The BC Oil and Gas Commission hereby corrects the amendment to a permit identified and dated above as follows:

Similar documents
COMMISSION. June 24, KM LNG Operating Ltd. do Chevron Canada Limited Fifth Avenue SW Calgary, AB T2P 0L7. Attention: KM LNG Operating Ltd.

If you have any questions or concerns, please do not hesitate to contact the Commission.

If you have any questions or concerns, please do not hesitate to contact the Commission.

Enforcement File: FSJ. On July 4, 2017, the Oil and Gas Commission (Commission) issued General Order to Tamarack Acquisition Corp.

Enforcement File: FSJ

On September 28, 2017 the Oil and Gas Commission (Commission) issued General Order to Pavilion Energy Corp. (Pavilion).

Oil and Gas Appeal Tribunal

Frequently Asked Questions for Act 162 of 2014 Implementation

What are Local Governments Required to do to Meet the Riparian Areas Regulation?

SOIL REMOVAL AND DEPOSITION BYLAW

Brooks Heat and Power Ltd.

File No. 185-A February 2003 T0: ALL INTERESTED PARTIES

Alberta Electric System Operator

A Practitioner s Guide to Instream Flow Transactions in California

CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance #

Compliance & Enforcement Manual

There are instances when the Executive Director may take immediate action to temporarily modify fishing regulations without formal Commission action.

Environment and Parks WATER ACT. BEING CHAPTER W-3 RS.A (the "Water Act") ENFORCEMENT ORDER NO. WA-EO-2018/07-LAR

STORM DRAINAGE WORKS APPROVAL POLICY

2. PLAN ADMINISTRATION

ADOPTED REGULATION OF THE BOARD OF WILDLIFE COMMISSIONERS. LCB File No. R Effective September 9, 2016

HUU-AY-AHT FIRST NATIONS

Directive 067 Schedule 1 Licence Eligibility (Well, Facility, or Pipeline)

Oil and Gas Appeal Tribunal

CONSULTATION AND NOTIFICATION REGULATION 279/2010

PERMIT TO CONSTRUCT, USE, AND MAINTAIN ACCESS TO A PROVINCIAL PUBLIC HIGHWAY

PROJECT APPROVAL CERTIFICATE M02-01

BEFORE THE BOARD OF COUNTY COMMISSIONERS FOR JOSEPHINE COUNTY

LETTER DECISION. Imperial Oil Resources Ventures Limited Mackenzie Gas Project Request for an Extension of the Sunset Clauses

SOUTHBOROUGH WETLANDS BY-LAW First Draft 1/2/92, (last revised 2/22/95) Approved at Annual Town Meeting of April 10, 1995 (Article #48)

AGREEMENT To Establish a Joint Review Panel for the Grassy Mountain Coal Project Between

TO THE CREDITORS OF ALBERTA LTD., carrying on business as SPAREPARTS

(Space for sketch on back - Submit detailed plan if available)

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT

CHAPTER 20B. CD DISTRICT (COASTAL DEVELOPMENT DISTRICT)

APPENDIX 4: "Template" Implementing Agreement

CONSULTATION AND NOTIFICATION REGULATION

SHORELINE MANAGEMENT PERMIT ACTION SHEET

Forest Appeals Commission

Code of Practice for Pits

Oil and Gas Appeal Tribunal

NC General Statutes - Chapter 113A 1

Seeking an Amendment to an Environmental Assessment Certificate. Guidance for Certificate Holders

Article 7. Department of Environmental Quality. Part 1. General Provisions.

LEGISLATIVE COUNSELʹS DIGEST

Devonia Rural Electrification Association Ltd.

Exclusive Economic Zone and Continental Shelf (Environmental Effects) Bill

Energy Projects & First Nations in Canada:

ORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:

SHORELINE MANAGEMENT PERMIT ACTION SHEET. Brian Miller 340 W. Marine View Dr. Orondo, WA

OVERRIDING ROYALTY AGREEMENT

ARTICLE VI. SOIL EROSION AND SEDIMENTATION PREVENTION*

Tomahawk Rural Electrification Association Limited

ROAD CROSSING AGREEMENT FOR SUB-SURFACE FACILITIES

Hazardous Substances (Enforcement Officer Qualifications) Notice 2015 OCTOBER 2015

Drayton Valley Rural Electrification Association Ltd.

