Record of Letter Ballot Review by TC Chapter for Procedural Review. Scheduled in Background Statement. Date 10/13/ /13/2017

Similar documents
I. Document Number and Title Document Number Document Title Specification for Dual Glass Module with Crystalline Silicon Terrestrial Solar Cell

Record of Letter Ballot Review by TC Chapter for Procedural Review

Document Information. I. Document Number, Title, Lists of Line Items Document Number 6336

I. Document Number and Title Document Number Document Title Revision to SEMI C , SPECIFICATIONS AND GUIDELINES FOR HYDROCHLORIC ACID

Record of Line-item Letter Ballot Review by TC Chapter for Procedural Review

Revision to SEMI C , with title change to Specifications for Hydrogen Peroxide

REGULATIONS GOVERNING SEMI STANDARDS PROGRAM. March 27, 2015

Dry Type Transformers Subcommittee Unapproved Meeting Minutes March 22, 2006 Costa Mesa, California

ASTM INTERNATIONAL Helping our world work better. Regulations Governing ASTM Technical Committees

At the end of this module, you will be able to: Understand the responsibilities of Standards & Certification Project Management Understand the roles

HL7 Australia Standards Development Practices: Due process requirements for HL7 Australia National Standards

Accellera Systems Initiative Intellectual Property Rights Policy

Table of Contents. 9 Intellectual Property Policy

Judgments of Intellectual Property High Court ( Grand Panel ) Date of the Judgment: Case Number: 2005(Gyo-Ke)10042

Revision May 18, 2011 Publication Date. Copyright LXI Consortium, Inc. All rights reserved

Test Report. File No.: SHV11085/16-01 Test Report No.:

RADIO TECHNICAL COMMISSION FOR MARITIME SERVICES STANDARDS DEVELOPMENT POLICIES

American Water Works Association (AWWA) Standards Program Operating Procedures

AMERICAN IRON AND STEEL INSTITUTE PROCEDURES FOR ANSI-APPROVED STANDARDS FOR COLD-FORMED STEEL DESIGN AND CONSTRUCTION

Budapest Treaty on the International Recognition of the Deposit of Microorganisms for the Purposes of Patent Procedure

Midwest Reliability Organization

CSA-SDP CSA Directives and guidelines governing standardization, Part 4: Development of ANSI Standards

Guidelines for Implementation of the ANSI Patent Policy

ACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016

SOP TITLE: Procedures Governing Standards Development SOP NO.: 2-100

Election Administration Manual for STRHA Elections for Table of Contents. General Information. Calendar. Candidates. Qualifications for Office

SERC Regional Standards Development Procedure Exhibit C to the Amended and Restated Regional Entity Delegation Agreement between

June Regulations Governing Consensus Development of the Water Efficiency and Sanitation Standard

TIA Procedures for American National Standards (PANS)

SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018

REGULATIONS GOVERNING ASTM TECHNICAL COMMITTEES

Information. Appeals & Hearings. International Association of Plumbing & Mechanical Officials

LUXEMBOURG Patent Regulations of November 6, 1997 ENTRY INTO FORCE: January 1, 1998

Document Approval Process. Wireless Innovation Forum Policy 001 Version 3.1.0

ASCE Rules for Standards Committees

SDI PROCEDURES FOR ANSI-APPROVED STANDARDS FOR STEEL DECK

Document Approval Process. SDR Forum Policy 001

ANSI Essential Requirements: Due process requirements for American National Standards

Part A: Adoption and general aspects of the IPR policy

ASME Codes and Standards. Development Committee Procedures. With Supplemental Requirements For Committees. Under the Jurisdiction of the

Belton I.S.D. Records Management Policy and Procedural Manual. Compiled by: Record Management Committee

POLAND Industrial Design Regulations as amended on June 13, 2005

AIR-CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE

Society of Motion Picture and Television Engineers Standards Operations Manual v.3 Approved by Board of Governors Effective

ASME Codes and Standards. Development Committee Procedures. With Supplemental Requirements For Committees. Under the Jurisdiction of the

Operating Procedures for ATIS Forums and Committees

SUMMARY OF CHANGES IN ISO 9001:2008 (DRAFT INTERNATIONAL STANDARD)

