Standard BAL Inadvertent Interchange

Similar documents
Future Development Plan: 1. Post for successive ballot. 3Q Post for recirculation ballot. 1Q Submit to BOT. 1Q13

WECC Criterion INT-021-WECC-CRT-2.1

Southwest Power Pool REGIONAL TARIFF WORKING GROUP Conference Call September 18, :00 a.m. 11:00 a.m. - A G E N D A D R A F T. September 18, 2008

NERC s Implementation of the Process Improvements and Compliance Findings Related to the Independent Evaluation of NERC s Standards Process Manual

1.4 The Parties believe that this Agreement is in the public interest.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

136 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING TARIFF REVISIONS. (Issued July 1, 2011)

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR RELIABILITY CORPORATION )

CONSOLIDATED TRANSMISSION OWNERS AGREEMENT. RATE SCHEDULE FERC No. 42

Introduction. Standard Processes Manual VERSION 3.0: Effective: June 26,

OPERATIONAL BALANCING AGREEMENT between. and

Governing Documents Tariff. Southwest Power Pool Governing Documents Tariff Document Generated On: 8/8/2017

PARTIAL REQUIREMENTS SERVICE AGREEMENT BETWEEN TAMPA ELECTRIC COMPANY AND CITY OF ST. CLOUD, FLORIDA, UNDER WHOLESALE REQUIREMENTS TARIFF

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Texas Reliability Entity Standards Development Process

BALANCING AUTHORITY OPERATIONS COORDINATION AGREEMENT. between. Wisconsin Electric Power Company. and. PJM Interconnection, LLC

BGS-FP SUPPLIER MASTER AGREEMENT

Agenda Project Management and Oversight Subcommittee (PMOS) Conference Call January 26, 2017 Noon to 1:30 p.m. Eastern

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR RELIABILITY CORPORATION )

Reliability Standards Development Procedures

January 4, Filing of Service Agreement No Docket No. ER

Midwest Reliability Organization

Draft Minutes Finance and Audit Committee

Into Product Conversion Convention upon MISO Operation of a Day 2 Energy Market

The North American Electric Reliability Corporation ( NERC ) hereby submits the

Texas Reliability Entity Standards Development Process

Implementation Plan Project PRC-005 FERC Order No. 803 Directive PRC-005-6

Minutes Operating Reliability Subcommittee

Alberta Electric System Operator

NorthWestern Energy requests an effective date of March 12, 2016, for the proposed revisions.

Minutes Standards Committee Meeting September 7, :00 a.m. to 3:00 p.m. Central

153 FERC 61,356 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING SERVICE AGREEMENT. (Issued December 29, 2015)

Data Licensing Agreement

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

131 FERC 61,217 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C June 4, 2010

Western Systems Power Pool Agreement

Name. City: State: Zip Code: City: State: Zip Code: City: State: Zip Code: City: State: Zip Code:

130 FERC 61,151 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER INITIATING REVIEW OF NOTICE OF PENALTY. (Issued February 26, 2010)

North American Electric Reliability Corporation (NERC) Rules of Procedure Effective in Manitoba April 1, 2012

Approved Meeting Minutes Standards Committee

TRANSMISSION AGREEMENT. By and among APPALACHIAN POWER COMPANY COLUMBUS SOUTHERN POWER COMPANY INDIANA MICHIGAN POWER COMPANY KENTUCKY POWER COMPANY

130 FERC 61,051 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING RELIABILITY STANDARD. (Issued January 21, 2010)

OPERATIONAL BALANCING AGREEMENT FORM OF SERVICE AGREEMENT CONTRACT NO.

