Guidelines. Type approval of constituents and signalling systems

Similar documents
Ordinance on electrical low-voltage equipment

Partial revision of Appendix G (ATMF) of the Convention (Text as modified and Explanatory Report)

The Railways (Interoperability) Regulations 2011

Electronic Document and Electronic Signature Act Published SG 34/6 April 2001, effective 7 October 2001, amended SG 112/29 December 2001, effective 5

STATUTORY INSTRUMENTS. S.I. No. 333 of 2011 EUROPEAN COMMUNITIES (ELECTRONIC COMMUNICATIONS NETWORKS AND SERVICES) (FRAMEWORK) REGULATIONS 2011

Telecommunications Authority of Trinidad and Tobago. Draft Telecommunications (Equipment Certification) Regulations, 2009

Data Distribution Agreement of BME Market Data

(Non-legislative acts) DECISIONS

Certified Translation from German. Licence Agreement. 1. Subject-matter of the Agreement

Electricity (Consumer Safety) Regulation 2006

DIRECTIVES. (Text with EEA relevance)

Telecommunications Act

Ordinance on the Safety Investigation of Transport Incidents (OSITI)

Official Journal of the European Union. (Legislative acts) REGULATIONS

DEPARTMENT OF LABOUR. Government Notice. R: October Electrical Installation Regulations, 1992

Annex I To Loughborough University Estates Services Health and Safety Policy

REGULATION ON THE APPROVAL AND IMPORTATION OF TELECOMMUNICATIONS EQUIPMENT CONNECTED TO PUBLIC TELECOMMUNICATIONS NETWORKS. Article 1 Definitions

Conditions for Processing Banking Transactions via the Corporate Banking Portal and HBCI/FinTS Service

Unofficial Translation TELECOMMUNICATIONS BUSINESS ACT, B.E (2001) 1

IC Chapter 15. Ballot Card and Electronic Voting Systems; Additional Standards and Procedures for Approving System Changes

Guidelines for the Type Approval Of Licence Exempt Radio Spectrum Devices

English version of. Executive Order on Authorisation for Placing in Service of Subsystems in the Railway Infrastructure

LICENCE ISSUED UNDER SECTION 24 OF THE INFORMATION AND COMMUNICATION TECHNOLOGIES ACT 2001 (AS AMENDED) Licence No. C.04/2003/002

REGULATION (EC) No 764/2008 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 9 July 2008

TRANSMISSION SYSTEM OPERATOR LICENCE GRANTED TO. Gaslink Independent System Operator Limited. Consultation Paper

No. 340/ April 2017 REGULATION. on procurement by parties operating in the water, energy, transportation and postal service sectors.

Official Journal of the European Union L 251/3

ELECTIONS TO THE PARLIAMENT OF THE CZECH REPUBLIC

Electricity Market Act 1

(17) It is necessary to update the legal references in Chapters 3, 12, 14, 16, 18 and 19 of Annex 1 to the Agreement; (18) Article 10(5) of the

Offshore Wind Energy Act (WindSeeG 2017)

LAW ON ELECTRONIC COMMUNICATIONS

Official Journal of the European Communities N L 139/19. (Acts whose publication is not obligatory) COUNCIL

Communications Act 8 of 2009 section 86

REGULATIONS. (Text with EEA relevance)

QUESTION / CLARIFICATION

Conditions for Processing Banking Transactions via the Corporate Banking Portal

DECISION OF THE EEA JOINT COMMITTEE No 76/2009. of 30 June 2009

Outer Space and High-altitude Activities Act 2017

(1 May 2008 to date) ELECTRICITY REGULATION ACT 4 OF 2006

THE FINANCIAL SERVICES ACT ARRANGEMENT OF SECTIONS PART I PRELIMINARY PART II THE FINANCIAL SERVICES COMMISSION

Arizona 2. DRAFT Verified Voting Foundation March 12, 2007 Page 1 of 9

STATUTORY INSTRUMENTS. S.I. No.?????????? of 2016

Water Supply And Sanitation (Quality Of Service) Rules THE WATER SUPPLY AND SANITATION ACT (CAP 272)

LAW ON LOCAL ELECTIONS. ("Official Gazette of the Republic of Serbia", no. 129/2007) I MAIN PROVISIONS. Article 1

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

TELECOMMUNICATIONS ORDINANCE (Chapter 106) SERVICES-BASED OPERATOR LICENCE. [Name of Licensee]...

