August 30, Commission's L.L.C Line CIG. Line Nos. 5A and. Inspector Report. under the 2018.

Similar documents
November 21, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

July 19, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

November 9, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

Order No. 587-Y Compliance Filing, Colorado Interstate Gas Company, L.L.C.; Docket No. RP19-

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

June 2, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Governors of the States of Arizona, California, Colorado, Montana, Nevada, New Mexico, Oregon, Utah, Washington and Wyoming, Docket No.

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

March 22, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

November 12, 2004 VIA ELECTRONIC FILING

August 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

main. July 6, 2017

December 13, 2004 VIA ELECTRONIC FILING

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) )

May 23, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

July 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

February 20, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Magalie R. Salas, Secretary

PJM Interconnection, L.L.C. and Progress Energy Carolinas, Inc. Docket No. ER

Section GT&C, Awarding of Available and Planned Pipeline Capacity, Bid Procedures ( Section ). 2

April 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

November 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

Mailing Address: P.O. Box 1642 Houston, TX

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. United Water Conservation District Project No.

CITY OF THOUSAND OAKS PUBLIC WORKS DEPARTMENT SPECIFICATIONS / ADDITIONAL CONDITIONS FOR ENCROACHMENT PERMITS. Encroachment Permit # Project #

Case , Document 1-1, 04/21/2017, , Page1 of 2

EXCAVATION PERMIT Application Packet

135 FERC 61,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation

Transco submits the amendments for inclusion in Original Volume No. 1A of Transco s FERC Gas Tariff.

MIDCONTINENT EXPRESS PIPELINE LLC

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southern California Edison Company ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER

IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

November 7, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

REPUBLICAN RIVER WATER CONSERVATION DISTRICT S RULE 26(a)(1) DISCLOSURES

130 FERC 61,051 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING RELIABILITY STANDARD. (Issued January 21, 2010)

March 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

April 10, Via etariff. Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

December 28, Via Electronic Filing

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

February 12, Notice of Certificate of Concurrence Regarding Agua Caliente Solar LGIA

NERC Notice of Penalty regarding EFS Parlin Holdings LLC FERC Docket No. NP10-_-000

MEMORANDUM OF UNDERSTANDING BETWEEN the TAHOE REGIONAL PLANNING AGENCY and COUNTY/CITY

76 FR , 2011 WL (F.R.) Page 1 NOTICES DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission

Tennessee Gas Pipeline Company, L.L.C. Orion Project Negotiated Rate and Non-Conforming Agreement Filing Docket Nos. RP and CP

Re: Errata Filing for Joint Submittal of Motion for Leave to Respond and Response to Indicated LSEs Comments, Docket No. ER09-40S-000.

8.130, 8.201, 8.235, 8.310, and 8.315, relating to General Applicability and Standards; Definitions;

NC General Statutes - Chapter 95 Article 7A 1

March 28, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Philis J. Posey, Acting Secretary

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Berry Petroleum Company ) Docket No. ER _

Any person violating any provisions of such code shall be punished as provided in section of this code. (Ord. 1004)

BOARD OF ELECTIONS IN THE CITY OF NEW YORK

ORDINANCE NO

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

Lakeland Regional Sewer District lakelandrsd.com

COMMISSIONERS PROCEEDINGS. Adams County Courthouse Ritzville, Washington Regular Meeting

RESOLUTION NO. REGULATIONS GOVERNING THE USE OF THE COUNTY RIGHT-OF-WAY

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Northern Natural Gas Company ) Docket No. RP

ARTICLE 905 Street Excavations. EDITOR S NOTE: Resolution , passed February 3, 2009, established street excavation fees.

TRENCH PERMIT PETITION Lawrence, Massachusetts [Ord. Secs and 12.30

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO

CHAPTER IV ADJUDICATION OF PROOFS

PSEG Energy Resources & Trade LLC

December 18, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Kimberly D. Bose, Secretary

ARLINGTON COUNTY CODE. Chapter 55 UNDERGROUND UTILITY PROTECTION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

CERTIFICATE. Final. Upon. Instructions: letterhead. Page 1 of 3. CDC Documents. Revised 1/22/2018

BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION : : : : : : : : : : : : : : : : : : : : : : : COMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

[NRC ] Mr. Joseph Quintanilla is a radiographer who was formerly employed by Quality

OBSTRUCT/EXCAVATE PETITION Lawrence, Massachusetts [Ord. Sec et. seq.]

DEKALB BOARD OF COMMISSIONERS SPECIAL CALLED MEETING, EXECUTIVE SESSION AND COMMITTEE OF THE WHOLE, TUESDAY, JULY 21, 2015

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Billing Code P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. [Docket No. IC ]

F I L E D :45 PM

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

STATE%OIL%AND%GAS%REGULATORY%EXCHANGE% % MISSION%STATEMENT%! The! STATE! OIL! AND! GAS! REGULATORY! EXCHANGE! (EXCHANGE)! is! an! outreach!

