EX-ante Evaluation. 1. Name of the Project. 2. Background and Necessity of the Project. Japanese ODA Loan

Similar documents
Ex-Ante Evaluation (for Japanese ODA Loan)

Japan s Actions Towards Gender Mainstreaming with Human Security in Its Official Development Assistance

Ex-Post Evaluation of Japanese ODA Loan Project Pak Kret Bridge and Connecting Road Construction Project

JBIC ODA Loan Project Mid-Term Review

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project

Evaluation Study of Japanese ODA for Vietnam Summary

Indonesia: Enhanced Water Security Investment Project

Building Capacity to Make Transport Work for Women and Men in Vietnam

Toward a New Era of Development Cooperation Harnessing Japan s Knowledge and Experience to Meet Changing Realities

Country Assistance Evaluation of China

Evaluation Report of Japan s Basic Human Needs Cooperation for Bolivia (Summary)

expert. The selection of the expert was carried out by the external evaluator, and agreed by JICA.

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

in Developing Countries in FY2009 Uganda SUMMARY March 2010

JICA S APPROACH TO GOOD GOVERNANCE AND ANTI-CORRUPTION. Chie Miyahara *

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map. 1. Sector Performance, Problems, and Opportunities

India: Delhi Meerut Regional Rapid Transit System Project

1. East Asia. the Mekong region; (ii) environment and climate change (launch of the A Decade toward the Green Mekong. Part III ch.

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

Country Assistance Policy for the Republic of Vanuatu

JICA s Position Paper on SDGs: Goal 10

an Inspector appointed by the Secretary of State for Communities and Local Government

Evaluation of Japan s Assistance for Pacific Island Countries

PROJECT RATIONALE. The new road and tunnel will open up the area to tourists coming south from Russia and north from Tblisi.

SB001_L.084 HOUSE COMMITTEE OF REFERENCE AMENDMENT Committee on Transportation & Energy. SB be amended as follows:

y Fomento Municipal (FUNDACOMUN);

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Resolution 2008/1 Population distribution, urbanization, internal migration and development

Texas Commission on Environmental Quality (TCEQ) Responses to Secretary of State Survey November 2007

Current Development Cooperation (DC) in the ASEAN Region

HIGH PRIORITY ROAD PROJECT AND EXPRESSWAY PLAN

WFP SUDAN SPECIAL OPERATION

Executive Board of the United Nations Development Programme, of the United Nations Population Fund

The Experience of Peru and its Applicability for Africa

PRC: Guangxi Southwestern Cities Development Project - Resettlement Due Diligence Report of Shijinglin Road Extension

Unit 3: Migration and Urbanization (Lessons 5-7)

Environmental and Social Considerations

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

Nepal. Poverty alleviation is the largest common agenda

SOUTHERN CONE OF SOUTH AMERICA

Rethinking Japan s Foreign Aid

Summer School November Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK)

THE GREAT SOCIALIST PEOPLE'S LIBYAN ARAB JAMAHIRIYA Peace, Security and Stability as Preconditions for Sustainable Development

Global Implementation of the SDGs

SYNOPSIS Mainstreaming Gender in Urban Renewal Projects

This section outlines Chinese law governing domestic dam building, Chinese policies. Policies Guiding Chinese Dam Building

Evaluating an International Cooperation Project. - from Beneficiaries Perspective -

The World Bank FOR OFFICIAL USE ONLY

San Diego s South Bay: Imperial Beach

Safety Audits and Beyond. Round Table

Country Assistance Policy for Tuvalu

Recognizing Community Contributions for Achieving SDGs in Nepal Federation of Community Forestry Users Nepal (FECOFUN)

Lesson Learned from Building Back Aceh & Nias Better. THE ROLE OF INFRASTRUCTURE IN WOMEN s ECONOMIC EMPOWERMENT

Key Words : Economic resilience, Floods, Role of Local Governments, Community empowerment, Risk communication, JEL classifications: M14

Community Survey. Report of Survey Results. April City Manager s Office

SPEECH OF AMBASSADOR MONDALE TO THE OVERSEAS ECONOMIC COOPERATION ASSOCIATION MAY 17, 1995 (As Prepared for Delivery)

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

Aggregate Permit Conditions / Site Plan Notes. Lands & Waters Aggregate & Petroleum Resources March 15, 2006

Joint Statement. Japan - Bangladesh Comprehensive Partnership

Evaluation of Japan s Grant Assistance for the Food Aid Project (KR)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA

H 7904 SUBSTITUTE A ======== LC005025/SUB A ======== S T A T E O F R H O D E I S L A N D

Gender-responsive climate action: Why and How. Verona Collantes Intergovernmental Specialist UN Women

B1: THE MAIN PROVISIONS OF THE PLANNING REGIME

Basic Polices on Legal Technical Assistance (Revised) 1

SUMMARY POVERTY REDUCTION AND SOCIAL STRATEGY

Table of Contents. Title 1: Administration. Table of Contents. gwinnettcounty Unified Development Ordinance Updated July 2015

Abidjan, Côte d Ivoire May 27-28, Mr. Chairman, Mr. President, distinguished Governors, ladies and gentlemen:

Strategy for regional development cooperation with Asia focusing on. Southeast Asia. September 2010 June 2015

Annex 2: Does the Xayaburi resettlement comply with Lao law?

MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT

HUMAN ECONOMIC SECURITY

The impacts of the global financial and food crises on the population situation in the Arab World.

APPENDIX B. Environmental Justice Evaluation

Board of Supervisors' Agenda Items

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction.

A Draft of the Co-operative Charter 1. Preamble

The Mesoamerican Region


1. East Asia. <Japan s Efforts>

Human Rights and Business Fact Sheet

Prospects for U.S.-Japan Cooperation in Development

c4hxpxnrz0

c. Equal access to employment during resettlement so that refugees are able to sustain themselves and their families in host countries;

MUNICIPALITY OF EAST HANTS BYLAW NUMBER P-100

DIRECTOR S REPORT TRANSPORTATION BOARD DECEMBER 11, 2017

Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold

Labor Based Public Works Can it be an instrument for Safety Net Strategies?

EBRD Performance Requirement 5

South-South and Triangular Cooperation in the Development Effectiveness Agenda

Economic and Social Council

EIGHTY-SIXTH SESSION WORKSHOPS FOR POLICY MAKERS: REPORT CAPACITY-BUILDING IN MIGRATION MANAGEMENT

Message. Toward the Realization of a World in Which No One Will Be Left Behind. from the President. Shinichi Kitaoka

NATIONAL REPORT ON IMPLEMENTATION OF THE UNITED NATIONS CONVENTION TO COMBAT DESERTIFICATION AND DROUGHT IN EL SALVADOR

The Power of. Sri Lankans. For Peace, Justice and Equality

The Association Agreement between the EU and Moldova

CHAPTER EIGHT: IMPLICATIONS AND LESSONS LEARNED FOR MEGACITIES

ORDINANCE NO * * * * * WHEREAS, the City Council of the City of Mont Belvieu, Texas, ( City ) is

CURRICULUM VITAE Ippei Tsuruga

Recalling resolution 57/254., proclaiming the United Nations Decade of Education for Sustainable Development,

Transcription:

Japanese ODA Loan EX-ante Evaluation 1. Name of the Project Country: Republic of El Salvador Project: San Miguel Bypass Construction Project Loan Agreement: August 20, 2014 Loan Amount: 125.95 million yen Borrower: The Government of the Republic of El Salvador 2. Background and Necessity of the Project (1) Current Situation and Issues of the Road Sector in El Salvador With an area of 21,000 square kilometers, the Republic of El Salvador (El Salvador) is the smallest nation in Central America. The main means of travelling and transportation is by land using the road infrastructure. The most important highway in El Salvador is the Pan-American Highway (Central American Highway 1: CA-1), which stretches from east to west through the center of the country. The CA-1, which connects not only San Salvador and other major cities in El Salvador but also Mexico and Panama, serves as the most important distribution network in Central America. For El Salvador, it is important to ensure smooth transportation on the CA-1. Along with the recent economic growth in El Salvador, the demand for road transportation in urban areas has been increasing. However, many cities are faced with serious traffic congestion because the highway passing through the center of each city is used as a local means of transportation. The situation is considerably serious in San Miguel, which is El Salvador s fourth largest city with approximately 220,000 people and located in the center of the eastern region, as it has lagged behind in development due to severe damage caused by conflicts. The urbanization of the city is increasing the amount of traffic to the CA-1 passing through the center of San Miguel. This causes the CA-1 traffic congestion, which in turn is greatly deteriorating both local and inter-city traffic situations. (2) Development Policies for the Road Sector in El Salvador and Priority of the Project The Funes Administration took office in June 2009. Under its key policies, namely the stimulation of the nation s economy and the promotion of integration with Central America, the government adopted economic revitalization as one of its five priority areas defined in the Five-Year National Development Plan (2010-2014). The establishment of an economic infrastructure such as road and bridge constructions was included as a specific initiative in this priority area. Furthermore, the National Land-Use and Development Plan formulated in 2004 defined this project as a priority project. It involves two plans: the construction of a route bypassing the central area of San Miguel and the widening of the existing CA-1 in the eastern area of the city. Mr. Salvador Sánchez Cerén, the current President of El Salvador who took office in June 2014, raised investment in public works for development as one of the 10 priority areas in the commitment he made during the presidential election campaign. Specific investment initiatives in this priority area include this project. (3) Japan and JICA s Policy and Operations in the Road Sector In Japan s Country Assistance Policies for El Salvador (April 2012), the stimulation of the economy and employment expansion are identified as priority areas for the rolling plan for El Salvador, and this project is in line with this area. Assistance projects that were implemented in the past for the road sector of El Salvador include an ODA loan project Road Improvement Project (loan amount: 10,332 million yen; in 1994). Taking into account that El Salvador is a hurricane-prone country, Japan s viewpoint on disaster prevention including slope protection was reflected in the Road Improvement Project, which contributed to maximizing the impact of the

