Navigable Waters Protection Act Regulatory Development October 30, 2009

Similar documents
1.0 Purpose To provide procedural direction for the implementation of Policy PL Work Permits Section 14 Public Lands Act.

HIGHWAYS DEVELOPMENT AND PROTECTION REGULATION

The Irrigation Act, 1996

CITY OF LYNN In City Council

Navigable Waters in BC

1. DEFINITIONS OF TERMS AS USED HEREIN:

Marine spaces Act, 1977, Act. No. 18 of 15 December 1977, as amended by the Marine Spaces (Amendment) Act 1978, Act No. 15 of 6 October 1978

ONTARIO REGULATION 197/96 CONSENT APPLICATIONS

Legislative Council, State of Michigan Courtesy of

MINISTRY OF TRANSPORTATION AND HIGHWAYS ACT

REGULATING BOATING ON LOCAL WATERS. The State Marine Board s Procedures for Adopting, Amending and Repealing Rules

Public Notice. Notice No. CELRP-OP 15-LOP1 Expiration Date: March 11, 2020

The Territorial Sea and Exclusive Economic Zone Act, Act No. 30 of 23 October 1978, as amended by Act No. 19 of 1989

2009 Bill 19. Second Session, 27th Legislature, 58 Elizabeth II THE LEGISLATIVE ASSEMBLY OF ALBERTA BILL 19 LAND ASSEMBLY PROJECT AREA ACT

BE it enacted by the Queen s Most Excellent Majesty,

Traditional Owner Settlement Act 2010

Marine Renewable-energy Act

Parliamentary Information and Research Service. Legislative Summary BILL C-3: INTERNATIONAL BRIDGES AND TUNNELS ACT

Marine Boundaries and Jurisdiction Act, , 25 February 1978 PART I PRELIMINARY

Flood Protection Bylaw

TERRITORIAL SEA AND EXCLUSIVE ECONOMIC ZONE 1977 No. 16 ANALYSIS

ORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:

HIGHWAYS DEVELOPMENT AND PROTECTION ACT

33 CFR PART 329 DEFINITION OF NAVIGABLE WATERS OF THE UNITED STATES. Authority: 33 U.S.C. 401 et seq.

1. (1) there is established under this Law the State Waterways Establish Ment of the Lagos State Waterways Authority

CHAPTER 20B. CD DISTRICT (COASTAL DEVELOPMENT DISTRICT)

2009 Bill 36. Second Session, 27th Legislature, 58 Elizabeth II THE LEGISLATIVE ASSEMBLY OF ALBERTA BILL 36 ALBERTA LAND STEWARDSHIP ACT

Dock Boat Lift and Vessel Bylaw

SUBCHAPTER 4B - EROSION AND SEDIMENT CONTROL

Canterbury Regional Council Flood Protection and Drainage Bylaw 2013

Subject Work Permits Section 14 Public Lands Act Compiled by Branch Natural Heritage, Lands & Protected Spaces

Municipal Government Act Subdivision and Development and Forms Regulations. Discussion Guide

Bill S-8 Bill S-11. An Act respecting the safety of drinking water on First Nation lands

National Gas (New South Wales) Act 2008 No 31

SOIL REMOVAL BYLAW

Water NSW Act 2014 No 74

NORTH CAROLINA GENERAL ASSEMBLY 1969 SESSION CHAPTER 1089 HOUSE BILL 1324 AN ACT TO ESTABLISH THE LAKE NORMAN MARINE COMMISSION.

Family Dispute Resolution Act 2013

STATE IRRIGATION ACT B.E Section 1. This Act shall be called the "The State Irrigation Act B.E. 2485(1942)".

SOIL REMOVAL AND DEPOSITION BYLAW

DISTRICT OF LAKE COUNTRY BYLAW 628, CONSOLIDATED VERSION (Includes amendment as of July 18, 2017)

Marine Navigation Act 2013

Peace Officer Act Employer Training Session

617. PUBLIC LAKE TRACTS DEFINITIONS. As used in this chapter, the terms defined in this section shall have the following meanings.

LAKE OF THE OZARKS PERMIT No. Activity: DOCK Sq. Ft.: Slips: Organization: Lake Mile: Township: Name: County: Range: Legal Desc.

