Application Form for New Connection

Similar documents
Application Form for New Connection

4. PROCEDURE FOR RELEASE OF NEW CONNECTION AND MODIFICATION IN EXISTING CONNECTION

ELECTRICITY SUPPLY CODE REGULATION 2011 (WITH 1 st & 2 nd AMENDMENT)

SEVENTEENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004.

HPSEBL Form CS-1 (b) HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A STATE GOVERNMENT UNDERTAKING)

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT)

Checklist for Incorporation of Company

Supply shall generally be given at the following voltages on the basis of contracted load:

Sample Agreement LEAVE AND LICENSE AGREEMENT. This agreement is made and executed on at. Between,

Gujarat Electricity Regulatory Commission (GERC) Electricity Supply Code and Related Matters Regulations. Notification No.

LEAVE AND LICENCE AGREEMENT

Annexure 2 (See Clause 4.11) Application for Supply of Electricity at High Tension (to be submitted in 5 sets)

SECTION #6 - REFERENCE #2. Standard Toronto Hydro Connection Agreements Terms of Conditions

Photovoltaic Inverter Network Connection Agreement

West Bengal State Electricity Distribution Company Limited

RESIDENTIAL RENT AGREEMENT FORMAT

1. Regn. No. & date. 2. Existing Account No. (If any) To The Punjab State Power Corporation Limited,

HARYANA ELECTRICITY REGULATORY COMMISSION. Notification. The 10th August, Electricity Supply Code. (1) recovery of electricity charges,

Storm Water Pump Covenant Master Requirement GEN 114 Building Department: , fax:

License of Souvenir/ Gift corner at Pilikula Regional Science Centre. Acceptance Letter. Acceptance of tender conditions of Souvenir / Gift corner

AGREEMENT FOR SUPPLY OF LT ENERGY

3. Full name of Applicant's father / husband 4. Status code of applicant (See serial no. 11 of the instructions) 5. Applicant's present address

SULTANATE OF OMAN GENERATION LICENCE. (Renewable Energy) Bahwan Astonfield Solar Power LLC GRANTED TO

CHAPTER 1: GENERAL. 1.1 Short Title, Extent and Commencement

NOTIFICATION. The 8th May, [Electricity Supply Code and Related Matters Regulations, 2004 (First Amendment) 2007]

Agreement for H.V./ L.V. Consumer.

KERALA STATE ELECTRICITY REGULATORY COMMISSION

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 20 PAUSH 1929(S) (NO. PATNA 27) PATNA, FRIDAY, 10TH JANUARY 2008

MORTGAGE DEED THIS DEED OF MORTGAGE IS MADE ON DAY OF THIS MONTH OF IN THE YEAR.

AGREEMENT FORM BETWEEN OWNER AND A BUILDER FOR CONSTRUCTION OF THE BUILDING. THIS AGREEMENT made at... on this...

AGREEMENT FOR SUPPLY OF HT ENERGY

ORDINANCE NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF MEADOWS PLACE, TEXAS:

The Electrical Contractor s Guarantee Bond Regulations, 1988

Wyandotte Municipal Services

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION KERALA ELECTRICITY SUPPLY CODE (THIRD AMENDMENT) REGULATIONS, 2007

v Street AP HOUSING BOARD COLONY vi Locality AP HOUSING BOARD COLONY Yes Yes

ALFRED DUMA LOCAL MUNICIPALITY ELECTRICITY SUPPLY BYLAW

ANNEXURE A AGREEMENT FOR SALE. [See rule 9] This Agreement for sale ( AGREEMENT ) entered into at [ ] on [ ] BY AND BETWEEN

ORISSA ELECTRICITY REGULATORY COMMISSION DISTRIBUTION (CONDITIONS OF SUPPLY) CODE, 2004

No.MePDCL/D(D)/T-383(B)/ /6 Dated 6 th December 2016 OFFICE ORDER

Eezyrent Sample E-Registered Agreement

TERMS AND CONDITIONS I. GENERAL CONDITION OF TENDER GENERAL CONDITIONS OF THE CONTRACT

SEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004

PUNJAB PUBLIC DISTRIBUTION SYSTEM (LICENSING AND CONTROL)

ANNEXURE A. [See rule 9] AGREEMENT FOR SALE

THE TAMIL NADU LIFTS RULES, (G.o.Ms.No.173, Energy (B1), 3rd November 1997)

POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only)

APPLICATION FOR REGULARISATION OF UNAUTHORISEDLY CONSTRUCTED BUILDING /BUILDING CONSTRUCTED IN DEVIATION OF THE SANCTIONED PLAN /SURYAPET MUNICIPALITY

DEPARTMENT OF LABOUR. Government Notice. R: October Electrical Installation Regulations, 1992

Business Park Maintenance Service Pvt. Ltd.

Phased Development Agreement Authorization Bylaw No. 4899, 2016 (Sewell s Landing)

Conducting Agreement

TITLE XV: LAND USAGE. Chapter BUILDING REGULATIONS Cross-reference: Local legislation regarding land usage, see Title XVII

CHENNAI METROPOLITAN WATER SUPPLY & SEWERAGE BOARD No.1,Pumping Station Road, Chintadripet, Chennai

LICENSE OF OCCUPATION

Gujarat Electricity Regulatory Commission (GERC)

Office Space required in Islamabad for NTI Tender No. IFB-03/2017

CITY OF LAURIE P.O. BOX 1515 LAURIE, MISSOURI (573) (573) FAX APPLICATION FOR WATER AND/OR SEWER SERVICE

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

NET METERING CONNECTION AGREEMENT

ELECTRICITY ACT Cap 95 8 July 1939 ELECTRICITY ACT. Revised Laws of Mauritius

ELECTRICITY ACT 1939

THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7,

DISTRIBUTION AND SUPPLY LICENCE

Building permit fee, completion fees, temporary structures permit fees and calculations thereof:

THE CORPORATION OF THE MUNICIPALITY OF PORT HOPE

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED

LEAVE AND LICENSE AGREEMENT

COMMERCIAL TERMS AND CONDITIONS

TENDER DOCUMENT FOR APPOINTMENT OF SUB-LICENSEE TO SET UP & OPERATE MILK STALLS AT RAILWAY STATIONS IN THE STATE OF ODISHA

Maharashtra Electricity Regulatory Commission (Procedure for filing appeal before the Appellate Authority) Regulations, 2004

Local Authorities Act 23 of 1992 section 94(2)(a) read with section 94(1)

LEAVE AND LICENSE AGREEMENT

Name. City: State: Zip Code: City: State: Zip Code: City: State: Zip Code: City: State: Zip Code:

THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)

TITLE 19 ELECTRICITY AND GAS CHAPTER 1 ELECTRICITY 1

INDEX. Sr. No. Particulars Page No.

This NET METERING CLASS 1 INTERCONNECTION AGREEMENT made as of the day of, 20, effective as of the day of, 20 ( Effective Date ).

OCCUPATIONAL HEALTH AND SAFETY ACT, 1993 ELECTRICAL INSTALLATION REGULATIONS SCHEDULE

TERMS & CONDITIONS TO APPLY AS CONSORTIUM

Disclaimer. N: v1

The Orissa Electricity (Duty) Act, 1961.

NON JUDICIAL STAMP PAPER OF Rs.100/- AGREEMENT FOR TRANSPORTATION OF NEEM SEEDS. THIS AGREEMENT MADE AT on (day) of 2017.

DEVELOPMENT AGREEMENT BY THE LANDLORDS IN FAVOUR OF A BUILDER. THIS AGREEMENT made at. this... day of..., 2000,

Electricity Regulations 1947

Biotech Park, Lucknow

Chapter 17 ELECTRICAL CODE

I, son / wife of Sh., aged years, resident of House No., Sector, Chandigarh, do hereby solemnly affirm and declare as under :-

Development Agreement of Immovable Property

SHORT TITLE, SCOPE EXTENT AND COMMENCEMENT

GENERAL POWER OF ATTORNEY

TRANSMISSION AGREEMENT FOR CONNECTIVITY BETWEEN POWER GRID CORPORATION OF INDIA LIMITED AND (NAME OF STAGE-II CONNECTIVITY GRANTEE) AND

Frequently Asked Questions General Electors

NOTICE FOR E-TENDERING GOLDEN OPPORTUNITY FOR SETTING-UP BANK ATM S AT CITCO S PETROL PUMPS

LEAVE AND LICENSE AGREEMENT

Sub: Checklist fortransfer on sale of Plot/booking of TDI Greens- Sonepat

VENDOR AGREEMENT. THIS AGREEMENT OF VENDOR is made at Chandigarh on this day of, 20 between:

TITLE 19 ELECTRICITY AND GAS CHAPTER 1 ELECTRICITY 1. SECTION To be furnished by Sequatchie Valley Electric

TENDER DOCUMENT FOR. Annual Contract for English and Hindi Typing at NABARD Regional Office, Dehradun

LEASING OUT SPACE FOR RUNNING FOOD COURT

Transcription:

40 [ Application Form for New Connection Annexure 1 Photograph of the Applicant (For office use only) Name of Division Name of Sub-division Unique Application Number Date of receipt (To be filled by the Applicant) 1 Applicant s Name (In Capital letters) 2 Father s/spouse Name 3 4 5 Address at which supply is required House/Plot Street Colony/Area District Telephone No. (if any) Mobile (If any) If Applicant is a company or organization or association Permanent House/Plot Address Street Colony/Area District Telephone No. (if any) If Applicant is tenant or occupier Address of House/Plot Owner of Street property Colony/Area District Telephone No. (if any) Mobile (if any) Mobile (if any) 6 Load applied for (in kw) 7 Plot Size and Built up area (Sq Meters) (for Domestic & non-domestic connection only) 8 Intended Usage Tick applicable: a. Domestic b. Non-Domestic c. Industrial d. Private Tube Well 9 If any electricity connection is existing at the premises Yes/No 11. If yes give the following details: a) Service connection number b) Book number 12 Nearest landmark Pole No./Feeder pillar No./Nearest house number ( to be filled by the licensee)

] 41 13 List of Document attached 1 Identity/Address Proof (copy of anyone of the following), Tick any one: a. Electoral Identity Card b. Passport c. Driving License d. Photo Ration Card e. Photo identity card issued by Government Agency. f. Certificate from village Pradhan or any village level Govt. functionary like Patawari/Lekhpal/ Primary school teacher/incharge of primary health centre etc. 2 Proof of Ownership/Occupancy (copy of anyone of the following), Tick any one: a. Copy of sale deed or lease deed or copy of the khasra or khatauni or b. Registered General Power of attorney or c. Municipal tax receipt or Demand notice or any other related document or d. Letter of allotment. e. An Applicant who is not an owner but occupier of the premises shall alongwith any of the documents listed in (a) to (d) above also furnish a no objection certificate from owner of the premises. 3 Declaration/Undertaking by Applicant in the prescribed format Date : Signature

42 [ Acknowledgement Received Application for new connection for electricity as per details given below: 1) Unique Application Number 2) Name of Applicant 3) Address where Connection is required 4) Load Applied for Rubber Stamp Signature of UPCL representative Name and Designation

] 43 Annexure 1.1 DECLARATION /UNDERTAKING I, son of Resident of (hereinafter referred as Applicant, which term shall mean and include executors, administrators, heirs, successors and assigns), do hereby swear and declare as under: Or The, a company incorporated under the provisions of the Companies Act, 1956 having its registered office at (hereinafter referred as Applicant, which expression shall unless repugnant to the context or meaning thereof, include its successors and assigns), do hereby swear and declare as under: THAT the Applicant is a lawful occupant of the premises at in support of which the Applicant has enclosed a proof of occupancy. THAT the Applicant has requested UPCL to provide a service connection at the above-mentioned premises in the Applicant s name for the purpose mentioned in the Application form. THAT in furnishing the Declaration, the Applicant has clearly understood that should the above statements prove to be false or incorrect at any later stage, the UPCL shall have every right to disconnect supply to the Applicant without any notice and above right to adjust dues against Consumer Security Deposit. THAT the Applicant hereby agrees and undertakes: To indemnify UPCL against all proceedings, claims, demands, costs, damages, expenses that UPCL may incur by reason of a fresh service connection given to the Applicant. That all the Electrical Works done within the premises are as per Indian Electricity Rules and has been carried out by a licensed electrical contractor (In case Applicant is owner and wiring in the premises is new) Or That all the Electrical Work done within the premises are as per Indian Electricity Rules to the best of our knowledge (where Application is for reconnection or Applicant is occupier of the premises) UPCL is indemnify against any loss accrued to the Applicant on this account. Further, Applicant agrees that if there is any harm/loss to the property of UPCL due to the fault in Electrical work within the premises of Applicant, all the liabilities shall be borne by the Applicant. To pay the Electricity consumption bills and all other charges at the rates set out in UPCL s Tariff Schedule and Miscellaneous charges for supply as may be in force from time to time, regularly as and when the same becomes due for payment. To deposit the additional Consumption deposit as revised by UPCL from time to time based on the consumption of the Applicant in preceding year. To abide by the provisions of the Electricity Act, 2003, Electricity Supply Code, Tariff Orders and any other Rules or Regulations notified by UERC, as applicable from time to time. That UPCL shall be at liberty to adjust the electricity consumption charges along with any other charges against the Consumer Security Deposit paid by the Applicant, in the event of termination of the agreement prior to expiry of the contracted period or in case of any contractual default. To be responsible for safe custody of Meters, CTs, Cables etc. provided by UPCL and in case, there is any damage to equipment due to the reasons attributable to Applicant the same shall be chargeable to the Applicant. Further, all repercussions on account of breakage of seals of meters etc. or Direct/Dishonest Abstraction of energy shall be to the account of Applicant, as per the existing laws.