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND BOARD OF TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND OF THE STATE OF FLORIDA

SP-l3-03 Douglas County Transportation and Land Services

302 CMR: DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

Declaration Pursuant to Section 106 of the Oil and Gas Conservation Act

AND SERIES OF 2007 RECITALS:

Subject Work Permits Section 14 Public Lands Act Compiled by Branch Natural Heritage, Lands & Protected Spaces

A. Implement the goals and policies of the Comprehensive Plan for citizen involvement and the planning process;

DRUG-ENDANGERED CHILDREN ACT

Alberta Energy Regulator. b64. October KMSC Law. Regulatory Law Chambers. Dear Counsel:

Admiralty Inlet Pilot Tidal Project FERC No Appendix H. Adaptive Management Framework

This Policy is State Environmental Planning Policy No 55 Remediation of Land.

Case 5:18-cv Document 85 Filed 03/21/18 Page 1 of 13 PageID #: 7313

6.1 Planned Unit Development District

CITY OF KELOWNA BYLAW NO REVISED: April 28 th, 1998

Invitation to Bid Commerce Blvd/A1A Intersection Improvements & Signalization NC APPENDIX E ST. JOHNS RIVER WATER MANAGEMENT DISTRICT

RELEASE REPORTING REGULATION

Title 19 Environmental Protection Chapter 5 Land Clearing

OFFICIAL ORDINANCE SOO LINE TRAIL RULES AND SAFETY REGULATIONS PINE COUNTY, MN

Office of Surface Mining Reclamation and Enforcement

Oil and Gas Appeal Tribunal

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

Chief Mountain Gas Co-op Ltd. and County of Cardston

Public Notice. Notice No. CELRP-OP 15-LOP1 Expiration Date: March 11, 2020

WASHINGTON COUNTY CODE CHAPTER 16 ANIMAL WASTE STORAGE FACILITY

ARLINGTON COUNTY CODE. Chapter 57 EROSION AND SEDIMENT CONTROL*

Assembly Bill No. 243 CHAPTER 688

This ordinance shall be known as the Erosion and Sediment Control Ordinance of Pulaski County, Virginia.

CHAPTER 3. Building Code

ANNEX ANNEX. to the. Proposal for a Council Decision

MEMORANDUM. FIRST READ: Amendments to Chapter 16 related to Streams and Stream Buffers (Rich Edinger)

Review and Investigation Procedures

Armena Rural Electrification Association Ltd.

ADOPTED REGULATION OF THE DEPARTMENT OF WILDLIFE. LCB File No. R Effective March 9, 2012

City of South St. Paul Dakota County, Minnesota. Ordinance No AN ORDINANCE REGARDING A GAS FRANCHISE AGREEMENT WITH XCEL ENERGY

Environmental Appeal Board

MARYLAND DEPARTMENT OF THE ENVIRONMENT GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY

CONSTRUCTION OF AN ADDITION TO AN EXISTING DETACHED DWELLING (COVERED DECK)

This AGREEMENT is made the 31st day of August, 2009 (the "Effective Date").

Environmental Appeal Board

Native Vegetation Conservation Act 1997 No 133

(2) To clear and grub stumps and other activity directly related to the selective cutting of trees, as may be permitted by law;

APPROVAL OF DEVELOPMENT PERMIT You are hereby notified that your application for a development permit with regard to the following:

STEVENS COUNTY TITLE 8 TIMBER AND FOREST PRACTICES

Water Resources Protection Ordinance

Transcription:

Correction v 1.0 December 11, 2017 400-4th Avenue SW Calgary, AB T2P 0J4 Attention: Re: Correction of an Amendment to Application Determination Number 100100705 Permit Holder: Date of Amendment Issuance: December 8, 2017 Date of Correction: December 11, 2017 Application Determination Number: 100100705 Amendment Application Number : 100104273 The BC Oil and Gas Commission hereby corrects the amendment to a permit identified and dated above as follows: Under Amendment details :Changes in and about a stream in Anderson Creek within the footprint of the LNG facility permit 9709124. Should read as: Changes in and about a stream in Beaver Creek. The Permit Holder must comply with any permissions, authorizations, approvals and conditions set out in the original permit, any subsequent amendments to the permit and any additional corrections as set out herein. This letter forms an integral part of your permit and should be attached thereto. Christine Latos Authorized Signatory Commission Delegated Decision Maker Copied to: First Nations Haisla Nation Council Permitting and Authorizations Page 1 of 1 Telephone: (250) 794-5200