Romania. ACT concerning the Legal Regime of the Internal Waters, the Territorial Sea and the Contiguous Zone of Romania, 7 August 1990 * CHAPTER I

Whale Protection Act 1980

CONTINENTAL SHELF ACT

Appendix G. Harbor Management Ordinance

DRAFT FOR CONSULTATION

THE MADRAS CANALS AND PUBLIC FERRIES ACT. (II of 1890) Amended byâ Act 16 of 2000

MURRAY-DARLING BASIN AGREEMENT

Electricity Supply Act 1995 No 94

Maritime Zones Act, 1999 (Act No. 2 of 1999) PART I PRELIMINARY

COMMISSIONERS OF OXFORD. Ordinance No. 1801

HYDRO AND ELECTRIC ENERGY ACT

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

SECTION SIXTEEN GENERAL RULES AND REGULATIONS - VESSELS ANCHORAGE GROUNDS AND FAIRWAYS

WHEREAS, the Board of Commissioners adopted the restated Pasco County Land Development Code on October 18, 2011 by Ord. No.

WATER POWER. The Water Power Act. being

CITY OF PORT MOODY BYLAW NO. 2821

Nonmetallic Mining Reclamation Permit Application Required.

DISTRICT OF VANDERHOOF SIGN BYLAW NO. 995, 2006

The Water Security Agency Act

Robin Rigg Offshore Wind Farm (Navigation and Fishing) (Scotland) Bill

Exclusive Economic Zone Act

Territorial Waters Act, No (1)

U.S. ARMY CORPS OF ENGINEERS REGULATORY DIVISION WILMINGTON DISTRICT

STREET OPENING AND CULVERT ORDINANCE

The Maritime Areas Act, 1984 Act No. 3 of 30 August 1984

ARLINGTON COUNTY CODE. Chapter 57 EROSION AND SEDIMENT CONTROL*

COASTAL AND INLAND SHIPPING (CABOTAGE) ACT

Environment Protection (Sea Dumping) Act 1981

Bui Power Authority Act, 2007 Act 740

Maritime Areas Act of 1996

CAP. 226 RIVERS ACT, 1903

Consolidation of State and Federal Wetland Permitting Programs Implementation of House Bill 759 (Chapter , Laws of Florida) Florida

Sporting Venues Authorities Act 2008 No 65

THE CORPORATION OF THE MUNICIPALITY OF HASTINGS HIGHLANDS BY-LAW

TASMANIA ELECTRICITY SUPPLY INDUSTRY RESTRUCTURING (SAVINGS AND TRANSITIONAL PROVISIONS) ACT

NEW HAMPSHIRE DRIVEWAY REGULATIONS

GAS DISTRIBUTION ACT

Province of Alberta PIPELINE ACT. Revised Statutes of Alberta 2000 Chapter P-15. Current as of March 29, Office Consolidation

Columbia County Nonmetallic Mining Reclamation Ordinance. Title 16 Chapter 600

HALIFAX REGIONAL MUNICIPALITY BY- LAW E RESPECTING ENCROACHMENTS UPON, UNDER OR OVER A STREET

STATE OF WISCONSIN TOWN OF MUKWA WAUPACA COUNTY ORDINANCE NO. 3-00

Mooring Regulations Ordinance

THE KARNATAKA MARINE FISHING (REGULATION) ACT, 1986

Waters LAWS OF MALAYSIA REPRINT. Act 418 WATERS ACT 1920

TOWN OF BELMONT NEW HAMPSHIRE DRIVEWAY REGULATIONS. Wording to be eliminated is crossed out Wording to be added is bold, italicized

REPORT CENTRAL LAKE ONTARIO CONSERVATION AUTHORITY

Reproduced by Sabinet Online in terms of Government Printer s Copyright Authority No dated 02 February 1998

ARLINGTON COUNTY CODE. Chapter 55 UNDERGROUND UTILITY PROTECTION

Control of Pollution Act 1974 c. 40. Part III NOISE. Construction sites

City of Delta COUNCIL REPORT Regular Meeting

BYLAW NUMBER 17M2016

ROAD CROSSING AGREEMENT FOR SUB-SURFACE FACILITIES

Building and Construction Industry Security of Payment Act 1999

DRAINAGE DISTRICTS ACT

2013 CHAPTER P

Transcription:

Navigable Waters Protection Act Regulatory Development October 30, 2009 1

Purposes To provide an overview of the Regulatory Development activities pursuant to the amended Navigable Waters Protection Act. To solicit comments on this topic from stakeholders and interested parties. Kenneth Hahn Project Manager NWPA Regulatory Development E-mail: Kenneth.Hahn@tc.gc.ca Telephone: (613) 998-6442 Fax: (613) 998-0637 2 2

Contents Background Consultation Strategy Minor Works and Waters 3 3

Background The Navigable Waters Protection Act (NWPA) was enabled to protect the public right of navigation in Canada. On March 12, 2009, the amended NWPA received Royal Assent. On June 7, 2009, using the authority of Section 13 of the amended Act, The Minister of Transport made the Minor Works and Waters (NWPA) Ministerial Order. Transport Canada has initiated an activity to convert that Ministerial Order into proposed regulations. 4 4

Amended NWPA Key Changes March 2009 Royal Assent NWPA amendments implemented New provision specifying that the NWPA is binding on Her Majesty in right of Canada, a province and the Territories. New definition of work providing greater clarity to applicants and greater flexibility for the Minister. New provision permitting the Grandfathering of Crown Works. Deletion of specific reference to the four named works under subsection 5(2) of the NWPA. Creating the Authority in the Act for the Minister to make Orders. Creating new Regulation-making powers in the Act. New inspection and investigative powers, increased fine limits and newly created continuing offence provision in the Act. Inclusion of a five-year review clause. 5 5

Minor Works and Waters (NWPA) Ministerial Order Defines the classes of works which are exempt from the approval process normally required under the NWPA*. Erosion Protection Works Docks and Boathouses Winter Crossings Aerial Cables Power and Communication Submarine Cables Power and Communication Pipeline Crossings Water Intakes Dredging Temporary Works Defines the classes of waters which are exempt from the approval process normally required under the NWPA*. Sections of Navigable Waters Artificial Irrigation Channels and Drainage Ditches Private Lakes * Note that the specific criteria which must be met are defined in more detail on the Ministerial Order, available at http://www.tc.gc.ca/acts-regulations/acts/1985cn-22/menu.htm. 6 6

Consultation Strategy 1. Consultation initially will focus on Minor Works and Waters. 2. The existing Ministerial Order on Minor Works and Waters will be the basis for the proposed regulations. 3. The purpose of consultation on Minor Works and Waters will be to finetune the criteria that are already defined. 4. Efforts will focus on ensuring coverage of stakeholders and interested parties in the following areas Geography Proponents Users Aboriginals 5. Communication channels will include presentations, teleconferences, registered letters, existing forum (TAC, CMAC, FCM, etc.) and other venues as opportunities arise. 7 7

Regulatory Development Timelines Minor Works and Waters September 2009 Consultation begins January 2010 Analysis of feedback and comments begins May 2010 Pre-publication in Part 1 of the Canada Gazette September 2010 30-day comment period March 2011 Publication in Part 2 of the Canada Gazette Other NWPP Regulatory Activities November 2009 Proposed NWPA Regulatory Structure defined January 2010 Consultation continues June 2010 Analysis of feedback and comments begins 8 8

Stakeholder and Interested Parties Comments, concerns, issues, feedback on any area of the Ministerial Order are of interest. For example Should the list of classes of works be modified, either by adding new classes, or removing existing classes? Are there ambiguities in the criteria defined in the Ministerial Order? Are there contradictions or inconsistencies between criteria? Is the rationale for some criteria not evident? Are some criteria too onerous? Too lax? Anything else? 9 9

Minor Works and Waters (NWPA) Ministerial Order Classes of Minor Works Erosion Protection Works Docks and Boathouses Winter Crossings Aerial Cables Power and Communication Submarine Cables Power and Communication Pipeline Crossings Water Intakes Dredging Temporary Works Classes of Minor Waters Sections of Navigable Waters Artificial Irrigation Channels and Drainage Ditches Private Lakes * Note that the specific criteria, definitions, and the terms and conditions which must be met are defined in more detail on the Ministerial Order. 10 10