Standards Development Manual

THE REFERENDUM AND OTHER PROVISIONS ACT, ARRANGEMENT OF SECTIONS

Japan Silicon Wafer TC Chapter Meeting Summary and Minutes

Dry Type Transformers Subcommittee Unapproved Meeting Minutes March 14, 2007 Dallas, Texas

GENERAL MOTORS COMPANY AMENDED AND RESTATED BYLAWS AS OF DECEMBER 13, 2017 ARTICLE I MEETINGS OF SHAREHOLDERS

TREATY SERIES 2000 Nº 2. Trademark Law Treaty With Regulations and Model Forms

COMPARATIVE STUDY REPORT REQUIREMENTS FOR DISCLOSURE AND CLAIMS - 1 -

Rules for the Election of Directors

Mid-Atlantic College Health Association By-Laws Table of Contents

Summary of Revisions to the ANSI Essential Requirements:

BALLOT & PROXY GUIDELINES FOR UNIT OWNER MEETINGS

County Initiative and Referendum Manual

NERC s Implementation of the Process Improvements and Compliance Findings Related to the Independent Evaluation of NERC s Standards Process Manual

ESTONIA Trademark Regulations as amended by Regulation No. RTL 2007, 58, 1045 of July 5, 2007 ENTRY INTO FORCE: July 16, 2007

INSTRUCTION GUIDE FOR POLLING STATION MEMBERS ABROAD

TEXAS ASSOCIATION OF STUDENT COUNCILS RESOURCE GUIDE SECTION 3: EVERYDAY COUNCIL MANAGEMENT

STANDING RULES I. Adoption of Rules II. General III. Delegate Selection and Certification

Standards Committee Procedures for ASHRAE Standards Actions PASA

Annex III Draft rules of procedure

BYLAWS. of the. American Public Health Association. (As Amended by the Governing Council November 7, 2017)

INTERNATIONAL ELECTROTECHNICAL COMMISSION

NATIONAL ASSOCIATION OF WOMEN S GYMNASTICS JUDGES CONSTITUTION

Inaugural Hon. Michael Kirby Contract Law Moot. Melbourne, Australia September 2011 THE RULES

Diplomatic Conference to Conclude a Treaty to Facilitate Access to Published Works by Visually Impaired Persons and Persons with Print Disabilities

Procedures for ASME Codes and Standards Development Committees

Accredited Standards Committee (ASC) N15 Methods of Nuclear Material Control

Standards Development Policy and Procedures Manual. Non- ANSI/RESNET Standards

Regulations Governing Consensus Development of the Uniform Solar, Hydronics & Geothermal and Swimming Pool, Spa & Hot Tub Codes

ASME B30 Subcommittee Chair Responsibilities. Revision 1 - January 2013 Revision 2 July 2016

COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX

IRELAND Patents Rules 1992 as amended by S.I. No. 334 of September 7, 2012, as amended up to and including the September 3, 2012

Constitution. International Chinese Society for Physical Activities and Health (ICSPAH) (Amended and Embodied on March 18th, 2015) CONSTITUTION

Revision Cycles for Binational and Trinational Standards Feb. 17, 2006 Published by UL, CSA and ANCE

SUMMARY OF CONTENTS SC-1.

Common Regulations under the Madrid Agreement Concerning the International Registration of Marks and the Protocol Relating to that Agreement

AGREEMENT. between the Russian Federal Service for Intellectual Property and the International Bureau of the World Intellectual Property Organization

INTERNATIONAL STANDARD

Laws of Uganda, 2005 [S.I. s] THE REFERENDUM AND OTHER PROVISIONS ACT, ARRANGEMENT OF SECTIONS PART I - PRELIMINARY.

HOUSE BILL 1060 A BILL ENTITLED. Election Law Delay in Replacement of Voting Systems

Law On Trade Marks and Indications of Geographical Origin

ARTICLE I: NAME & PURPOSE

POLAND Trademark Regulations of July 8, 2002

I am transmitting to you herewith the following decision of the IAPMO Standards Council.

