Canada. Record of Proceedings, Including Reasons for Decision. Hydro-Ouebec. In the Matter of. Applicant

Similar documents
Canada. Record of Proceedings, Including Reasons for Decision. In the Matter of

Canada. Record of Proceedings, Including Reasons for Decision. In the Matter of

Canada. Record of Proceedings, Reasons for Decision. Applicant

ln the Matter of Ontario Power Generation Inc.

Record of Proceedings, Including Reasons for Decision

Request for Ruling from the Canadian Environmental Law Association and Greenpeace

Summary Record of Proceedings and Decision

GoCo Model The Canadian Regulator s Perspective

Request for Ruling from the Canadian Environmental Law Association, Greenpeace and Durham Nuclear Awareness

Making, Reviewing and Receiving Orders under the Nuclear Safety and Control Act

Is Social Licence a Licence to Stall?

TABLE OF CONTENTS. B. Notice of Application dated April 12, Written Representations of the Applicants (Moving Parties)

ET Hydro One Networks Inc.

OPG Comments on REGDOC-2.2.3, Personnel Certification: Radiation Safety Officers

TRIPS Article 28 Rights Conferred. 1. A patent shall confer on its owner the following exclusive rights:

NATIONAL INSTRUMENT AUDITOR OVERSIGHT PART 1 DEFINITIONS AND APPLICATION

Canadian Nuclear Safety Commission. Commission canadienne de sûreté nucléaire. Public meeting. Réunion publique. Le 9 mai 2017.

Report to Convocation February 25, Interjurisdictional Mobility Committee

Independence o(quasi-judicial Administrative Tribunals. such as the CNSC

Bill S-8 Bill S-11. An Act respecting the safety of drinking water on First Nation lands

OECD Nuclear Energy Agency

The Act on Nuclear Activities (1984:3)

CANADA-ONTARIO ENVIRONMENTAL OCCURRENCES NOTIFICATION AGREEMENT (the Agreement )

BY-LAW 14. Made: May 1, 2007 Amended: June 28, 2007 April 30, 2009 May 21, 2009 (editorial changes) September 29, 2010 October 28, 2010

Guidance Document for the Precursor Control Regulations APPLICATION FOR CLASS B PRECURSOR REGISTRATION

CANADIAN ASSOCIATION OF NUCLEAR MEDICINE/ ASSOCIATION CANADIENNE DE MÉDECINE NUCLÉAIRE

I ntroduction to Nuclear Law

7> AECE EACE \5. PA Annual Report. %Joaut. the Administration. Report the. on Privacy Act Final. mai 2016 UNRESTRICTED ILLIMITEE

Building Materials Evaluation Commission Guidelines, Policies, and Procedures Handbook

POST LICENSING GUIDANCE DOCUMENT NATURAL HEALTH PRODUCTS DIRECTORATE

REQUEST FOR BIOGRAPHICAL INFORMATION

AECE EACE. 1fjezUc12zctt. PA Annual Report. Report on the Administration of the Privacy Act Final ILLIMITEE UNRESTRICTED.

Ch. 230 PACKAGING AND TRANSPORTATION CHAPTER 230. PACKAGING AND TRANSPORTATION OF RADIOACTIVE MATERIAL

REQUEST FOR BIOGRAPHICAL INFORMATION

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Exelon Generation Company, LLC

Liquor Amendment (3 Strikes) Act 2011 No 58

Lands & Waters Aggregate & Petroleum Resources March 15, 2006

S.O. 1995, CHAPTER 2

MARINE SAFETY MANAGEMENT SYSTEM TIER II PROCEDURE FOR NEWLY RECOGNIZED ORGANIZATIONS WITH A TEMPORARY CONDITION

CHARTERED PROFESSIONAL ACCOUNTANTS OF ONTARIO REGULATION 17-1 PUBLIC ACCOUNTING LICENSING

Toward Better Accountability

2ND SESSION, 41ST LEGISLATURE, ONTARIO 66 ELIZABETH II, Bill 87. (Chapter 11 of the Statutes of Ontario, 2017)

CANADA-BRITISH COLUMBIA ENVIRONMENTAL OCCURRENCES NOTIFICATION AGREEMENT (the Agreement )

(Revisions adopted by Council of the Federation of Law Societies of Canada as of December, 2008)

DIALOGUE CANADA. Proposed Bill to amend the City of Ottawa Act, City of Ottawa Act, 1999 Proposed Bill Notes

Licence condition handbook

Federation of Law Societies of Canada. Model Rule on Client Identification and Verification Requirements

NUCLEAR REGULATORY COMMISSION. [Docket Nos and EA ; NRC ] In the Matter of Energy Northwest; Columbia Generating Station

Procedure Publication of Enforcement Actions Taken By The Authority

Background. 1 P age. 1. Remove the existing Provisional Class of membership, which is no longer consistent with the College s assessment processes.

Compliance and Enforcement Policy under the Canadian Environmental Assessment Act, 2012

Broadcasting Notice of Consultation CRTC

Temporary Foreign Worker Program - Ontario Region Presentation to the Windsor Essex Economic Development Corporation March 26, 2013

IN THE MATTER OF THE SECURITIES ACT, S.N.B. 2004, c. S-5.5 AND IN THE MATTER OF. COLBY COOPER INC. and JOHN DOUGLAS LEE MASON.

CONVENTION ON NUCLEAR SAFETY TEXT

ONTARIO REGULATION 287/07 GENERAL

Board of Commissioners of Public Utilities

Ontario Power Generation. Audit and Risk Committee of the Board CHARTER

CONVENTION ON NUCLEAR SAFETY

Administrative Monetary Penalties Program. Available in multiple formats

A WATER LICENSEE S RIGHT TO EXPROPRIATE LAND (Updated: February 19, 2015)

LAW REGULATING ISLAMIC FINANCIAL BUSINESS DIFC LAW No.13 of 2004

Selecting an Arbitrator A Resource Tool

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Southern Nuclear Operating Company, Inc.

APPLICATION TO BECOME A LICENSED PRODUCER UNDER THE ACCESS TO CANNABIS FOR MEDICAL PURPOSES REGULATIONS (ACMPR) (Disponible en français)

2018: No. 2 June. Filing: File the amended pages in your Member s Manual as follows:

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to regulate the use of pesticides on public and private property in the City of Vaughan.

The Corporation of the Township of Huron-Kinloss

General Nuclear Safety and Control Regulations

REQUEST FOR BIOGRAPHICAL INFORMATION

Liquor Amendment (Kings Cross Plan of Management) Act 2013 No 76

City Of Kingston. Ontario. By-Law Number A By-Law To License, Regulate And Govern Certain Trades And Occupations

IN THE MATTER OF AND IN THE MATTER OF CHICAGO MERCANTILE EXCHANGE INC. RECOGNITION OF A TRADE REPOSITORY (Paragraph 35(1)(f) of the Securities Act)

CANADA-NORTHWEST TERRITORIES ENVIRONMENTAL OCCURRENCES NOTIFICATION AGREEMENT (the Agreement )

Class Environmental Assessment for Minor Transmission Facilities. November 16, 2016

In Brief. ADMINISTRATIVE POLICY RESPECTING RE-DETERMINATIONS OR FURTHER RE-DETERMINATIONS MADE PURSUANT TO PARAGRAPH 61(1)(c) OF THE CUSTOMS ACT

Ministry of Trade and Industry, Finland Nuclear Energy Act

1ST SESSION, 42ND LEGISLATURE, ONTARIO 67 ELIZABETH II, Bill 66

The National Energy Board s Enforcement Policy

APPLICATION TO BECOME A LICENSED PRODUCER UNDER THE MARIHUANA FOR MEDICAL PURPOSES REGULATIONS (Disponible en français)

REQUEST FOR BIOGRAPHICAL INFORMATION

Telecom Notice of Consultation CRTC

Liquor Amendment (Kings Cross Plan of Management) Act 2012 No 91

Toronto Municipal Code Chapter 140, Lobbying

Compensation Arrangements Compliance Report Directive

NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012

Environmental Appeal Board

S.O. 2002, CHAPTER 32

CANADIAN NUCLEAR FUEL WASTE PLANNING ORGANIZATION (the "WMO" ) MINUTES OF THE FIRST MEETING OF THE BOARD OF DIRECTORS

BY-LAW N O 38 September 2017

A AECE EACE. ATI Annual Report. Report on the Administration of the Access to Information Act Final ILLIMITEE UNRESTRICTED

NORTHWEST TERRITORIES WATERS ACT [FEDERAL] [Repealed April 1, 2014 by 2014, Chap. 2 (SI/ )]

Parliamentary Information and Research Service. Legislative Summary BILL C-3: INTERNATIONAL BRIDGES AND TUNNELS ACT

