RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework

Similar documents
Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

EBRD Performance Requirement 5

Rehabilitation & Resettlement (R&R) Policy for Kochi Metro Rail Project March 2015

IND: Mumbai Metro Rail Systems Project

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

Bangladesh: Urban Public and Environmental Health Sector Development Program

Guidance Note 5 Land Acquisition and Involuntary Resettlement

India: Madhya Pradesh Urban Services Improvement Project (MPUSIP)

Performance Standard 5 Land Acquisition and Involuntary Resettlement

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Government Of Andhra Pradesh. Resettlement And Rehabilitation. Policy For Project Affected Families CHAPTER I: POLICY

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007

SRI: Local Government Enhancement Project

SRI: Local Government Enhancement Project

THE REHABILITATION AND RESETTLEMENT BILL, 2007

BE it enacted by Parliament in the Sixty-third Year of the Republic of India as follows:

LUCKNOW METRO RAIL PROJECT

IND: Railway Sector Investment Program

Annex 2: Does the Xayaburi resettlement comply with Lao law?

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement

Resettlement Policy Framework

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives

India: Infrastructure Development Investment Program for Tourism

ORISSA RESETTLEMENT AND REHABILITATION POLICY

2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field

ORISSA RESETTLEMENT AND REHABILITATION POLICY, 2006

ASIAN DEVELOPMENT BANK

MINISTRY OF COMMERCE, TRADE AND INDUSTRY

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project

GOVERNMENT OF INDIA MINISTRY OF MINES LOK SABHA STARRED QUESTION NO. 259 TO BE ANSWERED ON 30 TH MARCH, 2012 R&R POLICY FOR MINING PROJECTS

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING

BAN: Railway Sector Investment Program

FEDERAL REPUBLIC OF ETHIOPIAN MINISTRY OF MINES

21 st September 2012 FREQUENTLY ASKED QUESTIONS ON THE LAND ACQUISITION, RESETTLEMENT AND REHABILITATION BILL

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia)

Involuntary Resettlement Due Diligence Report

Independent Research Project: Final Report Title: Comparative analysis of Resettlement and Rehabilitation Policies in India

INDIA: Tsunami Emergency Assistance (Sector) Project

Livelihood Restoration in Practice: Key Challenges and Opportunities

Involuntary Resettlement Due Diligence Report

Government of the Republic of Malawi MINISTRY OF FINANCE. Malawi Social Action Fund MASAF 4- Strengthening Safety Net Systems in Malawi

MLD: Greater Malé Environmental Improvement and Waste Management Project

Resettlement Framework

Resettlement Policy Framework

IND: Chhattisgarh State Road Sector Project

ABBREVIATED RESETTLEMENT ACTION PLAN

India: Jammu & Kashmir Urban Sector Development Project

BAN: Secondary Education Sector Investment Program

Involuntary Resettlement Due Diligence Report

Gender Equality and Development

Resettlement Plan. October Prepared by the Government of Jammu and Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Resettlement Policy Framework

India: Infrastructure Development Investment Program for Tourism

IND: Visakhapatnam to Chennai Industrial Corridor Development Program (VCICDP)

Resettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Ministry of Energy and Mining. Development Bank of Jamaica. Energy Security and Efficiency Enhancement Project

RP622 FEDERAL GOVERNMENT OF NIGERIA. Federal Ministry of Agriculture and Water Resources (FMAWR)

THE WOMEN FARMERS' ENTITLEMENTS BILL, 2011

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014)

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report

RESETTLEMENT AND REHABILITATION PLAN

Indonesia: Enhanced Water Security Investment Project

Nepal: Rural Reconstruction and Rehabilitation Sector Development Project

Resettlement Plan: Solar-LED Streetlights. BAN: Power System Efficiency Improvement Project

COVER NOTE Tanzania Energy Development and Access Project (TEDAP) Safeguard Documents

Resettlement Policy Framework

THE MIZORAM (LAND ACQUISITION, REHABILITATION AND RESETTLEMENT) BILL, 2016.