MINISTRY OF THE SEA, TRANSPORT AND INFRASTRUCTURE

LAW ON EXPORT AND IMPORT OF ARMS AND MILITARY EQUIPMENT I. INTRODUCTORY PROVISIONS. Subject Matter of the Law. Article 1

1) ICC ADR proceedings are flexible and party-controlled to the greatest extent possible.

Nuclear Energy Act (NEA)

ORDINANCE NO BE IT FURTHER ENACTED AND ORDAINED by the Mayor and City Council of Laurel, Maryland that

Ordinance on the Safety Investigation of Transport Incidents

PROCEDURE FOR REGISTRATION OF RENEWABLE ENERGY GENERATION PROJECT BY CENTRAL AGENCY

THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, (Made under section 45) ARRANGEMENT OF RULES

Translation from Finnish Legally binding only in Finnish and Swedish Ministry of the Interior, Finland

BULGARIAN STOCK EXCHANGE-SOFIA RULES AND REGULATIONS PART II MEMBERSHIP RULES

S-1. Supplementary Provisions. (Date of Enforcement) Article 1 These Articles of Agreement shall come into force as of July 1, 1999.

Code of conduct for identification service trust network

RULES OF TENNESSEE PUBLIC UTILITY COMMISSION CHAPTER REGULATIONS FOR TELEPHONE COMPANIES TABLE OF CONTENTS

Ordinance on Electromagnetic Compatibility

The Electricity (Supply Services) Rules THE ELECTRICITY ACT (CAP 131) THE ELECTRICITY (SUPPLY SERVICES) RULES, (Made under section 45)

OBJECTS AND REASONS

LAW ON FOREIGN TRADE IN WEAPONS, MILITARY EQUIPMENT AND DUAL-USE GOODS (Published in the Official Gazette No 7 from February 2, year 2005.

DATA PROTECTION LAWS OF THE WORLD. South Korea

ARRANGEMENT OF SECTIONS PART I PRELIMINARY

( ) Page: 1/5 WORK PROGRAMME ON ELECTRONIC COMMERCE ELECTRONIC SIGNATURES. Communication from Argentina, Brazil and Paraguay

Electronic Transactions Act, Act, Act 772 ARRANGEMENT OF SECTIONS. Object and scope of the Act

Working document on questions of interpretation: How to deal with TSI errors?

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 172 thereof,

LAW ON STATE BORDER PROTECTION

ELECTRICITY REGULATIONS FOR COMPULSORY NORMS AND STANDARDS FOR RETICULATION SERVICES (GN R773 in GG of 18 July 2008)

ARTICLE 23 TELECOMMUNICATIONS TOWERS

Recitals. Common Safety Method for assessing conformity with the requirements for obtaining railway single safety certificates.

THE FINANCIAL SERVICES ACT 2007

Ordinance on Electromagnetic Compatibility

LICENCE ISSUED UNDER SECTION 24 OF THE INFORMATION AND COMMUNICATION TECHNOLOGIES ACT 2001 (AS AMENDED) Licence No. C.02/2011/001

CHAPTER 308B ELECTRONIC TRANSACTIONS

Rule 1: Appointment of Officials

THE STATUTES OF THE REPUBLIC OF SINGAPORE ENERGY CONSERVATION ACT (CHAPTER 92C)

Ministry of Trade and Industry, Finland Nuclear Energy Act

Coordinated text from 10 August 2011 Version applicable from 1 September 2011

(1) This Act lays down provisions on the competence of an asbestos worker and licences for asbestos removal work and any related registers.