RE: CAPIC Response to the Citizenship and Immigration Committee Report Starting Again: Improving Government Oversight of Immigration Consultants

Broadcasting Regulatory Policy CRTC

National Mobility Agreement

HYDRO AND ELECTRIC ENERGY ACT

Potential Strategic Litigation Against Public Participation Legislation

CONSULTATION AND NOTIFICATION REGULATION 279/2010

In Brief PROCEDURES FOR MAKING A REQUEST FOR A RE-DETERMINATION OR AN APPEAL UNDER THE SPECIAL IMPORT MEASURES ACT

Transcription:

Canadian Nuclear Commission canadienne Safety Commission de surete nucleaire Record of Proceedings, Including Reasons for Decision In the Matter of Applicant Hydro-Ouebec Subject Application to amend Hydro-Ouebec's operating licence for the Gentilly-2 Nuclear Generating Station Hearing Date July 22, 2014 Edocs Pdf 448523 7 Canada

RECORD OF PROCEEDINGS Applicant: Address: Subject: Hydro-Québec 4900 Bécancour Boulevard, Bécancour, Quebec G9H 3X3 Application to amend Hydro-Québec's operating licence for the Gentilly-2 Nuclear Generating Station Application received: March 6, 2014 Date of hearing: July 22, 2014 Location: Members present: Secretary: Recording Secretary: Canadian Nuclear Safety Commission (CNSC) 280 Slater St., Ottawa, Ontario M. Binder, President M. Leblanc M. Hornof Licence: Amended

i Table of Contents 1.0 Introduction... 1 2.0 Decision... 2 3.0 Issues and Commission Findings... 2 4.0 Conclusion... 4

1.0 Introduction 1. Hydro-Québec has applied to the Canadian Nuclear Safety Commission 1 (CNSC) for an amendment to its operating licence for the Gentilly-2 Nuclear Generating Station (NGS), located in Bécancour, Quebec. The current licence PROL 10.01/2016 expires on June 30, 2016. 2. Following the decision to proceed with the decommissioning of the Gentilly-2 NGS, the reactor s defuelling has been completed. The station has been in a defueled core state since September 4, 2013. Its transition to a safe storage state is planned for 2015. Cobalt-60 production ceased in 2011, and will not resume. 3. The proposed amendments to the operating licence would adapt the regulatory requirements to the reduction in risks associated with the plant, and remove certain licence conditions that no longer apply to Gentilly-2's new status. Hydro-Québec also proposes to amend its obligations as set out in regulatory document S-99, Reporting Requirements for Operating Nuclear Power Plants, and licence condition 4.6 (which specifies reporting requirements for scheduled reports). Issue 4. In considering the application, the Commission was required to decide, pursuant to subsection 24(4) of the Nuclear Safety and Control Act (NSCA): a) whether Hydro-Québec is qualified to carry on the activities authorized by the amended licence b) whether, in carrying on that activity, Hydro-Québec would make adequate provision for the protection of the environment, the health and safety of persons and the maintenance of national security and measures required to implement international obligations to which Canada has agreed Hearing 5. Pursuant to section 22 of the NSCA, the President of the Commission established a Commission panel to review the application. In making its decision, the Commission considered the information presented at a hearing held on January 22, 2014, in Ottawa, Ontario. During the hearing, the Commission considered written submissions from Hydro-Québec (CMD 14-H103.1) and CNSC staff (CMD 13-H103). The Commission invited members of the public to file written submissions, but did not receive any. 1 The Canadian Nuclear Safety Commission is referred to as the CNSC when referring to the organization and its staff in general, and as the Commission when referring to the tribunal component.