PENNSYLVANIA UNIVERSAL DEFAULT SUPPLIER MASTER AGREEMENT. by and between. Duquesne Light Company. and [INSERT] Dated [Month, Day, Year]

Minutes Standards Committee Meeting September 13, :00 a.m. 3:00 p.m. Pacific

DISTRICT OF COLUMBIA LEVEL 1 INTERCONNECTION APPLICATION & AGREEMENT

MISO Rate Schedule 30 MISO RATE SCHEDULES ITC Midwest Joint Pricing Zone Revenue Allocation Agreement

North American Energy Standards Board Standards Development Process

Amended and Restated. Market-Based Sales Tariff. Virginia Electric and Power Company

June 14, Please contact the undersigned if you have any questions concerning this filing.

Decision 13/CMP.1 Modalities for the accounting of assigned amounts under Article 7, paragraph 4, of the Kyoto Protocol

PARTICIPANTS AGREEMENT. among. ISO New England Inc. as the Regional Transmission Organization for New England. and. the New England Power Pool.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc., ) Docket No. ER

Agenda Standards Committee Meeting December 6, :00 a.m. to 3:00 p.m. Eastern

Service Agreement No. under PG&E FERC Electric Tariff Volume No. 5

Draft Minutes Corporate Governance and Human Resources Committee

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting June 13, :00 10:00 a.m. Eastern

FRCC REGIONAL RELIABILITY STANDARD DEVELOPMENT PROCESS MANUAL. FRCC-RE-STD-001 Effective Date: Month Day, Year Version: 1

Stakeholder Governance Guide

Agenda Standards Oversight and Technology Committee November 12, :00 a.m. 9:30 a.m. Eastern

TARIFF FOR WHOLESALE TRANSMISSION SERVICE. CenterPoint Energy Houston Electric, LLC 1111 LOUISIANA P. O. BOX 1700 HOUSTON, TEXAS 77251

SCHIFF HARDIN LLP. January 24, 2011 VIA ELECTRONIC FILING

Meeting Notes Project SOL Standard Drafting Team

MIDWEST RELIABILITY ORGANIZATION

NYISO Agreements. New York Independent System Operator, Inc. Document Generated On: 3/5/2013

RELIABILITY STANDARDS DEVELOPMENT PROCEDURES

July 10, Operating Agreement, CAISO Rate Schedule No. 94 Docket No. ER

ENERGY PURCHASE AGREEMENT BETWEEN CONSUMERS ENERGY COMPANY AND

June 30, The CAISO submits the Amendment pursuant to Section 205 of the Federal Power Act, 16 U.S.C. 824d (2012).

BISON PIPELINE LLC OPERATIONAL BALANCING AGREEMENT (For Use at Point(s) of Interconnection)

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.16 Pseudo-Tie Participating Generator Agreement

Charter for Energy Imbalance Market Governance

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) Docket No. RR RELIABILITY CORPORATION )

Charter for the EIM Governing Body and EIM Governance

SUPERINTENDENT S EMPLOYMENT CONTRACT ADDENDUM TO BASIC REGULAR TEACHER CONTRACT

AMENDED AND RESTATED DELEGATION AGREEMENT BETWEEN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION AND MIDWEST RELIABILITY ORGANIZATION WITNESSETH

COMPETITIVE SERVICE PROVIDER AGREEMENT FOR APPALACHIAN POWER COMPANY'S VIRGINIA RETAIL ACCESS PROGRAM

Operating Committee and Planning Committee Member Selection Process

MASTER ENERGY SUPPLY AGREEMENT BY AND BETWEEN OHIO POWER COMPANY AND EACH ENERGY SUPPLIER SET FORTH ON ATTACHMENT A HERETO, 201_

FERC Ratemaking Orders Applicable to the SPS Formula Rate

Agenda Standards Committee Process Subcommittee Meeting March 13, :00 5:00 p.m. Mountain

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

CHAPTER Committee Substitute for House Bill No. 823

March 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Agenda Project Management and Oversight Subcommittee (PMOS) Meeting October 31, :00 1:30 p.m. Eastern

May 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

October 1, PJM Interconnection, L.L.C., Docket No. ER Default Allocation Assessment Clarifying Revisions

Universal Data Sharing Agreement

Mobile Deposit User Agreement

January 8, Southwest Power Pool, Inc., Docket No. ER15- Submission of Interconnection Agreement