RESNA Policies and Procedures for the Development of RESNA Assistive Technology Standards February 17, 2016

Policies and Procedures for Standards Development for the IEEE Communication Society/Green ICT Standards Committee (COM/GreenICT-SC)

INTERNAL REGULATIONS PART 2: COMMON RULES FOR STANDARDIZATION WORK

RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS ARTICLES OF ASSOCIATION AND BYLAWS

I am transmitting to you herewith the following decision of the Standards Council.

HISTORY OF THE UNIVERSITY OF TEXAS SYSTEM INTELLECTUAL PROPERTY POLICIES AND GUIDELINES 1985 TO PRESENT

SURFACE VEHICLE RECOMMENDED PRACTICE

P.L. 2018, CHAPTER 20, approved May 30, 2018 Senate, No. 868

[First Reprint] SENATE, No. 549 STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION

ISO/IEC Directives Part 1

Transcription:

Record of Letter Ballot Review by TC Chapter for Procedural Review Region/Locale: China Global Technical Committee: Photovoltaic TC Chapter Cochairs: Guangchun Zhang/CSI, Jun Liu/CESI Standards Staff: Sophia Huang/SEMI China Scheduled in Background Statement Actual Date 10/13/2017 10/13/2017 Location Reason for Change of Date and/or Location (if changed) Huang He Grand Hotel NO.666 Middle Renmin Road, Jiangyan,Taizhou,Jiangsu,China Huang He Grand Hotel NO.666 Middle Renmin Road, Jiangyan,Taizhou,Jiangsu,China Note: See Regulations 9.5 Exception for allowable reason to change. I. Document Number and Title Document Number 5968A Document Title Guide for Sample Preparation Method for Photovoltaic Backsheet Performance Tests II. Tally Standards staff to fill in.

Voting Tally: As-cast tally after close of voting period Note: A minimum of 60% of the Voting Interests that have TC Members within the global technical committee that issued the Letter Ballot must return s. (Regulations 9.7.1.1) Voting Tally (with example values): Voting Interest: Returned s Distribution Return Rate Letter Ballot 98 163 = 60.1% 60% >=90% Intercommittee Ballot 21 Voting Interest Reject(s) Voting Interest Accept(s) 1 Total rs with Rejects 1 55 Note: See Regulations 3.2.1 for definition of Voting Interest. III. Rejects Voting Interest Reject 1 (Voting Interest Name: Kelly, George) r Reject 1 (r: Kelly, George and BPS) Negative 1 Negative Referenced Section/ Paragraph Negative Text *TF/TC Chapter to fill in, including text in the ballot if necessary. The relation between Doc 5968 and IEC 62788-2. *Original complete Negative text (e.g., issue, justification, suggestion) should be copied. There is a potential conflict between this standard and IEC 62788-2 which will be Published by TC82 within next month. TF input (optional) Withdrawal No Negative withdrawal made by r. Withdrawal document received by Standards staff on MM/DD/YYYY. GO TO Related subsection (A) Related and Reason Related is mutually agreed upon. (Needs no motion.) Negative is not related. (Needs 2/3 votes to pass.) Reason GO TO Persuasive subsection

by/ 2 nd by Jianxiong NI (YINGLI)/ Tongrong Zhao (Jolywood) TF Compared with the draft IEC 62788-2, the differences are as follows: 1) The sample size is different. IEC 62788-2 is sampled from multiple samples, but this standard is sampled in the same sample. 2) The original sample preparation is different, the IEC 62788-2 is directly cut out the backsheet, this standard is sampled after laminated, so it is much closer to practical application. 38 Y-0 N; passed Result of [Negative is not related.] < 2/3 2/3 [Negative is not related.] GO TO Persuasive subsection (B) and Reason by/ 2 nd by Negative is related and persuasive. (Needs >1/3 votes to pass.) Negative is related and not persuasive. (Needs 2/3 votes to pass.) Reason None Persuasive Result of None Y- N; passed [Negative is related and persuasive.] > 1/3 [Negative is related and not persuasive.] < 2/3 Is a technical change recommended? Y GO TO Address by Technical Change Option subsection N (E) 2/3 [Negative is related and not persuasive.] < 90% 90% [Negative is related and not persuasive.] (C) GO TO Not Significant Finding Option subsection

Technical Change Recommendations Original section/paragraph number and at least one full sentence are required in FROM and TO fields. FROM: Section/Paragraph 1 Address by Technical Change Option Technical Changes 2 FROM: Section/Paragraph Negative is addressed by the technical change(s). by/2 nd by Name (Company)/Name (Company) Y- N; passed/failed. Result of 2/3 [Negative is addressed by the technical change(s).] [Negative is not addressed by the technical change(s).] < 2/3 GO TO Incorporation of the Technical Change subsection (E) Incorporation of the Technical Change by/2 nd by To incorporate the technical change(s). Name (Company)/Name (Company) Y- N; passed/failed.