Involuntary Resettlement Due Diligence Report

DRAFT RESETTLEMENT POLICY FRAMEWORK. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Volume-V: Resettlement Action Plan (RAP) ROADS AND BUILDINGS DEPARTMENT GOVERNMENT OF GUJARAT (DHANSURA - MEGHRAJ) Public Disclosure Authorized

RP1 93 RESETTLEMENT POLICY FRAMEWORK MINISTRY OF EDUCATION, YOUTH AND SPORTS (MEYS) REPUBLIC OF GHANA. (EdSeP) Public Disclosure Authorized

India: Sustainable Coastal Protection and Management Investment Program Tranche 2 Karnataka

Draft Resettlement Policy Framework

Involuntary Resettlement Safeguards. A Planning and Implementation Good Practice Sourcebook Draft Working Document

Minimizing the adverse of impact of distress migration. District study of Nayagarh in western Odisha by Madhyam Foundation

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP

VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Guidance Note 5 Land Acquisition and Involuntary Resettlement

India: Preparing the Energy Efficiency Enhancement Project in the Assam Power Sector

PUBLIC WORKS DEPARTMENT PPP DIVISION. Government of Rajasthan DRAFT RESETTLEMENT POLICY FRAMEWORK WORLD BANK FUNDED PROJECT

(EHRP) RESETTLEMENT POLICY FRAMEWORK (RPF)

Resettlement Plan Dili-Tibar-Liquica Road

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name Parent Project Name. Region Country Sector(s) Theme(s)

India: Uttarakhand State Road Investment Program

SOCIAL INCLUSION AND RURAL DEVELOPMENT THROUGH MGNREGA

Central African Backbone (CAB) Project Africa Coast to Europe (ACE) Submarine Cable

RESETTLEMENT POLICY FRAMEWORK (RPF) ZAMBIA RENEWABLE ENERGY FINANCING FRAMEWORK

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION

Human Rights and Business Fact Sheet

PESA ACT -BACKGROUND

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples

Sri Lanka: DRY ZONE URBAN WATER AND SANITATION PROJECT - for Mannar Subprojects

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL REPORT Resettlement and Rehabilitation (R&R) Entitlement Framework RP297 Under MWSIP, no new or on-going schemes are included and the proposed interventions at individual irrigation schemes mainly relate to rehabilitation of existing structures to improve their efficiency in water delivery. Therefore, no land appropriation is envisaged and the project thus does not involve physical resettlement, however, an encroachment in project areas is not totally ruled out. In order to address any adverse impacts during the course of the project, a Resettlement Framework has been prepared to address any resettlement issue as a result of project interventions at sub-project level. Rationale for R&R Entitlement Framework As part of project preparation, a social assessment of 18 sample (covering major, medium and minor) rehabilitation schemes was undertaken with a view to identify social issues, particularly those relating to resettlement associated with the proposed project interventions. The social assessment looked into the likely resettlement impacts due to the MWSIP that follows a Programmatic approach wherein various interventions at the sub project level will be identified during project implementation. In the absence of precise sub project intervention measures at the present stage, it is proposed that following the screening process (detailed out in the Social and Environmental Framework developed for the project), the requirement or otherwise of a Resettlement Plan shall be determined based on the type and extent of impacts and the measures required to mitigate them. The Resettlement Framework described below will help in categorizing impacts and mitigation measures. This framework has been developed taking into account the provisions of the Maharashtra Project Affected Persons Rehabilitation (MPAPR) Act, 2001, the National Policy on Resettlement and Rehabilitation for Project Affected Families (NPRRPAF), 2003 and the experience of implementing R&R policy of Mumbai Urban Transport Project and the feed back received during the consultation workshops held as part of Environmental and Social Assessment carried out as part of project preparation. Definitions used: For the proposed R&R entitlement framework, following definitions have been used. Project Displaced Person: A person who has been ordinarily living in the area, which is required for proposed project interventions, for at least one year from the date of publication of the notification Under Section 4 of the Land Acquisition Act or the date of social assessment and has been physically displaced due to loss of house/structure Project Affected Person: A person who has been affected due to loss of land, house, other immovable assets, livelihood or a combination of these due to project activities NOTE: All displaced persons are affected persons but not otherwise Project Affected Family: A family in respect of displaced/affected comprises of himself/heself and includes spouse, minor children and other dependents including aged parents and unmarried/widow sister. Every major son/ daughter of an affected family (major on the date of notification Under Section 4 of the Land Acquisition Act or the date Maharashtra Water Sector Improvement Project 135