DIVISION E--INFORMATION TECHNOLOGY MANAGEMENT REFORM

The High Contracting Parties to the present Treaty, Member States of the European Union,

Colloquium organized by the Council of State of the Netherlands and ACA-Europe. An exploration of Technology and the Law. The Hague 14 May 2018

Scrap and Material Handlers

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 687

Act on making products available on the market (Product Safety Act)

ETSI Industry Specification Group Agreement relating to ISG IP6 (IPv6 integration)

END-USER SOFTWARE LICENSE AGREEMENT FOR TEKLA SOFTWARE

PE-CONS 71/1/15 REV 1 EN

BELIZE TELECOMMUNICATIONS ACT CHAPTER 229 REVISED EDITION 2000 SHOWING THE LAW AS AT 31ST DECEMBER, 2000

The Electronic Communications Act (2003:389)

Regulations of Digital Information Processing and Communication (I&C) at the Karlsruhe Institute of Technology (KIT) [I&C Regulations]

27 July 2017 Without prejudice TITLE [XX] DIGITAL TRADE

Federal Act on Data Protection (FADP) Section 1: Aim, Scope and Definitions

ELECTRICITY ACT Cap 95 8 July 1939 ELECTRICITY ACT. Revised Laws of Mauritius

ELECTRICITY ACT 1939

Act means the Municipal Elections Act, 1996, c. 32 as amended;

Transcription:

BUNDESAMT FÜR VERKEHR OFFICE FÉDÉRAL DES TRANSPORTS UFFICIO FEDERALE DEI TRASPORTI FEDERAL OFFICE OF TRANSPORT Guidelines Article 7 of the Ordinance on the Construction and Operation of Railways (Railways Ordinance) 1 Type approval of constituents and signalling systems Federal Office of Transport (FOT) 1 April 2002 1 Cf. Annex 4 for wording of Article 7 of the Railways Ordinance.

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 2 Contents 1 Purpose... 3 2 Purpose and scope of type approval... 3 3 Definitions of terms used in these guidelines:... 3 4 Type approval obligation... 4 5 Type approval together with other procedures... 4 6 Obligations on the part of applicants... 4 7 FOT... 5 8 Type approval procedure... 5 8.1 Application... 5 8.1.1 Required information... 5 8.1.2 Addresses... 6 8.2 Examination of application... 6 8.3 Planning the type approval procedure... 6 8.4 Examination and approval of the specification... 7 8.5 Safety case... 7 8.6 Verification of safety case... 7 8.6.1 Examination... 7 8.6.2 Appointment of assessors by applicants... 7 8.7 Examinations to be carried out by the FOT... 8 8.8 Operational tests... 8 8.9 Type approval... 8 9 Subsequent modifications... 9 10 Acceptance of existing approvals... 9 11 Reporting obligation... 9 12 Revocation... 9 13 Confidentiality... 9 14 Fees... 9 15 Effective date... 10 Annexes 1) General type approval procedure 2) Applicable constituents 3) Applicable signalling systems 4) Wording of Article 7 of the Railways Ordinance

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 3 1 Purpose The aim of these guidelines is to explain the approval procedures for constituents and signalling systems (Article 7 of the Railways Ordinance) 2 to applicants and other interested parties. A separate set of guidelines has been issued for vehicles. They explain the practical application of the existing laws, ordinances and implementation regulations concerning type approval. This document does not have the status of a law or ordinance, but it is more binding than a mere recommendation. Deviations are permissible as long as the objectives pursued by the law, ordinance and guidelines are still attained in another manner. Applicants who closely observe these guidelines may be certain that the authorities will accept their application for consideration. Failure to do so may result in the rejection of their application. 2 Purpose and scope of type approval The aim of type approval is to facilitate the examination process of the FOT within the scope of subsequent plan approval and /or operating authorisation procedures, and thus to accelerate these procedures. With respect to new constituents and signalling systems for which the approval process involves a lengthier operational test, applicants are advised to initiate the type approval procedure before starting the plan approval procedure. When the type approval procedure is started well in advance, an important prerequisite is created so that the desgin approval procedure can take place within the deadlines. Type approval is primarily intended to apply to constituents and signalling systems (cf. Annexes 2 and 3 for details concerning scope of application) that are designed for multiple use in an identical manner and function (series). If multiple application is not a certainty, it is nevertheless possible to initiate a procedure for type approval. 3 Definitions of terms used in these guidelines: a) Applicant: Manufacturer or his authorised agent, proprietor or holder, network user and infrastructure operator. b) Specified safety requirements: Collective term that encompasses all safety requirements that have to be identified and specified by the applicant on the basis of legally binding safety regulations, measures arising from risk analyses and safety technical rules. c) Requirements: For example, functional, planning, operating, maintenance requirements. Application conditions: For example, technical, operational, environmental application conditions. d) Safety case: Documentary evidence supplied by the applicant that the object concerned meets all the specified safety requirements in accordance with the applicable safety technical rules. 2 SR 742.141.1

