Technical Committee on Liquefied Natural Gas

Similar documents
Technical Committee on Liquefied Natural Gas

Hartford Steam Boiler Inspection & Insurance, CT. DTE Electric Company, MI. General Electric/ALSTOM Power Inc., CT

MINUTES OF MEETING. Technical Committee on Pulverized Fuel Systems

Honeywell/Eclipse/CEC Combustion Safety, Inc., OH. Southern Company Services, Inc., AL. Global Asset Protection Services, Inc., TN

Technical Standards and Safety Authority, Canada. Southern Company Services, Inc., AL. Emerson Automation Solutions, PA

MINUTES OF MEETING. Technical Committee on Multiple Burner Boilers

Global Asset Protection Services, LLC, CT. Liberty Mutual Commercial Markets, Property, KY. Burns & McDonnell Engineering Company, MO

NFPA Technical Committee on Building Systems. NFPA 5000 Second Draft Meeting AGENDA

8. NFPA 5000 Second Draft (formerly ROC) Preparation. Public Comments to be distributed before meeting date.

2. Introduction of committee members and guests. For a current committee roster, see page 2.

MINUTES OF ROC MEETING Technical Committee on Multiple Burner Boilers Fall 2010 cycle SRP PERA Club 1 E. Continental Drive Tempe, AZ 85281

2015 UPC & UMC TECHNICAL COMMITTEE MEETING WELCOME TECHNICAL COMMITTEE IAPMO CODES AND STANDARDS DEVELOPMENT PROCESS

MEMORANDUM. NFPA Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No.

Page 1 of Self-introduction of Committee Members and Guests. For a current committee roster, pg. 2.

Technical Committee on Tank Leakage and Repair Safeguards

NFPA TECHNICAL COMMITTEE FOR Powered Rescue Tools

Technical Committee on Single Burner Boilers

Supplemental Operating Procedures for the National Electrical Code Project

COMMITTEE ON AGRICULTURAL DUSTS

Supplemental Operating Procedures for the NFPA Committees on Safety to Life

Report on Comments F2005 Copyright, NFPA NFPA 211 Report of the Committee on

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Meeting Agenda Second Draft Meeting NFPA 450, Guide for Emergency Medical Services and Systems August 12 th, 2015 Conference Call/Adobe Connect

Ph: Fax: East Philadelphia Street Ontario, California USA To:

4. Review and Approval of September A2010 ROC Meeting Minutes Connell. 5. Committee Member Status and Update of Membership Roster Stanek/Connell

MEMORANDUM. Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No. 1153

MEMORANDUM. Subject: NFPA 259 Proposed Tentative Interim Amendment (TIA) No. 957

AMERICAN IRON AND STEEL INSTITUTE PROCEDURES FOR ANSI-APPROVED STANDARDS FOR COLD-FORMED STEEL DESIGN AND CONSTRUCTION

COMMITTEE ON HAZARDOUS CHEMICALS. SUBJ: Minutes of NFPA 40 and 400 First Draft Meeting, November 5 7, 2013

MEMORANDUM. Subject: NEC Proposed Tentative Interim Amendment (TIA) No. 1117

TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. Double Tree by Hilton & Suites Pittsburgh Downtown One Bigelow Square Pittsburgh, PA 15219

Alternate Members Bradford Cronin Daniel Finnegan Coy Kevin Hill David LeBlanc Thomas Norton

M I N U T E S FOURTH BUILDING TECHNICAL COUNCIL MEETING OF 2011

RESNA Policies and Procedures for the Development of RESNA Assistive Technology Standards February 17, 2016

MINUTES OF THE MEETING NFPA CORRELATING COMMITTEE ON FIRE AND EMERGENCY SERVICES PROTECTIVE CLOTHING AND EQUIPMENT

PDA STANDARDS DEVELOPMENT PROGRAM Policies and Procedures

ASTM INTERNATIONAL Helping our world work better. Regulations Governing ASTM Technical Committees

SSPC 90.2 Committee Hilton Hotel Salt Lake City Salt Lake City, UT June 2008

CODES AND STANDARDS COMMITTEE OPERATING PROCEDURES

SDI PROCEDURES FOR ANSI-APPROVED STANDARDS FOR STEEL DECK

The attendees introduced themselves and reported affiliations.

