ADDENDUM No September 25

Similar documents
RULE ON SUPPORT SCHEME. (On Support of Generation of Electricity from Renewable Energy Sources)

NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012

SPECIFICATIONS. Renovations and Additions to the Coffee Springs Senior Center. Coffee Springs, Alabama. CDBG Project No.

DEPARTMENT OF REGULATORY AGENCIES DIVISION OF REAL ESTATE CONSERVATION EASEMENTS 4 CCR 725-4

Appendix E. Reservation of ESI Rights and Other RFP Terms. For

2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Arkansas, Inc.

PART III GENERAL INFORMATION, INSTRUCTIONS AND CONDITIONS FOR OFFERORS

Appendix E. Reservation of ESI Rights and Other RFP Terms. For

BERMUDA ELECTRICITY ACT : 2

RULE ON AUTHORIZATION PROCEDURE FOR CONSTRUCTION OF NEW GENERATION CAPACITIES FROM RENEWABLE ENERGY SOURCES

INFORMATION FOR BIDDERS

APPENDIX F PUBLIC PRIVATE PARTNERSHIP PROCUREMENT PROCEDURES

D R A F T - 10/08/09

FIRST AMENDMENT TO THE ANTELOPE BIG SKY RANCH SOLAR PROJECT POWER SALES AGREEMENT BETWEEN SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY AND

SCHEDULE 2 - EXHIBIT 2 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.5 Dynamic Scheduling Agreement for Scheduling Coordinators

LIVINGSTON PARISH COUNCIL. Request for Qualifications for. Professional Services for the Livingston Parish Road Overlay Project

PARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

SULTANATE OF OMAN GENERATION LICENCE. (Renewable Energy) Bahwan Astonfield Solar Power LLC GRANTED TO

OSWEGO COUNTY PURCHASING DEPARTMENT. Purchasing Director Purchasing Clerk Purchasing Clerk

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.16 Pseudo-Tie Participating Generator Agreement

REQUEST FOR BID 3D PRINTER FOR ILLINOIS VALLEY COMMUNITY COLLEGE BID # BID2017-B02

Oman Electricity Transmission Company S.A.O.C

SULTANATE OF OMAN POWER AND WATER PROCUREMENT LICENCE GRANTED TO

Appendix E. Reservation of ESI Rights and Other RFP Terms. For

WEST BOYLSTON MUNICIPAL LIGHTING PLANT 4 Crescent Street, West Boylston, Massachusetts Telephone (508) Fax (508)

SECTION INSTRUCTIONS TO BIDDERS

Iowa Public Employees Retirement System Request for Proposal Design and Construction Contract Administration Services

Index. 1. Introduction: Scope of the Guidelines Preparation for inviting bids Tariff Structure 6. 5.

ELECTRICITY GENERATION LICENCE GRANTED TO INSERT NAME HERE INSERT GEN REF NUMBER HERE

ENGINEERING AND CONSTRUCTION AGREEMENT WASHINGTON INTERCONNECTION

Republic of Uganda. Bidding Document for Framework Contracts for Supplies

ADDENDUM NO. 9 Request for Proposals for 2019 Section 8 Housing Choice Voucher Technology Solution Issued: February 15, 2019

City of Mexico Beach Replacement of Fire Department Roofing Shingles

PROCUREMENT, CONTRACT AWARD AND PROVIDER PROTESTS

Request For Proposals Hwy 124 E ADA Door Opener Hallsville City Hall

DISTRIBUTION AND SUPPLY LICENCE

REQUEST FOR PROPOSALS For Blanket Agreement to supply of coffins Boxes RFP #: 14/S/HAAD/PT/2012

ENGINEERING AND PROCUREMENT AGREEMENT

PERFORMANCE BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 620 First Edition, 2015 Design-Build Institute of America Washington, D.C.

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION

REQUEST FOR PROPOSALS APPOINTMENT OF MEDIA PLANNING AND BUYING AGENCY IN INDIA

Law No. 02/L-44 ON THE PROCEDURE FOR THE AWARD OF CONCESSIONS

PROFESSIONAL SERVICES CONTRACT GENERAL SERVICES BETWEEN COPPER VALLEY ELECTRIC ASSOCIATION, INC. AND

COUNTY OF OSWEGO PURCHASING DEPARTMENT

Addendum-3, dated 01 March 2018 for the recalled tender. This addendum shall be the part of the RFP, Draft PPA, ISA and LSA.

POWER SOURCE FRAMEWORK AGREEMENT BETWEEN GOVERNMENT OF MONGOLIA AND OYU TOLGOI LLC

FAST RESERVE TENDER RULES AND STANDARD CONTRACT TERMS

S P P U R C H A S I N G S P WI- 03 P U R C H A S E O R D E R G T C DATE OF ISSUE: 15/11/2015 REVISION: 01

CITY OF RICHMOND PERFORMANCE BOND

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION

ARKANSAS LOTTERY COMMISSION. Responses to GTECH Questions for the ALC On-line Lottery Game Services and Lottery Gaming Systems and Services RFP

NOTICE OF REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND RELATED SERVICES. This is a REQUEST FOR PROPOSAL by UMATILLA SCHOOL DISTRICT

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.3 Net Scheduled Participating Generator Agreement

PART III GENERAL INFORMATION, INSTRUCTIONS AND CONDITIONS FOR BIDDERS

PARTICIPATING GENERATOR AGREEMENT (PGA)

ELECTRIC VEHICLE CHARGING STATION PLACEMENT AGREEMENT

BID PROTEST PROCEDURES

CITY OF GONZALES BANK DEPOSITORY SERVICE RFP

Anglo American Procurement Solutions Site

ADDENDUM NO. 10 Request for Proposals for 2019 Section 8 Housing Choice Voucher Technology Solution Issued: February 21, 2019

Chapter I. General Provisions

KENTUCKY EDUCATIONAL DEVELOPMENT CORPORATION REQUEST FOR PROPOSALS. for. Guaranteed Energy Savings Contracts. Addendum #1

RFP ATTACHMENT I: ACKNOWLEDGEMENT OF RFP TERMS AND CONDITIONS

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET - P.O. BOX 191 MANCHESTER, CONNECTICUT

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT. Addendum No. 1. March 23, 2018 Sewer Line Replacement Student Life 9C Bid No. 3180

TBMA/ISMA GLOBAL MASTER REPURCHASE AGREEMENT (2000 VERSION) AGENCY ANNEX. Supplemental terms and conditions for Agency Transactions

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw)

Section moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

Please note that most Acts are published in English and another South African official language. Currently we only have capacity to publish the

CONTRACT FOR SALE AND PURCHASE

National Electric Power Regulatory Authority (Wheeling of Electric Power) Regulations, 2015

SPECIFICATIONS FOR THE TRANSPORTATION AND DISPOSAL OF MUNICIPAL SEWAGE SLUDGE CAKE

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection)

[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION EDITION

MARCH 27, 2019 INVITATION FOR BIDS

Instructions to Bidders Page 1 of 8

Architectural Design Services for Project No African Hyena Housing Exhibit RFP# EN P File #095 Bid date 2:00 P.M.

INTERCONNECTION AND PARALLEL OPERATING AGREEMENT FOR CATEGORY 1 AND CATEGORY 2 PROJECTS (PROJECTS UP TO 150 kw)

Bid #15-15 Goodyear Tires

PHOENIX NATURAL GAS LTD. DISTRIBUTION NETWORK CODE MODIFICATION RULES

2005 No. (W. ) TOWN AND COUNTRY PLANNING, WALES. The Town and Country Planning (Local Development Plan) (Wales) Regulations 2005

79th OREGON LEGISLATIVE ASSEMBLY Regular Session. Senate Bill 1565

INSTRUCTIONS TO BIDDERS Medical Center

CO-OPERATIVE SOCIETIES (AMENDMENT) BILL, 2013

Request for Proposal Document. For Selection of Developer for Setting up of

REQUEST FOR QUOTATION (RFQ) (Goods and services)

OPICO LIMITED STANDARD TERMS AND CONDITIONS OF SALE

CONNECTICUT Senate Bill 7 Summary

ROADS, PUBLIC WORKS & TRANSPORT SECTOR TENDER DOCUMENT

Your proposal is not revocable for ninety (90) days following the response deadline indicated above.

Name. City: State: Zip Code: City: State: Zip Code: City: State: Zip Code: City: State: Zip Code:

REQUEST FOR QUOTATION (RFQ) (Services)

MPERC (Procedure of Application for License) REGULATIONS, 2004.

GLOBAL MASTER REPURCHASE AGREEMENT (2011 VERSION) AGENCY ANNEX. Supplemental terms and conditions for Agency Transactions

Annex A. Proposed National Instrument Security Holder Rights Plans. Table of Contents

SMALL POWER RESEARCH AND DEVELOPMENT ACT

This renewable energy power purchase agreement is made on between

THE NEW LEGISLATIVE PACKAGE ON PUBLIC PROCUREMENT, CONCESSIONS FOR WORKS AND CONCESSIONS FOR SERVICES

ABC UNIFIED SCHOOL DISTRICT Notice Calling for Bids ABC-1325 E-Rate Equipment INSTRUCTIONS FOR BIDDERS

Transcription:

REQUEST FOR PROPOSALS for Supply of up to 37 MW (Net) of Electricity Generation from Renewable Energy Resources on a Build, Own and Operate (BOO) Basis ADDENDUM No. 1 2015 September 25 1

ADDENDUM NO. 1 1. In accordance with the provisions of Section 2.1.2 Amendments to RFP of the Request for Proposal for the Supply of up to 37 MW (Net) of Electricity Generation from Renewable Energy dated 2015 July 31 (the RFP ), the ( OUR ) HEREBY ISSUES this addendum ( Addendum No. 1 ) dated 2015 September 25 to the RFP. 2. Applicants are reminded that: The receipt of this Addendum No. 1 shall be acknowledged promptly in writing by prospective Applicants and so noted in the Applicant s proposal. Late receipt or non-receipt of this Addendum No. 1 shall not relieve any Applicant from being bound by it. 3. The sections of the RFP to be modified and the modifications being made are indicated below: A. Section 1.1 DEFINITIONS The definition of Licence is replaced as follows: Licence The licence granted by the Minister pursuant to section 9 of the Electricity Act, 2015, or such other legislation in replacement thereof, which authorizes the power provider to generate and supply electricity. B. Section 1.1 DEFINITIONS Immediately after the definition of PTI PSS/E the following definition of Renewable energy source is added: Renewable energy source Energy sources that are not depleted when exploited (such as solar, wind and hydro), and includes, for purposes of this RFP, solid waste and biomass. 2

C. Section 1.4 LEGAL AND REGULATORY FRAMEWORK FOR THE ELECTRICITY SECTOR In the 28 th paragraph, the information in the second bullet shall be deleted and replaced as follows: The Electricity Act, 2015. Note that the Electricity Act, 2015 came into force on 2015 August 27 and has repealed the Electric Lighting Act. This Act can be viewed on the Jamaica Parliament website: japarliament.gov.jm D. Section 1.10 PROCUREMENT PROCESS AND SCHEDULE The information in section 1.10 shall be deleted and replaced as follows: The proposed process and timetable are as follows: No ACTIVITY DATE 1 Issue of Request for Proposal 31 July, 2015 2 Pre-bid meeting 28 August, 2015 3 Deadline for Submission of Proposals by Applicants 4 Complete Evaluation of Proposals 5 Notify Highest Ranked Applicants 6 Complete negotiation of Project Agreements 7 Highest Ranked Applicants Post Performance Security Deposit by 27 January, 2016 26 April, 2016 06 May, 2016 03 November, 2016 14 November, 2016 8 Begin Construction 03 July, 2017 9 Proposed Commissioning Date (Energy Only, other than Hydroelectric Projects) 10 Proposed Commissioning Date (Firm Capacity, other than 28 December, 2018 27 December, 2019 3

