Modular Slab Track. Asfordby Slab Installation IVES PORR V-Tras. PWI Winter Conference December

Similar documents
CITY OF KINGSTON. Ontario. By-Law Number A By-Law To Regulate Fences. By-Law Number: Date Passed: September 9, 2014

STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT. Whereas, I (we),, hereinafter termed the

CHAPTER 16. EXCAVATIONS AND ARTIFICIAL POOLS. 1. Article I. Excavations.

(Non-legislative acts) DECISIONS

Efficient, Cost Effective and Sustainable Self-Delivery of Asphalt for Small Works

B-Series Section Overview. Ball Screw Cutaway. UNI-LIFT Ball Screw Actuators provide high. 34

STORA-DRAIN SELF CONCRETE DRAINAGE CHANNELS

2015 SOM Ballot Number 1. No/No Vote. Sponsored by Technical Section 3a

THE CORPORATION OF THE TOWN OF MILTON BY-LAW NO

For a permit to work within the County Highway Right-of-way (ROW), please provide the following:

TOWN OF CHESLEA ROAD DESIGN STANDARDS

M-Series, Actuator Overview. Machine Screw Cutaway. UNI-LIFT Machine Screw Actuators offer precise. 12

Present: Ms. Butts, Mr. Corrigan, Ms. Rodriguez, Mr. Hairston, Mr. Parker. Absent: Mr. Seifullah, Ms. Washington

DISTRICT OF LAKE COUNTRY BYLAW 628, CONSOLIDATED VERSION (Includes amendment as of July 18, 2017)

THE CORPORATION OF THE TOWN OF PENETANGUISHENE BY-LAW NUMBER

BY-LAWS RELATING TO FENCES

Physical Planning CAP

Chapter 68 STREETS AND SIDEWALKS

Bonding solutions in e-passports

Office Consolidation of By-Law

BY LAW. Number ROAD OCCUPANCY PERMIT BY LAW. within the Town of New Tecumseth

Local Law relating to Fences

(Space for sketch on back - Submit detailed plan if available)

CITY OF DOUGLAS Contract Documents & Specifications for a New Specified Reel Grinder Douglas Community Club (Golf Course)

TUNKHANNOCK BOROUGH WYOMING COUNTY, PENNSYLVANIA

DESIGN AND CONSTRUCTION OF THE I-5 SKAGIT RIVER BRIDGE REPLACEMENT. Best Value = Price + Time + More Time

MINUTES TOWN BOARD MEETING MAY 21, 2018

CONSOLIDATED WITH BY-LAW THE CORPORATION OF THE TOWNSHIP OF MULMUR BY-LAW NO FENCE BY-LAW

LAKE COUNTY ROAD DEPARTMENT P.O. BOX 908 LAKEVIEW, OREGON APPLICATION FOR RIGHT-OF-WAY PERMIT

FENCING OF SWIMMING POOLS ACT This Act may be cited as the Fencing of Swimming Pools Act 1987.

Versatile Linear Systems

INFORMATION REGARDING PROTECTION OF ADJOINING PROPERTIES.

201X No. TRANSPORT AND WORKS, ENGLAND. The Network Rail (Cambridgeshire Level Crossing Reduction) Order 201X

Conduit Entry System. At a Glance. FWS Assembly. 1. Fast and Easy Assembly. 2. Easy to Maintain. 3. Flexible

SMART MOTION C A T A L O G 2009:1

CEF POLYMERES. Spring. CEF POLYMERES sa.com DT.STRA.E l Fv F1 F. Strocke (S)

2. A final Subdivision Plat with the County Clerk s stamp and Filed Map number.

TECHNOLOGY FOR THE WELDER S WORLD. MIG/MAG CATALOG 4.1. MIG/MAG Welding Technology for all Metalworking Industries.

ISO INTERNATIONAL STANDARD. Footwear Test methods for uppers Water resistance. Chaussures Méthodes d'essai des tiges Résistance à l'eau

TOWN OF BELMONT NEW HAMPSHIRE DRIVEWAY REGULATIONS. Wording to be eliminated is crossed out Wording to be added is bold, italicized

1. The matter to be determined

Investigation of hydromechanical interactions at the tail void of bored tunnels due to grouting

Data sheet: Wilo-CronoNorm-NL 80/200-3/4

Draft Development Consent Order. Four Ashes Ltd. Document 3.1

CHAPTER 60: SEWERS I. SEWERS

University of Arizona AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2012 EDITION

STREET OPENING AND CULVERT ORDINANCE

TITLE 16 STREETS AND SIDEWALKS, ETC 1 CHAPTER 1 MISCELLANEOUS

QUESTION / CLARIFICATION

NEW HAMPSHIRE DRIVEWAY REGULATIONS

CHAPTER 11. Streets, Sidewalks and Public Property

BUILDING BYLAW

Chapter 21. Streets and Sidewalks

Outline. Proposed Elementary School Reading, Pennsylvania AEI Competition OVERVIEW

HANDOUT FOR MULMUR TOWNSHIP RATEPAYERS SWIMMING POOLS AND FENCES May 01, 2013

NORTHWESTERN WATER & SEWER DISTRICT TAPPING PROCEDURES & REQUIREMENTS

fiber optic through-beam and dif. reflection sensors

201X No. TRANSPORT AND WORKS, ENGLAND. The Network Rail (Suffolk Level Crossing Reduction) Order CONTENTS TRANSPORT ENGLAND PART 1 PRELIMINARY

Efficient-Tec International LLC.