of social assessment) will be considered as a separate family for the purpose of economic rehabilitation. Cut off date: For titleholders, the cut off date is the publication of section 4(1) notification under Land Acquisition (LA) Act amended in 1985. For all others (encroachers/ squatters), the cut off date is the date of survey and those identified should have been in occupancy for three years prior to the date of survey in the project activity area. This will be jointly verified by the WUA and field level staff of ID and will be certified by the Project Executive Engineer. However, this list will not include temporary structures constructed in the sub-project area (covered under MWSIP) for cattle, store of farm inputs and resting place for labour. Landless Agricultural labour: A person who holds no agricultural land himself or a joint land holding with his family member and works as agricultural labourer Small farmer: A person who owns 1-2 ha un-irrigated or 0.5-1 ha irrigated land Marginal farmer: A person who owns up to 1 ha un-irrigated or 0.5 ha irrigated land Urban affected family: Affected families in urban areas as identified by the Census of India 2001 Rural affected family: Affected families in rural areas as identified by the Census of India 2001 Encroacher: A person who has trespassed into Government/private/community land to which he/she is not entitled to ownership Squatter: A person who has unauthorizedly settled on the land or building for shelter or livelihood Below Poverty Line (BPL): The subsistence level of income, fixed by the Government of Maharashtra, is called the Poverty line and families having an income below this sum fall within this vulnerable group Vulnerable Groups: All those people who are socially distressed or economically backward fall under this group, viz., affected people living BPL, Land less, Schedule Caste/ Tribe, Women headed households (single/ widow/ divorced), Orphans/destitute, Disabled and aged (above 60 years). Titleholder: A person who can establish his/her ownership to the land and other assets or usufruct rights of the property. Cut off for a titleholder to be eligible for R&R entitlement is the date of issuing notice under section 4(1) of the Land Acquisition Act.. Non-titleholder: Any person unable to establish right to the property he/she is occupying without a legitimate evidence for being the owner is called a non-titleholder. Cut off Date for Non titleholder to be eligible for R&R entitlement is the date of Census Survey. Maharashtra Water Sector Improvement Project 136

Support during transition refers to providing transport facilities or an amount to displaced family/business to shift their belongings. Objectives of R&R Entitlement Framework: (i) The objective of this R&R framework is to avoid or minimize the potential adverse impacts of proposed project interventions resulting in displacement (physical or economic or both) of people in the project area. (ii) Where displacement (physical, economic or both) is inevitable due to technical reasons of the project design, the objective is to minimize the hardship to the affected families, enhance, or at least restore their livelihood opportunities. Basic Principles: Following basic principles will guide addressing R&R issues related to project activities i) The project does not envisage acquisition of any private land for the proposed project interventions, however, if any exigencies arise, compensation will be at replacement value. ii) iii) iv) Encroachers who are not affected by the proposed project activities will not be disturbed. Encroachers who are adversely affected (see entitlement framework) will get support under the project to mitigate the loss. All efforts will be made to encourage the encroachers to voluntarily surrender encroached lands (required for project interventions) through community persuasion. The affected community or families will be consulted throughout the design, planning, implementation and monitoring of the R and R activities. v) All those displaced will be socially and economically integrated with the local or host population. vi) vii) Adequate resources including physical, financial, and human will be made available to the implementing agency to carry out R and R activities under the project. Common pool resources, if affected, shall be replaced in consultation with the local community, especially keeping in mind the needs of the poor, and the vulnerable sections of the community. Guidelines for Implementation Voluntary surrender of land: Surrender of land, from all types of encroachers, required for project interventions should be properly documented. Such surrendered lands should Maharashtra Water Sector Improvement Project 137