Amendment Permit Template v 4.4 December 8, 2017 400-4th Avenue SW Calgary, AB T2P 0J4 Attention: RE: Amendment to Application Determination Number 100100705 Permit Holder: Amendment Date of Issuance: December 8, 2017 Amendment Effective Date: December 8, 2017 Application Submission Date: November 1, 2017 Amendment Application Number: 100104273 Approved Disturbance Footprint: 0.0 ha AMENDMENT DETAILS Changes In and About a Stream: 0003494 Changes in and about a stream in Anderson Creek within the footprint of the LNG facility permit 9709124. GENERAL AUTHORIZATIONS and CONDITIONS AUTHORIZATIONS 1. The BC Oil and Gas Commission (the Commission ), under section 26(1) of the Water Sustainability Act, hereby grants an amendment to the above referenced Application Determination Number permit, as detailed in the Amendment Details table, above, subject to the original permit, any subsequent amendments and any additional or revised conditions as set out herein. Water Sustainability Act 2. The Commission, pursuant to section 11 of the Water Sustainability Act, approves the changes in and about a stream, as detailed in the Amendment Details table above within the activity area for construction and maintenance activities, unless otherwise restricted by this approval. Instream works must be carried out in accordance with the methods and any mitigations, as specified in the application. CONDITIONS Notification 3. A notice of construction start must be submitted, as per the relevant Commission process at the time of submission, at least 48 hours prior to the commencement of activities under this permit. 4. Within 60 days of the completion of construction activities under this permit, the Permit Holder must submit to the Commission a post-construction plan as a shapefile and PDF plan accurately identifying the location of the total area actually disturbed under this permit. The shapefile and plan must be submitted via esubmission. 5. Permit Holder must notify Haisla First Nation a minimum of five (5) days prior to commencement of construction activities. Permitting and Authorizations Page 1 of 2 Telephone: (250) 794-5200

Permit Holder: Application Submission Date: November 1, 2017 Application Determination Number: 100100705 Date Issued: December 8, 2017 Clearing 6. The Permit Holder is permitted to fell any trees located on Crown land within 1.5 tree lengths of the activity area that are considered to be a safety hazard according to Workers Compensation Act regulations and must be felled in order to eliminate the hazard. Trees or portions of these trees that can be accessed from the activity area without causing damage to standing timber may be harvested. Environmental 7. Any substance, sediment, debris or material that could adversely impact the stream (1) must not be allowed or permitted to enter or leach or seep into the stream from an activity, construction, worksite, machinery or from components used in the construction of any works, or (2) must not be placed, used or stored within the stream channel; ADVISORY GUIDANCE 1. Sketch Plan 100100705_Amendment_sketchplan.pdf is for the Permit Holder s internal reference only and was not reviewed as a decision tool for this permit, nor does it form an integral part of this permit. This amendment forms an integral part of your permit(s) and should be attached thereto. Christine Latos Authorized Signatory Commission Delegated Decision Maker Copied to: First Nations Haisla Nation Council Landowners/Rights Holders OGC Compliance and Enforcement Permitting and Authorizations Page 2 of 2 Telephone: (250) 794-5200