44 [ To allow clear and un-encumbered access to the meters for the purpose of meter reading and its checking etc. That the Applicant would let UPCL disconnect the Service connection under reference, in the event of any default, non-compliance of statutory provisions and in the event of a legally binding directive by Statutory Authority(s) to effect such an order. This shall be without prejudice to any other rights of UPCL including that of getting its payment as on the date of disconnection. That UPCL shall not be held responsible for any interruption or diminution of supply of Electricity. All the above declaration given by the Applicant shall be construed to an Agreement between UPCL and the Applicant. Signature of the Applicant SIGNED AND DELIVERED In presence of witness Name of the applicant Name of Witness

] 45 Annexure 1.2 Test Result Report (refer rule 47 & 48 of IE Rules 1956) (To be filled by representative of the licensee) Result of Insulation Resistance (to be measured on applying a pressure of 500 volts for one minute between phase conductor and earth) - Phase-1 & Earth Phase-2 & Earth Phase-3 & Earth (i) Between Phase and Earth Caution: Insulation Resistance between phase and neutral or between phases shall not be measured when any of consumer s appliances, such as fans, tubes, bulbs, etc. is in circuit as results of such test would give resistance of appliance and not the insulation resistance of installation. Certified that an Earth Terminal as required under Rule 33 of IE Rules 1956 has been provided by UPCL and this terminal has been connected with UPCL s earthing system. Following deficiencies have been found in your Electrical installation. You are requested to remove them within 15 days i.e. by and inform UPCL failing which your request for new connection would lapse: 1-2- 3-4- Date: Signature of licensee representative (To be filled by Applicant) The testing of the premises has been carried out by licensee in my presence and *I am satisfied with the testing *I am not satisfied with the testing and may file an appeal with Electrical Inspector Name and Designation It is also certified that UPCL has*/has not* provided an Earth Terminal as per Rule 33 of IE Rules 1956 at the premises and this earth terminal has*/has not* been connected to UPCL s earthing system. Date Signature of Applicant * Strike out which is not applicable

46 [ Application for Load Enhancement/Reduction Annexure 2 Photograph of the Applicant Unique Application Number Date of Application Load Enhancement Existing Sanctioned Load Enhanced load requested Load reduction Existing Sanctioned Load Reduced Load requested 1 Consumer No. 1a Book No. 2 Consumer Name 3 Address at which supply is provided Telephone No. House/Plot Street Colony/Area District Mobile No. Date: Signatures of Applicant

] 47 Annexure 3 Procedure for Determination of Contracted Load in case of New Electricity Connection in Residential/Non-Residential Complex, Multiplex, Malls etc. to be constructed by Developer/Builder Load (i) Residential Use For every 400 sq. ft. built up area or part thereof (ii) a. In Municipal Corporation (Nagar Nigam) area 1 KW b. In Municipal Board (Nagar Palika) area 0.75 KW c. In Nagar Panchayat /Gram Panchayat area 0.50 KW Non-Residential Use a. For every 200 sq. ft. built up area or part thereof 1 KW b. 1000 sq.ft. built up area or part thereof for shed /godown /school 1 KW Note: The load of the common facilities like lift, water pump, street lights etc. shall be taken as declared by the Developer/Builder. By Order of the Commission, NEERAJ SATI, Secretary, Uttarakhand Electricity Regulatory Commission. ih0,l0;w0 ¼vkj0bZ0½ 06 fgunh xtv@95&hkkx 1&d&2013 ¼dEI;wVj@jhft;ks½A eqæd,oe~ çdk kd&vij funs kd] jktdh; eqæ.kky;] mùkjk[k.m] #M+dhA