Result of 90% [Agree to incorporate.] [Disagree to incorporate.]>10% (F) (E) This option can be used only if the TC Chapter finds a Negative not persuasive by a vote equal to or greater than 90% of the persons voting on the action. (Regulations 9.6.4.4.2) Not Significant Finding Option Use of Not significant finding option by/ 2 nd by It is mutually agreed upon to term the Negative not significant. It is mutually agreed upon to term the Negative significant. Whether or not the Negative is not significant is decided by a vote. The Negative is not significant. Name (Company)/Name (Company) (D) (C) Y- N; passed with simple majority Y- N; failed with simple majority (D) (C) (A) Withdrawn (counted under h in disposition) (B) Not related (counted under i in disposition) (check if applicable) (C) (D) Related and not persuasive (significant) Not significant (counted under j in disposition) Final (E) Related and persuasive and not addressed by technical change DOCUMENT FAILS (F) Addressed by technical change (counted under k disposition) (check if applicable) Comment generated. See Section V-(ii) Comment #. Disposition of Voting Interest Reject 1 Check only when the Document has not been failed. 1 Original number (#) of Negatives (g)

0 Number of Negatives withdrawn (h) 1 Number of Negatives found not related (i) 0 Number of Negatives found not significant (j) 0 Number of Negatives addressed by technical change (Negative becomes not significant) (k) Final g - (h + i +j + k) = 0 Reject is Not Valid and is not included in the denominator of VI. Approval Conditions Check g - (h + i +j + k) >0 Reject without a Negative Reject is included in the denominator of VI. Approval Conditions Check Not Valid IV. Other Technical Issues No Other technical issues V. Comments No comments V- (i) rs Comments Commenter 1 (Vargas-Bernal, Rafael/Instituto Tecnologico Superior de Irapuato) - Comment 1 Comment *TF/TC Chapter to fill in section/paragraph #, if necessary. Accept Comments: Vargas-Bernal, Rafael There are typing errors, spaces must be ' ' added in several places. The TC Chapter agreed to do one of the following actions. *No motion is required in this step. Action Already addressed by Commenter #, Comment # No further action was taken by the TC Chapter. Refer to the TF for more consideration. New Business Editorial Change Case 1: No vote in this section:

Options for editorial change (check one) To be included and voted on as a group in VI. Editorial Changes Other than Those d on in V. Case 2: d in this section: Original section number and at least one full sentence are required in FROM and TO fields. FROM: Section/Paragraph xxx 1 Editorial Changes 2 FROM: Section/Paragraph xxx by/2 nd by To approve above editorial change(s) None None Y- N; passed/failed. This table is needed for each Comment. Commenter 2 (Yang Gan/Harbin Institute of Technology) - Comment 2 Comment Actio *TF/TC Chapter to fill in section/paragraph #, if necessary. Yang Gan/Harbin Institute of Technology: 1. Please rewrite 6.1. It does not make sense. The TC Chapter agreed to do one of the following actions. *No motion is required in this step.