MEMORANDUM. Subject: NFPA 101 Proposed Tentative Interim Amendment (TIA) No.1114

MEMORANDUM. Subject: NFPA 1917 Proposed Tentative Interim Amendment (TIA) No.1170

1:00 PM A.) WELCOME AND INTRODUCTIONS

ICC Industry Advisory Committee DRAFT MEETING MINUTES. August 9, Underwriters Laboratory

NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE. AGENDA January 21, 2016 NFPA, Quincy, MA

8.130, 8.201, 8.235, 8.310, and 8.315, relating to General Applicability and Standards; Definitions;

MINUTES OF ROP MEETING. Day 1 - Sunday January 22, 2012

Governing Board Roster

M I N U T E S FIRST BUILDING TECHNICAL COUNCIL MEETING OF 2011

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting December 6, :00 10:00 a.m. Eastern

Organization and Procedures for the Committee on Standardization of Oilfield Equipment and Materials: Policy Document

International Legal Metrology Update for the 2016 NCWM Interim Meeting in San Diego

MEETING NOTICE 2014 NEC REPORT ON PROPOSALS

NFPA 502 Technical Committee on Road Tunnel and Highway Fire Protection A2013 Pre-ROP Web/Teleconference Meeting Minutes October 21, 2011

Approved Revisions to UL s Accredited Procedures Effective November 1, 2009

AIAA STANDARDS PROGRAM PROCEDURES

6 Disagree (Drobnick, Dyson, Eblen, Gray, Mohla)

NFPA Technical Committee on Fire Department Rescue Tools

MEMORANDUM. NFPA Technical Committee on Wastewater Treatment Plants. Subject: NFPA 820 Proposed Tentative Interim Amendment (TIA) No.

Re: Petition for Appeal of GDF SUEZ Gas NA LLC D.P.U

MEMORANDUM. Subject: NFPA 1971 Proposed Tentative Interim Amendment (TIA) No.1159

MEMORANDUM. NFPA Correlating Committee on Health Care Facilities. Subject: NFPA 99 Proposed Tentative Interim Amendment (TIA) No.

DECLARATORY STATEMENT. THIS CAUSE came on for consideration upon the Petition for Declaratory Statement

Policies and Procedures for Standards Development for the Smart Buildings, Loads and Customer Systems Technical Committee

SJI Procedures for the Development, Approval, and Maintenance of SJI American National Standards

SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018

Minutes API COLM: Committee on Liquid Measurement Thursday, March 16, :00 pm 4:00 pm Addison, TX Chair: Hilary Gleitz

ASME Controls and Safety Devices for Automatically Fired Boilers (CSDAFB) Standards Committee

API-AGA JOINT COMMITTEE ON OIL AND GAS PIPELINE FIELD WELDING PRACTICES 2018 ANNUAL MEETING MINUTES

Policies and Procedures Manual. Committee on Petroleum Measurement (COPM) October 2017

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

American Nuclear Society NFSC November Meeting Minutes November 17, 2003 * New Orleans, LA

CP#28-05 Code Development

Meeting Notice 2021 USHGC Technical Committee Meeting June 19, 2019

Supreme Court Decision What s Next

Table of Contents. 9 Intellectual Property Policy

1 Batterymarch Park, Quincy, MA Phone: Fax: NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE

REGULATIONS GOVERNING ASTM TECHNICAL COMMITTEES

NUCLEAR REGULATORY COMMISSION [NRC ] Qualification of Safety-Related Lead Storage Batteries for Nuclear Power Plants

IMPLEMENTATION GUIDE FOR THE PHOENIX AGREEMENT

NFPA Technical Committee on Data Exchange for the Fire Service

TEXAS STATE UNIVERSITY SYSTEM REQUEST FOR PROPOSALS FOR OUTSIDE COUNSEL. RFP ISSUE DATE: June 13, 2012 PROPOSALS DUE: July 20, 2012

*** MEDIA ADVISORY ***

OIML Update. Dr. Charles Ehrlich International Legal Metrology Program NIST Office of Weights and Measures U.S. CIML Member

Federal & State Issues Update. LCA/LMOGA Post-Session Government Affairs Meeting Point Clear, AL July 2017

MEMORANDUM. SUBJECT: NFPA 70E Proposed Tentative Interim Amendment (TIA) No. 1253R

MEMORANDUM. NFPA Technical Committee on Electronic Safety Equipment. Subject: NFPA 1982 Proposed Tentative Interim Amendment (TIA) No.