be free of any encumbrances. This should be accompanied by the consent letters indicating their willingness to surrender the land required for project interventions. Besides the person surrendering the land, the consent letter will be signed by Water Users Association, concerned staff of the Irrigation Department (ID), and concerned revenue official. The community will, however, ensure that such persons are not adversely affected and that they benefit from the project. Any grievances by the people will be resolved at the WUA level and Gram Sabha and if unresolved will be referred to the higher level of water users organizations. Replacement value of land: Though no acquisition of private land is envisaged, however, if such exigencies occur, norms of compensation will be fixed in consultation with land losers failing which it will be fixed as per the provisions of the Land Acquisition Act, 1894. Compensation so fixed along with rehabilitation assistance will ensure replacement value of land. In case alternate land is provided, occupancy price will be deducted from compensation. Compensation for structures: The value of all structures to be acquired for the project will be assessed as per the basic scheduled rates determined by the public works department of the state government. This along with the value of the salvage material will ensure the replacement value of the affected structures. In addition, such affected people will receive support in the construction of new house. Compensation for trees and crops: These will be compensated based on the productivity as assessed by the departments of agriculture/horticulture/forest. Assistance to displaced families: The project will develop the relocation site and services, as per the provisions of Schedule Part I of MPAPR Act, 2001. Each displaced family, in addition to the compensation as described above, will get assistance (a) Permission to take out the salvage material and (b) Transportation to move the salvage material to the new site (c) a house site and (d) support in house construction. Assistance for Economic Rehabilitation: In addition to the compensation for land and other assets, the following assistance for economic rehabilitation will be provided to the affected families (ref entitlement matrix) i) Skill training for income generating activity ii) Productive Asset Grant (up to Rs 25,000) for taking up Income Generation (IG) Activity. This will be given only in time as productive asset. iii) Access to institutional credit and government schemes for IG activities iv) Support from district industries center v) Institutional credit for crop production and allied activities vi) Affected families in the project area will be given preference to carryout the works related wage employment during the process of system rehabilitation. vii) In the absence of any traditional fishing community in the project area, fishing rights will be given on priority basis to the project affected families. Maharashtra Water Sector Improvement Project 138

Types of impacts: While the proposed rehabilitation works will not involve any land acquisition, the social assessment concluded that some of the project interventions may affect local people and the probable impacts include: * Loss of land and other immovable assets * Loss of livelihood systems/income opportunity (due to loss of productive land/business/employment) * Loss of Common Properties (religious structures, grazing land. etc) R&R Entitlement: Based on the type and extent of adverse impacts due to project interventions, an R&R entitlement framework has been developed which provides the base to extend support to the affected families to improve, if not at least, restore their livelihood. This has been presented below. Maharashtra Water Sector Improvement Project 139

R&R ENTITLEMENT FRAMEWORK Type of Impact Beneficiary Entitlement 1. Loss of land a. Homestead land with valid title or customary/ Titleholders Cash compensation as fixed by LA authorities + Allotment of house site (150 usufruct rights family sq. mtr in rural areas and 75 sq. mtr in urban areas) free of cost + Registration Charges. NOTE: In case, there is a major displacement, provisions of Schedule Part IV* of MPAPR Act 2001 will be applied + Registration Charges Nontitleholder family Allotment of house site (150 sq. mtr in rural areas and 75 sq. mtr in urban areas) free of cost + Registration Charges. NOTE: In case, there is a major displacement, provisions of Schedule Part IV* of MPAPR Act 2001 will be applied + Registration Charges. b. Agricultural land with valid title/ customary or Titleholder The affected families will have option to choose any one from the following. usufruct rights family Option 1: Cash compensation as fixed by LA authorities + alternate land at occupancy price fixed by Govt. The extent of land to be allotted will be as per the Part II* of the Schedule of MPAPR Act 2001 + Registration charges Option 2: Cash compensation as fixed by LA authorities + Rehabilitation assistance equal to minimum agricultural wages of (a) 750 days for families losing entire land, (b) 500 days for families losing part land and becoming marginal farmer and (c) 375 days for families losing part land and after loss becoming small farmers. (ii) tenants including Family sharecroppers/leasehold Option 3: Cash compensation as fixed by LA authorities + Option for IGS of equivalent amount for regular income; Reimbursement for unexpired lease Maharashtra Water Sector Improvement Project 140

Type of Impact Beneficiary Entitlement ers Family (iii) encroachers These families are not eligible for any compensation. However, vulnerable among them, who become landless will be eligible for support to take up IGS for regular income 2. Loss of structure a. House (i) with valid title, or Family Cash compensation for structure + permission to take salvaged material + customary/usufruct rights allotment of house site as per Part IV* of Schedule of MPAPR Act 2001 + Rs. 25,000/- assistance for construction of house (for BPL families only) + support during transition (ii) tenant/leaseholder Family Reimbursement for unexpired lease (iii) squatters Family House allotment under Indira Awas Yojana if displaced family is vulnerable + support during transition b. Shop/ Institutions (i) with valid title, or Individual Cash compensation for the structure + Rs. 10000/- for construction of customary or usufruct rights work shed/shop + support during transition (ii) tenants, leaseholder Individual (iii) squatters Individual Reimbursement for unexpired lease C. Any other immobile Owner Allotment of a site for a shop + Rs. 10000/- for construction of work asset shed/shop (for BPL families only) + support during transition Cash compensation as fixed by authorities Maharashtra Water Sector Improvement Project 141