Already addressed by Commenter #, Comment # No further action was taken by the TC Chapter. Refer to the TF for more consideration. New Business Editorial Change Options for editorial Case 1: No vote in this section: To be included and voted on as a group in VI. Editorial Changes Other than Those d on in V. change (check one) Case 2: d in this section: Original section number and at least one full sentence are required in FROM and TO fields. FROM: Section/Paragraph Section 6.1 Editorial Changes 1 Laminate the laminates under qualified lamination parameters (Confirm the qualified lamination technology based on different encapsulation materials and equipment) stacking with the structure of Glass, The first Encapsulation adhesive film, The second Encapsulation adhesive film,high temperature non-stick fabric (The thickness no more than the cell s), backsheet in sequence. TO: Section/Paragraph Section 6.1 Laminate a stack as follows: glass, the first encapsulation adhesive film, the second encapsulation adhesive film,high temperature non-stick fabric and backsheet. by/2 nd by To approve above editorial change(s) Jianxiong NI (YINGLI)/ Tongrong Zhao (Jolywood) accept 38Y-0 N; passed Commenter 3 (Yang Gan/Harbin Institute of Technology) - Comment 3 *TF/TC Chapter to fill in section/paragraph #, if necessary.

Yang Gan/Harbin Institute of Technology: Comment 2 Replace Chinese symbols with English ones. For example, Celsius degree, brackets, and the inequality sign in 8.1. The TC Chapter agreed to do one of the following actions. *No motion is required in this step. Action Already addressed by Commenter #, Comment # No further action was taken by the TC Chapter. Refer to the TF for more consideration. New Business Editorial Change Options for editorial Case 1: No vote in this section: To be included and voted on as a group in VI. Editorial Changes Other than Those d on in V. change (check one) Case 2: d in this section: Original section number and at least one full sentence are required in FROM and TO fields. Editorial Changes 1 FROM: Section/Paragraph Section 8.1 Before sample preparation, the backsheet should be stored in the environment which the temperature ( 23±2 ) and relative humidity 75 %, with no less than 24 hours. 1.1 TO: Section/Paragraph Section 8.1 Before sample preparation, the backsheet should be stored in the environment with appropriate temperature (23±2 C) and relative humidity ( 75%) for no less than 24 h. by/2 nd by To approve above editorial change(s) Jianxiong NI (YINGLI)/ Tongrong Zhao (Jolywood) accept 38 Y-0 N; passed

Commenter 4 (Yang Gan/Harbin Institute of Technology) - Comment 4 *TF/TC Chapter to fill in section/paragraph #, if necessary. Comment Yang Gan/Harbin Institute of Technology: 3 Remove the space between the numerical values the % and degree units in 8.1. The TC Chapter agreed to do one of the following actions. *No motion is required in this step. Action Already addressed by Commenter #, Comment # No further action was taken by the TC Chapter. Refer to the TF for more consideration. New Business Editorial Change Case 1: No vote in this section: Options for editorial To be included and voted on as a group in VI. Editorial Changes Other than Those d on in V. change (check one) Case 2: d in this section: Original section number and at least one full sentence are required in FROM and TO fields. FROM: Section/Paragraph xxx Editorial Changes 1 FROM: Section/Paragraph xxx 2

by/2 nd by To approve above editorial change(s) Name (Company)/Name (Company) accept Y- N; passed/failed. Commenter 5 (Yang Gan/Harbin Institute of Technology) - Comment 5 *TF/TC Chapter to fill in section/paragraph #, if necessary. Comment Yang Gan/Harbin Institute of Technology: 4 Change Of into of in Figure 1, Figure 2 and Figure 3. The TC Chapter agreed to do one of the following actions. *No motion is required in this step. Action Already addressed by Commenter #, Comment # No further action was taken by the TC Chapter. Refer to the TF for more consideration. New Business Editorial Change Case 1: No vote in this section: Options for editorial To be included and voted on as a group in VI. Editorial Changes Other than Those d on in V. change (check one) Case 2: d in this section: Original section number and at least one full sentence are required in FROM and TO fields. Editorial 1 FROM: Section/Paragraph xxx

FROM: Section/Paragraph xxx 2 by/2 nd by To approve above editorial change(s) Name (Company)/Name (Company) accept Y- N; passed/failed. Commenter 6 (Yang Gan/Harbin Institute of Technology) - Comment 6 *TF/TC Chapter to fill in section/paragraph #, if necessary. Comment Yang Gan/Harbin Institute of Technology: 5 The background stantement should be rewritten.the following usages or words are wrong. react, that not subject to, can t, raises the different sample prepareation, to subject to,because of the agening test emphasized, more colse to, that design in this standard. The TC Chapter agreed to do one of the following actions. *No motion is required in this step. Action Already addressed by Commenter #, Comment # No further action was taken by the TC Chapter. Refer to the TF for more consideration. New Business Editorial Change