Commission Number: AD#100100705 September 21, 2016 400 4 th Avenue SW Calgary, Alberta T2P 0J4 Attention: Surface Land Administrator Re: Correction of Changes in and About a Stream Permit The Oil and Gas Commission hereby corrects the Permit and Authorizations Associated with the Permit, as shown on construction plan, 04-057-001_REVA, revision A, dated August 31, 2016, as follows: To correct the permit s numbering to read as follows: 6. Activities within a fish bearing stream or wetland must occur: a. during the applicable reduced risk work windows as specified in the Skeena Region Reduced Risk In-stream Work Windows and Measures, May 2005, as amended from time to time; b. in accordance with alternative timing and associated mitigation recommended by a qualified professional and accepted by the Commission; or c. in accordance with an authorization or letter of advice from Fisheries and Oceans Canada that is provided to the Commission. The permit holder must ensure that riparian management areas are maintained. 7. The permit holder must ensure that riparian management areas are maintained. 8. Equipment used while conducting works must be situated in a dry stream channel or operated from the top of the bank. 9. The Permit holder must have written consent of the landowner prior to commencement of operations on Private Land. 10. The permit holder must notify the Haisla Nation a minimum of five (5) days prior to project commencement The permit holder must comply with all conditions in the original permission and any additional conditions as noted above. This letter forms an integral part of your Permit and should be attached thereto. Permitting and Authorizations Division Page 1 of 2 Telephone: (250) 794-5200

AD# 100100705 Date: September 21, 2016 Ashley Istead Natural Resources Officer cc: Worley Parson Commission Number AD# 100100705 FN Community(ies) Haisla Nation Permitting and Authorizations Division Page 2 of 2 Telephone: (250) 794-5200 100, 10003 110 th Avenue Facsimile: (250) 794-5379 Fort St. John, BC V1J 6M7 24 Hour: (250) 794-5200

Commission Number: AD# 100100705 September 19, 2016 400 4 th Avenue SW Calgary, Alberta T2P 0J4 Attention: Surface Land Administrator Re: Authorization for Changes in and About a Stream AUTHORIZATION 1. The Oil and Gas Commission (Commission), under section 11 of the Water Sustainability Act, hereby authorizes ( the permit holder ) to make changes in and about a stream for the purposes of carrying out oil and gas or related activities, as defined in the Oil and Gas Activities Act, identified in plan number 04-057-001_REVA, revision A, dated August 31, 2016(the construction plan ), submitted to the Commission dated September 2, 2016 (hereinafter referenced together as the operating area ), subject to the conditions set out below. CONDITIONS 2. A notice of construction start must be submitted to the Commission a minimum of 48 hours prior to the commencement of activities under this permit. Notification must be sent via OGC.ExternalNotifications@bcogc.ca. 3. Within 60 days of the completion of construction activities under this permit, the permit holder must submit to the Commission a post-construction plan as a shapefile and PDF plan accurately identifying the location of the total area actually disturbed under this permit. The shapefile and plan must be submitted via esubmission. 4. Any substance, sediment, debris or material that could adversely impact the stream (1) must not be allowed or permitted to enter or leach or seep into the stream from an activity, construction, worksite, machinery or from components used in the construction of any works, or (2) must not be placed, used or stored within the stream channel; 5. The permit holder is to ensure a qualified professional is on site during the operations. This individual must have the authority to issue a stop work order if fish and fish habitat is determined to be at risk, and will be responsible for developing/implementing mitigation measures to reduce the impacts on the fish and fish habitat, as required. 3. Activities within a fish bearing stream or wetland must occur: a. during the applicable reduced risk work windows as specified in the Skeena Region Reduced Risk Instream Work Windows and Measures, May 2005, as amended from time to time; Operations Division: Permitting and Authorizations Page 1 of 2 Telephone: (250) 794-5200

Commission Number: 100100705 Date: September 19, 2016 b. in accordance with alternative timing and associated mitigation recommended by a qualified professional and accepted by the Commission; or c. in accordance with an authorization or letter of advice from Fisheries and Oceans Canada that is provided to the Commission. 6. The permit holder must ensure that riparian management areas are maintained. 7. Equipment used while conducting works must be situated in a dry stream channel or operated from the top of the bank. 8. The Permit holder must have written consent of the landowner prior to commencement of operations on Private Land. 9. The permit holder must notify the Haisla Nation a minimum of five (5) days prior to project commencement. The attached plan(s) form an integral part of this authorization Ashley Istead Natural Resource Officer pc: WorleyParsons Commission Number: AD#100100705 FN Community(ies) Haisla Nation Operations Division: Permitting and Authorizations Page 2 of 2 Telephone: (250) 794-5200