2015 Annual Revision Cycle Notice of a Consent Standard NFPA 1071

Meeting Minutes. Attendees:

JEDEC SOLID STATE TECHNOLOGY ASSOCIATION

National Fire Protection Association 1 Batterymarch Park, Quincy, MA Phone: Fax:

Operating Procedures for ATIS Forums and Committees

June Regulations Governing Consensus Development of the Water Efficiency and Sanitation Standard

Standardization. Policies and Procedures. of the. National Electrical. Manufacturers. Association

M I N U T E S FOURTH ELECTRICAL SUB-COUNCIL MEETING OF 2015

NACE INTERNATIONAL TECHNICAL COMMITTEE PUBLICATIONS MANUAL APPROVED BY THE TECHNICAL AND RESEARCH ACTIVITIES COMMITTEE

DC: I estimate a 4,600 valid sig petition drive for President in I budget $15,000 from the LNC.

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )

M I N U T E S FOURTH BUILDING TECHNICAL COUNCIL MEETING OF 2010

Transcription:

Technical Committee on Liquefied Natural Gas Minutes Bechtel Oil, Gas, & Chemicals Inc. 3000 Post Oak Blvd. Houston, TX 77056 March 11-12, 2014 Part I, Attendance: Principal Members and Staff: Jay Jablonski, Chairman, HSB PLC, CT Richard Hoffmann, Secretary, Hoffmann & Feige, NY (via teleconference) Denise Beach, NFPA, MA Jeffrey Beale, CH-IV International, MD Leon Bowdoin, MA (Rep NFPA Industrial Section) Jeffrey Brightwell, Trunkline LNG, LA (rep AGA) (via teleconference, 3/11 only) David Butler, City of Everett Fire Department, MA (via teleconference, 3/11 only) Don Coers, Coers and Company, IL Brian Eisentrout, CB&I, IL (rep Steel Tank Institute/Steel Plate Fabricators) Mark Fessenden, Tyco Fire Suppression & Building Products, WI Filippo Gavelli, GexCon US, MD Ben Ho, TX Frank Katulak, Distrigas of Massachusetts, MA Joel Madison, Ebara International Corporation, NV Kenneth Paul, Chart Industries, Inc., NH Gil Poe, ExxonMobil Production Company, TX (rep API) Phani Raj, US DOT Railroad Administration, DC James Regan, Starr Technical Risks Agency Inc., IL Kevin Ritz, Baltimore Gas & Electric Co, MD Thomas Rodante, Baker Engineering & Risk Consultants, TX Jeffrey Sawchuk, BP Corporation, TX Alternates, Non-voting members, and guests: John Blanchard, CB&I, IL (alt rep Steel Tank Institute, Steel Plate Fabricators) Steve Clay, US DOT Railroad Administration (guest) (3/12 only) Pat Convery, Cornerstone Energy Services, MA (rep NFPA Industrial Section) Scott Delmotte, Dresser-Rand (guest) Adnan Ezzarhouni, GTT (Gaztransport & Technigaz SAs), TX (guest) Andrew Kohout, Federal Energy Regulatory Commission, DC Kenneth Lee, US DOT PHMSA (guest) Bernard Leong, Chevron, TX (guest) Roy Lucas, ORNL (guest) Matt Martingaj, Chart Inc. (guest)