Options for editorial change (check one) Case 1: No vote in this section: To be included and voted on as a group in VI. Editorial Changes Other than Those d on in V. Case 2: d in this section: Original section number and at least one full sentence are required in FROM and TO fields. FROM: Section/Paragraph xxx 1 Editorial Changes 2 FROM: Section/Paragraph xxx by/2 nd by To approve above editorial change(s) Name (Company)/Name (Company) According to SEMI Regulation: 9.2.5.1.4 Voting Prohibited on Background Statement In all cases, material within the Background Statement is not part of the material to be voted upon. Y- N; passed/failed. VII. Approval Conditions Check VII. - (i). Approval Rate APPROVAL CONDITION 1: All Negatives have been discussed and were withdrawn, found not related, found not persuasive, or addressed by a technical change. (Regulations 9.7.1.2)

APPROVAL CONDITION 2: At least 90% of the sum of valid Voting Interest Accept and Voting Interest Reject s must be Accept. (Regulations 9.7.1.3) Note: If both approval conditions are not satisfied, the Document fails. Accepts (Accepts + Valid Rejects) Approval Rate = 55 / 56 = 98.2% 90% VII. (ii) Approval Level Note: See Regulations 9.7.2 for further information. Globally Approved (No Ratification Ballot needed): The Letter Ballot meets the Letter Ballot approval conditions for the global technical committee. Need a Ratification Ballot: The Letter Ballot meets the Letter Ballot approval conditions for the TC Chapter and a Ratification Ballot will be issued to validate technical changes. VIII. Safety Check Note: See Regulations 15 for further information. This is not a Safety Document, when all safety-related information is removed, the Document is still technically sound and complete. (Regulations 8.7.1) This is a Safety Document, when all safety-related information is removed, the Document is not technically sound and complete. (Regulations 8.7.2) Safety Checklist (Regulations 15.3) is complete and has been included with the Document throughout the balloting process. (Regulations 15.1.2) by/2 nd by Jianxiong NI (YINGLI)/ Tongrong Zhao (Jolywood)

None 38 Y-0 N; passed I. Intellectual Property (IP) Check Note: This Letter Ballot may cover all or part of a Standard or Safety Guideline. This IP check applies to the entire Standard or Safety Guideline. See Regulations 16 for further information. The TC Chapter meeting chair asked those participating, if they were aware of any potentially material patented technology or copyrighted items* in the Standard or Guideline. (Regulations 8.8.1) No potentially material patented technology or reproduction of copyrighted items is known. Potentially material patented technology or reproduction of copyrighted items is known, but a Letter of Assurance (LOA) or copyright release letter for such items has been obtained or presented to the TC Chapter. GO TO SECTION. GO TO SECTION. Potentially material patented technology or reproduction of copyrighted items is known and use of such materials is technically justified by the TC Chapter, but an LOA or copyright release letter for some of the item(s) has NOT been obtained or presented to the TC Chapter. Ask ISC for special permission to publish. Quit activity. Wait for LOA for patented technology or release of copyrighted items. by/2 nd by Final Action Name (Company)/Name (Company) Y- N passed failed * Note: Such potentially material patented technology or copyrighted items might have become known since the Standard or Safety Guideline was last reviewed, or might become relevant due to this Letter Ballot.. Action for This Document This Document passed TC Chapter review as balloted and will be forwarded to the ISC A&R SC for procedural review.

This Document passed TC Chapter review with editorial changes and will be forwarded to the ISC A&R SC for procedural review. This Document passed TC Chapter review with technical changes and with or without editorial changes and will be forwarded to the ISC A&R SC for procedural review. A Ratification Ballot will be issued to verify the technical changes. This Document failed TC Chapter review and will be returned to the TF for rework. This Document failed TC Chapter review and work will be discontinued. by/ 2 nd by Jianxiong NI (YINGLI)/ Tongrong Zhao (Jolywood) None 38 Y-0 N Final Action passed failed Standards staff to record the result of the A&R procedural review here: Approved for publication Approved pending acceptance of the Ratification Ballot A&R Not approved Reason: