Admiralty Inlet Pilot Tidal Project FERC No Appendix H. Adaptive Management Framework

Similar documents
CUSHMAN PROJECT FERC Project No Settlement Agreement for the Cushman Project

UNITED STATES OF AMERICA 118 FERC 62,141 FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA 118 FERC 62,144 FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA 118 FERC 62,159 FEDERAL ENERGY REGULATORY COMMISSION

SERC Regional Standards Development Procedure Exhibit C to the Amended and Restated Regional Entity Delegation Agreement between

Texas Reliability Entity Standards Development Process

FERC INTRODUCTION

ARBITRATION RULES. Arbitration Rules Archive. 1. Agreement of Parties

Texas Reliability Entity Standards Development Process

Standards Development Policies and Procedures. 1.0 Standards Development

.REIT REGISTRATION ELIGIBILITY RECONSIDERATION POLICY

ADR CODE OF PROCEDURE

(Native Title Claim Group) Fishing Indigenous Land Use Area Agreement Template

Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards

Rules of Procedure. Effective: May 4, 2016

COMPREHENSIVE JAMS COMPREHENSIVE ARBITRATION RULES & PROCEDURES

Midwest Reliability Organization

American Water Works Association (AWWA) Standards Program Operating Procedures

ReliabilityFirst Corporation Reliability Standards Development Procedure Version 4

ACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016

X12 BYLAWS. CAP01v3. X12 Corporate Administrative Policy and Procedure. Bylaws (CAP01)

CITY OF RIVERSIDE FERC Electric Tariff Volume 1 First Revised Sheet No. 1 CITY OF RIVERSIDE, CALIFORNIA FERC ELECTRIC TARIFF

Dispute Board Rules. in force as from 1 September Standard ICC Dispute Board Clauses. Model Dispute Board Member Agreement

Policies and Procedures for the Development and Maintenance of Climbing Wall Association Standards

AMENDED AND RESTATED BYLAWS OF THE TENTH MOUNTAIN DIVISION FOUNDATION, INC.

CHAPTER TWELVE TRADE AND SUSTAINABLE DEVELOPMENT

AMENDED AND RESTATED TRANSMISSION CONTROL AGREEMENT. Among The California Independent System Operator Corporation and Transmission Owners

LEGISLATIVE COUNSELʹS DIGEST

Rule 8400 Rules of Practice and Procedure GENERAL Introduction Definitions General Principles

Streamlined Arbitration Rules and Procedures

TRADE AND SUSTAINABLE DEVELOPMENT

CERTIFICATION APPEALS HANDLING PROCESS. For Individual Candidates seeking Certification and Qualified Individuals seeking Re-Certification

TRIBAL CODE CHAPTER 14: RULES OF PARLIAMENTARY PROCEDURE ORDINANCE

WHEREAS, the Tribe and the County have a longstanding history of mutual assistance and cooperation with formalized agreements dating to 1993;

HL7 Australia Standards Development Practices: Due process requirements for HL7 Australia National Standards

Global Sustainability Standards Board Due Process Protocol October 2018

COOPERATIVE LAW ENFORCEMENT AGREEMENT BETWEEN THE TULALIP TRIBES OF WASHINGTON AND SNOHOMISH COUNTY

KALISPEL TRIBE OF INDIANS

STREAMLINED JAMS STREAMLINED ARBITRATION RULES & PROCEDURES

TRADE AND SUSTAINABLE DEVELOPMENT

ACCREDITED STANDARDS COMMITTEE

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.16 Pseudo-Tie Participating Generator Agreement

THE GREEN BUILDING INITIATIVE (GBI) PROCEDURES FOR THE DEVELOPMENT AND MAINTENANCE OF GREEN BUILDING STANDARDS. Document Code: GBI- PRO B

CHAPTER XX DISPUTE SETTLEMENT. SECTION 1 Objective, Scope and Definitions. ARTICLE [1] Objective. ARTICLE [2] Scope

CERTIFICATE OF INCORPORATION OF RENEWABLE ENERGY AND EFFICIENCY BUSINESS ASSOCIATION, INC. (A Connecticut Nonstock Corporation)

SETTLEMENT AGREEMENT CONCERNING THE RELICENSING OF THE PELTON ROUND BUTTE HYDROELECTRIC PROJECT FERC PROJECT NO AMONG

APG ASBESTOS TRUST. 1. A copy of these ADR Procedures; 2. Form Affidavit of Completeness; 3. Election Form and Agreement for Binding Arbitration; and

JAMS International Arbitration Rules & Procedures

United States Patent and Trademark Office and Japan Patent Office Collaborative Search. AGENCY: United States Patent and Trademark Office, Commerce.