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 4 e) Type approval: Decision in which the FOT confirms that a given object has been examined from both a technical and an operational point of view and is found to be suitable for use for a specified purpose under specific conditions, and if applicable that its interoperability is assured. f) Type approval concept: The FOT s type approval concept stipulates the organisation, responsibilities, required documentation, inclusion of assessors(cf. 8.6 below), any necessary operational tests and the schedule for the type approval procedure. g) Constituents: This term refers to the items listed in Annex 2. h) Signalling systems: This term refers to the items listed in Annex 3. i) Specification: This term refers to the information concerning the purpose, requirements (including specified safety requirements) and application conditions of the object to be approved. 4 Type approval obligation There is no type approval obligation in effect. 5 Type approval together with other procedures Whereas in the type approval procedure, the necessary examination is carried out independently of a given single application, in the plan approval and operating authorisation procedures a specific application is tested in its intended environment. If a given constituent, signalling system or components thereof are to be examined for the first time within the scope of a plan approval or operating authorisation procedure, the applicant may also submit a corresponding request for (non-projectspecific) type approval. The FOT implements these procedures separately (usually different applicants), but co-ordinates them in practical terms. 6 Obligations on the part of applicants Applicants are required to: Submit the specification State which legal provisions and standards are applicable with respect to the requirements (including the specified safety requirements), and indicate any deviations therefrom State that all information (planning details, maintenance guidelines, etc.) is available that is necessary for ensuring the safety throughout the entire lifecycle Produce the necessary safety case (cf. 8.5 below) Call on the appointed assessor(s) to verify the safety case (cf. 8.6 below) Indicate which interoperability requirements are met

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 5 The applicant is the sole party answerable towards the FOT in the type approval procedure. 7 FOT The FOT carries out the following actions within the scope of its type approval procedure: Checks that application is complete (cf. 8.2 below) Requests applicant to assist in planning the procedure (cf. 8.3 below) Specifies the course of the type approval procedure (cf. 8.3 below) Examines and approves the specification (cf. 8.4 below) Carries out the type approval examination as described in section 8.7 Issues the necessary authorisations for operational tests (cf. 8.8 below) Issues the type approval certificate (cf. 8.9) NB: The FOT acts solely as examining and approval authority. 8 Type approval procedure The type approval procedure itself is based on these guidelines and the provisions of the Federal Administrative Procedures Act 3. 8.1 Application 8.1.1 Required information The person signing the application on behalf of the applicant is required to submit the following information: Title of application: "Application for type approval of... [object concerned] in accordance with Article 7 of the Railways Ordinance " Name and address of applicant Brief description of purpose and use of the object, or its multiple application Technical identification of object Details concerning origin of object: prototype, preliminary series or series production Application conditions under which the type approval is to apply Substantiated petition concerning intended period of validity of type approval Details concerning any already existing approvals (including by foreign authorities) Details concerning any already existing applications 3 Federal Administrative Procedures Act, SR 172.021

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 6 Specified safety requirements (if available) Indication of references concerning safety case (if available) Indication of references concerning safety assessment report (if available) Draft type approval concept 8.1.2 Addresses Applications for type approval of constituents and their components should be sent to the following address: Federal Office of Transport Installations section CH 3003 Berne Telephone enquiries: 031 323 14 52 (from abroad: +41 31 323 14 52) Applications for type approval of signalling systems and their components should be sent to the following address: Federal Office of Transport Safety Technology section CH 3003 Berne Telephone enquiries: 031 323 14 52 (from abroad: +41 31 323 14 52) Enquiries may also be made by e-mail to: zulassung@bav.admin.ch or homologation@bav.admin.ch or approvazione@bav.admin.ch or approval@bav.admin.ch 8.2 Examination of application The FOT ascertains whether the application is complete (i.e. whether it contains all the necessary information for carrying out a detailed examination). It then contacts the applicant within 30 days after its receipt of the application to confirm the initiation of the type approval procedure, to request more information, or to reject the application. If the applicant fails to respond within the stated deadline, the FOT will not process the application. 8.3 Planning the type approval procedure Once the FOT is in possession of the complete application material, the next step, initiated by the FOT, is for both parties to finalise the details of the type approval concept within 30 days. The applicant is responsible for preparing the type approval concept. The FOT specifies the course of the type approval procedure.

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 7 8.4 Examination and approval of the specification During the planning stage (cf. 8.3 above), the deadline also has to be specified for the examination and approval of the specification. The FOT may approve the specification by an interim decision. 8.5 Safety case The applicant is responsible for providing the necessary safety case. It is required to provide evidence of the fact that the specified safety requirements are duly met. These include the relevant safety requirements stipulated in the Railways Ordinance (including the provisions of Article 5, Paragraph 2) as well as supplementary regulations 4 and implementation provisions in consideration of the recognised technical rules 5, e.g. those of CEN and CENELEC. In principle, for type approval in the area of signalling systems, the safety case has to be prepared in accordance with the provisions of pren 50129 6. 8.6 Verification of safety case 8.6.1 Examination The applicant is obliged to entrust an assessor with the task of verifying the safety case. The assessor issues a safety assessment report. If specified within the scope of the planning of the type approval procedure (cf. 8.3 above), the FOT may verify the safety case or parts thereof. 8.6.2 Appointment of assessors by applicants Assessors may take the form of bodies or individual experts. Bodies Any body called on by an applicant to function as an assessor has to be duly accredited in accordance with the provisions of the Ordinance on Accreditation and Designation 7. The FOT verifies the validity of the scope of application stated in the accreditation. The applicant is required to issue a written mandate to the body concerned, and to submit it to the FOT, which uses it as basis for verifying the safety assessment report. 4 Article 4, Railways Ordinance 5 Article 2, Railways Ordinance 6 pren 50129 Railway applications - Safety related electronic systems for signalling 7 SR 946.512

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 8 Individual experts Any individual experts called on by the applicant to function as an assessor has to meet the criteria cited in Chapter 6 of the Guidelines for Experts 8 (specialised knowhow and neutrality). The FOT decides whether a given individual expert is acceptable. The applicant is required to issue a written mandate to each individual expert concerned, and to submit it to the FOT, which uses it as a basis for verifying the safety assessment report. 8.7 Examinations to be carried out by the FOT The FOT verifies at least: The specification The result of the safety assessment report The safety case, if agreed during the planning of the type approval procedure Compliance with the agreed interoperability requirements Whether the processes described by the applicant are suitable for avoiding safety gaps, and whether these processes have been implemented Whether an operational test is necessary The results of any operational test deemed necessary 8.8 Operational tests If an operational test is deemed necessary (cf. 8.7 above), the FOT issues an authorisation in the form of an interim decision. NB: If an operational test is called for within the scope of the type approval procedure, this normally requires a plan approval. 8.9 Type approval The FOT issues the type approval certificate. A type approval certificate may include certain conditions (e.g. with respect to supervision). The period of validity of a type approval decision is normally limited. Once the stated period has expired, the object concerned may no longer be used for new applications. The FOT specifies the period of validity in consideration of the applicant s request. The period of validity may be extended. For this purpose, the applicant is required to submit a request in good time, and is obliged to provide credible evidence that the object concerned is still to be used for the same purpose and meets the original requirements. 8 Guidelines dated 1 May 2000 by the Federal Office of Transport concerning Article 6 of the Ordinance on the Construction and Operation of Railways

