April 16, Docket No. ER

Similar documents
February 12, Notice of Certificate of Concurrence Regarding Agua Caliente Solar LGIA

November 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

June 2, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

March 22, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

March 27, Tariff Amendment to Modify Administrative Oversight of the Department of Market Monitoring

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

October 10, FERC Electric Tariff No. 7, Transmission Control Agreement

Governors of the States of Arizona, California, Colorado, Montana, Nevada, New Mexico, Oregon, Utah, Washington and Wyoming, Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

December 28, Via Electronic Filing

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

March 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

166 FERC 61,098 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC February 8, In Reply Refer To:

December 13, 2004 VIA ELECTRONIC FILING

June 9, Tariff Amendment to Modify Definition of Pre-RA Import Commitment

January 4, Filing of Service Agreement No Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Lathrop Irrigation District ) Docket No. ER

April 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

July 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

December 12, Filing of EIM Entity Agreement with the Salt River Project Agricultural Improvement and Power District

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

April 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

Arizona Public Service Company, Docket No. ER , Agency Agreement

October 1, PJM Interconnection, L.L.C., Docket No. ER Default Allocation Assessment Clarifying Revisions

December 18, Filing of PSP Agreement with Placer County Water Agency

March 24, Filing of CAISO Rate Schedule No. 89

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

November 12, 2004 VIA ELECTRONIC FILING

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Southern California Edison Company ) Docket No.

August 31, Generator Scheduling Agreement CAISO Service Agreement No Docket No. ER

PJM Interconnection, L.L.C. and Progress Energy Carolinas, Inc. Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

June 10, Filing of non-conforming Service Agreement No Docket No. ER

July 10, Operating Agreement, CAISO Rate Schedule No. 94 Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. J.P. Morgan Ventures Energy ) Docket No. EL Corporation )

Section GT&C, Awarding of Available and Planned Pipeline Capacity, Bid Procedures ( Section ). 2

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

California lndependent System Operator Corporation Docket No. ER Compliance Filing

IS0 CALIFORNIA. February 2,2004

main. July 6, 2017

The Atlantic Building 950 F Street, N. W. Washington, DC Fax: Direct Dial:

April 10, Via etariff. Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Vineyard Wind LLC ) Docket No. ER

July 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

May 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

June 30, The CAISO submits the Amendment pursuant to Section 205 of the Federal Power Act, 16 U.S.C. 824d (2012).

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Pacific Gas and Electric Company ) Docket No.

Mailing Address: P.O. Box 1642 Houston, TX

March 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

July 5, PJM Interconnection, L.L.C., Docket No. ER17- Amendment to Service Agreement No. 4597; Queue No. AB2-048

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

A. Zonal Agreements and Termination of the GFA

160 FERC 61,058 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

NorthWestern Energy requests an effective date of March 12, 2016, for the proposed revisions.


MIDCONTINENT EXPRESS PIPELINE LLC

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

March 31, Columbia Gulf Transmission, LLC. 700 Louisiana Street, Suite 700 Houston, TX

Tennessee Gas Pipeline Company, L.L.C. Orion Project Negotiated Rate and Non-Conforming Agreement Filing Docket Nos. RP and CP

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southern California Edison Company ) Docket No.

131 FERC 61,217 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C June 4, 2010

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) )

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Berry Petroleum Company ) Docket No. ER _

124 FERC 61,004 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

February 12, Southwest Power Pool, Inc., Docket No. ER15- Submission of Interconnection Agreement

153 FERC 61,356 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING SERVICE AGREEMENT. (Issued December 29, 2015)

136 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING TARIFF REVISIONS. (Issued July 1, 2011)

FIRST AMENDMENT TO THE ANTELOPE BIG SKY RANCH SOLAR PROJECT POWER SALES AGREEMENT BETWEEN SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY AND

129 FERC 61,075 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

Southern California Edison Company Tariff Title: Rate Schedules Tariff Record Title: Rate Schedule FERC No. 304 FERC FPA Electric Tariff United States

The North American Electric Reliability Corporation ( NERC ) hereby submits the

November 10,2004. The Honorable Magalie R. Salas Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

SCHIFF HARDIN LLP. January 24, 2011 VIA ELECTRONIC FILING

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

Order No. 587-Y Compliance Filing, Colorado Interstate Gas Company, L.L.C.; Docket No. RP19-

UNITED STATES OF AMERICA92 FERC 61,109 FEDERAL ENERGY REGULATORY COMMISSION

152 FERC 61,253 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

January 8, Southwest Power Pool, Inc., Docket No. ER15- Submission of Interconnection Agreement

February 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION : : : : : : : : : : : : : : : : : : : : : : : COMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

November 30, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Transcription:

The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 April 16, 2019 Re: Filing of Certificate of Concurrence Relating to Affected Participating Transmission Owner Upgrade Facilities Agreement Submitted in Docket No. ER19-1081-000 Docket No. ER19- -000 Dear Secretary Bose: The (CAISO) hereby submits for filing a Certificate of Concurrence with respect to the Affected Participating Transmission Owner Upgrade Facilities Agreement (UFA) among Sunshine Valley Solar, LLC (SV), Southern California Edison Company (SCE), and the CAISO (SV UFA). 1 I. Overview and Designated Filer On February 21, 2019, SCE submitted the SV UFA for filing with the Commission in Docket No. ER19-1081-000, with a requested effective date of February 21, 2019. In that filing, SCE explained that the UFA specifies the terms and conditions pursuant to which SCE will design, procure, construct, own, operate, and maintain the necessary facilities and upgrades to the Affected Participating TO s transmission system, which is under the CAISO s operational control, in connection with interconnecting SV s generating unit and associated facilities to the transmission system of Valley Electric Association, Inc., the Interconnecting Participating TO. The SV UFA is not a CAISO pro forma, agreement. Rather than filing a duplicate version of the SV UFA under the CAISO tariff, the CAISO is submitting a concurrence tariff record. The concurrence tariff record is designated under the CAISO tariff as Service Agreement No. 4954. 1 The CAISO submits this filing pursuant to Sections 35.1 and 131.52 of the Commission s regulations, 18 C.F.R. 35.1, 131.52. www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400

