RULE ON TARIFF PROCEEDINGS

Similar documents
Article 5 Building, Electrical, Plumbing and Mechanical Code

ALABAMA SURFACE MINING COMMISSION ADMINISTRATIVE CODE

LICENCA ZA OBAVLJANJE DJELATNOSTI DISTRIBUCIJE ELEKTRIČNE ENERGIJE U BRČKO DISTRIKTU BOSNE I HERCEGOVINE

Substitute for SENATE BILL No. 323

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.5 Dynamic Scheduling Agreement for Scheduling Coordinators

English Translation of Royal Decree 78/2004. The Law for the Regulation and Privatisation of the Electricity and Related Water Sector

The court annexed arbitration program.

RULE ON THE RESOLUTION OF COMPLAINTS AND DISPUTES IN ENERGY SECTOR

Rules for the Conduct of an administered Arbitration

153 FERC 61,356 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING SERVICE AGREEMENT. (Issued December 29, 2015)

2 No GOVERNMENT GAZETTE, 21 JANUARY (English text signed by the President.) (Assented to 16 January 2008.) ACT

NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012

RULES GOVERNING ALTERNATIVE DISPUTE RESOLUTION

LOCAL RULES SUPERIOR COURT of CALIFORNIA, COUNTY of ORANGE DIVISION 7 FAMILY LAW

LAW ON DISPLACED-EXPELLED PERSONS AND REFUGEES-REPATRIATES IN THE SARAJEVO CANTON (Canton Sarajevo Official Gazette, no. 27/05)

RULES OF TENNESSEE PUBLIC UTILITY COMMISSION CHAPTER PRACTICE AND PROCEDURE - CONTESTED CASES TABLE OF CONTENTS

PARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.16 Pseudo-Tie Participating Generator Agreement

CHAPTER 5. FORMAL PROCEEDINGS

RULE ON RESOLUTION OF COMPLAINTS AND DISPUTES IN ENERGY SECTOR

LCB File No. T ADOPTED TEMPORARY REGULATION OF THE PUBLIC UTILITIES COMMISSION OF NEVADA

JAMS International Arbitration Rules & Procedures

UNITED STATES OF AMERICA92 FERC 61,109 FEDERAL ENERGY REGULATORY COMMISSION

The Wonderful World of. A Guide for Tariff Filings by Municipal and Rural Cooperative Electric Utilities. Florida Public Service Commission

( Official Gazette of Bosnia and Herzegovina, No. 19/02) LAW ON ADMINISTRATIVE DISPUTES OF BOSNIA AND HERZEGOVINA

47 USC 332. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

47064 Federal Register / Vol. 63, No. 171 / Thursday, September 3, 1998 / Notices

National Patent Board Non-Binding Arbitration Rules TABLE OF CONTENTS

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.3 Net Scheduled Participating Generator Agreement

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC)

R in a Nutshell by Mark Meltzer and John W. Rogers

Alaska UCCJEA Alaska Stat et seq.

WORLD TRADE ORGANIZATION

Department of Labor Relations TABLE OF CONTENTS. Connecticut State Labor Relations Act. Article I. Description of Organization and Definitions

CHAPTER 6 SANITARY AND PHYTOSANITARY MEASURES ARTICLE 6.1. Scope

Kansas Corporation Commission

Arizona UCCJEA Ariz. Rev. Stat et seq.

BOSNA I HERCEGOVINA БOСНA И ХEРЦEГOВИНA

DUBAI INTERNATIONAL ARBITRATION CENTRE RULES 2007 AS OF 22 ND FEBRUARY Introductory Provisions. Article (1) Definitions

ARBITRATION RULES OF THE SINGAPORE INTERNATIONAL ARBITRATION CENTRE SIAC RULES (5 TH EDITION, 1 APRIL 2013)

129 FERC 61,075 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL

Nevada UCCJEA Nev. Rev. Stat. 125A.005 et seq.

(1 May 2008 to date) ELECTRICITY REGULATION ACT 4 OF 2006

Federal Rules of Civil Procedure

Indiana UCCJEA Ind. Code Ann

[LADWP Business Practice] Procedures for Public Participation in Tariff Changes for the Department of Water and Power of the City of Los Angeles. Sec.

ALABAMA PUBLIC SERVICE COMMISSION ADMINISTRATIVE CODE CHAPTER 770-X-9 WASTEWATER MANAGEMENT ENTITY RULES TABLE OF CONTENTS

Georgian National Energy and Water Supply. Regulatory Commission. Resolution #23

Wyoming Public Service Commission FY Strategic Plan

Rhode Island UCCJEA R.I. Gen. Laws et seq.

