LEAVENWORTH WATER DEPARTMENT

Similar documents
LEAVENWORTH WATER DEPARTMENT

LEAVENWORTH WATERWORKS MINUTES OF A MEETING OF THE BOARD OF DIRECTORS HELD ON APRIL 25, 2016

LEAVENWORTH WATERWORKS

LEAVENWORTH WATERWORKS MINUTES OF A MEETING OF THE BOARD OF DIRECTORS HELD ON JANUARY 11, 2016

Regular Meeting Wednesday, August 15, :30 PM Mayor s Conference Room

Bath Electric Gas & Water Systems

THE CORPORATION OF THE CITY OF GRAND FORKS

CHAPTER XIV WATER AND SEWERS ARTICLE 1. WATER SERVICE

TOMS RIVER MUNICIPAL UTILITIES AUTHORITY Meeting Number Twelve Hundred

INSTRUCTIONS FOR APPLICATION FOR FIBER OPTIC CABLE LICENSE

TITLE 18 WATER AND SEWERS 1 CHAPTER 1. WATER. 2. SEWERS. 3. SEWAGE. 4. CROSS CONNECTIONS, AUXILIARY INTAKES, ETC. CHAPTER 1 WATER

An Amendment to Ordinance 52 An Ordinance Establishing Water Regulations City of Ashby, County of Grant, State of Minnesota.

Chapter XV. Utilities

NORTH TEXAS MUNICIPAL WATER DISTRICT 501 E. Brown Street Wylie, Texas (972) Phone (972) Fax

S.I. No. of 2018 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2018

Minutes of the Regular Meeting of the Board of Directors of Bachelor Gulch Metropolitan District May 30, 2018

Sewerage & Water Board OF NEW ORLEANS

CASSATT WATER Kershaw County and Lee County Regional Water Authority

Lower Bucks County Joint Municipal Authority

TITLE 2 BUILDING AND FIRE REGULATION

CHAPTER 52: WATER Introduction of fluoride into water system Water main specifications Abandoned water wells

REGULATION OF THE SANITARY SEWER DISTRICT OF WAUKEE, IOWA, PROVISIONS FOR SEWER RENTAL AND REGULATION CONNECTIONS WITH THE CITY SANITARY SEWER SYSTEM.

DOCKET NO. D DELAWARE RIVER BASIN COMMISSION

MINUTES HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 82. April 27, 2015

DOCKET NO. D DELAWARE RIVER BASIN COMMISSION

Mayor Weakley opened the meeting with the pledge of allegiance followed by silent meditation.

Motion by Mr. Simmeth seconded by Mr. Schad and carried to waive the reading of the Minutes of the Meeting held on December 21, 2017.

BUTLER COUNTY BOARD OF COMMISSIONERS Tuesday, April 24, 2012

ARTICLE 1 BASIC PROVISIONS SECTION BASIC PROVISIONS REGULATIONS

COMMITTEE SESSION ************************************************************** ************************************************************* AGENDA

Permanent Minutes Page No Regular Meeting: Monday: May 14, 2012:

CITY OF LYNN In City Council

DOCKET NO. D DELAWARE RIVER BASIN COMMISSION

Minutes of the Village of Galena

S.I. No. of 2016 PLANNING AND DEVELOPMENT (AMENDMENT) REGULATIONS 2016

MINUTES CITY OF DARIEN MUNICIPAL SERVICES COMMITTEE January 4, 2016

MINUTES OF A REGULAR MEETING OF THE BOARD OF DIRECTORS OF THE CASTLE PINES METROPOLITAN DISTRICT

ORDINANCE NO WHEREAS, the City of Rapid City currently has ordinances regulating trenching contractors licenses within the City; and

GLENCOE CITY COUNCIL MEETING MINUTES JUNE 6, :00 P.M.