Hydroelectric Projects) 11 Proposed Commissioning Date (Hydroelectric Projects) 27 December, 2019 E. 2.2.20 Proposal Security In the 98th paragraph, the information in the third and fourth bullets shall be deleted and replaced as follows: In the event that the Power Purchase Agreement(s) and Licence(s) have been executed or issued, as the case may be, and the required Performance Security Deposit(s) have been paid in relation to the quota of 37 MW of electricity procured from other Applicants; or In the event that the Applicant has executed the Power Purchase Agreement, been issued its Licence and has furnished the required Performance Security Deposit. F. Section 2.7 STAGE 2 EVALUATION TECHNICAL EVALUATION The information in paragraph 2.7.2 shall be deleted and replaced as follows: 2.7.2 Proposed Technology [8%] Years of successful commercial use of proposed renewable technology 3 Years and over [6%] Under 3 years [2%] Technological enhancements in Proposal that could improve performance of the proposed project. [2%] G. Section 3.1 SECURITY PACKAGE The information in the 167 th paragraph in section 3.1.1 Granting of Licence shall be deleted and replaced as follows: 167 th The Project Company will be required to apply for and obtain a Licence from the Minister issued pursuant to the Electricity Act, 2015. Under the Licence, the Minister will grant the Project Company the right to design, build, own and operate the Complex and sell electrical energy to the national grid. A format of the Licence is attached as Appendix D. Note however that with the 4

coming into force of the Electricity Act, 2015, the form and content of this Licence, as well as the applicable licensing procedures, may change. H. Section 3.1 SECURITY PACKAGE At the 169 th paragraph of section 3.1.2 Principles of Power Purchase Agreement the information in the third to last round bullet shall be deleted and replaced as follows: Liquidated damages will be assessed against the Project Company with Energy Only Proposals for delays in commissioning. I. Section 3.1 SECURITY PACKAGE The information in the sixth bullet of the 174 th paragraph in section 3.1.6 Principles of Engineering, Procurement & Construction Agreement shall be deleted and replaced as follows: The performance of the contractor shall be secured by a Construction Security Deposit. The amount of the Construction Security Deposit should not be less than five percent (5%) of capital cost of the Project for Firm Capacity Projects and one percent (1%) for Energy Only Projects. The Construction Security Deposit shall cover the warranty period for the Facility. J. Appendix A Applicants Proposal and Supporting Data The two tables in Exhibit 9: PROPOSED TARIFF in section 4.10 of Appendix A should be relabeled Table 5-1 (i): Firm Capacity Proposed Tariff Components as Applicable and Table 5-1 (ii): Energy Only Proposed Tariff Components as Applicable respectively, and the information in the second paragraph immediately before the tables deleted and replaced as follows: The Tariff for Firm Capacity Proposals shall be presented by filling in the blank spaces in the following Table 5-1 (i) and the Tariff for Energy Only Proposals in Table 5-1 (ii) accordingly. 5

K. Appendix D FORM OF LICENCE All references to the Electric Lighting Act and ELA in the form of Licence are deleted and replaced with references to the Electricity Act, 2015. In section 3.1 of the form of Licence the reference to section 3 of the ELA is deleted and replaced with a reference to section 9 of the Electricity Act, 2015. L. Form of Power Purchase Agreements The forms of Power Purchase Agreements (PPAs) posted on the OUR s website prior to the date of this Addendum No. 1 are withdrawn. The forms of PPAs attached to this Addendum No. 1 as Exhibit A Form of PPA for Energy Only Renewable Projects and Exhibit B Form of PPA for Firm Capacity Renewable Projects shall be deemed to form a part of the RFP. Yours sincerely, OFFICE OF UTILITIES REGULATION Ambassador Peter Black Secretary to the Office Attachments: Exhibits A and B 6

EXHIBIT A: FORM OF POWER PURCHASE AGREEMENT FOR ENERGY ONLY RENEWABLE PROJECTS Document No. 7

EXHIBIT B: FORM OF POWER PURCHASE AGREEMENT FOR FIRM CAPACITY RENEWABLE PROJECTS Document No. 8