AMENDMENTS TO THE 2006 INTERNATIONAL BUILDING CODE (Effective August 1, 2010)

THE CORPORATION OF THE TOWNSHIP OF KING THE FENCE BY-LAW NUMBER

Township of SLIPPERY ROCK BUTLER COUNTY

FORM A: BID (See B8) 1. Contract Title FERRY ROAD RIVERBEND COMBINED SEWER RELIEF CONTRACT NO. 2

Railway Interoperability and Safety Committee. Working document

DEMOCRATIC NATIONAL COMMITTEE RULES AND BYLAWS COMMITTEE

SECTION DETENTION DOOR HARDWARE

ROUNDO Section Bending Machines Type R-1 through R-21-S

CITY OF SNOHOMISH Snohomish, Washington ORDINANCE 2325

2008/163/EC, 2008/164/EC, 2008/217/EC, 2008/231/EC, 2008/232/EC, 2008/284/EC, 2011/229/EU, 2011/274/EU, 2011/275/EU, 2011/291/EU

THE CORPORATION OF THE CITY OF CLARENCE-ROCKLAND BY-LAW NUMBER BEING A BY-LAW TO REGULATE HEIGHT AND DESCRIPTION OF LAWFUL FENCES

DECLARATION OF PERFORMANCE

MAAG TM PPU gear unit for roller presses, horizontal mills and kilns

IEC : 3 rd Edition with Amendment 1 (2012) Michael Howell, P.E., UL LLC

Draft of the Proposed Order

For the purposes of this chapter, the following words and phrases will have the meanings respectively ascribed to them by this section:

Facility Crossing Agreement

PPG Series High Precision Gearbox. Datasheet

Highlights on WPSR 2018 Chapter 7 Realizing the SDGs in Post-conflict Situations: Challenges for the State

RIGHT OF WAY / STREET OPENING PERMIT

Facility Crossing Part 2

LED545-series TECHNICAL DATA. Specifications. Absolute Maximum Ratings (T a =25 C) Electro-Optical Characteristics (T a =25 C)

MONGOLIA-CHINA-RUSSIA ECONOMIC CORRIDOR. Otgonsuren Buyankhishig Researcher Institute for Strategic Studies, National Security Council of Mongolia

LUCAS COUNTY SANITARY ENGINEER BUILDING SEWERS AND CONNECTIONS RULES AND REGULATIONS

TECHNOLOGY FOR THE WELDER S WORLD. MIG/MAG Welding Torches MB EVO. air & liquid cooled. The classic line.

CHAPTER 23: DETENTION BASIN STANDARDS Introduction and Goals Administration Standards Standard Attachments 23.

OCTOBER 15, Trustees Edward A. Sullivan Linda L. Baessler Andrew J. Rubin. Absent: Trustee Danae Muddiman EXCUSED

DÖRRIES SCHARMANN ECOSPEED HSK-A63/80 STARRAG WERKZEUGAUFNAHMEN TOOL HOLDERS HSK A63/80.

COUNCIL DIRECTIVE 1999/74/EC

PUTNAM COUNTY PUBLIC WORKS DEPARTMENT RIGHT-OF-WAY USE PERMIT APPLICATION

PERMIT TO CONSTRUCT, USE, AND MAINTAIN ACCESS TO A PROVINCIAL PUBLIC HIGHWAY

Expansion Vessels & Separators

Driveway Crossings Bylaw No. 3748, 1992

TITLE III: PROPERTY/LAND USE AND DEVELOPMENT

WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (WORK AT HEIGHTS) REGULATIONS 2013

Application to Establish or Alter a Memorial or Place of Interment

Klinger Manometer Serie 200

City CQ)f WesiwCQ)Jrth Village 31]1 Bm ' ~o:n JHljl1 IRo 'Il '~ VVest-wodh Village, T :g: ]Pax ll7.7jlo.2501

LED1200-series TECHNICAL DATA. Specifications. Absolute Maximum Ratings (T a =25 C) Electro-Optical Characteristics (T a =25 C)

MINUTES REGULAR MEETING CITY OF PLACERVILLE PLANNING COMMISSION TUESDAY, MAY 19, 2015, 6:00 P.M. TOWN HALL, 549 MAIN STREET, PLACERVILLE, CALIFORNIA

TT SERIES OD ORBITAL CUTTING & BEVELING MACHINES 1/8 TO 168 OD 1/9

Transcription:

Modular Slab Track Asfordby Slab Installation IVES PORR V-Tras PWI Winter Conference December 2014 1 www.rhomberg-sersa.com

Development of the Modular concept Although many forms of slab track have been developed it can be argued that the birthplace of high speed slab system is Japan. 1965 JNR started to develop new track structures, the design specification being Ø Construction cost being less than twice that of ballasted track Ø Elasticity and lateral/vertical strength be greater than that of ballasted track Ø Construction rate of >200m per day In 1972 the ballastless track structure was named Slab Track and first applied on the Sanyo Shinkansen line

Development of the Modular concept Ø Slab dimensions 5m x 2.2m x 0.19m Ø Stopper gives lateral stability

Life Cycle Cost

Life Cycle Cost

Continued Development Many variations have since been developed as well as alternative slab systems Standard Frame Slabs - Japan Rheda 2000 - Germany

Continued Development Bogl - Germany PORR - Austria

Asfordby Network Rail made the decision to undertake a trial of two slab track forms in 2013 with the addition of a new form of transition module Ø System 1 Rhomberg Sersa IVES

System specifics Asfordby

Asfordby

Asfordby

Ø System 2 PORR Asfordby

Asfordby

Asfordby Ø Transition Module Rhomberg Sersa V-Tras

Asfordby

Asfordby

Asfordby LH Curve radius 1655m 70m transition 180m straight 50m transition LH Curve radius 1785m V-Tras 165 IVES Blocks 24 PORR Slabs 209 IVES Blocks

Sequence of works; Ø Formation prepared with 100mm of Type 1 material compacted to achieve a minimum stiffness of 30kN/mm Ø Using standard highways asphalt machine (laser controlled) lay two layers of hot rolled asphalt, total depth is 250mm with a minimum width of 2700mm Tolerance of Asphalt layer +0mm / -10mm Asfordby

Installation of IVES; Asfordby Ø IVES blocks are lifted and placed on the Asphalt layer Total accuracy of the vertical and horizontal alignment is not required at this stage.

Asfordby Ø Baseplates are laid in readiness for rail installation

Ø Rails are installed and clipped up Ø RhoTas system is installed Ø Rail and Baseplate are lifted and aligned to the final design Asfordby

Asfordby Ø Rails are installed and clipped up Ø RhoTas system is installed Ø Rail and Baseplate are lifted and aligned to the final design Ø Hergie measuring system is used to measure the track position / gauge / super elevation Ø Accuracy of +/- 1mm is achievable

Ø Shutters are fitted to the Baseplates Ø Grout is poured through the grout aperture to fill the void below the Baseplate Asfordby

Installation of PORR; Asfordby Ø PORR slabs are lifted and placed on the Asphalt layer Ø Wire mesh is laid / supported 50mm above the Asphalt layer Ø Five threaded support bars hold the slab to design height

Ø Reinforcement cages are fitted in the slab recesses Ø Shuttering is fitted to the sides of the slab Ø Rails are installed and clipped up Ø Final design is achieved by adjusting the threaded support bars Asfordby

Ø Self Compacting Concrete is poured to fill the void below the slab Asfordby

Asfordby Installation V-Tras; Ø Concrete slab is cast to hold the pivot rail

Asfordby Installation V-Tras; Ø V-Tras unit is lifted into place

Asfordby Installation V-Tras; Ø V-Tras is lifted to final design Ø Sleepers are placed on V-Tras Ø Ballast is placed and compacted in layers

Asfordby Installation V-Tras; Ø Rail is installed and clipped up Ø Adjustment made to the horizontal alignment Ø Horizontal alignment is fixed Ø V-Tras is lifted to final vertical alignment and ballast compacted

Summary of Benefits Simple and robust structure Ø Use existing sub structure Ø Standard asphalt / concrete formation layer Ø Single design of pre stressed concrete bearer for straight and curved track Ø Low surface pressure Fast and simple construction Ø Simplicity and robustness of the bottom up system with accuracy of the top down rail positioning Ø Only the final rail positioning requires time consuming accuracy Ø Mechanised construction Ø Single line working construction Ø Simple and effective surface drainage Ø Low surface pressure

Summary of Benefits Efficiency in design Ø Long term track stability Ø Designed and managed track stiffness Ø Improved track drainage eliminates drainage faults such as wet beds Ø Low ground bearing forces Ø High accuracy of rail positioning with long term stability of the rail geometry thus reduction a in track component failure.

Summary of Benefits Efficiency in operation Ø Line speed handback Ø Increased infrastructure performance Ø Reduced impact on operational running Ø Reduced faults Ø ballast deterioration Ø drainage failure Ø reduced rail wear therefore increased rail life (+25%) Ø eliminates maintenance interventions Ø reduced renewal interventions Ø increase in S+T performance Ø System will allow for track lowering in tunnels for gauging or OLE installations fixed geometry allowing reduced gauge clearances