I 5 South Multimodal Corridor Study. Appendix B. Issue Statement

Similar documents
Freeway Deficiency Plan Final. Central Interstate 5 Corridor Study

Freeway Deficiency Plan Final. Central Interstate 5 Corridor Study

4-71. Tecate / Tecate. Ports of Entry Tecate Pedestrian/ Transit Facilities

Summary of At-Border Data Collection Results

APPENDIX B. Environmental Justice Evaluation

TRANSPORTATION COMMITTEE

3.12 TRAFFIC AND CIRCULATION

San Diego Regional Briefing I-5 South Realignment Communications Plan

COMMITTEE ON BINATIONAL REGIONAL OPPORTUNITIES

APPENDIX D - APPENDIX E - APPENDIX F - APPENDIX G - APPENDIX H

Cross-Border Transportation

FINAL REPORT SAN DIEGO REGION-BAJA CALIFORNIA CROSS-BORDER TRANSPORTATION STUDY

Columbia River Crossing Investment Grade Traffic and Revenue Study

SUMMARY REPORT December 1999

MARINE CORPS BASE CAMP PENDLETON

Conducted for. Estimating Economic Impacts of Border Wait Times at the San Diego-Baja California Region. April 6, Research you can trust.

AGENDA SAN DIEGUITO RIVER VALLEY REGIONAL OPEN SPACE PARK CITIZENS ADVISORY COMMITTEE. 10:30 a.m. to 12:15 p.m. Friday, December 2, 2011

COMMITTEE ON BINATIONAL REGIONAL OPPORTUNITIES

CITY OF TORONTO. BY-LAW No (OMB) To adopt Amendment No. 9 to the Official Plan for the former Borough of East York.

MAIN COCONUT CREEK DRI

HIGH CAPACITY TRANSIT CORRIDOR STUDY LYNNWOOD TO EVERETT FINAL REPORT JULY 2014 FINAL

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement

2017 SAN DIEGO-BAJA CALIFORNIA BORDER CROSSING AND TRADE STATISTICS

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement

ITS at the Border. Technologies, Strengths/Weaknesses & Why It s Important

Regional Border Crossing Trends & Economic Impacts

POSSIBLE 2,000+ UNIT RESIDENTIAL / MULTI-USE ENTITLEMENT OPPORTUNITY 128 ACRES

Economic Impact Study: Otay Mesa East Port of Entry. e RB. conomic research bureau

SB001_L.084 HOUSE COMMITTEE OF REFERENCE AMENDMENT Committee on Transportation & Energy. SB be amended as follows:

NAFTA II: California Border Zone Land Transportation Issues

March 2016 University Link Bus Integration Service Changes. Title VI Service Equity Analysis Final Adopted Changes

HB Index. Accountability

1. Why is a New Border Crossing Needed?

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Follow this and additional works at: Part of the Transportation Commons

Environmental Justice Technical Report

An excavation permit is required for any excavation work within the public right-ofway.

Public comments, including those by Montecito Association, followed the presentations.

16 June 13, 2012 Public Hearing APPLICANT: ANTHONY & ALYIAH PETERKIN

2017 Surrey Roads Survey JANUARY 2018

Economic Prosperity Element

Torrey Pines Community Planning Board

A Regional Transportation Plan for the Meramec Region

PLANNING COMMISSION STAFF REPORT

Marine Corps Base Camp Pendleton

I-5 Empire Project. 3 rd Annual. Community Open House. June 9, 2016

Torrey Pines Community Planning Board Boquita Drive, Del Mar, CA

US-131/US-131BR Interchange Options Kalamazoo County

City of Los Alamitos

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

1. Why is a New Border Crossing Needed?

Chapter 1. Introduction. 1.1 Background

Revitalization along the Hiawatha Corridor. Central Corridor Funders Collaborative and Learning Network

Orange County Transportation Authority

Call to Order. Invocation Vice Chairman Bates. Pledge of Allegiance Director Dixon

CONNECTING NORTH AMERICA: U.S. ROAD BORDER NEEDS

IV. ENVIRONMENTAL IMPACT ANALYSIS J. PUBLIC SERVICES 2. POLICE PROTECTION

Letter FW030. General Transmission. Page 1

AGENDA. Wednesday, January 9, 2013 TAMC Conference Room 55-B Plaza Circle, Salinas. ***9:00 a.m.***

