Delhi Integrated Multi Modal Transit System Limited First Floor, ISBT Kashmere Gate, Delhi

Similar documents
Corrigendum 2 dated 27 th August 2018 for RFQ Notice No. 2/ APADCL/ BIA/ RFQ Notification/ 2018/ dated 17th July The Managing Director,

Response to Bidder Queries-II

Sl. No. Query/ Concern Clarification/ Information/ Amendment

LUCKNOW DEVELOPMENT AUTHORITY

GUIDELINES OF THE MINISTRY OF FINANCE File No 24(1)/PF II/2006 Ministry of Finance Department of Expenditure (PF II Section) New Delhi, May 18, 2009

STANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM. Under Case 1 Bidding Procedure THROUGH

The last date for submission of the bids is at

Addendum-I to the RFQ-cum-RFP document

Request For Qualification. for. Engineering, Procurement & Construction. for

Clause No. Query (Draft) Response

NOTICE INVITING TENDER (NIT)

RFQ-Pre-Qualification of Developer for Biotech Incubator Park at Savli, Vadodara, Gujarat on DBFOT Basis. Table of Contents

REQUEST FOR QUALIFICATIONS VARIOUS BOROUGH PROFESSIONAL POSITIONS AND EXTRAORDINARY UNSPECIFIABLE SERVICES POSTIONS. ISSUE DATE: November 14, 2018

UTI INFRASTRUCTURE TECHNOLOGY AND SERVICES LIMITED

ADDENDUM. Sl.No. Page No / Clause. No. [Type text]

Request for Qualification. For. Power Supply Agreement. For

Clause No. Query (Draft) Response

REQUEST FOR EMPANELMENT (RFE) FOR

REQUEST FOR PROPOSAL

Request for Proposal Document. For Selection of Developer for Setting up of

Rajasthan Council of Secondary Education

NOTICE INVITING TENDER (NIT)

DIRECTOR SHRI VINOBA BHAVE CIVIL HOSPITAL

DRAFT CONCESSION AGREEMENT FOR DEVELOPMENT & OPERATION OF VIZHINJAM INTERNATIONAL DEEPWATER MULTIPURPOSE SEAPORT KERALA

REFERENCE SECTION OF TENDER DOCUMENT Whether there is a minimum bid amount or quantum prescribed by or expected by the Govt. of M.

National Highways Authority of India G-5 & 6, Sector-10, Dwarka, New Delhi

National Highways Authority of India G-5 & 6, Sector-10, Dwarka, New Delhi

APPENDIX F PUBLIC PRIVATE PARTNERSHIP PROCUREMENT PROCEDURES

DEVELOPMENT OF ALAMBAGH BUS TERMINAL IN LUCKNOW. DRAFT CONCESSION AGREEMENT Part. between. I Uttar Pradesh State Road Transport Corporation.

REQUEST FOR QUALIFICATION (RFQ) FOR SETTING UP OF RURAL BPO CENTERS IN MADHYA PRADESH

PROCUREMENT POLICIES AND PROCEDURES. BOARD OF DIRECTORS POLICY AND PROCEDURE No. BOD 014

15 Jul 11 VA TECH WABAG LIMITED Annual General Meeting

Ordinances of the City of Ocoee, Florida, is hereby amended to read as follows:

SOLAR ENERGY CORPORATION OF INDIA New Delhi-17

Development of Transport Nagar at Tewar Village, Jabalpur on DBFOT (Design, Built, Finance Operate and Transfer) Basis under PPP Mode

ANDAMAN & NICOBAR ADMINISTRATION DIRECTORATE OF SHIPPING SERVICES. Cost of Tender Document : Rs.1000/- per set. Sold to : M/s...

Setting up Composite Logistics Hub at Pawarkheda, District Hoshangabad in state of Madhya Pradesh on PPP Model

Request for Qualification (RFQ) For Rooftop Solar Projects for Indian Railways. Ministry of Railways Government of India

SAN FRANCISCO AIRPORT COMMISSION MINUTES

A Presentation by. Years of Expert Professional Services

CHAPTER Committee Substitute for House Bill No. 1345

REQUEST FOR EXPRESSIONS OF INTEREST & QUALIFICATIONS Newark Pennsylvania Station Food and/or Food/Retail Concession(s)

Location & Subject Matter Substance of Change Proposed Changes

SECURITIES AND EXCHANGE BOARD OF INDIA (INFRASTRUCTURE INVESTMENT TRUSTS) (AMENDMENT) REGULATIONS, 2016

Request for Proposal VOLUME I. Request for Proposal. 07 Dec 2017

REQUEST FOR PROPOSAL For Food Plaza for Leasing

CORRIGENDUM-02 Dated:

REQUEST FOR PROPOSAL

CHAPTER 6 BUSINESSES Article 1. Cemeteries. Article 2. Dance Halls. Article 3. Mobile Homes.

