UNC DSC Contract Management Committee Minutes Wednesday 18 April 2018 at Lansdowne Gate, 65 New Road, Solihull, B92 OED

Similar documents
Record of Determinations: Panel Meeting 15 September 2016

Report for Modification Panel February 2008 Distribution Workstream

Website Refresh Consultation March Consultation on the refresh of the Joint Office of Gas Transporters Website

MODIFICATION SCHEDULE A UNIFORM NETWORK CODE TRANSPORTATION PRINCIPAL DOCUMENT SECTION E DAILY QUANTITIES, IMBALANCES AND RECONCILIATION

Review Group Report Review Proposal Reference Number 0158 Review of User Suppressed Reconciliation Values incentive arrangements. Verion1.

User Pays User Group Minutes Monday 14 July 2008 Elexon, 350 Euston Road, London NW1 3AW

UNC 0623: Governance Arrangements for Alternatives to Self-Governance Modification Proposals. UNC Modification

igt UNC - TRANSITION DOCUMENT 1.1 This is the Transition Document which forms part of the igt UNC

HARLAXTON GAS NETWORKS LTD INDIVIDUAL NETWORK CODE NETWORK CODE OF HARLAXTON GAS NETWORKS LTD

Amendments to Capacity Allocations Mechanisms to comply with EU Capacity Regulations

NHS Education for Scotland

Topic: Steering Group update

GC0074: GCRP Membership

National Grid House, Warwick

Grid Code Review Panel Meeting - FINAL

NORTHERN IRELAND TRANSPORT HOLDING COMPANY

CUSC Amendments Panel

NATIONAL GRID plc SAFETY ENVIRONMENT AND HEALTH COMMITTEE TERMS OF REFERENCE

NORTHERN IRELAND TRANSPORT HOLDING COMPANY

NATIONAL GRID plc SAFETY ENVIRONMENT AND HEALTH COMMITTEE TERMS OF REFERENCE

Meeting of the IHE-UK Deployment Committee held on Tuesday 14 January 2014 at the BCS offices, London from 13:00 16:00

Grid Code Review Panel - Panel and Alternate Election and Appointment Process for 2018 User Guide

AUDIT COMMITTEE MEETING (Part 1) 15 March 2017

Complaints Handling Code of Practice. SGN Natural Gas. 27 th July 2016

Stage 05: Draft CUSC Modification Report Annexes

The Chair (TF) welcomed everyone to the meeting and congratulated Stuart Brown on his appointment to an EIS Area Officer post.

CUSC Amendments Panel

Actions Arising from Meeting No. 101 Held on 28 th August 2009

THE BOARD OF COMMISSIONERS OF FIRE DISTRICT NO. 3 TOWNSHIP OF EAST BRUNSWICK, NEW JERSEY

JULY Scottish Police Authority. complaints audit

IMCA HOLDINGS LIMITED

AUDIT & RISK ASSURANCE COMMITTEE TERMS OF REFERENCE

CUSC Modifications Panel Panel Member and Panel Alternate Member Election Process for 2017

Non Executive Director and Committee Chair. Deputy Chief Executive and Executive Director of Finance and Operations

FINANCE COMMITTEE. Terms of Reference

Complaints in Relation to Child Protection Conferences For parents, carers, children and young people

Complaints, Comments & Compliments Policy

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)

Audit and Risk Committee s Annual Report to Council

MINUTES OF A MEETING OF THE LINCOLN COLLEGE AUDIT COMMITTEE HELD AT LINCOLN COLLEGE ON TUESDAY 19 SEPTEMBER 2017 AT HOURS. Chair.

MINUTES OF THE BOARD MEETING HELD ON 1 OCTOBER 2015 (Normal Business)

Information Security and Compliance Committee Meeting Minutes University Hall, Room 310 January 19th, 2017

Energy Networks Association

Present: Dr L Lee (Chairman) (LL), Mrs A J Phillips OBE (AP), Dr G A Woods (GW)

N. Ireland S. Bowen, Y. Forsey, C. Lacey, D. Parker, Mrs V. Dudley, M. Hoidn, S. Mlewa, Mrs J. Toleman.

ACMA Chapter Advisory Council March 2016

UNIFORM NETWORK CODE GENERAL TERMS SECTION B - GENERAL

CUSC Key Performance Indicators January 2011

Women Leaders in Law Enforcement San Diego County Chapter BY LAWS Revised & Adopted January 20, 2016

PHOENIX NATURAL GAS LTD. DISTRIBUTION NETWORK CODE MODIFICATION RULES

Director (All Board Members)

CRIGGLESTONE PARISH COUNCIL

SENATE MINUTES OF THE MEETING HELD ON WEDNESDAY 13 DECEMBER 2017 AT 2PM IN HARDY SEMINAR ROOM 1. Head of School of Teacher Development

APPENDIX A. Associate Chair of the UAB Faculty Senate [Associate Chair of the Faculty; Associate Chair of the Senate] Job Description

MINUTES OF AUDIT AND ASSURANCE COMMITTEE MEETING HELD ON TUESDAY 8 JANUARY 2019, AT 09:15hrs AT SOUTHGATE HOUSE, DEVIZES

Once you have gathered all the information required please send to Key Travel s visa department

NOVEMBER HOA BOARD MEETING MINUTES Time: 6:30 PM 8:30 PM Date: Tuesday, November 10, 2015 Location: Ruby Ranch Lodge

Confirmed MINUTES of MANAGEMENT COMMITTEE MEETING held on Monday, 10 July 2017

MINUTES OF THE MEETING OF THE BOARD OF COLEG SIR GAR HELD AT THE GRAIG CAMPUS, LLANELLI ON THURSDAY 5 TH DECEMBER 2013

FINANCE AND PERFORMANCE COMMITTEE. Final - Terms of Reference - Final

INTERNAL AUDIT DIVISION REPORT 2017/157

Service Level Agreement. between. Derry City and Strabane District Council. and. EPB Team (facilitating authority) 1 April March 2017

Gas Distribution Complaints Handling Code. firmus energy Ltd. Version 1.0. As approved by the Northern Ireland Authority for Utility Regulation

Minutes of Panel Meeting 22

Merseyside Police Domestic Abuse Action Plan - October 2014

DATE: Friday 23 June 2017 TIME: MINUTE/ACTION TAKER:

AMENDMENT REPORT DRAFT FOR AMENDMENTS PANEL RECOMMENDATION VOTE

Board and Committee Roles and Responsibilities

In-common Meeting of Bristol, North Somerset and South Gloucestershire Clinical Commissioning Groups Governing Body

Once you have gathered all the information required please send to Key Travel s visa department

Minutes of the meeting of Heworth Without Parish Council held 19 March 2018 in HEWORTH WITHOUT COMMUNITY CENTRE, APPLECROFT ROAD, HEWORTH YO31 0HG

Innovation and energy industry codes in Great Britain

Model Bylaws For Clubs

Clubs and Societies AGM Guidelines

Coca-Cola European Partners plc Audit Committee Terms of Reference

Dear Members. Karl Tindale CMIOSH. Chairman

INTERNAL AUDIT DIVISION REPORT 2018/118

Audit Committee Terms of Reference

Board Charter Approved 26 April 2016

Minutes of the meeting held on 12 September Lisa Greenhalgh Independent member Committee Chair

TERMS OF REFERENCE The LUK Regulatory Reporting Oversight Committee

COMPASS contracts for the provision of accommodation for asylum seekers

CMP285. CUSC Governance Reform Levelling the Playing Field. CUSC Modification Proposal Form

A permit scheme for the South East - Have your say

AGENDA MESA WATER DISTRICT SPECIAL EXECUTIVE COMMITTEE MEETING TUESDAY, SEPTEMBER 1, 2015 AT 12:00 PM PANIAN CONFERENCE ROOM

PAYMENTS ASSOCIATION OF SOUTH AFRICA. CHEQUE & MICR STANDARDS AUTHORITY COMMITTEE MEETING NO.4 of 2012

New Zealand Inline Hockey AGM 2014 Held at Mt Wellington Panthers 19 April 2014 commencing at 10.30am

PUBLIC WORKS COMMISSION MEETING OF WEDNESDAY, FEBRUARY 11, :30 A.M.

Minutes of the Annual Council Meeting of Wigginton Parish Council

Once you have gathered all the information required please send to Key Travel s visa department

NHS Northern, Eastern and Western and South Devon and Torbay Clinical Commissioning Groups Primary Care Committee Terms of Reference (September 2017)

AGM Guide & Meeting Procedure

Audit Committee. Public minutes of the 53 rd meeting of the Audit Committee held on:- Date: Wednesday 16 March 2016

Internal Audit. Internal Audit Report. Treasury Management Audit

DATED 1 JUNE The DISTRIBUTION BUSINESSes as named herein. - and - The SUPPLIERs as named herein. - and - Elexon Limited (as the BSC Agent)

Working in Partnership

CAMBRIDGE PRIMARY EDUCATION TRUST

Dispute Resolution Process between Commissioners and Providers for the 2014/15 Contracting Process

First session of the Ad hoc LRIT Group London, United Kingdom, 29 January to 1 February 2008

STCP Amendment Proposal Form

Transcription:

UNC DSC Contract Management Committee Minutes Wednesday 18 April 2018 at Lansdowne Gate, 65 New Road, Solihull, B92 OED Attendees Chris Shanley (Chair) (CS) Joint Office Non-Voting Karen Visgarda (Secretary) (KV) Joint Office Non-Voting Shipper User Representatives Graham Wood (GW) British Gas Resigned Kirsty Dudley (KD) E.ON Voting (2 Votes) Lorna Lewin (LL) Orsted Voting Steve Mulinganie (SM) Gazprom Voting (3 votes) Transporter Representatives Hilary Chapman (HCh) SGN DNO Voting Joanna Ferguson (JF) Northern Gas Networks DNO Voting Beverley Viney (BV) National Grid NTS NTS Voting (2 Votes) John Cooper (GH) BU-UK igt Voting (2 votes) CDSP Contract Management Representatives Dave Turpin (DT) Xoserve Non-Voting Emma Smith (Esm) Xoserve Non-Voting Observers David Mitchell (DM) SGN Non-Voting Ellie Rogers (item 9.1) (ER) Xoserve Non-Voting Michele Downes (item 5.x) (MD) Xoserve Non-Voting Michael Orsler (MO) Xoserve Non-Voting Shiv Singh (SS) Cadent Non-Voting Smitha Coughlan (SC) Wales & West Utilities Non-Voting Chris Warner (CW) Cadent Non-Voting Richard Pomroy (RP) Wales & West Utilities Non-Voting Apologies Robert Cameron Higgs (RCH) Flow energy Voting (2 votes) Victoria Parker (VP) ESP igt - Voting Phil Lucas (PL) National Grid NTS Voting Copies of all papers are available at https://www.gasgovernance.co.uk/dsc-contract/180418 1. Introduction 1.1. Apologies for absence Chris Shanley (CS) highlighted the apologies as indicated above and drew attention to the resignation from Graham Wood. As there is no alternate for British Gas, CS suggested that the rules indicated that Kirsty Dudley would get an additional Shipper Class A vote. He also added that other Shippers in Class A, could propose to take up this vacancy and should contact the Joint Office, if this is something they wish to progress. Page 1 of 6

1.2. Alternates John Cooper for Victoria Parker Steve Mulinganie for Robert Cameron Higgs The voting rights for each member was noted as follows: 1.3. Approval of Minutes (14 March 2018) The minutes from the previous meeting were approved. 2. Business Continuity Plan No update was provided this month. 3. Information Security Arrangements Dave Turpin (DT) talked the Committee through the Information Security report, which encompassed the new Dashboard. He explained this new Dashboard would be supplied each month and covered under item 5 going forward. He highlighted 3 incidents to the Committee. Contract Assurance Audit No update was provided this month. 4. Monthly Contract Management Report (KPIs) 4.1. KPI reports Representative Classification Vote Count Kirsty Dudley Shipper Class A 2 votes (2.2.9 applies) Steve Mulinganie Shipper Class B 1 vote Steve Mulinganie (alternate for Rob Cameron-Higgs) Shipper Class C 2 votes (2.2.9 applies) Lorna Lewin Shipper Class B 1 vote Hilary Chapman DNO 1 vote Joanna Ferguson DNO 1 vote Beverley Viney NTS 1 vote Beverley Viney (alternate for Phil Lucas) NTS 1 vote John Cooper igt 2 votes John Cooper (alternate for Victoria Parker) Michael Orsler (MO) talked the Committee through an onscreen review of the Summary for the March 2018 KPI Report. For further detail please see the KPI reports and 3 rd Party invoicing which can be found here: https://www.gasgovernance.co.uk/dsc-contract/180418 Steve Mulingainie (SM) proposed that it would be useful and helpful to have the invoicing failures included in this report and highlighted the KPI information in relation to this specific Customer issue was not evident. MO and DT agreed to investigate this and for this information to be included moving forward. Emma Smith (ES) highlighted that some late alterations were being been made to the Change Budget information, as some minor errors had been spotted the day before the meeting, which she wanted to apologise for. New Action 0401: MO to include details of the recent invoicing failures within the KPI report. Page 2 of 6

4.2. KVI Framework Update (for approval) Michele Downes (MD) provided a presentation on the updated KV1 Framework (accepted version) drawing attention to the changes that had been highlighted in red font. A brief discussion took place regarding the Customer Feedback KPI and Richard Pomroy (RP) proposed that this should encompass all the Change Managers and that the reporting period should be quarterly to include all the minor releases, in flight changes and those changes that had recently been delivered. MD agreed to update this section accordingly. Issue Resolution MD requested the views and opinions of the Measure for the Issues Resolution KVI and others where customer feedback was to be used as the Measure. A lengthy discussion took place and it was agreed that that the rating should be; Great, Good, Not good, Poor but this approach should be checked against industry best practice in order to finalise wording. MD said for the rest of the presentation there were no significant changes and then she overviewed the schematics detailing the Timescales and Next Steps and the KVI Capture and Reporting proposed schedules. Beverley Viney (BV) commented that September was a long time period to wait for the Financial Report and said she would prefer to have this in June. MD agreed to update this accordingly. Kirsty Dudley (KD) asked how she would know how to respond to the different feedback requests and MD said that a Box account was to be used for the Issue Resolution KVI so that customers can respond after every issue and that Xoserve would make it clear which KVI other feedback was being requested for. MD added that for the Issues Resolution KVI Xoserve were still only getting 20% email responses for Customer feedback which was still quite low, and that the overall performance could only improve once the feedback was received. Joanna Ferguson (JF) apologised for the fact that she had not had time to brief all her teams as yet, but she would be addressing this. MD said she would send the final Briefing Document in the next two days for publication and she also said this would be included as a topic for discussion in the forthcoming Xoserve Customer Day. SM said the Briefing Document would assist in updating his internal teams and requesting the necessary feedback. The Committee then voted unanimously in favour of the updated KVI Framework document and agreed its implementation from 01 May 2018. 4.3. Summary position of aggregate UIG flows Dave Turpin (DT) provided a presentation on UIG Resolution the which covered the following areas: DM Read Rejection Update DM Financial Adjustments Progress Invoiced Figures (CA Only) Latest UIG Volatility DT explained there had been some UIG spikes due to the weather and overviewed each schematic. He explained that Xoserve were working with National Grid NTS on the nomination process and he also noted as the data showed, that the DM Read rejections continued to decrease. He explained that a decision from Ofgem was still yet to be made on the UIG modifications, and added that he understood Ofgem were about to conduct an Impact Assessment with a 4 week turnaround time, and that Ofgem were going to release their minded to position on Friday 20 April 2018. DT added that until Ofgem made a decision on the UIG modifications, Xoserve were unable to progress any corresponding system changes. 5. Financial Information 5.1. Cost allocation model and methodology Page 3 of 6

No update provided this month. 5.2. CDSP Budget No update provided this month. 5.3. Annual Charging Statement No update provided this month. 5.4. Invoicing JF explained that there were some issues with regards to the invoicing process in relation to the supporting information for additional charges, which meant it was very difficult to validate. DT agreed to speak with the Financial Team to discuss the frequency of the additional charges and the supporting information provided, and JF said the solution did not need to be complex, but assistance would be helpful and useful. SM reiterated there were still issues with the mis-management of the invoices from a Shipper perspective, and these needed to be addressed and resolved in an expedient manner, due to the ongoing costs that were presently being incurred. DT said that Xoserve were in talks with Customers and agreed more discussion was needed with the Operational and Issue Management Teams, as the reconciliation invoicing process was clearly not working correctly. SM said this issue needed to be addressed and DT agreed this was the right forum to discuss this in and highlighted the earlier action to look at why the KPI s were not showing this issue as a failure. DT proposed to have this area included in future meetings on the agenda under Section 5, together with the Must Read and CMS issues. 6. Review of Outstanding Action(s) No actions to review. 7. Key Committee Updates 7.1. DSC Change Management Committee Emma Smith (ES) provided an update from the DSC Change Management Committee held on 11 April 2018. Highlighting that all was approvals for Release 2 & 3 had been met and all was green within the RAG status. ES also highlighted that new Change Proposal templates were in use and feedback had been positive so far. 7.2. PAC/PAFA ES provided a verbal update from the Performance Assurance Committee (PAC) meeting held on 10 April 2018 and advised the Committee that there continued to be lengthy discussions within PAC around the Meter Read performance specifically regarding Class 2 and Class 3 and data regarding the SMART Meter installations. The Key Messages from the PAC meeting were as detailed below: The Performance Assurance Committee (PAC) agreed the PAC financial year 2018/19 project plan that was presented by the Performance Assurance Framework Administrator (PAFA); Xoserve presented Post Nexus meter read performance analysis across Product Classes and highlighted the guidance provided to Shippers on this issue; The PAC discussed the Daily Metered (DM) read submission performance for Product Classes 2 & 3 along with the issue of delays in DM consumption adjustment; Conversations were had by PAC around incentivisation of positive performance in the industry and challenges to be addressed for an effective process to be in place; Page 4 of 6

The PAC discussed industry performance on lack of transfer read submission and resulting issue of AQs of 1; The PAFA presented the three finalised PARR reports with analysis on trends; The PAC looked into AQ reports as a reporting area not covered by MOD520A reporting and will consider raising a Modification next month to implement this reporting; The PAC to introduce a Smart Meter agenda item for future meetings to discuss smart meter related issues e.g. Smart meter exchanges and read submission statistics; The PAFA to continue to develop the PRIDe performance assurance approach to provide a low level summary of a toolset for the PAC to consider. 7.3. General Data Protection Regulation (GDPR) ES provided an update explaining this project was still tracking green and all was on track for implementation in May. JF said that the updates and notes regarding this project had been very helpful. 8. Any Other Business 8.1. SPAA Schedule 25 Reporting Arrangements between CDSP and Siemens Ltd (for approval) Michael Orsler (MO) explained that a paper had been developed on the provision of data for pre paid meters (PPM) to Siemens. Ellie Rogers (ER) joined the meeting and explained that the intention was to seek approval from the DSC Contract Management Committee members regarding the release of PPM data to Siemens but highlighted that the SPAA schedule needs to be further discussed with Siemens. She explained that within the terms of the contract, that the data supplied, was only for Siemens and that Xoserve would be working directly with Siemens, but a change to the schedule would be required to reflect the differences being requested. Kirsty Dudley (KD) said that in principal she was happy with the proposal from the Shippers perspective, but not from the Suppliers point of view, as she would be agreeing to something that differed from the emails regarding the original SPAA principles. ER said that Xoserve did want to be involved in the GPEG meetings to ensure the SPAA Schedule does align correctly, as the permissions were not yet agreed or confirmed. KD agreed with the sharing of permissions in some form or other, but she said she was not comfortable to give overall approval, but wanted to know what could be done to keep everything progressing between SPAA, Siemens and Xoserve. CS said that the information could be released to Seimens and the Schedule 25 report could be investigated in parallel. SM said that the DSC Contract Committee could just empower KD to progress this matter further and to come back with a recommendation, and approve the paper to keep it on track. KD agreed to work with Xoserve and the SPAA representatives to work on the framework for SPAA, and ER said she would continue to work with SPAA on the report/schedules and permissions, including any changes required for the longer term. All Shippers were in agreement regarding the delegating of authority to KD to work on their behalf with SPAA and Xoserve to progress this matter. A brief discussion then took place regarding the feasibility of the 3 options that had been proposed and KD said that she thought Option 1 was possibly the best fit, but that it required further work, and the Committee members were in agreement. The DSC Contract Committee (Shipper Representatives) then approved KD working with Xoserve (MO/ER) and the SPAA representatives to agree what information would be released to Siemens and any changes required to the SPAA schedules going forward. New Action 0402: E.ON (KD) to work with Xoserve (MO/ER) and the SPAA representatives on the framework for the SPAA, to agree what information would be released to Siemens and any changes required to the SPAA schedules going forward. Page 5 of 6

8.2. CMS Update ES and DT highlighted that there had been some issues from 06 April with CMS as the audit table had not been updated correctly by the system, as these had been corrupted and needed fixing. DT explained that the Route Cause Analysis was presently being undertaken to investigate the system. He confirmed these issues had already been resolved and that he would provide full details at the next meeting to ensure everyone was fully aware of what has happened. 8.3. Pricing Smitha Coughlan said that the Pricing Managers were experiencing issues with the reporting and cleansing of certain data. DT said he would investigate this area with her offline and would confirm the Governance of the reports themselves as well. 9. Diary Planning Further details of planned meetings are available at: https://www.gasgovernance.co.uk/events-calendar/month Meetings will take place as follows: Time / Date Venue Workgroup Programme 11:00, Wednesday 16 May 2018 Lansdowne Gate, 65 New Road, Solihull B91 3DL Standard Agenda items, and any other matters arising. Action Table (as at 18 April 2018) Action Ref Meeting Date Minute Ref 0401 18/04/18 5.1 Action Owner Status Update MO to include details of the recent invoicing failures within the KPI report. Xoserve (MO) Pending 0402 18/04/18 9.1 E.ON (KD) to work with Xoserve (MO/ER) and the SPAA representatives on the framework for the SPAA, to agree what information would be released to Siemens and any changes required to the SPAA schedules going forward. E.ON (KD) & Xoserve (MO/ER) Pending Page 6 of 6