M. Jared Morrison, Starr Technical Risks (guest) Antonino Nicotra, Bechtel Oil Gas & Chemicals, TX Patricia Outtrim, Cheniere Energy Inc., TX (guest) Arthur Ransome, CH-IV, MD Anthony Scaraggi, Distrigas of Massachusetts LLC Joseph Sieve, US DOT PHMSA (guest) Jenna Wilson, CH-IV International, MD (guest) Part II, Minutes: 1. The meeting was called to order at 8:00 a.m. CDT. Chairman Jablonski welcomed the committee members to the meeting and thanked them for their service. 2. The committee members and guests introduced themselves. 3. The minutes of the pre- meeting held in October 2013 in Washington DC were accepted as written. 4. The NFPA Staff Liaison reviewed the new document revision process and tools, including the new terminology, the revision cycle timeline, and the online public input submittal process. (Attachment A) 5. New Business. Document Revision. Committee actions related to document revisions and public input will be available in the Report, which will be posted on the NFPA 59A document information page no later than Sept. 5, 2014. A. A task group was created to recommend requirements for membrane tank systems. B. Eisentrout reported that a Canadian task group has created standards on membrane tanks that could provide guidance. European code EN 14620 could also serve as a resource for the task group. The task group members are: A. Ezzarhouni (chair)(gtt), J. Blanchard, D. Coers, B. Eisentrout, R. Hoffmann, and A. Kohout. B. A task group was created to review section 5.3 to recommend performance-based requirements, rather than prescriptive. The task group members are: P. Raj (chair), D. Coers, F. Gavelli, and J. Sawchuk. C. Committee member Phani Raj made a brief presentation on LNG applications within the jurisdiction of the Federal Railroad Administration, including the use of LNG as motive fuel for locomotives. The committee didn t identify any specific course of action, however, NFPA staff noted that LNG vehicle fuel systems and refueling stations fall under the scope of NFPA 52, Alternative Vehicular Fuel Systems. 6. Old Business A. Chapter 5 Task Group. The committee established a task group to identify uncertainties in chapter 5, identify the single leakage source and recommend additional coverage or requirements to address both. The task group reported progress on a flow chart and gap analysis (Attachment B). A research request was submitted to the FPRF on single leakage source, but the awards have not yet been made. The task group members are L. Bowdoin (chair); J. Brightwell, P. Convery, B. Eisentrout, F. Gavelli, A. Hatfield, F. Katulak, B. Leong, P. Outtrim, K. Paul, G. Poe, T. Turpin, and J. Wilson.

B. Chapter 15 Task Group. The committee expanded the scope of the task group perform complete review of chapter 15 including tables for errors and omissions, and to perform a gap analysis. The task group should also recommend revisions to clarify the requirements for executing a quantitative risk assessment. The task group members are: F. Gavelli (chair); L. Bowdoin, P. Convery, A. Nicotra, P. Outtrim, G. Poe, T. Turpin, P. Raj, and J. Wilson. C. Fire Analysis for Roof Loss Task Group. The committee established a task group to review current fire analysis requirements for roof loss and develop recommendations to differentiate between steel and concrete construction. The task group has developed a draft TIA and is in the process of reviewing it. Task group members are: J. Blanchard Chair, J. Beale, D. Coers, C. Hanskat, R. Hoffmann, F. Katulak, A. Kohout, B. Leong, J. Lewis, and A. Nicotra. The committee did not have time to discuss the additional task groups. However, an interim in-person task group meeting was requested to allow task groups to further discuss the tasks and deliverables. NFPA staff will schedule a multi-day meeting so that task groups can meet consecutively for approximately a half day each. D. Fire Protection Task Group. The committee established a task group to review other NFPA documents and recommend revisions to the definition and annex material on Fire Protection. Several Public Inputs (formerly proposals) were acted upon to update existing standards, identify new standards, and update the requirements in chapter 12. The actions of the committee will be available in the Report, posted on the NFPA 59A document information page no later than Sept 5, 2014. The task group members are: Andrew Kohout Chair; Dale Edlbeck, Jay Jablonski, Bernard Leong, Ian Queen, James Regan, Kevin Ritz, and Jenna Wilson. E. Chapter 13 Task Group. The committee established a task group to review chapter 13, including reviewing the scope, performing a gap analysis, and recommend additional requirements or refinements based on the analysis, recognizing that not all LNG facilities are under federal jurisdiction. The members of the task group are Jeffrey Beale (chair); Alan Hatfield, Dick Hoffmann, Frank Katulak, Glenn Mahnken, Ken Paul, Pat Outtrim, and Kevin Ritz. F. Referenced Standards. The committee requested that NFPA 3 and NFPA 110 be added to the committee documents download page because these are now being referenced by action in First Revision 107 and First Revision 113. G. Offshore LNG Facilities Standard. NFPA staff submitted a memo to the Standards Council requesting that the work item be closed. The Standards Council reviewed the request in their March 3-4, 2014 meeting and submitted the item for public comment through NFPA News. The Standards Council will review any comments received in their August 2014 meeting. H. Code Fund Project. NFPA staff submitted a code fund research request on the development of a source term model for input into DEGADIS. Research Foundation awards will be announced late first quarter 2014.