Phoenix Transportation 2050 (T2050) Update

ASIC 2018 Penelope (Jenny) Quintana San Diego State University School of Public Health. Pictured David Flores, Casa Familiar

NC General Statutes - Chapter 160A Article 23 1

TRAVEL COSTS ASSOCIATED WITH FLOOD CLOSURES OF STATE HIGHWAYS NEAR CENTRALIA/CHEHALIS, WASHINGTON

METROPOLITIAN TRANSPORTATION SERVICES DIRECTOR AND METRO TRANSIT GENERAL MANAGER REPORTS

and Arizona Highlights of the 106th Arizona Town Hall April 19-22, 2015 Tucson, Arizona

6.1 Planned Unit Development District

COMPREHENSIVE PLAN AMENDMENT STAFF REPORT AMENDMENT ROUND 12-2 BCC TRANSMITTAL PUBLIC HEARING, JULY 23, 2012

Los Angeles County One Gateway Plaza zi3.gzz Metropolitan Transportation Authority Los Angeles, CA goo~ metro.n~~

MEETING OF THE SAN DIEGO METROPOLITAN TRANSIT SYSTEM EXECUTIVE COMMITTEE 1255 Imperial Avenue, Suite 1000 San Diego, CA June 7, 2018 MINUTES

BORDERS COMMITTEE AGENDA

NASHVILLE AREA TRANSPORTATION PLANNING PROSPECTUS & BYLAWS OF THE MPO EXECUTIVE BOARD

23 USC 148. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

Fredericksburg Area Metropolitan Planning Organization 2045 Long Range Transportation Planning Advisory Committee Meeting #7 Part 1 November 1, 2017

14. General functions, powers and duties of department. Effective: April 1, 2005

HOUSE SPONSORSHIP. Bill Summary

San Diego Association of Governments BORDERS COMMITTEE. BORDERS COMMITTEE DISCUSSION AND ACTIONS Meeting of February 24, 2006

Community Organizations

Survey Results Summary

TOWNSHIP OF MAHWAH BOARD OF ADJUSTMENT MINUTES MARCH 2, 2016

Congestion Management Program & Planning Committee MINUTES

SBCAG STAFF REPORT. MEETING DATE: January 18, 2018 AGENDA ITEM: 6

$102 Million Investment 4.4 Track Miles, 2.2 Route Miles May 2014 Groundbreaking Fall 2015 Substantial Completion May 6, 2016 Grand Opening

STAFF REPORT. Interregional Transit Memorandum of Understandings. MEETING DATE: June 4, 2014 AGENDA ITEM: 5

MINUTES OF THE SPECIAL MEETING/CLOSED SESSION AND THE REGULAR MEETING OF NORTH COUNTY TRANSIT DISTRICT HELD JULY 17, 2008 PAGE 1

Citizens Ray Chiaramonte, Ben Collier, Jim Flateau, Frank Havoer, Fred Krauer, Andy Padget, Georgianne Youngblood

Supplemental Guide Signing Manual

3.0 EXISTING CONDITIONS AND ANALYSIS 3.1 TRAFFIC CONDITIONS

MEXICO U.S. BORDER INFRASTRUCTURE

YORK COUNTY GOVERNMENT

ARTICLE 8. SECTION 1. Section of the General Laws in Chapter entitled "Size,

Board of Supervisors' Agenda Items

METROPOLITAN DEVELOPMENT COMMISSION DOCKET NO AO-01

Village of Bellaire PLANNING COMMISSION. Commissioners: Dan Bennett, Butch Dewey, Bill Drollinger, Fred Harris, and Don Seman

Surface Transportation Authorization extended to March 4 th

Caltrain Business Plan. LPMG July, 2018

SCP Mini-RFP#: Ver 8/17/15 1

Commuter Attitudes Toward Proposed High-Occupancy-Vehicle Lanes 1n Orange County, California

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 1 UNDERSTANDING THE NEED CONSULTATION SUMMARY REPORT MARCH 2013

STAFF REPORT CITY OF LAKE OSWEGO PLANNING AND BUILDING SERVICES DEPARTMENT

VALLEY METRO RAIL PROJECTS UPDATE

Transcription:

I 5 South Multimodal Corridor Study Appendix B

I-5 SOUTH MULTIMODAL CORRIDOR STUDY ISSUE STATEMENT JUNE 5, 2009 PROJECT DESCRIPTION The goal of the Interstate 5 (I-5) South Multimodal Corridor Study is to identify the various forms of transportation that exist along and adjacent to the I-5 corridor between State Route 54 (SR-54) and Main Street, and find ways to maximize their effectiveness through multimodal planning to meet the anticipated demand through the year 2035, and to use available funding for this multimodal corridor in the most efficient way possible. Existing modes of transportation include (1) motorized vehicles (including transit vehicles), (2) freight trains, (3) light rail transit (LRT), (4) bicycles, and (5) pedestrians. I-5, SR-54, and local streets provide the primary opportunities for motorized vehicles, such as cars, buses, and trucks. Initially, up to seven multimodal alternatives will be identified for consideration. The alternatives will incorporate proposed highway and rail projects for the corridor as presented in the 2030 San Diego Regional Transportation Plan: Pathways for the Future (2030 RTP) prepared by San Diego Association of Governments (SANDAG) and other transportation projects and proposed development identified in local planning documents, as well as concepts/projects that have not specifically been identified by existing plans or studies. Based upon a preliminary evaluation of the ability of each of these alternatives to meet the overall goal of facilitating transportation along the corridor, a total of three alternatives will be developed for more detailed evaluation. It is intended that early multimodal transportation planning within the I-5 South Corridor will facilitate comprehensive land use planning within and adjacent to the Corridor that accommodates and is complementary with regional transportation planning. In order to determine the initial set of issues in the corridor, the Project Development Team has reviewed various documents developed by SANDAG, City of Chula Vista, Caltrans, SD&IV, MTS, among other agencies. Documents reviewed include: 2030 San Diego Regional Transportation Plan: Pathways for the Future (2030 RTP) City of Chula Vista General Plan City of Chula Vista Urban Core Specific Plan Final Concept Engineering Report for E Street and H Street Grade Separations Chula Vista Bayfront Master Plan TCIF Proposal South Line Rail Improvements/San Ysidro Yard ISSUE STATEMENT Traffic congestion is one of the most tangible and frustrating quality of life issues facing the San Diego region. Dramatic increases in motorized travel, combined with limited financial capacity to improve roads and build more transit, have resulted in severe congestion of many of our major roadways during Page 1 of 6

peak commuting hours. Besides simply being annoying, this hampers our regions productivity and long term economic prosperity. (Ref: Regional Comprehensive Plan for the San Diego Region, July 2004). The following are issues that exist for the I-5 South Multimodal Corridor: Limited Travel Choices: Although the I-5 South Corridor has multiple travel mode choices, there are currently no HOV or managed lanes along I-5 in this location; and regional transit trips must be accomplished through the use of localized and corridor service, such as the Blue Line Trolley 1, inter-city MTS Bus Routes (929 and 932), and intra-city Chula Vista Transit (CVT) Bus Routes (701, 704, 705, 709 and 712). The Blue Line Trolley offers service from the International border with Mexico to Old Town San Diego, with stops in Downtown San Diego. Regional destinations not served by the Blue Line Trolley may require multiple transfers. Many of the existing transit routes operate at or near capacity, and below the desired 15-minute all-day service frequency goal identified in the 2030 RTP. Increasing Demand for Trolley Service and Associated Conflicts with Vehicle Traffic: The San Diego Trolley s Blue Line along the I-5 corridor experiences the highest ridership of any LRT line within the San Diego region, and projections indicate that ridership will continue to rise for the foreseeable future. The Bayfront/E Street, H Street, and Palomar Street LRT stations also experience heavy demands during peak commute hours, and are popular park and ride and bus transfer destinations as they are located along three major east-west arterial streets within Chula Vista. 2 Pedestrian/ Bicycle Mobility: The traditional street grid of Chula Vista has been broken, especially between I-5 and Broadway, with truncated streets creating a connectivity problem within neighborhoods. Other key constraints to mobility within the Chula Vista Urban Core include an environment that is generally unfriendly to pedestrians and cyclists, as well as the lack of links from the Urban Core to other portions of the City, such as the Bayfront area or east Chula Vista. 3 At Grade Rail Crossings: MTS provides LRT service along the South Line seven days a week, operating with a schedule that provides up to 8 trains per hour during peak service, 102 roundtrips along the corridor on Monday through Friday, 148 round trips on Saturday, and 65 round trips on Sunday. 4 The vehicular traffic on E Street, H Street, and Palomar Street is also projected to increase as more commuters utilize these streets to access trolley stations and the northbound and southbound ramps to I-5, and as Chula Vista s Bayfront area to the west is developed. As the frequency of the LRT service increases, the level of service at these crossings decreases due to the increased frequency that the crossing arms are down. 5 The 1 Interstates 805/5 South Corridor Study, Dated June 2005 2 Final Concept Engineering Report for E Street and H Street Grade Separations, July 2004 3 Final Concept Engineering Report for E Street and H Street Grade Separations, July 2004 4 Final Concept Engineering Report for E Street and H Street Grade Separations, July 2004 5 Final Concept Engineering Report for E Street and H Street Grade Separations, July 2004 Page 2 of 6

existing at grade crossing of the local roads and LRT and freight rail pose safety risks to the rail workers during maintenance activities and the general public during normal operation. 6 Capacity Constraints for Goods Movement: The region s heavy freight rail systems exhibit substantial congestion and delays, as well as some loss of existing and potential business because of capacity constraints associated with limited infrastructure and the sharing of tracks with passenger operations (LRT). 7 The double track system located on the eastern side of I-5 is owned by MTS, and operated and controlled by the San Diego Trolley, Inc. (SDTI), an asset of MTS. The freight rail service on the South Line is provided by the San Diego and Imperial Valley Short Line Operator (SDIV), a Rail America railroad, which is owned by Fortress Investment Group. Operating freight trains on the same tracks as the Blue Line LRT subjects the line to Federal Railroad Administration (FRA) jurisdiction and must conform to the Code of Federal Regulations, Title 49, Parts 234, 235, and 236. Standard Operating Procedure (SOP) 105.32 for SDIV require that before entering SDTI tracks, the SDIV crew must obtain permission from the SDTI controller and must report to the controller when clear of the main track. Freight operating hours are currently restricted to a 2.5 hour window when the trolleys are not in service on Monday through Saturday mornings, and not permitted Saturday night into Sunday morning. 8 In addition to freight trains, the I-5 corridor provides an important goods movement link for commercial trucks utilizing the Otay Mesa Land Port of Entry (POE). The volume of trucks and the value of goods crossing northbound and southbound at the Otay Mesa POE has increased steadily since the Otay Mesa POE was opened in 1985, serving as the only POE for commercial vehicles in the San Diego Metropolitan area. The volume of commercial vehicles utilizing I-5 and involved in international commercial trade is expected to increase as the capacity of commercial vehicle inspection at the Mexican border increases with the planned modernization of the Otay Mesa POE and development of the new Otay Mesa East POE. Population Growth and Increased Travel Demand: Projected population and employment growth in the region will result in additional travel demand on the I-5 corridor. By the year 2030, population growth in the area surrounding the corridor is expected to reach 39 percent while employment growth is anticipated at 28 percent. In particular, growth in the South Bay subregion is expected to be higher than the San Diego regional average. For example, in Chula Vista, population is anticipated to increase by 60% from 2000 to 2030 or nearly 105,000 residents (from 173,600 to 278,200) residents. 9 Traffic forecasts indicate that travel demand on the I-5 corridor will increase up to 46 percent on the I-5 corridor south of SR-54 by 2030 10. Planned expansion of the San Ysidro POE and resulting capacity increases for passenger vehicles will increase travel demand on I-5. Without improvements, additional segments of this corridor are projected to operate at LOS F in 2030. 11 6 Final Concept Engineering Report for E Street and H Street Grade Separations, July 2004 7 South Line Rail Goods Movement Final PSR, June 2008 8 South Line Goods Movement Project, June 2008 9 SANDAG Regional Growth Forecast Update 10 Interstates 805 / 5 South Corridor Study, June 2005 11 2030 Regional Transportation Plan, November 2007 Page 3 of 6

Insufficient Interchange Spacing: The current interchange spacings in the I-5 corridor from Main Street to the SR-54 interchange are less than the recommended spacing in the Caltrans Highway Design Manual, which is 1.0 mile between local street interchanges in urban areas, and 2.0 miles between freeway to freeway interchanges and local street interchanges. The current spacing is as follows: Interchange/Ramp Spacing along the I-5 South Corridor Ramps for Street Crossing / Interchange SR-54 System Interchange E Street Local Interchange H Street Local Interchange J Street Local Interchange L Street Local Interchange Palomar Street Local Interchange Main Street Local Interchange Distance Between (Miles) 0.8 0.75 0.5 0.55 0.75 0.5 Environmental Factors: A number of environmental factors could affect or, be affected by, future transportation improvements located within the I-5 South Corridor study area. The most important environmental factors are associated with the following issues: air quality/climate change, biological resources, cultural resources, visual aesthetics, noise, water quality, and environmental justice. Of the above environmental issues, biological resources represent the primary potential physical constraint to the design and location of future transportation improvements. Biological resource constraints are primarily related to wetlands between the SR-54 and E Street interchanges where the Sweetwater River passes beneath the I-5/SR-54 interchange and along the west side of I-5 between SR-54 and E Street. To a lesser extent, improvements to the I-5/Main Street interchange could also be constrained by wetland resources lying to the west. State and federal resource agencies with jurisdiction over these wetland habitats will require consideration of transportation alternatives that avoid or, at a minimum, reduce wetland impacts. Although it is considered unlikely, the presence of historic or archaeological resources within the study corridor, that are determined to be of national, state, or local significance, could represent constraints to transportation improvement options, due to the need to avoid or mitigate impacts to such resources. For transportation projects with federal oversight or funding, these significant historic/archaeological resources may be subject to Section 4(f). Section 4(f) resources include public parks; recreational areas and historic/archaeological sites of national, state or local significance; and wildlife or waterfowl refuges. Impacts to 4(f) resources Page 4 of 6

could also represent a constraint to transportation improvements with federal funding/oversight. Unless de minimus impact findings can be made, it would be necessary to study and document the absence of any feasible and prudent avoidance alternatives to a proposed impact to a 4(f) resource. Thus, federal transportation projects strive to avoid impacts to such resources. It will be important to identify any potential 4(f) resources early in the corridor planning. Environmental factors related to Air Quality/Climate Change, Noise and Water Quality would primarily be associated with the ultimate operation of transportation activities within the corridor. Optimizing the efficiency of fossil-fueled transportation modes within the corridor (e.g., vehicle, bus and freight travel) and facilitating the use of alternatives to the personal automobile will be important to minimizing the air quality/climate change impacts of future transportation improvements. The dispersal of diesel particulates and carbon monoxide into sensitive receptor areas will be of concern with respect to air quality. Incorporation of Best Management Practices (BMPs) into the design of future transportation improvements would be essential to reducing their contributions to urban runoff. Accommodating noise attenuation techniques such as barriers (e.g. berms and walls) and/or roadway composition (e.g. rubberized pavement) will be important to reducing the impacts on adjacent noise receptors (e.g. residential and medical development). Factors related to Environmental Justice would primarily be associated with providing mobility opportunities and accessibility for minority and low-income populations, providing convenient transit services nearby jobs and homes. Limited Funding The challenging current economic conditions reinforce the need for efficient funding decisions to maintain and improve upon the integrity of the existing modes of transportation and to avoid throw away costs. Funds that might be allowable by the funding authority for one mode of transportation might also benefit another mode of transportation, either directly or indirectly. Conversely, some funding requirements do not allow the use of their funding mechanism for specific elements, such as operation and maintenance. Competing Interests for Right of Way: There are several stakeholders within the study corridor and multiple needs within a limited right-of way. Some of the competing uses include: o Bayfront Redevelopment o Bikeways o Bus Service Ingress/ Egress o Citizen Community Groups (Broadway Business Association, Crossroads II, Southwest Civic Association, Northwest Civic Association, among others) o Environmental Sweetwater River Channel, potential urban wetlands o Freeway Improvements o Goods Movement (Freight Rail, Trucking, Port) o Light Rail Transit (Trolley) o Local Street Network o Operation and Maintenance Activities for all modes of transportation o Pedestrian Mobility o Public Parking for Transit Users Page 5 of 6

o Utilities (Electric, gravity storm drain, gravity sewer, water, gas, telephone, cable, ITS) o Western Chula Vista Redevelopment Page 6 of 6