REQUEST FOR QUALIFICATIONS VARIOUS BOROUGH PROFESSIONAL POSITIONS AND EXTRAORDINARY UNSPECIFIABLE SERVICES POSTIONS. ISSUE DATE: December 29, 2018

1 P a g e P r i v a t e & C o n f i d e n t i a l

Public Private Partnership Legislation: Ohio

NABHA POWER LIMITED Page 1 of 6. Response to the Clarification raised by the Vendor on RFQ

APPENDIX 38 C FOREIGN TRADE (REGULATION) RULES, 1993

Request for Proposal DEVELOPMENT OF SOLAR POWER PROJECTS IN THE STATE OF KARNATAKA VOLUME I. Request for Proposal. June 2014

IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION. CIVIL APPEAL NO OF 2018 (Arising out of SLP (C) No of 2018) VERSUS

DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-01

Notice for inviting Tender for hiring of vehicle

DATE: 24/01/2018. REQUEST FOR PROPOSAL: No. 2018/HCR/HKG/RFP/10005 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

Power to provide public baths and washhouses

SHIVSHAHI PUNARVASAN PRAKALP LTD. CIN: 70200MH1998SGC No.SPPL/MD/RFP/CF/ 468 /2016, Date: 13/04/2016

Request For Proposal. For. Engineering, Procurement & Construction (EPC) Mode

Municipal Corporation Gurgaon

DATE: 04 April REQUEST FOR PROPOSAL: No. CANTO/RFP/PSP/2018/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

Mineral Resources Department, Government of Chhattisgarh REPLY TO PRE BID QUERIES FOR "AUCTION OF MINING LEASE FOR GUMA LIMESTONE BLOCK

REQUEST FOR QUALIFICATIONS RFQ No. CS PROGRAM MANAGEMENT SERVICES ADDENDUM #4

(Staff requested to confirm projected FY 03 revenues for transient/occupancy tax)

Insolvency and Bankruptcy Moot Competition 2017, 28-29_Oct_NLU Delhi

REQUEST FOR PROPOSAL: No. 2017/HCR/HKG/RFP/10048 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

Addendum-I. Refurbishment, Operation and Maintenance of the Fruit & Vegetable Market located at Mohali on PPP mode

LEASING OUT SPACE FOR RUNNING FOOD COURT

Section 139: Appointment of auditors

Request for Proposal for Selection of System Integrator for Implementation of Intelligent Transit System (ITS) Solutions in Jabalpur

Secretariat 28 July 2011

The Government of The Bahamas - Home

BILL CREEK, GRAND BAHAMA (DEEP WATER HARBOUR AND INDUSTRIAL AREA) HARBOUR AND INDUSTRIAL AREA) CHAPTER 262

Case No. 166 of The Tata Power Co. Ltd. (Generation) [TPC-G] Brihanmumbai Electric Supply & Transport Undertaking (BEST)...

E-TENDER NOTICE. For Ferrying Solar Boat at Sukhna Lake

Request for Expression of Interest

Request for Proposal (RfP) For. Procurement of 215 MW Power. From. Grid Connect Solar PV Power Projects. Through

PONDICHERRY ASHOK HOTEL CORPORATION LIMITED UNIT : HOTEL PONDICHERRY ASHOK,PONDICHERRY TENDER FORM FOR LICENSE FOR ERECTING AND OPERATING 40 COTTAGES

Himachal Pradesh Infrastructure Development Board & Department of Tourism & Civil Aviation, Himachal Pradesh REQUEST FOR PROPOSAL DOCUMENT

RFP FOR PROCUREMENT ANTI SKIMMING DEVICES AND PIN SHIELD (GUARD)

Clause Queries by IDMC Clarifications

Board of Directors Special Meeting March 11, 2019

Functional Analysis and Records Appraisal of the Alabama Manufactured Housing Commission

AL ISMAIL HAJ TOUR Vs. UNION OF INDIA

SHARE PURCHASE AGREEMENT. This SHARE PURCHASE AGREEMENT ( Agreement ) is made on this day of.., 20..,