152 FERC 61,253 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Japan-EU EPA (SPS) (Non-Paper) Article 1: Objectives

SEMINOLE TRIBE OF FLORIDA

ELECTION LAW OF BOSNIA AND HERZEGOVINA. Last amended 4/3/2006. Chapter 1. General Provisions

Guam UCCJEA 7 Guam Code Ann , et sec.

REGULATION ON PROVIDING THE APPLICATION OF INTELLECTUAL PROPERTY RIGHTS. Article 1. Article 2

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.17 EIM Entity Agreement (EIMEA)

ELECTRICITY REGULATIONS FOR COMPULSORY NORMS AND STANDARDS FOR RETICULATION SERVICES (GN R773 in GG of 18 July 2008)

PARTICIPATING GENERATOR AGREEMENT (PGA)

The Board of Supervisors of the County of Riverside, State of California, ordains as follows:

LAW ON CONCESSIONS GENERAL PROVISIONS. Subject matter of the Law Article 1

Technical Standards and Safety Authority. Rules of Practice

The NATIONAL CONGRESS decrees: CHAPTER I PRELIMINARY PROVISIONS

COMPLEX BUSINESS LITIGATION DIVISION PROCEDURES FOR THE THIRTEENTH JUDICIAL CIRCUIT COURT, IN AND FOR HILLSBOROUGH COUNTY, FLORIDA

NC General Statutes - Chapter 50A 1

CHAPTER SIX CUSTOMS AND TRADE FACILITATION

LAW ON THE BANKING AGENCY OF THE FEDERATION OF BOSNIA AND HERZEGOVINA (The FBiH Official Gazette, 9/96, 27/98, 20/00 and 45/00)

IN THE GENERAL COURT OF JUSTICE DISTRICT COURT DIVISION., ) Plaintiff, ) ) CONSENT STIPULATIONS FOR v. ) ARBITRATION PROCEDURES ), ) Defendant.

PUBLIC UTILITIES COMMISSION

L A W ON DISPLACED PERSONS, RETURNEES AND REFUGEES IN THE REPUBLIKA SRPSKA (RS Official Gazette, no. 42/05 of 26 April 2005)

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.8 Utility Distribution Company Operating Agreement (UDCOA)

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

IC Chapter 5. Family Law Arbitration

ON THE ADMINISTRATIVE PROCEDURE

MARKET PARTICIPANT SERVICE AGREEMENT. This MARKET PARTICIPANT SERVICE AGREEMENT is dated this day of, 2013 and is entered into by and between:

COMPREHENSIVE JAMS COMPREHENSIVE ARBITRATION RULES & PROCEDURES

Government of Bangladesh MINISTRY OF COMMERCE

Standing Practice Order Pursuant to 20.1 of Act Establishing Rules Governing Practice and Procedure in Medical Assistance Provider Appeals

Section moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

SECTION 1 INTRODUCTORY RULES...

CHAPTER 60 - BOARD OF REFRIGERATION EXAMINERS SECTION ORGANIZATION AND DEFINITIONS

2009 No (L. 20) TRIBUNALS AND INQUIRIES

ENMAX Power Corporation

Interlocal Agreement Regarding Asset Forfeitures within Hays County

RULE ON AUTHORIZATION PROCEDURE FOR CONSTRUCTION OF NEW GENERATION CAPACITIES FROM RENEWABLE ENERGY SOURCES

UNITED STATES OF AMERICA 94 FERC 61,141 FEDERAL ENERGY REGULATORY COMMISSION

Chapter Ten: Initial Provisions Comparative Study Table of Contents

POSTAL SERVICES (JERSEY) LAW 2004

RULES GOVERNING THE COURTS OF THE STATE OF NEW JERSEY RULE 8:3. COMMENCEMENT OF ACTION; PLEADINGS

REALTORS ASSOCIATION OF NORTHEAST WISCONSIN PROFESSIONAL STANDARDS POLICIES. GENERAL POLICIES related to both Ethics and Arbitration

Factory Act, B.E (1992) BHUMIBOL ADULYADEJ REX. Given on the 2nd day of April, B.E. 2535; Being the 47th year of the Present Reign.