- 2-2.0 Decision 6. Based on its consideration of the matter, as described in more detail in the following sections of this Record of Proceedings, the Commission concludes that Hydro-Québec meets the conditions of subsection 24(4) of the NSCA. Therefore, pursuant to section 24 of the Nuclear Safety and Control Act, the Commission amends operating licence PERP 10.01/2016, issued to Hydro-Québec for its Gentilly-2 Nuclear Generating Station, located in Bécancour, Quebec. The amended licence, PERP 10.02/2016, remains valid until June 30, 2016. The Commission also approves Hydro-Québec's application for exemption from the obligation to produce certain scheduled reports, as provided for in CNSC regulatory document S-99, Reporting Requirements for Operating Nuclear Power Plants, and licence condition 4.6, as described in CMD 14-H103. 7. The Commission includes in the licence the conditions recommended by CNSC staff in CMD 14-H103. 3.0 Issues and Commission Findings 8. The amendments proposed to the Gentilly-2 operating licence are to align the licence with the changes being made to the facility (to transition it to the safe storage state). The CNSC staff considers the proposed amendments to the licence to be of an administrative nature. 3.1 Clerical amendments 9. Hydro-Québec has applied to the CNSC for clerical amendments to the operating licence. The proposed amendments to the licence conditions and the rationale for those changes are detailed in CMD 14-H103. 10. Hydro-Québec requested amendments to specify that the facility may be operated in the defueled core state or safe storage state only. The amendments clearly define the states in which plant operation is authorized until the next licence renewal in 2016. Hydro-Québec also requested that Appendix 3 to the licence be removed, and that the derived release limits be included in the Licence Conditions Handbook (LCH). The same action was taken for Pickering's last licence renewal. Hydro-Québec requested that the licence conditions specify that the licensee must implement the decommissioning program, not only maintain it. 11. The CNSC staff indicated that the amendments would have no impact on the safety of Gentilly-2, and that they clearly define the states in which the plant s operation is authorized. The CNSC staff recommends the approval of those amendments to the

- 3 - Gentilly-2 operating licence. 3.2 Removal of licence conditions that no longer apply 12. Hydro-Québec applied to the CNSC to remove licence conditions that no longer apply, since the Gentilly-2 NGS is in a defueled core state. The licence conditions proposed for removal and the rationale for the changes are detailed in CMD 14-H103. 13. Hydro-Québec is requesting the removal of the licence conditions that no longer apply to the station (since cobalt-60 production ceased in 2011), and to the reactor (which is in a defueled core state, in transition to the safe storage state). 14. In regard to Hydro-Québec's application to remove a licence condition referring to CNSC regulatory document RD-360, Life Extension of Nuclear Power Plants, the CNSC staff indicated that certain elements of the environmental impact assessment for the refurbishment of Gentilly-2 and the expansion of the storage site still apply, even though the plant will not be refurbished. The CNSC staff proposes including in the LCH Hydro-Québec's obligation to maintain the follow-up program for those elements of the environmental impact assessment that are still pertinent. 15. The CNSC staff has reviewed the amendments proposed by Hydro-Québec concerning licence conditions that no longer apply and should be removed (since Gentilly-2 is in a defueled core state). The CNSC staff recommends the approval of those amendments. 3.3 Amendments to licence conditions, to account for reduced risk and Gentilly- 2 s change of status 16. Hydro-Québec applied to the CNSC to amend the licence conditions to take into account that the risk of operating the Gentilly-2 NGS is greatly reduced, given its defueled core state. The licence conditions proposed for amendment and the rationale for the changes are detailed in CMD 14-H103. 17. Hydro-Québec requested amendments to the operating licence to amend its obligations respecting the minimum shift crew (number of workers required and their accreditation), to reflect the reduced risk associated with the plant's state. Hydro- Québec also requested the minimum shift crew table to be moved within the LCH, to facilitate changes to that team. 18. Hydro-Québec is requesting the removal or amendment of several licence conditions that refer to the standards and regulatory documents applicable to an operating power reactor, to reflect the plant s current status and to prohibit fuelling. These standards and regulatory documents are identified in CMD 14-H103.

- 4-19. The CNSC staff has reviewed the amendments proposed to take into account the reduced risk associated with Gentilly-2, and recommends the approval of those amendments. 3.4 Application for exemption from S-99 for certain scheduled reports 20. Hydro-Quebec applied to the CNSC for exemption from (or amendments to) its obligation to produce certain scheduled reports, as set out in regulatory document S-99, as cited in licence condition 4.6 of the operating licence. Those reports are identified in CMD 14-H103. 21. As Gentilly-2 is in a defueled core state, and the risk associated with a reactor in that state is greatly reduced, Hydro-Quebec requests exemption from the obligation to produce those reports. Hydro-Quebec also requests a reduction in frequency (from quarterly to annually) for the report on pressure boundary degradations. 22. CNSC staff has reviewed Hydro-Quebec's applications for exemption from (or amendments to) its obligation to produce certain scheduled reports, as per regulatory document S-99, and recommends the approval of those amendments. 4.0 Conclusion 23. The Commission has considered the information and submissions from Hydro- Quebec and CNSC staff. It concludes that the requested amendments are administrative in nature, and will not adversely affect the safety of Hydro-Quebec's operations. JUl22 2014 Michael Binder President Canadian Nuclear Safety Commission Date