BOARD OF COUNTY COMMISSIONERS AGENDA ST. LUCIE COUNTY

Exhibit H-2 BILL OF SALE FOR UTILITY INFRASTRUCTURE RELATED TO TREASURE ISLAND

NORTH HUDSON SEWERAGE AUTHORITY MINUTES OF REGULAR MEETING. February 19, 2015

DOCKET NO. D CP-4 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters

MINUTES OF THE HARDIN COUNTY WATER DISTRICT NO. 2 BOARD OF COMMISSIONERS MEETING. July 15, 2014

CITY OF SNOHOMISH Snohomish, Washington ORDINANCE 1886

The Cuba Village monthly Board Meeting was held on Monday March 14, 2016 at 7:00 pm in the Cuba Village Hall, 17 E. Main St.

DOCKET NO. D CP-4 DELAWARE RIVER BASIN COMMISSION. Special Protection Waters

PENN TOWNSHIP MUNICIPAL AUTHORITY PERRY COUNTY 102 Municipal Building Road Duncannon, PA May 7, 2014

THE CORPORATION OF THE MUNICIPALITY OF GREY HIGHLANDS BY-LAW NO

MINUTES HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 81 OF HARRIS COUNTY, TEXAS. February 22, 2018

City of Independence. March 17, 2008 REGULAR AGENDA. Rev. Gordon Smith, Christ United Methodist Church. APPROVAL OF MINUTES February 19, 2008 Approved

PLUMBING CODE ORDINANCE NO

CITY OF MOYIE SPRINGS. Regular Meeting and Public Hearing September 5 th, 2018

MINUTES OF THE REGULAR MEETING OF THE MOUNT LAUREL TOWNSHIP MUNICIPAL UTILITIES AUTHORITY

MINUTES TAX ASSESSMENT AND COLLECTION MATTERS

Schedule of: Water & Sanitary Sewer Service Rates Stormwater Fees Meter Readings Billing Practices Bill Payment Guarantees

Supervisor: Mark C. Crocker. Also present: Brian D. Seaman, Town Attorney, Robert Klavoon, Town Engineer and Judith Newbold, Town Clerk.

Regional Wastewater Treatment: Sanitary Districts and Cooperative Agreements

ARLINGTON COUNTY CODE. Chapter 55 UNDERGROUND UTILITY PROTECTION

MEETING MINUTES April 10, 2013 WEST EARL SEWER AUTHORITY PO BOX 725 BROWNSTOWN, PA

Rootstown-Kent Joint Economic Development District Contract

TOWN OF GRANT-VALKARIA, FLORIDA REGULAR TOWN COUNCIL MEETING MINUTES SEPTEMBER 26, 2007 GRANT COMMUNITY CENTER, ST STREET, GRANT, FL 32949

SPECIAL SESSION OF THE MOWER COUNTY ANNUAL MEETING OF THE BOARD OF COMMISSIONERS

Chapter 10 BUILDINGS AND BUILDING REGULATIONS*

The regular monthly meeting was called to order by President, Kathy Busco.

INVOCATION: Mayor Doug Knapp gave invocation.

NC General Statutes - Chapter 162A 1

CLAYTON COUNTY WATER AUTHORITY Battle Creek Road Morrow, Georgia Regular Board Meeting, September 2, 2010

4. APPROVAL OF MINUTES FROM THE FEBRUARY 17, 2016 MEETING

THE McCANDLESS TOWNSHIP SANITARY AUTHORITY THE REGULAR MEETING MINUTES JULY 12, 2018 MEETING NO. 08

Regular Session of the Niagara Falls Water Board January 29, :00 PM at Michael C. O Laughlin Municipal Water Plant

ORDINANCE NO. 14,314

City of Derby WPCA Wednesday, May 25, 2011 Public Hearing. Roll Call - Leo DiSorbo, Richard Bartholomew, John Saccu, James Gildea and Carolyn Duhaime.

FILLMORE CITY COUNCIL MEETING November 15, 2016

M E M O R A N D U M. The Promontory project debt service will be funded with special assessment paid by the Promontory developer.

Board of Directors Western Virginia Regional Industrial Facility Authority AGENDA

BOROUGH OF PITMAN COUNCIL MEETING MINUTES AUGUST 11, :00 P.M.