Honorable Kimberly D. Bose April 16, 2019 Page 2 SCE serves as the designated filer as to the SV UFA pursuant to the Joint Tariff Filing procedures outlined in Order No. 714. 2 As the Affected Participating Transmission Owner and a party to the SV UFA, SCE filed the SV UFA under SCE s FERC Electric Tariff, Original Volume No. 6 and designated it as Service Agreement No. 230. II. Proposed Effective Date and General Request for Waivers The CAISO respectfully requests any waivers of the Commission s filing regulations necessary to establish an effective date of February 21, 2019, for its concurrence tariff record for the SV UFA, consistent with the February 21, 2019, effective date that SCE requested in its February 21, 2019, filing, which the Commission accepted on April 8, 2019. 3 To the extent that the enclosed materials and information do not meet the detailed filing requirements of the Commission s regulations, the CAISO respectfully requests that the Commission grant any necessary waivers. III. Communications Pursuant to Rule 203(b)(3) of the Commission s Rules of Practice and Procedure, 4 the CAISO requests that the following individual be placed on the official service list to receive all communications and other communications for this proceeding: Roger E. Collanton General Counsel Sidney L. Mannheim Assistant General Counsel William H. Weaver Senior Counsel California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 Tel: (916) 608-1225 Fax: (916) 608-7222 Email: bweaver@caiso.com 2 See Electronic Tariff Filings, Order No. 714, 124 FERC 61,270, at P 63 (2008) (Order No. 714) (permitting joint filers to designate one entity to file a tariff and requiring non-designated entities to submit a certificate of concurrence). 3 See Delegated Letter Order issued April 8, 2019, Docket No. ER19-1081-000. 4 18 C.F.R. 385.203(b)(3). www.caiso.com

Honorable Kimberly D. Bose April 16, 2019 Page 3 IV. Service The CAISO has served a copy of this filing on SV, SCE, and the California Public Utilities Commission. In addition, the CAISO has posted a copy of this filing on its website. V. Contents of Filing filing: In addition transmittal letter, the following documents support the instant Attachment A: Attachment B: Executed Certificate of Concurrence with Service Agreement No. 230 under SCE s FERC Electric Tariff, Original Volume 6 (the SV UFA); and Concurrence tariff record in clean format for the SV UFA, designated as Service Agreement No. 4954 under the CAISO tariff and as Service Agreement No. 230 under SCE s FERC Electric Tariff, Original Volume No. 60. VI. Conclusion For the reasons stated herein, the CAISO respectfully requests that the Commission accept the Certificate of Concurrence and the concurrence tariff record, with an effective date of February 21, 2019, consistent with the SV UFA effective date. Additionally, the CAISO respectfully requests that the Commission grant the necessary waivers requested herein. Respectfully submitted, /s/ William H. Weaver Roger E. Collanton General Counsel Sidney L. Mannheim Assistant General Counsel William H. Weaver Senior Counsel California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 www.caiso.com

Attachment A Executed Certificate of Concurrence Affected Participating Transmission Owner Upgrade Facilities Agreement

DocuSign Envelope ID: AC076299-CBA6-4BD6-8A64-E75B4CCBC011 CERTIFICATE OF CONCURRENCE This is to certify that the ( CAISO ) assents and concurs in the service agreement described below, which Southern California Edison Company ( SCE ) as designated filing company, has filed in its Transmission Owner Tariff database. The CAISO hereby files this Certificate of Concurrence in lieu of filing the specified service agreement. SCE s Service Agreement Adopted by Reference: Service Agreement No. 230 under SCE FERC Electric Tariff Volume No. 6 Description of Service Agreement Adopted by Reference: Affected Participating Transmission Owner Upgrade Facilitates Agreement among Sunshine Valley Solar, LLC, SCE, and CAISO, designated as SCE Service Agreement No. 230 Tariff Program/Regulated Industry: FERC Federal Power Act (Traditional Cost of Service and Market-Based Rates) California Independent System Operator Corporation By its duly authorized official, Keith E. Casey 20 Dated: March, 2019

Attachment B Clean Tariff Affected Participating Transmission Owner Upgrade Facilities Agreement

Service Agreement No. 4954 Upgrade Facilities Agreement For the terms and conditions and rates of this service, please see the tariff document located as noted below: Joint Tariff Name/Description: Designated Filing Company: Designated Filing Utility Tariff Program: Designated Filing Utility Tariff Record Adopted by Reference (Tariff Record Description/Tariff Record Title): Affected Participating Transmission Owner Upgrade Facilities Agreement (UFA) among Sunshine Valley Solar, LLC and Southern California Edison Company and California Independent System Operator Corporation, designated as SCE Service Agreement No. 230 Southern California Edison Company Transmission Owner Tariff (Traditional Cost of Service and Market-Based Rates) UFA, Service Agreement No. 230, and all tariff records for which the designated tariff record is a direct or indirect parent record