BYLAWS. Lockheed Martin Corporation

ACCREDITED PROCEDURES FOR THE DEVELOPMENT OF AMERICAN NATIONAL STANDARDS

AMENDED AND RESTATED BYLAWS AMAZON.COM, INC.

June Regulations Governing Consensus Development of the Water Efficiency and Sanitation Standard

ARTICLE V GRIEVANCE PROCEDURE

Huron-Perth Catholic District School Board

A BILL FOR A LAW FOR THE ADMINISTRATION OF CIVIL JUSTICE IN EKITI STATE EKITI STATE OF NIGERIA

Arbitration Rules. Administered. Effective July 1, 2013 CPR PROCEDURES & CLAUSES. International Institute for Conflict Prevention & Resolution

PROTOCOL ON ENVIRONMENTAL PROTECTION TO THE ANTARCTIC TREATY

CONSOLIDATED INTERNAL RULES OF PROCEDURE OF THE PERMANENT HIGH LEVEL GROUP OF THE ENERGY COMMUNITY

BICSI Standards Program Regulations

DOOR AND HARDWARE INSTITUTE BYLAWS ARTICLE I NAME. The name of this association shall be the Door and Hardware Institute (the "Association").

ANNEXES. to the PROPOSAL FOR A COUNCIL DECISION

Rules for Uniform Domain Name Dispute Resolution Policy ( the Rules )

INTERAGENCY COOPERATION

OpenID Process Document

Terms of Reference and Rules of Procedure Clinical Trials Subcommittee

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, DC FORM 8-K CURRENT REPORT

California Independent System Operator Corporation Fifth Replacement Tariff. B.11 Pro Forma Congestion Revenue Rights Entity Agreement

BY-LAWS OF THE BOEING COMPANY. (as amended and restated effective December 17, 2017)

CHAPTER 16 EMPLOYMENT PRACTICES - UNLAWFUL DISCRIMINATION

ICC CONSENSUS PROCEDURES

SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018

COMPENSATION COMMITTEE CHARTER

Constitution of the International Association of Anti-Corruption Authorities

BY-LAWS of RIDGE VIEW ESTATES HOMEOWNERS ASSOCIATION, INC.

Chapter 5: Water Management and Inuit Water Rights

Rules of the Equal Opportunities Commission November 10, 2016

Regulations Governing Consensus Development of the Uniform Solar, Hydronics & Geothermal and Swimming Pool, Spa & Hot Tub Codes

ICC CONSENSUS PROCEDURES

SJI Procedures for the Development, Approval, and Maintenance of SJI American National Standards

PURPOSE. To establish general procedures for the Council meetings and administrative matters. MEETINGS. Public Participation

ARBITRATION RULES FOR THE TRANSPORTATION ADR COUNCIL

BYLAWS OF DISTRICT OF COLUMBIA COOPERATIVE HOUSING COALITION, INC. DC/CHC, INC. ARTICLE I OFFICES

APALACHICOLA-CHATTAHOOCHEE-FLINT RIVER BASIN COMPACT

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL

SDI PROCEDURES FOR ANSI-APPROVED STANDARDS FOR STEEL DECK

National Oceanic and Atmospheric Administration. Resource Agency Procedures for Conditions and Prescriptions in Hydropower

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Docket No. RR16- Corporation )

Legal Referral Service Rules for Panel Membership

Department of Labor Division of Industrial Affairs Office of Anti-Discrimination Statutory Authority: 19 Delaware Code, Sections 712(a)(2) and 728

INTERNAL REGULATIONS OF THE FEI TRIBUNAL

WIPO Mediation, Arbitration, Expedited Arbitration and Expert Determination Rules and Clauses. Alternative Dispute Resolution

North American Electric Reliability Corporation (NERC) Rules of Procedure Effective in Manitoba April 1, 2012

No MULTILATERAL. Convention for the conservation of southern bluefin tuna (with annex). Signed at Canberra on 10 May 1993 MULTILATERAL

BYLAWS OF KLAMATH RIVER RENEWAL CORPORATION ARTICLE I NAME, PURPOSE AND PRINCIPAL OFFICE

RULES OF PROCEDURE. NAESB Operating Practices as approved via Board Resolution September 11, 2015 Page 1

BROADRIDGE FINANCIAL SOLUTIONS, INC. COMPENSATION COMMITTEE CHARTER

AMENDED AND RESTATED BYLAWS ORACLE CORPORATION

Amended and Restated Bylaws of Computer Programs and Systems, Inc.