I. Compressed Natural Gas. On behalf of the LNG committee, NFPA staff submitted a request to the Industrial and Medical Gases technical committee to expand and clarify coverage of Compressed Natural Gas in NFPA 55. NFPA staff will update the committee on the IMG committee efforts. J. NFPA 56. The committee reviewed two Public Inputs related to NFPA 56. The actions of the committee will be available in the Report, posted on the NFPA 59A document information page no later than Sept 5, 2014. 7. Other Items. A. Small, non-storage LNG Plants. Scott Delmotte of Dresser-Rand made a brief presentation on Dresser-Rand s small scale, modularized, LNG manufacturing plant producing 6,000 gallons per day. More information on this system is available from the Dresser-Rand website, http://www.dresser-rand.com/markets/smallscalelng.php. The applications for this type of small scale LNG are anticipated to continue to grow. The committee did not establish any specific actions that would need to be taken to address these applications, but noted that they should comply with chapter 13, assuming that the LNG manufacturing plant would ultimately be connected to a sitesupplied storage container. 9. Date/Location of Next Meeting. The Second Draft meeting is tentatively scheduled for March 2015. Several committee members offered to host the meeting. NFPA staff will conduct a poll of the committee to determine a preference. 10. Adjournment. The meeting was adjourned at 5:40 pm CDT on March 12, 2014.

Attachment A: NFPA Staff Presentation

Welcome TC on Liquefied Natural Gas March 11-12, 2014 Bechtel Oil, Gas, & Chemicals Inc. At this and all NFPA committee meetings we are concerned with your safety. If the fire alarm sounds, please proceed to an exit. Use of tape recorders or other means capable of reproducing verbatim transcriptions of this or any NFPA meeting is not permitted Guests All guests are required to sign in and identify their affiliations. Participation is limited to those individuals who have previously requested of the chair time to address the committee on a particular subject or individuals who wish to speak to Public Input they have submitted. Guest chairs are located around the room as a courtesy. Members categorized in ANY interest category who have been retained to represent the interests of ANOTHER interest category (with respect to a specific issue or issues that are to be addressed by a TC/CC) shall declare those interests to the committee and refrain from voting on any Public Input, Comment, or other matter relating to those issues. 1

General Procedures Follow Robert s Rules of Order. Discussion requires a motion. Motions for Ending Debate Previous Question or Call the Question Not in order when another has the floor Requires a second This motion is not debatable and DOES NOT automatically stop debate A 2/3 affirmative vote will immediately close debate and return to the original motion on the floor. Less then 2/3 will allow debate to continue. Committee member actions: Member addresses the chair. Receives recognition from the chair. Introduces the motion. Another member seconds the motion. Committee chair actions: States the motion. Calls for discussion. Ensures all issues have been heard. Takes the vote. Announces the result of the vote. 2

