/or withdrawal dispatching contract and be compliant with the ICMR. 2. In order to Nominate physical transmission rights to ELES, the holders of PTRs must have a Balance Group Contract signed with Slovenian Market Operator or Contract for settlement of imbalances with the Balance Responsible Party in Slovenia. Article 5 Minimum technical requirements to nominate 1. The nomination tool of TERNA is a web-based application, therefore the minimum technical requirement to nominate to TERNA is to have an internet access and the MS Internet Explorer. The nomination tool gives the possibility to communicate also through a web services connection. 2. The nomination tool of ELES is a web-based application, to which the minimum technical requirements are published on ELES homepage (www.eles.si). Article 6 Description of the nomination process 1. The PTRs must be Nominated to both TSOs. 2. The holder of PTRs shall notify to the Allocation Platform the person eligible to nominate PTRs, according to the provisions set in the Allocation Rules. 4

3. The Allocation Platform notifies by electronic message the Rights Document of the yearly and monthly PTRs to the person eligible to nominate according to the Allocation Rules. For each direction, one Rights Document is sent to TERNA and ELES where all the yerly and monthly allocated PTRs are listed with the indication of the related contract identification and the person eligible to nominate. 4. The person eligible to nominate, has to submit the nomination at least to one TSO. The nominations to the other TSO can be submitted by the person eligible to nominate or by one or more counterparty/ies. 5. The Nominations submitted to TSOs for each contract identification shall not exceed the capacity indicated in the Rights Documents, otherwise the Nominations are reduced to the values determined in the Rights Documents. 6. After the GCT, TSOs match the Nominations and in case of mismatch, a correction cycle provides time to correct the nomination. Matching is done per each contract identification and couple of counterparts. In case the mismatch persists after the two correction cycles, the following rules are applied: a) For each hour, the lower nomination prevails; b) Following the application of rule a), in case the sum of the nominations for each contract identification exceed the capacity indicated in the Rights Document, the relevant nominations are curtailed pro rata. Values with decimals are rounded down to the next lower integer value. Article 7 Nomination timings 1. Nominations shall be sent to both TSOs for both directions by 08:30 CET of the day preceding the delivery day (GCT). 2. The Single Allocation Platform shall publish information on its website on the nomination deadline related to the nomination of long term PTR. In case of any discrepancy between the deadline published by the Single Allocation Platform and those of this valid and legally binding nomination rules Proposal, the latter shall prevail and the Single Allocation Platform shall not be held liable for any damaged due to such a discrepancy. Article 8 Format of nomination and communication 1. The nomination tool of TERNA supports two ways of communication: (a) web form interface; (b) web services communication of XML files through secure standard protocol HTTPS. The format of XML file is defined by XSD charts available on the web site of TERNA, which make it possible to validate semantics of a XML message. The structure is based on the ECAN standard provided by the ENTSO-e. 2. The nomination tool of ELES supports two ways of communication: (a) web form interface, where values can be inserted manually or by uploading the XML file; (b) nomination can be send via email in XML file, after the authorized email is reported to and validated by ELES. 5

TITLE 3 Miscellaneous For any matter related to PTR s nomination that is not contained in the present document, the following document shall be valid for nomination to TERNA: Congestion management rules on the Italian interconnection, pursuant to art. 7 of annex A of the deliberation by the Italian Authority for Electricity and Gas arg/elt 162/1. Article 9 Amendment of the nomination rules Any change of the Congestion Management Rules on the Italian interconnection, pursuant to art. 7 of annex A of the deliberation by the Italian Authority for Electricity and Gas arg/elt 162/11] that has an impact on the present nomination rules shall lead to an amendment of the present nomination rules proposal. Article 10 Language The reference language for this nomination rules Proposal shall be English. For the avoidance of doubt, where TSOs need to translate this nomination nrules Proposal into their national language(s), in the event of inconsistencies between the English version published by TSOs in accordance with Article 4(13) of the FCA Regulation and any version in another language the relevant TSOs shall, in accordance with national legislation, provide the relevant NRAs with an updated translation of the nomination rules Proposal. 6