ALTERNATIVE DISPUTE RESOLUTION (ADR) PROCEDURES

Transcription:

Admiralty Inlet Pilot Tidal Project FERC No. 12690 Appendix H Adaptive Management Framework

ADMIRALTY INLET PILOT TIDAL PROJECT FERC PROJECT NO. 12690 ADAPTIVE MANAGEMENT FRAMEWORK (submitted with the Final Application for a New Pilot Project License) Submitted by: Public Utility District No. 1 of Snohomish County February 29, 2012

Admiralty Inlet Pilot Tidal Project FERC No. 12690 TABLE OF CONTENTS 1.0 MARINE AQUATIC RESOURCE COMMITTEE... 1 2.0 COMMITTEE MEMBERSHIP AND MEETING PARTICIPATION... 1 3.0 MEETING PROVISIONS... 2 4.0 COMMITTEE DELIBERATIONS... 3 5.0 DISPUTE RESOLUTION PROCEDURES... 3 5.1 Dispute Resolution Procedures... 4 5.2 Remedies... 5 6.0 NOTICE... 5 FINAL APPLICATION FOR A NEW PILOT PROJECT LICENSE Adaptive Management Framework February 29, 2012 APPENDIX H PAGE i

ADAPTIVE MANAGEMENT FRAMEWORK for the Admiralty Inlet Pilot Tidal Project 1.0 MARINE AQUATIC RESOURCE COMMITTEE The purpose of the Marine Aquatic Resource Committee ( MARC or Committee) is to advise the District on aquatic resource issues related to construction, monitoring, and operation of the Admiralty Inlet Pilot Tidal Project (Federal Energy Regulatory Commission Project No. 12690). As a component of this purpose, the Committee will advise the District on implementation of the following monitoring plans: (1) the Marine Mammal Monitoring Plan; (2) the Near-Field Monitoring Plan; (3) the Derelict Gear Monitoring and Removal Plan; (4) the Benthic Habitat Plan; and (5) the Acoustic Monitoring Plan. Key functions of the Committee are to: 1.1 Review the results of studies, including pre-installation and monitoring, (e.g., interim, quarterly, annual, or final reports), and determine whether results are properly characterized; 1.2 Use study results or other sources of new information to determine whether a change to project monitoring (e.g., study design, methods, or duration) is warranted or if existing monitoring approaches continue to be appropriate; 1.3 Evaluate, propose an alternative, and/or approve, any changes in plans made by the District in response to studies; and 1.4 In the event that effects are identified that require modification to project operation or monitoring, provide the District with recommended measures to avoid, minimize, or mitigate for the effects. 1.5 In the event that adverse effects are identified that require immediate response, provide the District with actions to address these effects. 2.0 COMMITTEE MEMBERSHIP AND MEETING PARTICIPATION 2.1 The Committee shall be comprised of the following entities: the District, National Marine Fisheries Service, U.S. Fish and Wildlife Service, Washington Department of Fish and Wildlife, Washington Department of Ecology, Washington Department of Natural Resources, the Tulalip Tribes, Suquamish Tribe, Swinomish Indian Tribal Community, and Sauk-Suiattle Tribe (hereafter referred to as Members ). The Committee, by unanimous agreement, may grant any other entity membership status on the Committee. 2.2 Each Member should designate a primary representative to the Committee within 30 days after issuance of the Project License, and may change their representative at any time thereafter. Designation shall be by notice to the Members in accordance with section 6. Each Member may name alternate representatives to the Committee to act on the representatives behalf. Failure to designate a representative shall not prevent the Committee from convening or conducting its FINAL APPLICATION FOR A NEW PILOT PROJECT LICENSE APPENDIX H PAGE 1 Adaptive Management Framework February 29, 2012