project. Japan has a policy of including disaster prevention measures in various aspects of development initiatives in order to help developing countries build disaster-resistant societies. In accordance with the policy, this project adopts the viewpoint of mainstreaming disaster risk reduction. (4) Other Donors Activities With an emphasis on the transportation infrastructure in the northern region of El Salvador, the United States has provided financial support of approximately 2.34 million dollars to the Northern Transnational Highway Project through the Millennium Challenge Account (MCA). The Inter- American Development Bank (IDB), which focuses on El Salvador s transportation sector as a priority area for cooperation, has been providing support to rural roads infrastructure initiatives since 2010. The Central American Bank for Economic Integration (CABEI) adopted the productive infrastructure including roads as its strategic priority area and thus has provided support to the bypass construction project in Usulután, a city located in the southern region of El Salvador. (5) Necessity of the Project This project aims to help El Salvador improve its transportation capability through the bypass construction work in the periphery of San Miguel, thereby contributing to the economic growth of El Salvador. This project is in line with the development goals and plans of the El Salvador government as well as Japan s and JICA s assistance policies for this country. In light of these points, it is highly necessary and relevant for JICA to support the implementation of this project. 3. Project Description (1) Project Objective(s) This project aims to reduce traffic congestion in San Miguel and increase the transportation capability of the CA-1 through bypass construction in the periphery of the city, thereby contributing to the economic growth of San Miguel, which in turn will lead to the economic growth of the entire country. (2) Project Site/Target Area San Miguel, Quelepa, and Moncagua in San Miguel Region (3) Project Components 1) Widening of the existing CA-1 (from the current dual single-lane (asphalt-paved) to dual 2- lanes): Between Moncagua and El Obrajuelo 2) Construction of a bypass (a new road: dual 2-lanes, asphalt-paved): Between El Obrajuelo and Hato Nuevo 3) Construction of a bypass (a new road: dual single-lane, asphalt-paved): Between Hato Nuevo and El Papalon 4) Construction of two bridges: One to cross the Rio Grande de San Miguel in the section specified in the above 2); and the other to cross the Taisihuat River in the section specified in the above 3) 5) Provision of consulting services (detailed design (D/D), tender assistance, supervision of construction works, monitoring related to environmental and social considerations, support for preventing road disasters (close examination of the vulnerability assessment method, reflection in the existing inventories and proposal for design standards) and support to the project implementation units)