December 18, Filing of PSP Agreement with Placer County Water Agency

OUR ELECTRICITY AGREEMENT Constellation NewEnergy, Inc. P.O. Box 4911, Houston, TX 77210

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

LINK System Customer Interface. Capacity Redirect Nomination (Exchange)

An etariff XML filing package, filed as a zip (compressed) file, containing:

SCHIFF HARDIN LLP A Limited Liability Partnership Including Professional Corporations

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

MASTER STANDARD SERVICE OFFER ( SSO ) SUPPLY AGREEMENT BY AND BETWEEN OHIO POWER COMPANY AND EACH SSO SUPPLIER SET FORTH ON ATTACHMENT A HERETO, 201_

CITY OF RIVERSIDE FERC Electric Tariff Volume 1 First Revised Sheet No. 1 CITY OF RIVERSIDE, CALIFORNIA FERC ELECTRIC TARIFF

Transcription:

A. Introduction 1. Title: Inadvertent Interchange 2. Number: BAL-006-2 3. Purpose: This standard defines a process for monitoring Balancing Authorities to ensure that, over the long term, Balancing Authority Areas do not excessively depend on other Balancing Authority Areas in the Interconnection for meeting their demand or Interchange obligations. 4. Applicability: 4.1. Balancing Authorities. 5. Effective Date: First day of first calendar quarter after applicable regulatory approval, or in those jurisdictions where no regulatory approval is required, first day of first calendar quarter after Board of Trustees adoption. B. Requirements R1. Each Balancing Authority shall calculate and record hourly Inadvertent Interchange. (Violation Risk Factor: Lower) R2. Each Balancing Authority shall include all AC tie lines that connect to its Adjacent Balancing Authority Areas in its Inadvertent Interchange account. The Balancing Authority shall take into account interchange served by jointly owned generators. (Violation Risk Factor: Lower) R3. Each Balancing Authority shall ensure all of its Balancing Authority Area interconnection points are equipped with common megawatt-hour meters, with readings provided hourly to the control centers of Adjacent Balancing Authorities. (Violation Risk Factor: Lower) R4. Adjacent Balancing Authority Areas shall operate to a common Net Interchange Schedule and Actual Net Interchange value and shall record these hourly quantities, with like values but opposite sign. Each Balancing Authority shall compute its Inadvertent Interchange based on the following: (Violation Risk Factor: Lower) R4.1. Each Balancing Authority, by the end of the next business day, shall agree with its Adjacent Balancing Authorities to: (Violation Risk Factor: Lower) R4.1.1. The hourly values of Net Interchange Schedule. (Violation Risk Factor: Lower) R4.1.2. The hourly integrated megawatt-hour values of Net Actual Interchange. (Violation Risk Factor: Lower) R4.2. Each Balancing Authority shall use the agreed-to daily and monthly accounting data to compile its monthly accumulated Inadvertent Interchange for the On-Peak and Off- Peak hours of the month. (Violation Risk Factor: Lower) R4.3. A Balancing Authority shall make after-the-fact corrections to the agreed-to daily and monthly accounting data only as needed to reflect actual operating conditions (e.g. a meter being used for control was sending bad data). Changes or corrections based on non-reliability considerations shall not be reflected in the Balancing Authority s Inadvertent Interchange. After-the-fact corrections to scheduled or actual values will not be accepted without agreement of the Adjacent Balancing Authority(ies). (Violation Risk Factor: Lower) R5. Adjacent Balancing Authorities that cannot mutually agree upon their respective Net Actual Interchange or Net Scheduled Interchange quantities by the 15th calendar day of the following 1