Admiralty Inlet Pilot Tidal Project FERC No. 12690 functions in accordance with the time schedules set forth in specific License Articles in the Project License. 2.3 Each Member should select a representative who has relevant training or experience with natural resource management. Parties may also send staff with particular expertise or experience in addition to a designated Member to attend and participate in meetings to advise the Member. 2.4 Committee participation by state or federal agencies does not affect their statutory responsibilities and authorities. Issues involving the exercise of agencies specific authorities can be discussed, but decisions are not delegated to the Committee. Consensus advice from the Committee is not binding on any state or federal agency. 2.5 An entity may withdraw as a Member from the Committee at any time, for any reason, by providing prior written notice to the other Members. An entity that has withdrawn as a Member of the Committee may continue to be involved in Committee matters in an informal advisory capacity but will not have voting rights for purposes of Section 4.1 of the plan. Such withdrawal may be temporary, and the entity that has withdrawn may rejoin the Committee as a Member at any time by providing prior written notice to the other Members. 3.0 MEETING PROVISIONS 3.1 The District shall arrange, administer, and chair all meetings, unless otherwise agreed. The Committee shall establish protocols for Committee meetings such as agenda development, subcommittee involvement, and timely distribution of materials, location and scheduling. 3.2 Scheduling of meetings should be informed by milestone events contained within specific License Articles (e.g., following development of study reports summarizing monitoring results), and as the need arises based on new information and monitoring results. The Committee will meet quarterly for the term of the Project License or as needed to meet the consultation requirements of the License Articles. 3.3 The District shall make the Committee meeting schedule and meeting agenda available on its web site. 3.4 The District shall bear all costs associated with conducting meetings. Each Member shall bear its own cost of attendance. A Member s ongoing participation on the Committee is subject to that Member s budget and resource constraints. 3.5 Committee Members shall first use the dispute resolution process described in section 5 herein to resolve disputes arising from Committee deliberations (e.g., disputes over characterization of study or monitoring results or the need to alter Project monitoring or operation), prior to seeking remedies in any other forums. FINAL APPLICATION FOR A NEW PILOT PROJECT LICENSE APPENDIX H PAGE 2 Adaptive Management Framework February 29, 2012

Admiralty Inlet Pilot Tidal Project FERC No. 12690 4.0 COMMITTEE DELIBERATIONS 4.1 The Committee shall seek to reach consensus. Consensus is achieved when all Committee Members cast a supportive or neutral vote, or have abstained from the decision. When any vote is taken at a meeting, the District will provide the results to and seek the vote of non-present members within three (3) working days. Members not present must inform the District of their vote within ten (10) working days after the meeting or they will be deemed to have abstained from the decision. Alternatively, a vote may be cast by proxy. 4.2 Agencies do not waive or relinquish in any respect any approval authority under the Federal Power Act or other applicable law through their participation in the Committee consensus process and any subsequent dispute resolution process. 4.3 The District shall implement any action where consensus by the Committee has been reached, subject to the requirements of the Project License (such as filing for Commission approval) and any necessary regulatory approval. In the absence of consensus, the District may proceed to file plans or make any required filings necessary to meet a License deadline. Unless otherwise noted, the District shall file with the Commission any plans or other required actions within seven (7) days of Committee approval or of an agency decision in case of dispute resolution. Where appropriate, prior to implementing a plan or other required action, the District shall obtain Commission and agency approval. 4.4 Unless otherwise noted in a specific License Article in the Project License, the District shall allow a minimum of thirty (30) days for Committee Member comments and recommendations, and subsequent document revision, before submitting the document to the Commission or the state or federal agencies for approval. When filing the document with the Commission, the District shall include documentation of consultation, copies of comments and recommendations, and specific descriptions of how comments and recommendations from Committee Members are accommodated by the District s plan. If the District does not adopt a recommendation, the filing shall include the District s reasons based on Project-specific information. 4.5 The District may seek review from the Committee participants individually on matters in which they have expertise prior to seeking consensus of the Committee. 5.0 DISPUTE RESOLUTION PROCEDURES Committee Members shall first use the dispute resolution process described herein to resolve disputes arising from Committee deliberations or otherwise related to the Committee, prior to seeking other remedies, unless otherwise precluded by statute or regulation. The Member initiating dispute resolution under this section 5 shall notify the Commission when ADR proceedings are initiated. FINAL APPLICATION FOR A NEW PILOT PROJECT LICENSE APPENDIX H PAGE 3 Adaptive Management Framework February 29, 2012