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 7C Subdivision Plat Vacation 8/25/99

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF COMPLIANCE & INSPECTION

NorthWestern Energy requests an effective date of March 12, 2016, for the proposed revisions.

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION ROUTE PERMIT FOR CONSTRUCTION OF A LARGE [PIPELINE TYPE] PIPELINE AND ASSOCIATED FACILITIES IN [COUNTY]

January 25, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

SCHIFF HARDIN LLP. January 24, 2011 VIA ELECTRONIC FILING

RIGHT-OF-WAY PERMIT SUBMITTAL REQUIREMENTS CHECKLIST

TUNKHANNOCK BOROUGH WYOMING COUNTY, PENNSYLVANIA

Public Service Commission

Township of SLIPPERY ROCK BUTLER COUNTY

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Vineyard Wind LLC ) Docket No. ER

Terry W. Rankin vs. COMMERCE AND INSURANCE

Chapter 1. TECHNICAL STANDARDS AND SAFETY ACT (Assented to March 6, 2002)

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO

A. Zonal Agreements and Termination of the GFA

BILLING CODE P. Notice of Commission Staff Attendance at MISO Meetings

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

As used in this ordinance, unless the context otherwise requires, the following terms shall mean:

July 28, Please do not hesitate to call if you have any questions in regard to the enclosed. Very truly yours, /s/ James William Litsey

Transcription:

August 30, 2018 Federal Energy Regulatory Commission 888 First Street, N..E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: Colorado Interstate Gas Company, L.L.C. Docket No. CP18-94-0000 CIG 2018 Line Nos. 5A and 5B Expansion Project Commissioners: ("CIG") is hereby filing with the Federal Energy Regulatory Commission ( Commission ) in Docket No. CP18-94-000 its Weekly Environmental Inspector Report related to the CIG 2018 Line Nos. 5A and 5B Expansion Project. Description of Proceeding On February 27, 2018, CIG filed a prior notice request, pursuant to Sections 157.205, 157.208( (b), and 157.210 of the Federal Energy Regulatory Commission's ("Commission") Regulations under the Natural Gas Act to modify certain existing compression facilities located at the Cheyenne Hub in Weld County, Colorado. The project is referred to as the "CIG 2018 Line Nos. 5A and 5B Expansion Project" or "Project." On March 9, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60-day comment period to allow for any person or Commission s stafff to file motions or notice to intervene and protests. No protests were filed with the time allowed therefore, the Project was deemed authorized on May 9, 2018. Submittal of Environmental Inspector Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, CIG is providing Environmental Inspector Report No. 9 for the period of August 19, 2018 through August 25, 2018.

Federal Energy Regulatory Commission -2- August 30, 2018 Filing Information CIG is e-filing this letter and attachment with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000. A copy of this filing is also being provided to all parties of record. Respectfully submitted, COLORADO INTERSTATE GAS COMPANY L.L.C. Attachment /s/ Francisco Tarin Director, Regulatory

CIG 2018 Line Nos. 5A and 5B Expansion Project Reporting Period: 8/19/2018 thru 8/25/2018 Environmental Inspector: Tom Blandi Construction Status: During this reporting period, CIG installed conduit for the emergency shut down interlock at the Line Nos. 5A & 5B valve yard. In addition, foundations for the cooler and V100 vessel were completed. Fabrication work continues. Grading: Topsoil was completed for the new hydrovac site and all erosion control devices are in place and operational. Erosion Control: All erosion controls were inspected and are performing as expected. Work Planned for the Following Reporting Period (08/26/18 09/01/18): During the next reporting period, CIG will continue to slot trench for the bi directional valve and install conduit to Line Nos. 5A & 5B and the inlet valves. CIG will also strip the forms, polish the concrete, backfill and compact the CIG foundations. Correspondence from Federal, State, and Local Agencies Concerning Compliance Issues: No federal, state or local permitting agency has notified CIG of instances of noncompliance. Landowner Complaints: There were no landowner/resident complaints received during the reporting period. Environmental Training: Environmental training was provided to 6 employees during site safety orientation. To date a total of 115 employees have received environmental training.

CIG 2018 Line Nos. 5A and 5B Expansion Project Hydrovac spoil site.

CIG 2018 Line Nos. 5A and 5B Expansion Project Concretee forms for cooler andd the V1000 vessel.

CIG 2018 Line Nos. 5A and 5B Expansion Project Conduit trench at the Line Nos. 5A & 5B valve yard.

Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 30 th day of August, 2018. /s/ Francisco Tarin Two North Nevada Avenue Colorado Springs, Colorado 80903 (719) 667-7517