Rules of Procedure. Effective: May 4, 2016

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

GUIDELINES FOR DRAFTING & IMPLEMENTING INTEGRITY PLANS IN THE JUDICIAL INSTITUTIONS OF BOSNIA AND HERZEGOVINA

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

Administrative Rules for the Office of Professional Regulation Effective date: February 1, Table of Contents

EXTRAORDINARY PUBLISHED BY AUTHORITY ISLAMABAD, TUESDAY, JULY 29, PART II Statutory Notification (S.R.O) GOVERNMENT OF PAKISTAN

Bangladesh Trade Marks Rules Amended on September 10, 1963

CHAPTER House Bill No. 7009

Transcription:

Pursuant to Article 4.3. of the Law on Transmission, Regulator and Electricity System Operator in Bosnia and Herzegovina ( Official Gazette of BiH, No. 7/02 and 13/03) and Article 36 of the Procedural Rules of the State Electricity Regulatory Commission ( Official Gazette of BiH, No. 2/05), the State Electricity Regulatory Commission at its session held on April 21, 2005 has issued RULE ON TARIFF PROCEEDINGS I GENERAL PROVISIONS Article 1 Scope of Procedural Rules for Procedures Relating to Tariffs This Rule shall determine the procedural basis for consideration of applications and any other pleadings relating to tariffs, tariff methodologies and standards for issuance if tariffs, which are necessary for the State Electricity Regulatory Commission (hereinafter: the SERC) to meet its obligations with regard to compliance with the Law on Transmission, Regulator and Electricity System Operator (hereinafter: the Law). Article 2 Definitions The terms used in this Rule shall have the meanings as set forth in the Law, Procedural Rules and Rules on Hearing Procedures of the SERC. II BASIS OF TARIFF PROCEEDINGS Article 3 Commencement of Tariff Proceedings Tariff proceedings, as a group of activities conducted in the tariff approval procedure, shall be commenced by filing of a tariff application by the regulated company or at the initiative of the SERC. The application referred to in the previous paragraph may relate to full or partial change of tariff rates. The tariff proceedings initiated upon request of the regulated company shall commence when the SERC establishes that the tariff application meets all formal and procedural requests prescribed by the Rules on Hearing Procedures and this Rule. Article 4 Content of Tariff Application Tariff application, or annexes to the application, including but limited to mandatory data referred to in Article 7 of this Rule, must clearly present and confirm: a) anticipated effect of proposed tariff, if any, on the revenue of regulated company; b) any significant change in tariff design expected to result from the application; c) the statement that the information and data submitted with the application are true and correct to the best of one s knowledge. 1

d) The application and attachments to the application referred to in the previous paragraph must be organized in such a way to provide identification of: e) the name of the regulated company, services included in tariff(s), requested date of coming into effect of the proposed tariff(s) and the authorized representative of the regulated company; f) table of content or indices of attached tables with sufficient details so that particular costs, revenues, requested tariffs or serves, or any other item; and current tariffs charged by the regulated company to its customers for any regulated service and any additional information necessary to identify tariffs of the regulated company fir particular services. The SERC shall inform the public on the tariff proceedings initiated upon request of the regulated company or the procedure initiated at its own initiative, as determined by the Procedural Rules of the SERC, i.e. Rule on Public Hearings of the SERC. Article 5 Public Notice The regulated company filing tariff application must submit notices on filed application to all of its customers individually. The notice must include: a) the amount of proposed tariff change; b) the percentage of proposed tariff change for each customer class; c) the date of coming into effect of proposed tariff change; d) the customer s right to request information related to current and proposed tariffs; and e) customer s right to participate in an open and fair hearing before the SERC. The SERC shall inform the public on the tariff proceedings initiated upon request of the regulated company or the procedure initiated at its own initiative, as determined by the Procedural Rules of the SERC, i.e. Rule on Public Hearings of the SERC. Article 6 Approval of Application The SERC shall approve request for tariff change in a manner and following procedure set forth in the Procedural Rules of the SERC and SERC s procedures for hearings as prescribed by the Rules on Public Hearings of the SERC. As a rule, the SERC shall not review tariff applications relating to tariff period which, in the previous decision of the SERC, has been determined as the period of unchanged tariffs. Article 7 Tariff Methodology The tariff application shall be filed and reviewed in accordance with the Tariff Pricing Methodology for Electricity Transmission Services, Independent System Operator and Ancillary Services which is determined by the separate document of the SERC. The Methodology from the previous paragraph shall define the tariff structure and pricing in electricity transmission related activities, and operation of transmission network. The Methodology must take into account the following objectives: approved tariffs shall be transparent, non-discriminatory and based on the justified operation and maintenance costs, 2

to stimulate energy efficiency, to create stable relations on the power market, to stimulate development of transmission activity, to take into consideration environmental protection and to maintain standards of prevailing international practice. In the Methodology from the paragraph 1 of this Article included shall be the content and the shape of Tables of all indicators necessary for allocating data in tariff proceedings, and instructions for expressing reference values. It is within SERC s authority and discretion to: - consider and verify all costs and revenues submitted as support to proposed tariffs and to allow, disallow or adjust any item which is not justified; - consider and verify entire assets proposed to be the part of regulatory asset base and allow, disallow or adjust the value of any of such assets; - allow, disallow or adjust any other value or analysis used for calculation of the proposed tariffs; and - accept proposed tariff design or to adapt it as appropriate. Article 8 Regulatory Chart of Account For the purpose of implementation of Methodology referred to in Article 7 of this Rule, the SERC shall determine the regulatory chart of account in the separate decision, using the basic classification of the official chart of accounts. Article 9 Standards for Approval of Tariffs The SERC shall only approve those applications that provide sufficient information to the SERC in order to make decision. The SERC shall approve applications in cases when the prices, terms and conditions for implementation of tariffs are nondiscriminatory, reasonable to customers, and based on the properly incurred costs of providing a particular service. The burden of proof shall be on the applicant to show that the proposed tariff satisfies the requirements of the Law and this Rule. Article 10 Informal Hearings In cases where the subject of dispute is insignificant and trivial or when the SERC determines that the impact on customers is not large, not controversial, or there are no interveners in the proceedings, the SERC may expedite action on the pleadings, shorten time periods for submitting replies and comments, implement informal information request procedures, schedule a public hearing in shorter period then prescribed in the Rules of Hearing Procedures, limit the length of participation in the hearing, and take such other action necessary to expedite the decision. However, this simplification of the proceeding shall not free the SERC from its obligation to conduct proceedings in public and to permit interested persons to participate in the proceeding. Article 11 Prohibited Activities It is unlawful for any regulated company to charge, demand, collect or receive compensation for any regulated service performed within Bosnia and Herzegovina, a greater or lesser compensation than as specified in the decision of the SERC or to demand, collect or receive any other compensation not specified in the decision approving tariffs. 3

Article 12 Enforcement The SERC may sanction each violation of approved tariffs or noncompliance with this Rule as provided in the Law, taking into account the severity of the violation. If the SERC determines, after hearings conducted in accordance with the Rules of Hearing Procedures, that a regulated company has not operated in compliance with its approved tariffs, it shall bind the regulated company to disgorge any economic benefits it received in such a way, and may order payment to injured parties in an amount three times the economic benefit. Article 13 Effectiveness of Tariff The approved tariffs shall become effective on the date established in the SERC decision. The approved tariffs shall be effective until changed by the new decision of the SERC, in accordance with provisions of this Rule. Article 14 Public Access to Official Tariffs When tariffs become effective, the SERC shall provide the regulated company with a copy of all approved tariff rates, with the actual effective date of the tariff, the pertinent docket number, and an official stamp of the SERC. The regulated company shall make the approved tariffs available to the public for inspection at its main business office during regular business hours, and by posting such documents on its website. Article 15 Monitoring Requirements Whether or not a proceeding is pending, the regulated companies shall cooperate with any reasonable information request in order to enable the SERC to execute its responsibilities under the Law to monitor the regulated companies compliance with approved tariff. Article 16 Investigation The SERC may, on its own motion or in response to an application, initiate an investigation on regulated company s tariffs and practices affecting such tariffs, and may take such actions within its authority to correct unreasonable tariffs and practices. Article 17 Waiver The SERC may authorize a waiver from or modification of this Rule after a clear finding of exigent circumstances, necessity or severe unnecessary complexity. 4

III TRANSITIONAL AND CLOSING PROVISIONS Article 18 Initial/Interim Tariffs Initial/interim tariffs for the services of electricity transmission and the operation of the independent system operator during the initial period of functioning of regulated companies until meeting conditions for establishment and implementation of tariffs in accordance with the Law and rules and regulations referred to in Articles 6, 7 and 8 of this Rule, shall be determined by the separate decision of the SERC. Article 19 Interpretation The SERC shall provide interpretation of this Rule. If an issue is not covered by this Rule, the SERC shall decide on its resolving in each concrete case. Article 20 Effectiveness This Rule shall become effective on the eighth day upon its publication in the Official Gazette of Bosnia and Herzegovina. Number: 04-02-9/05 April 21, 2005 Tuzla Chairman of the Commission Mirsad Salkić 5