Admiralty Inlet Pilot Tidal Project FERC No. 12690 The Members agree to devote such time and attention to dispute resolution as necessary and reasonable to attempt to resolve the dispute at the earliest time possible; and each Member will cooperate in good faith promptly to schedule, attend, and participate in dispute resolution. Each Member will promptly implement all final agreements reached, consistent with its applicable statutory and regulatory responsibilities. 5.1 Dispute Resolution Procedures 5.1.1 Dispute Initiation Notice A Member initiating a dispute resolution procedure shall provide timely notice to the other Members, describing the matter(s) in dispute and any proposed relief or resolution. Each Member that wishes to participate in dispute resolution shall provide written Notice to the other Members within twenty (20) days of receiving the dispute initiation Notice. 5.1.2 Informal Meetings The Members involved in attempting to resolve the dispute (the Disputing Members ) shall hold at least two (2) informal meetings to resolve the dispute, unless agreed otherwise, commencing within thirty (30) days after the dispute initiation Notice and concluding within sixty (60) days. If the Members are unable to resolve the dispute, at least one (1) meeting will be held at the management level to seek resolution. The 60-day period may be extended upon mutual agreement of the Disputing Members. If these meetings fail to resolve the dispute, the Disputing Members may, by unanimous consent, agree to mediation. The Member initiating the dispute shall be responsible for coordinating all meetings under this section and shall make good faith efforts to coordinate a meeting time and location satisfactory to all Disputing Members. 5.1.3 Mediation The Disputing Members shall choose a mediator within thirty (30) days of the conclusion of the informal meetings. Mediation shall not occur if the Disputing Members cannot unanimously agree on the allocation of costs or choice of mediator. The mediation process shall be concluded not later than sixty (60) days after the mediator is selected. The above time periods may be shortened or lengthened upon mutual agreement of the Disputing Members. 5.1.4 Dispute Resolution Notice The Member initiating the dispute shall provide Notice to all Members of the result of the ADR process. 5.1.5 Commission Filings After Dispute Resolution If the District is required to make a Commission filing relating to an issue that was not successfully resolved through ADR, such filing will include the District s reasons, based on Project-specific information, for not adopting a Member s recommendation or for seeking the Commission s approval without obtaining agency approval. Any other Member may oppose or seek modification of the District s filing. FINAL APPLICATION FOR A NEW PILOT PROJECT LICENSE APPENDIX H PAGE 4 Adaptive Management Framework February 29, 2012

Admiralty Inlet Pilot Tidal Project FERC No. 12690 5.1.6 Effect of ADR on Other Proceedings The ADR process in this section 5 does not preclude any Member from timely filing and pursuing an action for administrative or judicial relief of any Commission order, compliance matter, or other regulatory action related to the Project License; provided that any such Member shall initiate ADR pursuant to this section 5 as soon as practicable thereafter or concurrently therewith. 5.2 Remedies Following conclusion of dispute resolution, the Members may exercise any appropriate remedy, including filing comments with the Commission, and seeking a License amendment or other appropriate relief from the Commission. 6.0 NOTICE Any Notice required to be given to other Committee Members shall be written. If practicable, Notice shall be provided by e-mail or facsimile to all Members. Notice shall also be sent to all Members by first-class mail or comparable method of distribution, and as applicable shall be filed with the Commission. Unless otherwise specified, a Notice, including Notice via e-mail or facsimile, shall be effective upon receipt, but if provided only by U.S. Mail, seven (7) days after the date on which it is mailed. When Notice is required in fewer than seven (7) days, Notice shall be provided by facsimile or e-mail and shall be effective when provided. For the purpose of Notice, the list of authorized representatives of the Members as of the Effective Date is attached as Appendix 1. The Members shall provide Notice of any change in the authorized representatives designated in Appendix 1, and the District shall maintain the current distribution list of such representatives. The Members acknowledge their responsibility to keep the other Members informed of their current address, telephone, facsimile and e-mail information. Notice obligations under this section are in addition to any notice provisions required by applicable law. FINAL APPLICATION FOR A NEW PILOT PROJECT LICENSE APPENDIX H PAGE 5 Adaptive Management Framework February 29, 2012