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 9 9 Subsequent modifications Any modifications after the type approval decision must be submitted to the FOT for approval. 10 Acceptance of existing approvals Within the scope of its type approval procedure, the FOT may accept existing approval documents (including those issued abroad 9 ). In any case, the FOT verifies that the application conditions stated in the existing approval duly apply to those cited in its own current type approval procedure. 11 Reporting obligation Any findings and/or occurrences of relevance to safety that may be associated with type approved objects have to be immediately reported to the FOT. This reporting obligation applies throughout the entire lifecycle of the object(s) and its series application, from development stage to disposal. 12 Revocation The FOT is authorised to revoke a type approval in the following cases: If the technical and / or operational safety is not guaranteed If the present application conditions do not correspond to those specified in the type approval 13 Confidentiality Those employees of the FOT who handle documents submitted by an applicant in association with the type approval procedure are obliged to observe professional, business and official secrecy in accordance with the provisions of the Federal Employees Act 10. The FOT is not permitted to pass on any documents or the contents thereof to any third parties without the prior consent of the applicant. 14 Fees Fees are charged in accordance with the provisions of the FOT s ordinance on fees 11. 9 Obligation of acceptance in accordance with corresponding international agreements 10 SR 172.220.1 11 SR 742.102

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 10 15 Effective date These guidelines are effective as of 1 April 2002. FEDERAL OFFICE OF TRANSPORT Max Friedli, Director

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 11 A N N E X 1 Type approval procedure in accordance with Article 7 of the Railways Ordinance R: applicant S: GL, 8.1 Start Application Examination of application R: FOT S: GL, 8.2 Type approval concept R: applicant Procedure planning R: applicant, together with FOT S: GL, 8.3 Examination of the specification Providing safety case R: FOT S: GL, 8.4 R: applicant S: GL, 8.5 Approval of the specification R: FOT S: interim decision Verification of safety case R: assessor or FOT S: GL, 8.6 Examination by FOT S: GL, 8.7 no Operational test? yes Operational test R: FOT S: GL 8.8; interim decision R: applicant S: cf. type approval concept Examination of results by FOT Approval possible? yes R: FOT no R: FOT Rejection of type approval Type approval Type approval Key R : Responsibility S : Special remarks GL : Guideline End R: FOT S: GL, 8.9; decision

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 12 Applicable constituents A N N E X 2 constituents include objects relating to power supply, tracks / superstructures, buildings / structures. Power supply - Catenary systems (including earthing and return current feed) - Energy transmission systems - High-tension equipment (switches, separators, converters, etc.) - Sub-station transformers - Voltage testers and earth rods - Catenary wiring material - Catenary insulators - Catenary support and wire strainers - Supports for catenary systems, transmission lines, etc. - Masts for radio antennas, rail beams, etc., that have to meet special earthing requirements (List not complete) Tracks / superstructures - Rails - Rail fastenings - Sleepers - Switches and crossings and components thereof (switches, crossings, sleepers and bearers, etc.) (List not complete) Buildings / structures - Auxiliary bridges - Prefabricated subterranean passageways - Platform roofs - Platform angle sections - Waiting rooms (List not complete)

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 13 A N N E X 3 Page 1 of 2 Applicable signalling systems Signalling systems include all items that are used for performing the following functions (list not complete): - Control / Command - Signalling - Automatic train control - Protection of people in the vicinity of tracks - Train monitoring - Train protection (vehicle- and wayside) - Train describer Signalling systems may comprise the following sub-systems and components (list not complete): - Axle counters - Lineside signals - Level crossings - Balises - Barrier drives, closing devices, warning lamps - Operating and display elements - Diagnostics systems - Vehicle identification (AFI) - Cab signalling - Train detection (track circuits, axle counter systems) - Centralized traffic control systems (CTC) - Planning and development tools - Testing devices / simulators - Registration equipment - Safety relays

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 14 - Transmission of safety-relevant information - Safety-related software / safe computers - Interlockings - ETCS, ZUB, Signum - Warning systems (permanent or temporary) - Points control systems A N N E X 3 Page 2 of 2 - Train monitoring devices (hot-box and standstill positioning, wheel flat location, wheel-load scales, profile location)

Federal Office of Transport Guidelines for the type approval of constituents and signalling systems Page 15 Wording [translated] of Article 7 of the Railways Ordinance (SR 742.141.1) A N N E X 4 Article 7 1 Type approval A certificate of type approval may be issued for vehicles, constituents and signalling systems that are used for multiple purposes in an identical manner and function. 1 Version in accordance with Paragraph I of the Ordinance dated 25 November 1998, in effect since 1 January 1999 (AS 1999 1083).