Re: Concerns about Project (Proposed Private Sector Loan to Sarawak Energy Bhd.)

Similar documents
A Fact-Finding Mission Report. Written by: Tanya Lee, Thomas Jalong & Wong Meng-Chuo

Observations on the State of Indigenous Human Rights in Malaysia

UNITED NATIONS DEVELOPMENT PROGRAMME

NAM THEUN 2: HAS THE ADB LEARNED THE LESSONS? Bruce Shoemaker Independent Researcher

Asian Development Bank

Asian Development Bank

PARIS AGREEMENT. Being Parties to the United Nations Framework Convention on Climate Change, hereinafter referred to as "the Convention",

106 MEMBERS 40 COUNTRIES NGO. in brief FOUNDING MEMBER FOUNDED. SECRETARIAT in MANILA, Philippines. DURING the 6 th ADB conference for DFIs

Re: Submission for carbon credits of the Kamchay Hydroelectric BOT Project

Indonesia: Enhanced Water Security Investment Project

FCCC/CP/2015/10/Add.1 Annex Paris Agreement

Law, Justice and Development Program

Dark secrets of foreign investment in Ethiopia and tears of the poor

THE ASIA PACIFIC NTI-CORRUPTION INITIATIVE

Strategy for regional development cooperation with Asia focusing on. Southeast Asia. September 2010 June 2015

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project

Pangolin Asia Fund January 2017 NAV

ASIA INDIGENOUS PEOPLES PACT (AIPP) SUBMISSION ON SAFEGUARDS INFORMATION SYSTEM (SIS)

DEVELOPMENT FOR WHOM? SAFEGUARD POLICIES AND PROJECTS OF INTERNATIONAL FINANCIAL INSTITUTIONS AFFECTING INDIGENOUS PEOPLES IN ASIA

UN Permanent Forum on Indigenous Issues: Questionnaire to National Human Rights Institutions

Dated Article 1

THE HABIBIE CENTER DISCUSSION REPORT. No. 02/September 2014 TALKING ASEAN. The Climate Change Issues: Ensuring ASEAN s Environmental Sustainability

Sustainable Green Ecosystem Council

The Asian Development Bank. Transportation Infrastructure in Asia and the Pacific

This section outlines Chinese law governing domestic dam building, Chinese policies. Policies Guiding Chinese Dam Building

Mekong Youth Assembly and International Rivers submission to John Knox, United Nations Special Rapporteur on Human Rights and the Environment

RESPONDING TO THE CROSS- BORDER PURSUIT OF HEALTH CARE IN EAST MALAYSIA

Power of the law, power to the people: pursuing innovative legal strategies in human rights advocacy

The Extractive Industries Transparency Initiative why. Jonas Moberg Tokyo 26 January

PRIOR PRINTER'S NOS. 303, 1487 PRINTER'S NO THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL

2018 Southeast Asia Disaster Risk Governance Academic Seminar September 2018 Bangkok, Thailand CALL FOR PAPERS

SUSTAINABILITY REPORTING NAVIGATOR 2016

CREDIT GUARANTEE AND INVESTMENT FACILITY

Catholics continue to press Trump on climate change

Global Contributions to the New Social Compact: Towards effective and just conservation of biological and cultural diversity.

Phil 108, April 24, 2014 Climate Change

Achieving Corporate Integrity

KIRUNA DECLARATION KIRUNA, SWEDEN 15 MAY 2013

Chapter Ten Concluding Remarks on the Future of Natural Resource Management in Borneo

NUUK DECLARATION. On the occasion of the Seventh Ministerial Meeting of. The Arctic Council. 12 May 2011, Nuuk, Greenland

GCSE 4231/02 GEOGRAPHY. (Specification A) HIGHER TIER UNIT 1 Core Geography. A.M. MONDAY, 13 June hours. Candidate Name.

Special edition, March 2009

EXIT. gtav. VCE Geography Resource for students

Cry out as if you have a million voices, for it is silence which kills the world. Catherine of Siena. The Journey to Rio+20

Global responsibility strategy

ASEAN. Overview ASSOCIATION OF SOUTHEAST ASIAN NATIONS

Trans-Pacific Trade and Investment Relations Region Is Key Driver of Global Economic Growth

Doha Amendment to the Kyoto Protocol

MURUM DAM - Fast Facts

Frequently asked questions

Pacific Indigenous Peoples Preparatory meeting for the World Conference on Indigenous Peoples March 2013, Sydney Australia

EXTRATERRITORIAL OBLIGATIONS IN THE CONTEXT OF CROSS-BORDER INVESTMENT IN ASEAN: THE ROLE OF HUMAN RIGHTS INSTITUTIONS

PUBLIC CLIMA60 ENV492 ENER207 ONU74 FORETS56 TRANS293 IND175 FISC /14ADD1 BE/FC/kp DGE1 LIMITE EN. Councilofthe EuropeanUnion

Pöyry s Role in the Xayaburi Dam Controversy International Rivers (February 2013)

Indigenous Peoples Rights in the UNFCCC Negotiations: Challenges and Ways Forward

Markscheme May 2015 Geography Higher level and standard level Paper 1

Asia and the Pacific s Perspectives on the Post-2015 Development Agenda

SECURING TRANSNATIONAL OIL: ENERGY TRANSIT STATES IN THE MALACCA STRAIT

Forest Peoples Programme

Subject: Request MRC Council to Pass a Resolution Calling for the Cancellation of the Xayaburi Dam

KYOTO PROTOCOL TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE

Poverty Profile. Executive Summary. Malaysia

Policy Statement No POPULATION AND DEMOGRAPHIC CHANGE

Discuss what this map shows. In your book write three concise bullet points to describe what this map shows. Explain what the Brandt Line is.

Kirsten L. Nathanson Crowell & Moring LLP October 20, 2011

Institut für Ökologie und Aktions-Ethnologie gemeinnütziger Verein

KYOTO PROTOCOL TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE. Final draft by the Chairman of the Committee of the Whole

Environmental Justice: ADB and Asian Judges for Sustainable Development. OGC Law and Policy Reform Program

ANNEX QUICK FACTS AND THEIR SOURCES 1

Belo Monte Case, Brazil

NGO and Civil Society Participation in United Nations Climate Conventions

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT)

Trade Facilitation and Better Connectivity for an Inclusive Asia and Pacific

Presented by Sarah O Keefe External Relations Officer European Representative Office Frankfurt, Germany

UNITED NATIONS. Distr. GENERAL. FCCC/KP/CMP/2009/7 15 June Original: ENGLISH. Note by the secretariat

Workshop: Human Rights and Development-Induced Displacement Concept Note

Paper Reference. Paper Reference(s) 4370/1F London Examinations IGCSE Geography Foundation Tier Paper 1F

PATENTS COMMITTEE REPORT MALAYSIA By Clara Yip and Caroline Francis. 1. Legislative Changes

Summary of the Indigenous Peoples' Consultation with the Asian Development Bank, November 27 th 2007

MEMORANDUM OF UNDERSTANDING COOPERATION IN THE FIELD OF CLIMATE CHANGE VULNERABILITY, RISK ASSESSMENT, ADAPTATION AND MITIGATION.

UN FORUM ON BUSINESS AND HUMAN RIGHTS:

Some are Doing Well How Well? (India vs. China)

Australian Conservation Foundation v Latrobe City Council

Final Installed Capacity ( FIC ) Guidance for Onshore and Offshore Wind. Version 1.0 Issued on 06 April 2018

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction.

KYOTO PROTOCOL TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATECHANGE

HAUT-COMMISSARIAT AUX DROITS DE L HOMME OFFICE OF THE HIGH COMMISSIONER FOR HUMAN RIGHTS PALAIS DES NATIONS 1211 GENEVA 10, SWITZERLAND

H 7904 SUBSTITUTE A ======== LC005025/SUB A ======== S T A T E O F R H O D E I S L A N D

CRS Report for Congress Received through the CRS Web

Indigenous Peoples and Sustainable Development:

Green 10 position paper on post-brexit EU-UK collaboration in the field of environmental protection

However, the exclusive intergovernmental process, as well as elements of the content of the joint statement, are flawed and require further attention:

Peace Palace, the Hague 15 March 2007 Dewan Adat Papua

Country programme for Thailand ( )

Euromalt position paper on the EU-ASEAN trade negotiations

Activist Guide to Sinohydro s International Corporation Limited s Environmental and Social Policy Commitments

INDIGENOUS PEOPLES' PLAN OF IMPLEMENTATION ON SUSTAINABLE DEVELOPMENT

International treaty examination of the Doha Amendment to the Kyoto Protocol

Council of the European Union Brussels, 14 September 2017 (OR. en)

1. Introduction. Michael Finus

Transcription:

Mr. Takehiko Nakao President Chairperson, Board of Directors Asian Development Bank (ADB) Headquarters: 6 ADB Avenue Mandaluyong City 1550 Metro Manila, Philippines 6 October, 2014 Re: Concerns about Project 44921-014 (Proposed Private Sector Loan to Sarawak Energy Bhd.) Dear President Nakao, We are writing in regards to the proposed private sector loan of US $ 45 million under Project 44921-014 (Trans Borneo Power Grid: Sarawak to West Kalimantan Transmission Link) to Malaysia s stateowned company, Sarawak Energy Berhad (SEB). According to the Project Data Sheet, the loan is intended to finance the construction of a 47 kilometer, double-circuit 275 kv transmission line in Sarawak between Mambong and the West Kalimantan border and two 275 kv line bays at the Mambong substation. The loan for the development of the electricity distribution network in West Kalimantan (Indonesia), Project 40174, was approved in August 2013. According to the corresponding Report and Recommendation of the President to the Board of Directors: Proposed Loan and Administration of Loan and Grant to Republic of Indonesia: West Kalimantan Power Grid Strengthening Project, importing power from Sarawak is rationalized as economical because hydropower-generated energy can be utilized as an alternative to coal and oil reserves. The Report and Recommendations of the President also note that the project will contribute to a net overall reduction in the carbon footprint of power generation in Borneo. We respectfully urge the Asian Development Bank to conduct a comprehensive analysis of the economic, social and environmental risks at stake in relation to Project 44921-014, and duly consider withdrawing the proposed loan from the institution's project portfolio. In particular, we recommend the risks of the loan be evaluated with the following concerns in mind: 1. The loan is to be issued to SEB, a company that has a systematic record of corruption. Allegations of gross corruption against SEB have been brought to the attention of the Norwegian anti-corruption agency (Økokrim), which has in turn sought to raise the concerns with the Malaysian Anti-Corruption Commission (MACC). SEB is fully owned by the state of Sarawak, with oversight from the State Financial Secretary and the Minister of Finance. Until six months ago, the then Chief Minister, Taib Mahmud (now the Head of State), held the position of Minister of Finance. Taib's cousin chairs SEB, and Taib's brother-in-law acted as SEB's former CEO. Over the past six years, contracts worth US $400 million have been awarded by SEB to companies linked to Taib's family, including Sarawak Cable, Naim Holdings and Cahya Mata Sarawak,

despite not offering the most competitive bids. According to the ADB's Integrity Principles and Guidelines (2012), such conflicts of interest in the procurement process would constitute acts of corruption. A list of contracts awarded by SEB in which conflicts of interest are evident is enclosed separately (Bruno Manser Fund, 2014). Specific incidences of corrupt practices by SEB are emerging in relation to the hydropower projects in which the company is involved. For example, in January 2014, villagers to be affected by SEB s proposed Baram Dam reported incidents of SEB personnel delivering large sums of money in December 2013 to village headman known to be opposed to the dam. Since villagers from at least two affected areas, Long Mekaba and Tanjung Tepalit, interpreted these cash gifts as an attempt by the company to exert pressure on the people who vocally oppose the Baram Dam, they filed a police report, and returned the money to the local police headquarters. In another incident, in November 2013, villagers displaced by SEB s Murum Dam who had been demonstrating their opposition to the project resettlement scheme reported being promised large sums of money (approximately US$ 6,940) by SEB personnel, and receiving the said amount of cash after leaving the blockade. In both of the above instances, no formal agreements or receipts were signed or provided. Such acts of corruption constitute as coercive practice under the ADB s Integrity Principles and Guidelines. If the ADB is to proceed with the loan, the bank s reputation and staff integrity are at risk of being compromised because connections may be drawn with SEB s acts of corruption. 2. Recent human rights investigations have demonstrated SEB s repeated complicity in violations of individual and collective rights outlined in the provisions of the national constitution and international laws. Recent investigations conducted by the Malaysian Bar Council, the national human rights commission (SUHAKAM), and an independent fact finding mission that was endorsed by the national human rights non-governmental organization (SUARAM) and the national indigenous peoples organization (JOAS), have examined allegations of SEB s complicity in extinguishing customary land rights, denial of the right to information, violation of the right to livelihood and use of coercive tactics, including threats and intimidation. Each of the above has issued reports (2014) outlining evidence and examples of such abuses and has called on SEB to respect national and international human rights frameworks. Given that the majority of these human rights violations are yet to be resolved, the ADB will face significant reputational risk by offering a loan to SEB, whether or not the particular transmission line to be financed is associated with violations of Indigenous Peoples rights.

3. Shifting reliance towards energy generated through large scale hydropower developments does not automatically equate to a low carbon footprint or to being a cheaper source of power. The suggestion that investing in a shift towards generating power via large-scale hydropower projects that require flooding vast expanses of forested areas in Sarawak would lead to a reduced carbon footprint in Borneo appears to be based on an outdated mode of carbon equations. An increasing body of scientific evidence has revealed that greenhouse gas discharges from hydropower dam reservoirs in tropical climates are substantial and do have a corresponding impact on global climate change. Over the lifecycle of a hydropower project, the masses of methane gas emissions produced can be equivalent to the greenhouse gases emitted by a coal-fired plant because methane gas is a much more potent greenhouse gas than carbon dioxide. In determining that the Sarawak-West Kalimantan transmission line project would cause a reduction of carbon emissions, it is not clear how - or if - methane emissions from the source of the power in Sarawak are being taken into account. Although electricity produced by damming rivers in Sarawak may be deemed cheap for West Kalimantan investors, associated environmental and social costs borne by the ecosystems and people of Sarawak, including irreversible losses to biodiversity, jeopardized food security, and social instability due to mass displacement, are evidently being ignored. In the current project balance sheet, these costs are not mentioned, but in the long term will negatively impact the health, well-being, sustainability and climate resilience of local communities, economies and the environment. 4. Recent design and mechanical problems at SEB s Murum Dam demonstrate disregard for appropriate measures to ensure operational safety and accuracy. SEB s lack of attention to design complexities and project performance present an investment risk to the ADB. At the Murum Dam site, SEB is confronted with the necessity to take urgent measures to rectify alarming mechanical problems. An assessment by Norway s Norconsult identified serious defects in the turbine runners, which were noted as not suitable for installation and operation and as potentially leading to operational breakdowns. Without the Murum Dam being operational, is not clear if SEB will be in a position to guarantee adequate power supply for export to West Kalimantan. The lack of regard for project safety, quality assurance and oversight in preparation for dam commissioning at the Murum site raises questions in regards to SEB s performance and ability to meet the stipulations of cross-border power exchange agreements. With the above evidence, we trust the ADB management will make a responsible decision based on principles of ethics, economics and accountability, and that you will have the integrity to withdraw the proposal to offer a loan to Sarawak Energy Berhad. Thank you for your time and consideration.

Sincerely, Thomas Jalong, President, Jaringan Orang Asal SeMalaysia Peter Kallang, Chair, SAVE Rivers Lukas Straumann, E.D., Bruno Manser Fund Joan Carling, E.D., Asia Indigenous Peoples Pact Tanya Lee, Program Coordinator, International Rivers With the support of the following Malaysian, regional and international non-governmental organizations: Alliance Sud (Switzerland) Article 19: Defending Freedom of Expression and Information (International) Asia Indigenous Peoples Network on Extractive Industries and Energy (Asia) Asian Indigenous Women s Network Secretariat (Asia) BaramKini (Malaysia) Berne Declaration (Switzerland) BERSIH 2.0 (Malaysia) Bob Brown Foundation (Australia) Borneo Resources Institute Malaysia Sarawak (Malaysia) Both ENDS (Netherlands) Borneo Project (USA) Center for Orang Asli Concerns (Malaysia) Centre for Research and Advocacy-Manipur (India) Committee on the Protection of Natural Resources-Manipur (India) Dignity International (International) Friends of the Earth International (International) Forest Peoples Programme (International) GegenStrömung CounterCurrent (Germany) Indigenous Peoples' Links (International) Institute for Development of Alternative Living (Malaysia) Institute for Ecology and Action Anthropology (Germany) NGO Forum on the ADB (Asia) Naga Peoples Movement for Human Rights (India) PACOS Trust (Malaysia) Pax Romana/International Catholic Movement for Intellectual and Cultural Affairs Rainforest Rescue (Germany) Sahabat Alam Malaysia/Friends of the Earth Malaysia (Malaysia) Sarawak Dayak Iban Association (Malaysia) Sarawak Native Customary Land Rights Network (Malaysia) SOS-Selangor (Malaysia) Suara Rakyat Malaysia (Malaysia) Society for Threatened Peoples-Switzerland (Switzerland) TEBTEBBA: Indigenous Peoples' International Centre for Policy Research and Education (International) WALHI /Friends of the Earth-Indonesia (Indonesia) World Rainforest Movement (International)

Cc: Clare Wee, Head, Office of Anti-Corruption and Integrity David Binns, Director, Office of Anti-Corruption and Integrity Nigel Savidge, Lead Integrity Specialist, Office of Anti-Corruption and Integrity Ma. Mildred R. Villareal, Senior Integrity Officer, Office of Anticorruption and Integrity Chong Chi Nai, Director, Energy Division, Southeast Asia Department Sohail Hasnie, Principal Energy Specialist, Energy Division, Southeast Asia Department Chris Morris, Head, NGO Center ADB Board of Directors