EROSION PROTECTION WORKS An erosion protection project meeting all of the following criteria and standards is considered a minor work and does not require the submission of an application for review and approval under the NWPA: 1. the works are integrated with and parallel to the existing or natural shoreline or bank; 2. the base of the works is 5 m or less from the high-water mark; 3. the vertical to horizontal slope of the works from the navigable waters is greater than 33%; 4. the works are not associated with an existing or proposed structure, including a bridge, a boom, a dam or a road, across the navigable waters; and 5. the works do not include groynes or spurs or other devices to deflect the current. 11 11

DOCKS AND BOATHOUSES A dock or boathouse project meeting all of the following criteria and standards is considered a minor work and does not require the submission of an application for review and approval under the NWPA: 1. the works are at least 5 m from the adjacent property boundaries; 2. the works are at least 10 m from any dock, boathouse or other structure that is fully or partially in, on or over the navigable waters; 3. the extremity of the works that is furthest from the land is at least 30 m away from any navigation channel; 4. the works do not extend further in, on or over the navigable waters than any adjacent docks; 5. the works are not associated with any other proposed works, such as launch ramps, breakwaters, landfill, dredging and marinas; and 6. the works are not used for float planes or other aircraft equipment with floats. 12 12

WINTER CROSSINGS Crossings built or placed on, over or across navigable waters that are frozen to such an extent that navigating by a vessel other than an icebreaker is not possible is considered a minor work and does not require the submission of an application for review and approval under the NWPA. The following terms and conditions must be strictly adhered to during construction: 1.Before spring break-up commences, all parts of the works, including piers, abutments, log fills and debris, shall be completely removed from the navigable waters, including the area from the waters edge to the high-water mark; and 2.Before the navigable waters are thawed to such an extent that navigating by a vessel other than an icebreaker is possible, the bed of the navigable waters shall be restored to its natural contours if the works disturbed it. 13 13

AERIAL CABLES (Power and Communication) An aerial cable project meeting all of the following criteria and standards is considered a minor work and does not require the submission of an application for review and approval under the NWPA: 1. the width of the navigable waters that the cables are over or across is less than 15 m when measured from the high-water mark on one side to the high-water mark on the other side of the waters; 2. the works are more than 1 000 m from any lake or tidal waters; 3. the works are not over or across charted navigable waters; 4. the works are not or across a canal that is accessible to the public; and 5. the works do not include towers or poles within the navigable waters, including within the area from the waters edge to the high-water mark. 14 14

SUBMARINE CABLES (Power and Communication) A submarine cable project meeting all of the following criteria and standards is considered a minor work and does not require the submission of an application for review and approval under the NWPA: 1. the works lie on or under the natural contours of the bed of the navigable waters; 2. the works are more than 10 m from any dock or boat launch; 3. the works are not in or under charted navigable waters; 4. the works are not across the entrance to any port, including any marina or yacht club. 15 15

PIPELINE CROSSINGS A submarine cable project meeting all of the following criteria and standards is considered a minor work and does not require the submission of an application for review and approval under the NWPA: 1. the pipeline crossing project is buried underneath the bed of the navigable water. A pipeline crossing project meeting any of the following criteria is not considered a minor work: 1. the works are regulated under the National Energy Board Act; 2. the works are under charted navigable waters; 3. the works require the placement of temporary cables not lying on the bed of the waters, to facilitate the construction, placement, testing, alteration or repair of the works; or 4. the width of the waters at the crossing location exceeds 50 m. 16 16

WATER INTAKES A water intake project meeting all of the following criteria and standards is considered a minor work and does not require the submission of an application for review and approval under the NWPA: 1. the intake pipe is less than 10 cm in diameter and lies on the bed of the navigable waters; 2. the intake end of the work is: a. in waters more than 2.5 m in depth, in the case of uncharted navigable waters, or b. in waters less than 0.5 m, according to chart datum, in the case of charted navigable waters; 3. the work is more than 50 m from a navigation channel; 4. the work does not include a crib or other intake structure, such as an anchor, a collar or a weight, that extends more than 50 cm above the bed of the navigable waters; 5. the work is not associated with a dam, a weir, or a headpond, including a proposed dam, weir or headpond. 17 17

DREDGING A dredging project meeting all of the following criteria is considered a minor work and does not require the submission of an application for review and approval under the NWPA: 1. the works consist of regular maintenance around docks, retaining walls, marina basins or other structures; 2. the works and associated marine equipment are more than 30 m from a navigation channel; 3. all dredged materials are disposed of above the high-water mark; 4. no suction dredging that includes any floating or submerged pipes is used; 5. the works have no cables that cross on, over or through any portion of the navigable waters; and 6. the works do not include blasting. 18 18

TEMPORARY WORKS Temporary* works that are required for the construction or placement of any other work determined to be a minor work are also considered a minor work and does not require the submission of an application for review and approval under the NWPA, unless the temporary works: 1. are roads, bridges, dams, cofferdams, berms or booms; 2. change the course of the navigation channel in the navigable waters; 3. cross more than halfway from one side of the navigable waters to the other side; or 4. are in, on, over, under, through or across a navigation channel. * The the temporary works must be completely removed; and if the temporary works disturbed the bed of the navigable waters, it must be restored to its natural contours. 19 19

Sections of Navigable Waters (1) 200 meter sections of navigable waters is considered a minor water and works that affect its navigability do not require the submission of an application for review and approval under the NWPA if : 1.The average width of the navigable waters measured at the high-water level is less than 1.20 meters; OR 1.The average depth of the navigable waters measured at the high-water level is less than 0.30 meters. 20 20

Sections of Navigable Waters (2) A 200 meter section of navigable water is considered a minor water and works affecting its navigability do not require the submission of an application for review and approval under the NWPA if 1. the average width of the navigable waters measured at the high-water level is between 1.20 m and 3.00 m; and any of the following conditions are met: a. The average depth of the navigable waters measured at the high-water level is less than.60 m; b. The slope of the navigable waters measured at the high-water level is greater than 4%; c. The sinuosity ration is greater than 2; d. There are more than two natural obstacles in the navigable waters, at least one of which is upstream, and another which is downstream from the midpoint of the centre line of the navigable waters. 21 21

Artificial Irrigation Channels and Drainage Ditches Artificial irrigation channels and drainage ditches is considered a minor water is considered a minor water and works affecting its navigability do not require the submission of an application for review and approval under the NWPA if 1. They are not created or built in whole or in part from a natural body of water; 2. They have an average width of less than 3.00 m. 22 22

Private Lakes A lake that is 5 hectares or less in area is considered a minor water and works affecting its navigability do not require the submission of an application for review and approval under the NWPA if 1. One person is the registered owner of all the land abutting the lake; 2. There are no navigable waters that enter into or exit from the lake; 3. There is no current or past public access to the lake; and 4. There are no easements or servitudes that allow access to the lake. 23 23

Additional Regulations, pursuant to Section 12. (1) 12. (1) The Governor in Council may make any orders or regulations that the Governor in Council deems expedient for navigation purposes respecting any work to which this Part applies or that is approved or the plans and site of which are approved under any Act of Parliament or order of the Governor in Council, and may make regulations a) prescribing the fees payable to the Minister on an application for an approval under this Part; b) respecting the grant, amendment, renewal, suspension and cancellation of approvals under this Part; c) prescribing the period for which an approval under this Part is valid; d) respecting notification requirements for a change in ownership in a work; e) establishing classes of works or navigable waters for the purposes of subsection 5.1(1); f) respecting the placement, construction, maintenance, operation, safety, use and removal of works; and g) for carrying out the purposes and provisions of this Part. 24 24

In Summary On June 7, 2009, using the authority of Section 13 of the amended Act, The Minister of Transport made the Minor Works and Waters (NWPA) Ministerial Order. Transport Canada has initiated an activity to convert that Ministerial Order into a proposed regulation. We are currently consulting with interested parties and stakeholders. Please contact Ken Hahn (at Kenneth.Hahn@tc.gc.ca or 613-998-6442) for additional information, clarifications, and to provide comments on the existing criteria for minor works and waters. We would appreciate your comments by December 31, 2009. 25 25