Procurement Procedure for Supply of Interim Staff for IT and General Administration Ref. EBA/2012/018/OPS/IT/RT

SCOPE Forum of Conciliation & Arbitration (SFCA) (As amended upto 2017)

AVIATION AUTHORITY REGULAR BOARD MEETING. Thursday, November 3, :00 A.M. Boardroom Level 3 at Tampa International Airport DRAFT AGENDA

NOTICE INVITING TENDER (e-tender)

DISTRIBUTION OF ELECTRICITY

Mineral Block Auction in Odisha

Request for Qualification cum Request for Proposal (RFQ cum RFP) for

B4.7 Calling of Tenders

THE MAHARASHTRA STATE CO-OP. BANK LTD., MUMBAI (Incorporating the Vidarbha Co-op. Bank Ltd.) Scheduled Bank

AMC for attending faults of Split AC s installed over L-2E, L-3E, L-4 & including Depot.

Ch. 23 PUPIL TRANSPORTATION 22 CHAPTER 23. PUPIL TRANSPORTATION GENERAL PROVISIONS

AN ANALYSIS OF REVISED CLAUSE 49 OF THE LISTING AGREEMENT

Transcription:

Development of Inter State Bus Terminal (ISBT) at Dwarka, New Delhi Clarification to RFQ Document dated April 29, 2008 Response to from Applicants for Development of Inter State Bus Terminal (ISBT) at Dwarka: Date of Issue: May 26, 2008 1. As per Page 2 Item 1.1.4 : The hotel area of 3 Hectares is indicative only and the actual ground area for the hotel shall be based on detailed concept plans being worked out in terms of master plan Delhi 2021 where Hotel / passenger accommodation and facilities can have a maximum FAR 30 (subject to a maximum of 10 Hectares of ISBT). Concept not clear. Built-up area for hotel shall be 30 times of plot area or 30% of plot area. Kindly clarify. 2. As per Page 20 3.2.2.1 : Financial capability of applicant would be evaluated in following: 30% of the built-up area FY 2007 and FY 2006 audited statements shall be considered.(refer Addenda 1) i.) ii.) Networth as at the end of most recent financial year FY2007. Aggregate Net Cash Accruals for the last two completed financial years (FY 2006 and FY 2007). But at Page 28 Item 3: 1

The Financial year would be the same as followed by the applicant for its annual reports. Year 1 shall be financial year 2007-2008. Since accounts for the financial years 2007-2008 are not audited so far Bidders networth upto 31.03.2007 and Cash Accruals for FY 2006-2007 and 2006-2005 should be considered for financial qualification. 3. Kindly specify in detail of other related commercial facilities viz hotels, parking 4. Kindly explain the term : Build-Operate-Maintain- Manage 5. What title does the private partner shall have. Would he be the partner in profit sharing or how would the private partner shall generate revenues The details would be provided in the second stage (RFP Stage) (i) No title to the land or building are given to the Concessionaire. Transport Department, GNCTD, shall be the owner of the buildings that are constructed on the land; The Concessionaire is vested with the exclusive right to: a) design, construct, operate and maintain the ISBT ; b) market and grant licenses, for and on behalf of Transport Department, GNTCD, to licensees for commercial space (including the Hotel); c) retain the revenue derived from the granting licenses, operation and maintenance of the project facilities; For title Refer response to point 4 The Concessionaire would retain all the revenues flowing from the Project facilities including the Operation of Bus terminal (Entry Fee, Parking Fee, night charges) 2

Revenues from the commercial activities including the Hotel 6. Who would provide the conceptual plans, design and the detailed Architectural drawings. Details would be available in the draft BOMM Agreement to be issued as a part of RFP Broad Conceptual plan would be provided in the RFP. Who shall provide the GFC drawings and what would be the responsibilities for the private partner in this regard 7. What is the exact Area of the Hotel plot alongwith the dimensions of the plot 8. Kindly provide the draft of BOMM Agreement Refer Clause 1.1.8 However, detailing and GFC shall be done by the Concessionaire. To be provided in the second stage (RFP Stage) 9. What are the other applicable laws / bye laws To be provided in the second stage (RFP Stage) 10. What is the period of Agreement for public private Refer to Clause 1.1.6 partnership 11. Please specify the scope of private developer in detail To be provided in the second stage (RFP Stage) 12. Can the change in composition of the Consortium be made after the bidding process 13. Can the change in composition of the Consortium be made after the bidding process without effecting the specifications of Clause 2.2.4 14. Can the developer operate the Hotel through the different operator 15. How much commercial activities are allowed to be developed in total Refer Clause 2.2.4 of RFQ Refer Clause 2.2.4 of RFQ Yes, Refer Clause 1.1.7 Refer Clause 1.1.5 3