Type of Impact Beneficiary Entitlement 3. Loss of access to Common Property Resources/facilities Community Replacement/augmentation of common property resources a. Rural common property resources Community Replacement/access to equivalent amenities/services b. Civic amenities/services 4. Loss of standing crops/trees Owner family For either category, only the cultivator will get compensation at market a. With valid title rate for crops and fruit bearing trees b. Tenant/lessee 5. Losses to Host communities - amenities Community Augmentation of resources of host community to sustain pressure of PAPs &Services * scanned copy attached To attach scanned copies of Part III and IV of Schedule of MPAPRP Maharashtra Water Sector Improvement Project 142

- Consultations: Consultations with affected community is a precondition to prepare any mitigation measures. These consultations will continue while implementing the R & R activities in the project area. Such consultations should take place with the following stakeholders (both individually and collectively) as indicated below. => Project affected people => Local community X~ Gram Sabha => Elected representatives of Panchayat Raj Institutions =X Land revenue officials => Project officials => NGOs These consultations will be held to explain the project objectives and likely impact on the project area, its people and their benefits. Some of the issues that need to be discussed in these consultations are: * Eviction of encroachers through mutual consent or voluntary surrender. * Land acquisition and norms of compensation * Loss of livelihood and alternate opportunities * Criteria for eligibility to R&R assistance under the project * R& R options and assistance to adversely affected families * Relocating community properties * Support in relocation Procedure for Preparing Resettlement Plan Resettlement Plan Process will follow the project cycle stages. In accordance with the Social and Environmental Management Framework prepared to integrate Environmental and Social Safeguard measures, all sub projects shall be screened for their likely adverse impacts, in the Pre-Planning Stage. If the issues related to resettlement are triggered, a Resettlement Plan will have to be prepared for the concerned sub project. Such a plan shall be prepared at the Planning and Design Stage of the project preparation, wherein physical intervention measures shall be planned and designed. Project Affected Persons (PAP) will be involved in the Pre-Planning stage through holding regular consultations with them. Voluntary relocation shall be encouraged to the extent possible, as most of the relocation shall pertain to encroachers. Based on the potential impacts, a Resettlement Plan will be prepared for the relevant sub-project. Resettlement Plan Contents: The contents of the Resettlement Plan to be prepared for individual sub projects consistent to the Resettlement Framework are as follows: => Baseline census and socio-economic survey information; => Specific compensation rates and standards; => Policy entitlements related to any additional impacts identified through the census or survey. Maharashtra Water Sector Improvement Project 180

- => Description of resettlement sites and programs for improvement or restoration of livelihoods and standards of living; => Implementation schedule for resettlement activities; and => Detailed cost estimate. Organizational support: RAP will form an integral part of the sub-project Plan and its implementation will be synchronized with other project interventions at WUA level. Both at the state level (in the Project Management Unit), and at the Basin level, the Social Development Specialists will be responsible for guiding and supervising the preparation and implementation of resettlement plans. The responsibility of approving RAP as part of sub-project Plan will be with the PMU/Basin level organization. The social development specialist with both PMU and Basin level organization will ensure that RAP conforms to the agreed R&R Entitlement Framework of the project. At the sub-project level involving RAP, an Assistant Engineer will be assigned the responsibility of implementing RAP. Where ever suitable NGOs are available, they will be engaged to facilitate the preparation and implementation of RAP. Grievance Redress Mechanism: Farmers organization at different (outlet, distributary and project) levels will provide the first base to resolve any grievances faced by PAPs. The affected people will also have access to approach the District level Grievance Committee which is headed by the District Collector. In addition, the project/id staff will also be responsible to address grievances of the affected people. Funding for R&R activities under the Project: All the cost of resettlement activities will be met from the sub-project level cost.. Detailed R&R cost estimates will be developed based on the proposed mitigation measures proposed and will be included in the project cost at the scheme level. Maharashtra Water Sector Improvement Project 181