Chapter 8-12 GEOTHERMAL SYSTEM REGULATIONS

ALLEGHENY COUNTY HEALTH DEPARTMENT ADMINISTRATIVE CONSENT ORDER

CHAPTER 18 SEWERS AND SEWAGE DISPOSAL. Part 1 Sewer Connections

MINUTES OF THE REGULAR MEETING OF THE MOUNT LAUREL TOWNSHIP MUNICIPAL UTILITIES AUTHORITY

THE McCANDLESS TOWNSHIP SANITARY AUTHORITY THE REGULAR MEETING MINUTES SEPTEMBER 6, 2018 MEETING NO. 10

MINUTES OF MEETING OF BOARD OF DIRECTORS February 21, 2017

FRIPP ISLAND PUBLIC SERVICE DISTRICT

Declarations of Pecuniary Interest and General Nature Thereof - None

Regular Session of the Niagara Falls Water Board July 30, :00 PM at Michael C. O Laughlin Municipal Water Plant

Directors Present: Virginia Quinan, Vice President; Janet S. Grant; Jon Northrop; Charles Nungester

Diane Dillon District 3. Gladys I. Coil, CCB Clerk of the Board GENERAL INFORMATION

BOROUGH OF BOYERTOWN COUNCIL MEETING February 5, 2018

Dallas City Council Agenda Mayor Brian Dalton, Presiding Monday, September 21, :00 pm Dallas City Hall 187 SE Court St.

Varick Town Board Minutes April 1, 2008

ORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:

Regular Meeting OAKLEY CITY COUNCIL February 21, 2017

Violet Township Board of Trustees

MINUTES OF THE HELPER CITY COUNCIL MEETING Thursday, April 5, :00 p.m. Helper Auditorium. Council Members: 19 South Main Helper, Utah 84526

Mr. Gralik reported the Crestwood Relining pre-construction meeting is scheduled for tomorrow and the project will start shortly.

Plan and Zoning Commission City of Richmond Heights, Missouri

This ordinance shall be known as the Erosion and Sediment Control Ordinance of Pulaski County, Virginia.

AMOUNTS LISTED IN ITALICS ARE AMOUNTS SPENT DURING 15/16 TAX YEAR. MINUTES OF Annual Town Meeting July 27, :00pm

Mr. Schad welcomed Mr. John Mye, the Authority s new Executive Director.

Transcription:

LEAVENWORTH WATER DEPARTMENT MINUTES OF A MEETING OF THE BOARD OF DIRECTORS HELD ON JULY 8, 2013 A regular meeting of the Board of Directors of the Leavenworth Water Department was held at 5:00 PM on Monday, July 8, 2013 at the Leavenworth Water Department located at 601 Cherokee, Leavenworth, Kansas 66048. ATTENDANCE Directors in Attendance Michael Bogner, Chairman Greg Kaaz, Vice Chairman Teresa Wood, Assistant Secretary Richard Gervasini, Secretary Howard Kirk, Member (by telephone) Staff in Attendance John Kaufman, Department Manager Lesia Hegeman, Finance Manager Kayla Manning, Staff Engineer Jeff Arnold, Water Treatment Manager Gary Simanowitz, South Plant Superintendent Dennis Baragary, Sr., Water Distribution Manager Patrick Garrett, Water Distribution Supervisor Others in Attendance Mike Crow, Attorney Crow & Associates Scott Miller, City Manager City of Leavenworth Pat Kitchens, Chief of Police City of Leavenworth CALL TO ORDER Chairman Bogner called the meeting to order noting that a quorum was present. ROLL CALL, ANNOUNCEMENT OF QUARUM Quorum Present REQUESTS, COMMENTS, PETITIONS BY MEMBERS OF THE PUBLIC None CONSIDERATION OF MAIN EXTENSION AND COST SHARING WITH CITY FOR NEW ANIMAL CONTROL FACILITY Upon motion of Director Wood, seconded by Director Gervasini, and unanimously adopted, it was RESOLVED (No. 14221), that the Waterworks Board approved the City s request to share the cost of the main extension project equally. The estimated cost of the water main project, as designed is $106,350, 1

including materials, contractor labor for excavation and installation (excluding service line construction), street restoration, engineering, and inspection. The design is to be modified by extending the water main to just the north end of 3 rd Street, installing a fire hydrant, and constructing a service line north to the new facility from near the fire hydrant. CONSIDERATION OF : NO FIREARMS SIGNS FOR ADMINISTRATION OFFICE AND NORTH AND SOUTH WATER TREATMENT PLANTS Upon motion of Director Kaaz, seconded by Director Gervasini, with Director Bogner as a naye vote, and the other Directors as a yes vote, motion was adopted RESOLVED (No. 14222), that the Waterworks Board directed Attorney Mike Crow to prepare and send a letter to the Leavenworth City Commissioners requesting that the Water Department properties (administration office and two water treatment plants) be deleted from the City s list of municipal buildings to be exempt from the new Personal and Family Protection Act (HB 2052). PRESENTATION OF LEGAL OPINION FOR AUDIT REPORT As part of the recent audit report, Crow & Associates prepared a written opinion of the status of ongoing legal matters affecting the Water Department. Mike Crow of Crow & Associates addressed the following legal matters: Bettis Asphalt Company settlement; real estate foreclosures where the Water Department has filed a lien for nonpayment of water bills; and, settlement of two cases involving damage to Southwestern Bell underground cables. BOARD MEMBER ITEMS OUTSIDE OF EXECUTIVE SESSION Director Bogner requested that at least one existing board policy be reviewed by the Board at each board meeting. Director Wood stated that she would not be an authorized check signer due to a potential conflict of interest because she is employed at Country Club Bank. APPROVE MINUTES OF JULY 8, 2013 Upon motion of Director Kaaz, seconded by Director Wood, that the minutes were adopted it was. RESOLVED (No. 14223), that the minutes of the June 25, 2013 Board Meeting is hereby approved. CONSIDERATION OF PAYROLL DISBURSEMENTS Upon motion of Director Kaaz, seconded by Director Gervasini, and unanimously adopted, it was RESOLVED (No. 14224), that the regular payroll for the period ending July 15, 2013 amounting to gross pay of $77,255.04 (composed of Federal Tax Withheld - $7,985.20; FICA Withheld - $5,656.75; State Tax Withheld - $2,627.85; KPERS Withheld - $3,337.46; P.E.D.C. - $2,954.83; Insurance - $2,308.14; United Way - $98.75; EQ-Flex - $2,898.32; Misc. - $265.00; Garnishment $755.00 and Direct Deposits - $48,367.74, and including the following overtime amounts: Distribution 74.50 hours @ $2,439.97; North Plant 5 hours @ $152.40; South Plant 10 hours @ 315.80 be 2

approved and disbursements made from the Revenue Fund for their respective amounts. CONSIDERATION OF, REGULAR CLAIMS, SPECIAL CLAIMS, SPECIAL/SPECIAL CLAIMS Upon motion of Director Kirk, seconded by Director Wood, and unanimously adopted, it was RESOLVED (No. 14225), that the Board approved the Regular Claim $222,760.06, Special Claims $204,556.74, and the Special/Special Claims as follows AT&T $155.25, AXA Equitable $5,909.66, Westar Energy $35,106.19 and Kansas Gas Service $212.04, and the checks be drawn on the Revenue Fund for their respective amounts. CONSIDERATION OF CONSENT AGENDA ITEMS Upon motion of Director Kaaz, seconded by Director Wood, and unanimously adopted, it was. RESOLVED (No. 14226), that the Board approved the new consent agenda item policy, which includes the following routine items voted upon together as a single motion for passage: payroll disbursements, payment of claims, and updated schedule of events. CONSIDERATION OF NEW CHECK SIGNING AND APPROVAL POLICY Upon motion of Director Wood, seconded by Director Kaaz, and unanimously adopted, it was.. RESOLVED (No. 14227), that the Board approved a new check signing policy whereby all checks will be signed by two board members, except that checks not exceeding $15,000 in value may be signed by the General Manager or Staff Engineer and co-signed by a board member (stamped signatures are no longer allowed); all board members are authorized to sign checks, except when a potential conflict of interest exists; and, that the bank signature cards be to updated accordingly in accordance with the bank policy. ADMINISTRATION REPORT Human Resources Update South Plant Operator Position The open position is being advertised in the Leavenworth Times newspaper. Customer Service Position -- Five interviews were conducted. The position was offered to Ms. Donna McDowell, who will start work on July 29 th. Job Descriptions -- Job descriptions are being prepared for each position in the Water Department. Other HR Tasks There is nothing new to report at this time. Board was in agreement that the Water Department not continue the effort with the consultant to develop job descriptions due to a lack of progress on other efforts they are currently supporting. The Board's desire is that no further work be issued to the HR Consultant until all previous task orders have been completed. Future work given to the HR Consultant would be determined on how much progress was made on the current efforts. 3

Software and Computers The Sungard HTE system is not compatible with Windows 8. For the near term, management will work to develop an online account to initiate, terminate, bill delivery, and/or payment systems. Presentation of Draft Procurement Policy and Procedures There is nothing new to report at this time. PROJECTS UPDATE Water Diversion and Treatment Projects 1. Well Field Access Road Reconstruction Letters were submitted to KDEM for payment and project close out. 2. Radial Collector Well Feasibility Study An RFP developed by Black and Veatch is being reviewed by staff. 3. Southern Star Gas Line Installation Final draft report was completed by Black & Veatch. Proposed easement agreements for construction and operation of the pipelines is being reviewed with legal counsel. There is nothing new to report at this time on the following projects: Lime Residuals Disposal Well Cleaning RFP South Plant VFD Study Backup Generators North Plant Head Gate Booster Pump Station VFD Installation Water Distribution Projects 1. Shawnee Street Main Replacement The new water main is forecast to be pulled between 3 rd Street and 4 th Street on July 5 th or 8 th. Service transfers connections to the new main will occur following the main installation and interconnections. When the current section is finished, replacement of the water main will continue along Shawnee from 3 rd Street to Esplanade and along Esplanade to Delaware. Streets. 2. Delaware Street (from 13th Street to 16th Street) Design specifications for the main replacement project are in progress and will be completed following completion of the water main extension specifications for the new Animal Control Facility. 3. 16 th and Choctaw Water Main This project is part of the Delaware Street project, above. 4. 3 rd Street at Three-Mile Creek This project involves suspending pipe from the bridge to replace the pipe removed when the Three-Mile Creek trail was installed. A review of the structural analysis and conceptual completed by BG Consultants is pending. 4

5. KDOT Facility (16490 Springdale Road) This project is pending a response from RWD-5 concerning supplying additional water to the KDOT facility. A request was made by KDOT to the Water Department for a new line capable of providing fire protection and sufficient capacity for a new KDOT wash-bay facility. RWD-5 currently provides water service to this KDOT property, while the adjoining property (also owned by KDOT) is served by the Water Department. 6. Stove Factory Lofts Water Mains and Hydrants A meeting between the Water Department, Fire Department, and project civil engineers occurred on June 18 th. Fire protection plans for buildings E and F were reviewed. The remaining building fire protection plans have not yet been completed. A tee will be installed at the planned water main service tap beneath 2 nd Street. The water main is 10-inch cast iron pipe. The tee will enable easy access to the main from both the east and west sides of the 10-in line, because future redevelopment of the property on the west side of 2 nd Street is planned by the project developer, Foutch Brothers. The Fire Department prefers that the fire hydrants on the south side of the Stove Factory Loft building complex be moved away from the building for easier access. If the hydrant at the southeast corner is to be used, the existing 4-inch line will be enlarged to 8 inches by pipe bursting. The water line may be extended and the hydrant moved onto a landscape island east of the current location. Pipe material selection may be an issue due to the Brownfields site south of the property. 7. Radio-Read Meter Installations Installation of new radio read meters is continuing. Final shipment of meters arrived Friday. 8. GIS and Field Devices A planning session with Kim Andrews (an ESRI civil engineer) is scheduled for July 9 th to discuss options for field use. The GIS system will play an important role in developing an asset management plan for the water distribution system. There is nothing new to report at this time on the following projects: 16th Street (from Santa Fe to Thornton Street)(Combine with17th and Thornton) 17 th and Thornton 6-Inch Water Main (planned for fall) Miami Street (from 8 th Street to 10 th Street) Franklin Street (from Ohio to Kansas) VA Water Main Connections and Metering Shop Area Security Fence and Gates (pending new FEMA flood map) City of Leavenworth Projects 1. City Animal Control Facility A new water main is needed to provide water service to the City s new animal control facility near 3 rd Street and Marion. Due to the 5