(4) Estimated Project Cost (Loan Amount) 16,377 million yen (including the amount covered by ODA loan: 12,595 million yen) (5) Schedule August 2014 December 2019 (64 months in total): The project will be completed on the day when the constructed infrastructure facilities become available. (6) Project Implementation Structure 1) Borrower: The Government of the Republic of El Salvador 2) Executing Agency: Ministerio de Obras Públicas, Transporte, Vivienda y Desarrollo Urbano (MOPTVDU) 3) Operation and maintenance system: Fondo de Conservación Vial (FOVIAL) (7) Environmental and Social Considerations/Poverty Reduction/Social Development 1) Environmental and Social Considerations (i) Category: A (ii) Reason for Categorization: Based on JICA Guidelines for Environmental and Social Considerations (issued in April 2010), this project is included in the category A projects defined for the road sector which are likely to have significant adverse effects on the environment and society. (iii) Environmental Permit: Environmental impact assessment (EIA) reports related to this project have been approved by the Ministerio de Medio Ambiente y Recursos Naturales (MARN) in December 2012. (iv) Anti-Pollution Measures: Measures to be taken against dust and noise during construction works and to maintain the water quality will include spraying working areas regularly, building noise-blocking walls, and managing waste water and materials. As noise control measures after the infrastructure facilities become available, noise-blocking walls will be built in residential areas, and education will be provided in terms of traffic manners by the executing agency MOPTVDU including speed regulation and restriction on the use of horns. (v) Natural Environment: The construction area is neither a sensitive area specified in the guidelines including national parks nor its surrounding areas. As trees that are on the endangered species list are planted in the construction area and its surrounding areas, they will be left untouched as much as possible. If this is not possible, necessary actions will be taken such as planting of the same kind of trees or transplanting. (vi) Social Environment: This project requires the acquisition of land (124.6 ha) and the relocation of the residents of 57 households. The land acquisition will be carried out in accordance with the resettlement action plan formulated based on JICA Guidelines for Environmental and Social Considerations (issued in April 2010). In the residents meeting, there were no objections from local residents against this project or the compensation policy. (vii) Other/Monitoring: In this project, the contractor will monitor the air and water quality and noise levels during the construction works as well as the air quality and noise levels after the construction facilities become available. 2) Promotion of Poverty Reduction The implementation of this project will not only create jobs required for the construction works but also develop industries such as promotion of agricultural product distribution and tourism and provide easier access to educational and medical facilities, thereby contributing to poverty reduction.

3) Promotion of Social Development (e.g. Gender Perspectives, Measure for Infectious Diseases including HIV/AIDS, Participatory Development, Consideration for People with Disabilities, etc.) There are 17 educational facilities (e.g. kindergarten and primary schools) in the construction area of this project. Children in this area cannot go to school in the rainy season because there are no roads; therefore, this project is expected to provide them with easier access to schools. This project also will implement environmental management measures including the installation of speed bumps, the building of pedestrian bridges and the provision of traffic education. (8) Collaboration with Other Donors None (9) Other important issues None 4. Target Outcomes (1) Quantitative Effects 1) Performance Indicators (Operation and Effect Indicators) Indicator Annual average of traffic volume (No. of vehicles/day) Widening of the existing CA-1 (Between Moncagua and El Obrajuelo) Construction of a bypass (Between El Obrajuelo and Hato Nuevo) Construction of a bypass (Between Hato Nuevo and El Papalon) Baseline (Recorded in 2011) Target (2023) (5 years after completion) 22,524 30,911 N.A. 13,132 N.A. 2,064 Average travel speed in urban areas (km/h) 8.0 14.1 Time required for passing through the above section (min.) 58.3 26.9 2) Internal Rate of Return Based on the conditions given below, the economic internal rate of return (EIRR) of this project is 13.94%. This project s financial internal rate of return (FIRR) is not calculated because this project does not involve income charge from tolls. Expense: Project cost (excluding taxes), Operating and maintenance cost Benefits: Reduction in driving costs Project life: 20 years (2) Qualitative Effects Alleviation of traffic congestion in San Miguel, elimination of narrow paths to facilitate distribution in San Miguel and its surrounding areas, support for and promotion of economic development in urban/rural areas (improvement of distribution, promotion of industrial and tourism development), securing of smooth traffic on the Pan-American Highway (collaboration with regions in Central America) and promotion of measures for adaptation to climate change 5. External Factors and Risk Control Natural disasters at the construction area

6. Lessons Learned from Past Projects (1) Evaluation results of similar projects According to the results of the evaluation carried out by MOPTVDU of the Road Improvement Project, an ODA loan project, unexpected natural disasters and abnormal weather, route changes after project planning and the delay of land acquisition due to such changes were the biggest factors that largely extended the project period and increased the project expenses. Lessons learned from the evaluation results were as follows; 1) a timetable should be set out with due consideration given to possible impacts of rainfall on the construction work period; and 2) it is desirable to carry out more detailed technical investigation and design in order to avoid design changes that may cause cost overruns as well as delays in construction working. (2) Lessons to this project In recognition of the above lessons, the implementation schedule for this project was set out with it borne in mind that natural disasters are highly likely to occur in the rainy season (in general, this is the period between May and November). Furthermore, the project schedule of the existing agency will be followed up while careful attention is paid to design changes that may cause delays to the implementation schedule and cost overruns. 7. Plan for Future Evaluation (1) Indicators to be used As specified in 1) Performance Indicators (Operation and Effect Indicators) of (1) Quantitative Effects in 4. Target Outcomes (2) Timing of the next evaluation Two years after project completion