16. Can the commercial area be sold or leased to different parties Commercial area can not be Sold or Leased to any party, however, it could be sub-licensed to different parties 17. At Clause 3.2.1.1, Construction Experience in real Refer Clause 3.2.1.1 estate / core sector has not be defined 18. At Clause 3.2.1.3 (iii), what does threshold size means, Refer Clause 3.2.1.3 whether for One Project or Cumulative total of more For Clarification : Threshold Size is of Eligible Project than one project must be Rs. 50 crores 19. Clause 3.2.1.3 (iii) what do you mean by certified Refer Appendix 6B, para 2 billings For Clarification : Duly certified billings of construction works 20. As per Clause 3.2.1.3 (ii) threshold size as Rs. 50 crores Yes and in Clause 3.2.1.6 experience score of 150 is a must for qualification, please explain whether it means that a person falling under category 2 must have project cost of at least 187.50 crores to qualify 21. Explain the definition of networth Refer Appendix 5, General Instructions, para 2 22. Whether Share application money pending allotment Yes, however applicant should give an undertaking that the can be considered in networth shares would be allotted before Proposal Due Date 23. As per Clause 3.2.2.1 (a) that networth as at the end of No financial year 2007, whether allotment of shares after 31/3/2007 can be considered in this if we submit form 2 24. What do you mean by net cash accruals Refer Appendix 5, General Instructions, para 1 25. If audited figures of year ending 31/3/2008 is available Refer response to point 2 with us, then whether two years be considered as 31/3/2007 and 31/3/2008 26. What does VCF means as mentioned in Clause 3.3.2 Refer Clause 2.2.1 (2) 4

27. Please clarify the position of the present land use (whether it is a agricultural, commercial, office spaces, institutional, industrial etc) The land use may have to be changed. It is presumed that DIMTS will play a proactive role in this regard 28. After reading of the RFQ document the revenue streams apparent are: Bus terminal fees from State transport and private companies Parking fees from private and government vehicles and buses Ticketing services from travel agents and state transport undertakings Hotels, both non star and star Luggage handling, cargo handling, ware house and cloak room facilities Pay and use toilets Bathrooms etc, sulabh shauchalaya Restaurants of all categories Bookshops and newsagents Taxi services and tour operators Commercial complexes, malls etc Offices Marriage halls, function halls Refer Enclosure 1, Para 3 Refer response to point 5 and 15 Please clarify if all the above are permitted or there are any restrictions about the use of the land. Any other revenue stream apart from the above may also be indicated 5

29. Has Power of Attorney strictly to be submitted as per the format given in the RFQ document? Could not it be submitted in the general format (not specifically indicating the name of work) indicating the authority given to the signee of POA by the Board of Directors to apply for works costing certain limit.? 30. If audited financial reports for the year (FY-2007-2008) are not ready at present then in that case for financial eligibility of the business entity could the audited reports for FY-2006-2007 & FY-2005-2006 be considered for evaluation. Refer Clause 2.2.2 and Appendix 2 (Note at the bottom) Refer Response to point 2 31. Please specify Project Implementation period and Concession period Project Implementation period to be defined in Draft BOMM Agreement Refer response to point 10 32. Position of Environment Clearances are to be clarified Responsibility of the Concessionaire 33. Position of clearances of present Utilities on the plot of Responsibility of the Concessionaire 11 hectares 34. Land acquisition status if any please clarify Vests with Transport Department, GNCTD 35. Fee to be paid as concession fee To be provided in the RFP Stage 36. Traffic studies indicating the proposed usage by State Transport and private buses if any, may be given to the bidders 37. The extent of land to be developed for ISBT and other developments are not indicated clearly Clause 1.4 (b) total area mentioned is 10.9 hectors Clause 1.4 hotel indicative area of 3 hectors.. Hotel To be provided in the RFP Stage To be provided in the RFP Stage Additional Information : Minimum 10 hectors to be used for development of ISBT 6

/passenger accommodation and facilities can have a Maximum FAR of 30 (Subject to maximum of 10 hectare for ISBT) 38. Please clarify - Break-up of built up area which can be developed in the project along with utilization of FAR Refer Clause 1.1.5 7