WECC Criterion INT-021-WECC-CRT-2.1

Similar documents
Standard BAL Inadvertent Interchange

Reliability Standards Development Procedures

Sovrin Founding Steward Agreement

Southwest Power Pool REGIONAL TARIFF WORKING GROUP Conference Call September 18, :00 a.m. 11:00 a.m. - A G E N D A D R A F T. September 18, 2008

Introduction. Standard Processes Manual VERSION 3.0: Effective: June 26,

June 14, Please contact the undersigned if you have any questions concerning this filing.

Model Zoning Ordinance

2017 Financial Disclosure Report For a Candidate

Alberta Electric System Operator

This document has been provided by the International Center for Not-for-Profit Law (ICNL).

OFFICE WAREHOUSE SPACE 4717 Priem Ln Pflugerville

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR RELIABILITY CORPORATION )

March 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.17 EIM Entity Agreement (EIMEA)

Texas Reliability Entity Standards Development Process

B (bottom) Package type descriptive code. LFBGA624 Package type industry code. LFBGA624 Package style descriptive code

Agenda Standards Committee Process Subcommittee Meeting March 13, :00 5:00 p.m. Mountain

Data Licensing Agreement

Texas Reliability Entity Standards Development Process

Unanimous Written Consent of Board of Directors Approval of Convertible Debt

Revision May 18, 2011 Publication Date. Copyright LXI Consortium, Inc. All rights reserved

AGREEMENT AND LICENSE TO ENCROACH UPON A PUBLIC RIGHT-OF-WAY. THIS AGREEMENT entered into this day of. 20, between METRO TOWNSHIP, a municipal

Session of HOUSE BILL No By Committee on Federal and State Affairs 3-25

Universal Data Sharing Agreement

PROPOSED AMENDMENTS TO THE BYLAWS AND STANDING RULES OF UTAH STATE CHAPTER

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting June 13, :00 10:00 a.m. Eastern

S P P U R C H A S I N G S P WI- 03 P U R C H A S E O R D E R G T C DATE OF ISSUE: 15/11/2015 REVISION: 01

Minutes Standards Committee Meeting September 7, :00 a.m. to 3:00 p.m. Central

AMENDED AND RESTATED DELEGATION AGREEMENT BETWEEN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION AND MIDWEST RELIABILITY ORGANIZATION WITNESSETH

SCREENING REPORTS PUBLIC RECORDS DATA SOURCE REQUIREMENTS GENERAL

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting March 15, :00 a.m. to 10:00 a.m. Mountain

BALANCING AUTHORITY OPERATIONS COORDINATION AGREEMENT. between. Wisconsin Electric Power Company. and. PJM Interconnection, LLC

HOURLY CONSULTING TERMS AND CONDITIONS

Agenda Project Management and Oversight Subcommittee (PMOS) Conference Call January 26, 2017 Noon to 1:30 p.m. Eastern

AMENDED AND RESTATED TRANSMISSION CONTROL AGREEMENT. Among The California Independent System Operator Corporation and Transmission Owners

68th UN Civil Society Conference

Privacy Policy & Terms of Use

RELIABILITY STANDARDS DEVELOPMENT PROCEDURES

Future Development Plan: 1. Post for successive ballot. 3Q Post for recirculation ballot. 1Q Submit to BOT. 1Q13

Minutes Operating Reliability Subcommittee

ARTICLE 1 GENERAL PROVISIONS

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting December 6, :00 10:00 a.m. Eastern

Software License Agreement

US Economic Indicators: Producer Prices

ACCREDITED STANDARDS COMMITTEE

SUMMARY OF CHANGES IN ISO 9001:2008 (DRAFT INTERNATIONAL STANDARD)

Service Agreement No. under PG&E FERC Electric Tariff Volume No. 5

VILLAGE OF NORTH RIVERSIDE ORDINANCE NO. 17-O-09

AGREEMENT ON THE IMPLEMENTATION OF THE QUÉBEC RELIABILITY STANDARDS COMPLIANCE MONITORING AND ENFORCEMENT PROGRAM

REMOTE DEPOSIT ANYWHERE AGREEMENT

EIGHTH SUPPLEMENTAL INDENTURE OF TRUST WITNESSETH:

131 FERC 61,217 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C June 4, 2010

TRADEMARK COEXISTENCE AGREEMENT PARK CITY DRAFT

Midwest Real Estate Data, LLC. MRED Participant Agreement 1 DEFINITIONS AND USAGE. MRED S OBLIGATIONS. PARTICIPANT ACKNOWLEDGMENTS.

Bylaws of the Commonwealth Health Research Board Effective July 1, 2018

NASA OPEN SOURCE SOFTWARE AGREEMENT

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting September 7, :00 10:00 a.m. Central

AUTHOR PUBLISHING AGREEMENT

CORPORATION OF THE MUNICIPALITY OF WEST GREY BY-LAW NUMBER

NorthWestern Energy requests an effective date of March 12, 2016, for the proposed revisions.

B (bottom) Package type descriptive code. LFBGA96 Package type industry code. LFBGA96 Package style descriptive code. P (plastic) Mounting method type

SALT LAKE CITY MOSQUITO ABATEMENT DISTRICT

1.1 The Committee operates under delegated authority from the Board.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

1.4 The Parties believe that this Agreement is in the public interest.

1. General. 2. Right of Use

PARTIAL REQUIREMENTS SERVICE AGREEMENT BETWEEN TAMPA ELECTRIC COMPANY AND CITY OF ST. CLOUD, FLORIDA, UNDER WHOLESALE REQUIREMENTS TARIFF

for research or clinical purposes only under the following conditions:

METER DATA MANAGEMENT SERVICES AGREEMENT BETWEEN AMEREN SERVICES COMPANY AND

Terms and Conditions of Apollo Display Technologies, Corp.

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.16 Pseudo-Tie Participating Generator Agreement

LA14-20 STATE OF NEVADA. Performance Audit. Judicial Branch of Government Supreme Court of Nevada. Legislative Auditor Carson City, Nevada

External Audit Report. The University of Texas at Austin s Center for Transportation Research TxDOT Compliance Division

June 10, Filing of non-conforming Service Agreement No Docket No. ER

CRIMINAL JUSTICE PROCESS FOLLOW-UP AUDIT

Contributary Platform User Terms of Service

HOSTED SERVICES AGREEMENT

Terms & Conditions. Effective Date: September 17th, Site Covered:

Part 2: Risk Analysis and Scenario-Based Planning

Growth Management Act, RCW A et seq., for the City of Des. the greatest extent practicable, and ORDINANCE NO. 1476

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.5 Dynamic Scheduling Agreement for Scheduling Coordinators

EXHIBIT L FORM OF VIOLATIONS PROCESSING SERVICES AGREEMENT

Directive 067 Schedule 1 Licence Eligibility (Well, Facility, or Pipeline)

May 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

PROPOSED AMENDMENTS TO THE BYLAWS AND STANDING RULES OF UTAH STATE CHAPTER

Case 1:16-cv BLW Document 1 Filed 10/28/16 Page 1 of 9

BY-LAWS THE NEW YORK STATE DENTAL FOUNDATION. Incorporated by the Regents of the University of the State of New York.

AUTHORIZED USE LICENSE Page 1 of 5

BOROUGH OF ELMER, COUNTY OF SALEM, NEW JERSEY ORDINANCE NO

Meeting Notes Project 2016-EPR-02 August 11, 2016

PARTICIPATION AGREEMENT

US Economic Indicators: Inventories-to-Sales Ratios

Memorandum of understanding (MOU)

Meeting of the New York State Reliability Council, L.L.C. (NYSRC) Reliability Rules Subcommittee (RRS)

PROPOSAL SUBMISSION AGREEMENT

Sensor Concepts Incorporated TERMS OF SERVICE

Summer Special Milk Program Program Agreement

Introductions and Chair s Remarks Ms. Metro welcomed members and observers and provided safety information.

Cobb County Genealogical Society, Inc.

ANSI C American National Standard. for Roadway and Area Lighting Equipment Enclosed, Post Top-mounted Luminaires

Transcription:

WECC Criterion INT-021-WECC-CRT-2.1 A. Introduction 1. Title: WECC Interchange Tool (WIT) Checkout Confirmation 2. Number: INT-021-WECC-CRT-2.1 3. Purpose: To provide WECC Balancing Authorities with an auditable means of confirming Net Scheduled Interchange (NSI) and Net Actual Interchange (NAI). The WECC Interchange Tool (WIT) or successor electronic confirmation tool will serve as the primary means for confirmation and will be treated as the final record of NSI and NAI under normal operating conditions. 4. Applicability: 4.1. Functional Entities: 4.1.1. Balancing Authority 5. Effective Date: January 1, 2016 WESTERN ELECTRICITY COORDINATING COUNCIL 155 North 400 West, Suite 200 Salt Lake City, Utah 84103-1114

INT-021-WECC-CRT-2.1 WECC Interchange Tool (WIT) Checkout Confirmation Page 2 of 6 B. Requirements and Measures WR1. Each Balancing Authority shall use the WECC Interchange Tool (WIT), or its successor, as the primary means to confirm common Net Scheduled Interchange (NSI) and Net Actual Interchange (NAI), except when the tool is not available. WM1. Each Balancing Authority will have evidence that it used the WIT, or its successor, as the Balancing Authority s primary means of common NSI and NAI confirmation, except when the tool is not available, as required in Requirement WR1. WR2. Each Balancing Authority shall confirm its common NSI with each Adjacent Balancing Authority at the following time periods: 1) Prior to implementing the energy profile of the aggregated Confirmed Interchange (and) 2) After the operating hour. WM2. Each Balancing Authority will have evidence that it confirmed its common NSI with each Adjacent Balancing Authority at the times required in Requirement WR2. Evidence may include but is not limited to the confirmation audit log provided by the WIT or its successor. Bullet 2 is not to be interpreted to conflict with the allowance of after-the-fact settlement. WR3. Each Balancing Authority shall provide hourly NAI data, equal in magnitude and opposite in sign or direction, to the electronic confirmation tool for each of its Adjacent Balancing Authorities no later than the end of the current hour for the last hour in which the energy flowed or within a mutually agreed time frame if mutually agreed to changes arise. WM3. Each Balancing Authority will have evidence that hourly NAI data was submitted to the electronic confirmation tool for each of its Adjacent Balancing Authorities, as required in WR3. Evidence may include but is not limited to the data submittal audit log provided by the WIT, or its successor.

INT-021-WECC-CRT-2.1 WECC Interchange Tool (WIT) Checkout Confirmation Page 3 of 6 Version History Version Date Action Change Tracking 1 July 14, 2011 Operating Committee Approve Initial version 1 September 22, 2011 WECC Board of Directors Approved Initial version 1.1 October 4, 2011 Errata WM2 Balancing Area was corrected to reach Balancing Authority. 1.1 September 5, 2012 WECC Board of Directors changed designation from CRT to RBP Designation change 1.2 December 13, 2011 Errata Interchange Authority was removed from the Applicability section as there are no assigned tasks and the entity is not an approved entity under the NERC Functional Model, Version 5. In WM2 and WM3, Interchange Authority was replaced with the proper term Interchange Coordinator as approved under the NERC Functional Model, Version 5. 1.3 January 16, 2013 Errata The term Western in the Title was corrected to WECC. The Number was corrected from the project number of WECC-0064 to the document number INT-021-WECC- RBP-1.3. Fn 1 was added to explain the Effective Dates. The document was conformed to a new template. 1.3 June 25, 2014 WECC Board of Directors changed designation from RBP to CRT Designation change 2 September 15, 2015 WECC Board of Directors Approved Developed as WECC-0108. Changes to the scheduling standardization methodology 2.1 January 28, 2016 Errata A period was added to the end of the last sentence of WM2. In the Rationale section: 1) the phrase This Criterion was replaced with the phrase This document, 2) the phrase For purposes of INT-021-WECC-CRT-2 has been replaced with For purposes of this document. Both changes were made to keep the document current as document titles and categories fluctuate. 2.1 April 1, 2016 No Change Converted to new template Under review as WECC-0118. March 2016. Disclaimer WECC receives data used in its analyses from a wide variety of sources. WECC strives to source its data from reliable entities and undertakes reasonable efforts to validate the accuracy of the data used. WECC believes the data contained herein and used in its analyses is accurate and reliable. However, WECC disclaims any and all representations, guarantees, warranties, and liability for the information

INT-021-WECC-CRT-2.1 WECC Interchange Tool (WIT) Checkout Confirmation Page 4 of 6 contained herein and any use thereof. Persons who use and rely on the information contained herein do so at their own risk.

INT-021-WECC-CRT-2.1 WECC Interchange Tool (WIT) Checkout Confirmation Page 5 of 6 Attachments Attachment A Not Used

INT-021-WECC-CRT-2.1 WECC Interchange Tool (WIT) Checkout Confirmation Page 6 of 6 Rationale A Rationale section is optional. If Rationale Boxes were used during the development of this project, the content of those boxes appears below. This document is in support of BAL-006-2, Inadvertent Interchange. For purposes of this document, the word common means that Net Scheduled Interchange (NSI) or Net Actual Interchange (NAI) between only two Adjacent Balancing Authorities (BA) as opposed to the aggregate NSI or NAI with all BAs.