Overview What s New? Still basically 4 steps: (Report on Proposals) Second Draft (Report on Comments) NITMAM/CAM Issuance NEW opportunities to skip steps: If no public comments are received, the committee can request immediate issuance NITMAMs will only be certified based on public comments. Changes in Terms: New Term Input Stage Public Input Meeting Committee Input Committee Statement (CS) First Revision (FR) Report Old Term ROP Stage Proposal ROP Meeting Trial Balloon (or later, FR that fails ballot) Committee Statement Committee Proposal or Accepted Public Proposal ROP ROP Draft What s New? Changes in Terms: New Term Comment Stage Public Comment Second Draft Meeting Committee Comment Second Revision Second Draft Report Second Draft Old Term ROC Stage Public Comment ROC Meeting Comment that Failed Ballot (Second Revision that failed ballot) Committee Comment or Accepted Public Comment ROC ROC Draft NEW Committee Actions and Motions: Resolve Public Input Create a First Revision Create a Committee Input (Trial Balloon) 3

Resolve a Public Input (PI) o Committee develops a Committee Statement (CS) to respond (resolve) a Public Input. o Committee must clearly indicate reasons for not accepting the recommendation in CS and/or point to a relevant First Revision o PI does not get balloted Create a First Revision (FR) o Committee wants to make a change to a current section or add new text. o Committee develops a Committee Statement (CS) substantiating the change. (do not refer to PI as the reason) o Ensure any associated PIs get a committee response, often simply referring to the relevant FR. o Each FR gets balloted Create a Committee Input (Trial Balloon) Committee wants to receive Public Comment on a topic, but not ready to incorporate it into the draft Need to have a Committee Statement Does not get balloted Committee Statements (Substantiation): All Public Input must have a Committee Statement Must include a valid technical reason No vague references to intent Explain how the submitter s substantiation is inadequate 4

Committee Statements (Substantiation): Should reference the First Revision if it addresses the intent of the Submitter s Public Input Formal voting Voting during meeting is used to establish a sense of agreement (simple majority) Secured by letter ballot (2/3 agreement) Only the results of the formal ballot determine the official position of the committee on the Ballots are on the First Revisions (FR) ONLY Public Input and Committee Input not balloted Reference materials are available:, PI, CI, CS, etc Ballot form allows you to vote: Affirmative on all FR Affirmative on all FR with exceptions specifically noted Ballot form provides a column for affirmative with comment Note: This box only needs to be checked if there is an accompanying comment. Reject or abstain requires a reason. Initial ballot Circulation of negatives and comments Members may change votes during circulation First Revision that fails letter ballot becomes Committee Input (CI) just like the trial balloon version of CI so as to solicit Public Comment 5

Balloting Ballots will be an online format Alternates are strongly encouraged to return ballots No New Material after the Public Input Stage What constitutes new material is to some extent a judgment call Online submittal of comments through Terra NFPA Overview Legal Comment phase works similar to old process HOWEVER, comments that do not contain specific action will no longer be accepted NO Reverse committee action NO I agree with the committee action NO Use submitter s original material No new material after the Public Input Stage What constitutes new material is to some extent a judgment call NITMAMs will be certified ONLY on comments Nitmammers must participate in the entire process Patent: Disclosures of essential patent claims should be made by the patent holder, but others may also notify NFPA if they believe that a proposed or existing NFPA standard includes an essential patent claim. Antitrust: the single most important provision- Federal law prohibits contracts, combinations, or conspiracies which unreasonably restrain trade or commerce. Section 1 of the Sherman Act 6

Legal Doc Info Pages Activities Disapproved by the Courts Document Information Next Edition Technical Committee Packing meetings Hiding commercial interest throwing the committees out of balance No final decision-making authority to unbalanced Task Groups; include all interested parties. Hiding scientific or technical information from committees Document scope Current/Previous Edition information Issued TIAs, FIs and Errata Archived revision information Standard Council Decisions Articles and Reports Read only document Meetings and Ballots ROP/ROC or First Draft Report and Second Draft Report NITMAMand Standard Council Decisions Submission of Public Input/Comment Private TC info Ballot circulations, informational ballots and other committee info Committee name, responsibility and scope Staff liaison Committee list Private committee contact information Current committee documents in PDF format Committees seeking members and committee online application Thank you for participating! Any questions? 7

Attachment B: Flow Chart Related to Chapter 5 Task Group