previous site uses and potential for contaminated soil, a decision was made to install polyethylene encased 8-inch ductile iron pipe (DIP) with Nitrile gaskets. This will conform to AWWA standards. Test pits revealed the existence of shallow landfill waste and black organic soil. The Water Department has an inventory of about 130 feet of 8-inch DIP that can be used for the project. The additional pipe, nitrile gaskets and stainless steel fittings have been ordered. Meetings with City personnel on July 3 rd and July 8 th, should determine the extent of installation for the Water Department. Once the extent is determined, a design (plan and profile) will be prepared and the project will be placed on Drexel to obtain competitive contractor bids. 2. 2 nd Avenue and Limit Street Bridge Replacement and Road Realignment Easements for construction and operation of the new 12-inch transmission line are being defined. Construction work has not been scheduled. There is nothing new to report at this time on the following projects: Fairfield Inn (Marriot-4 th and Metropolitan) 2 nd Street Bridge Replacement City Sidewalk and Street Overlay Projects Stormwater Repairs and Improvements - 5 th Ave and Prospect (design plans are expected in the fall which will be reviewed for infrastructure conflicts) Stormwater Repairs and Improvements 18 th Street North of Spruce (design plans are expected in the fall which will be reviewed for infrastructure conflicts) Ottawa 12 th to 13 th (settlement issues are to be addressed) Hampton Inn 4 th and Choctaw Marion and Girard (utility relocates expected where located over collapsed arch) Storm Sewer Upgrade, Curb, and Sidewalk 2 nd Street Bridge Replacement from 13 th St. Terrace to 17 th Street GENERAL MANAGER S REPORT Government Affairs There is nothing new to report at this time. Community Relations There is nothing new to report at this time. Legislation and Regulation Update There is nothing new to report at this time. Water Treatment Plant Operations During the month of June, 2013, 144,730,800 gallons were pumped into the water-distribution system from both treatment plants. Demand ranged from about 3.77 MDG to 5.96 MGD and averaged 4.82 MGD. The total volume of treated water pumped into the water distribution system 6

from both water treatment plants from January 1 st through June 30 th of 2013 was 762,315,000 gallons, or about 4.21 MGD average for the 181- day period. a. North Plant: During the month of June, the North Plant produced 74,728,000 gallons and met about 52% of the total system demand by producing from 207 to 3.16 MGD and averaging about 2.49 MGD for the period. b. South Plant: During the month of June, the South Plant produced 70,002,800 gallons and met 48% of the total system demand by producing from 1.35 to 2.87 MGD and averaging nearly 2.33 MGD for the period. The flow in the Missouri River at Leavenworth on July 4 th was declining to about 46k cfs, as measured at St. Joseph, Missouri. Since the current discharge from Gavins Point Dam is about 21k cfs, then most of the remaining flow (25k cfs) at Leavenworth is from recent local rainfall and tributary flow into the Missouri River Basin below Gavins Point Dam and above Leavenworth. Water Distribution Operations Since the previous Board meeting on June 25, 2013 the following waterdistribution activities occurred: a. New Water-Service Connections: none b. Service Kills, Relocations or Repairs: none c. Valves and Fire Hydrants (new and replacements): a new hydrant and valve assembly was installed at the northeast corner of 3 rd Street and Shawnee Street d. Waterline Breaks: four (including a ¾-inch break at 1706 9 th Avenue) 2-inch (1) 4-inch (0) 6-inch (2) 8-inch (0) 10-inch (0) 1 1308 Klemp none 1425 Grand Ave. none none 1320 Ottawa 7

e. Service Renewals without Main Replacements: none a. Service Transfers to New Replacement Mains: none f. Radio-Read Installations: 20 g. Large Meter Replacements: none h. Meter Relocations: none i. Main Replacements: none ADJOURNMENT There being no further business to come before the Board, Chairman Bogner adjourned the meeting. Approved 2013 Michael Bogner, Chairman Richard Gervasini, Secretary 8