month shall, for the purposes of dispute resolution, submit a report to their respective Regional Reliability Organization Survey Contact. The report shall describe the nature and the cause of the dispute as well as a process for correcting the discrepancy. (Violation Risk Factor: Lower) C. Measures None specified. D. Compliance 1. Compliance Monitoring Process 1.1. Each Balancing Authority shall submit a monthly summary of Inadvertent Interchange. These summaries shall not include any after-the-fact changes that were not agreed to by the Source Balancing Authority, Sink Balancing Authority and all Intermediate Balancing Authority(ies). 1.2. Inadvertent Interchange summaries shall include at least the previous accumulation, net accumulation for the month, and final net accumulation, for both the On-Peak and Off- Peak periods. 1.3. Each Balancing Authority shall submit its monthly summary report to its Regional Reliability Organization Survey Contact by the 15th calendar day of the following month. 1.4. Each Balancing Authority shall perform an Area Interchange Error (AIE) Survey as requested by the NERC Operating Committee to determine the Balancing Authority s Interchange error(s) due to equipment failures or improper scheduling operations, or improper AGC performance. 1.5. Each Regional Reliability Organization shall prepare a monthly Inadvertent Interchange summary to monitor the Balancing Authorities monthly Inadvertent Interchange and all-time accumulated Inadvertent Interchange. Each Regional Reliability Organization shall submit a monthly accounting to NERC by the 22nd day following the end of the month being summarized. 2

2. Violation Severity Levels R# Lower VSL Moderate VSL High VSL Severe VSL R1. N/A N/A N/A Each Balancing Authority failed to calculate and record hourly Inadvertent Interchange. R2. N/A N/A The Balancing Authority failed to include all AC tie lines that connect to its Adjacent Balancing Authority Areas in its Inadvertent Interchange account. The Balancing Authority failed to include all AC tie lines that connect to its Adjacent Balancing Authority Areas in its Inadvertent Interchange account. OR AND Failed to take into account interchange served by jointly owned generators. Failed to take into account interchange served by jointly owned generators. R3. N/A N/A N/A The Balancing Authority failed to ensure all of its Balancing Authority Area interconnection points are equipped with common megawatt-hour meters, with readings provided hourly to the control centers of Adjacent Balancing Authorities. R4. The Balancing Authority failed to record Actual Net Interchange values that are equal but opposite in sign to its Adjacent Balancing Authorities. The Balancing Authority failed to compute Inadvertent Interchange. The Balancing Authority failed to operate to a common Net Interchange Schedule that is equal but opposite to its Adjacent Balancing Authorities. R4.1. N/A N/A N/A The Balancing Authority, by the end of the next business day, failed to agree with its Adjacent Balancing Authorities to the hourly values of Net Interchanged N/A 3

R# Lower VSL Moderate VSL High VSL Severe VSL Schedule. AND The hourly integrated megawatthour values of Net Actual Interchange. R4.1.1. N/A N/A N/A The Balancing Authority, by the end of the next business day, failed to agree with its Adjacent Balancing Authorities to the hourly values of Net Interchanged Schedule. R4.1.2. N/A N/A N/A The Balancing Authority, by the end of the next business day, failed to agree with its Adjacent Balancing Authorities to the hourly integrated megawatt-hour values of Net Actual Interchange. R4.2. N/A N/A N/A The Balancing Authority failed to use the agreed-to daily and monthly accounting data to compile its monthly accumulated Inadvertent Interchange for the On- Peak and Off-Peak hours of the month. R4.3. N/A N/A N/A The Balancing Authority failed to make after-the-fact corrections to the agreed-to daily and monthly accounting data to reflect actual operating conditions or changes or corrections based on non-reliability considerations were reflected in the Balancing Authority s Inadvertent 4

R# Lower VSL Moderate VSL High VSL Severe VSL R5. Adjacent Balancing Authorities that could not mutually agree upon their respective Net Actual Interchange or Net Scheduled Interchange quantities, submitted a report to their respective Regional Reliability Organizations Survey Contact describing the nature and the cause of the dispute but failed to provide a process for correcting the discrepancy. Adjacent Balancing Authorities that could not mutually agree upon their respective Net Actual Interchange or Net Scheduled Interchange quantities by the 15th calendar day of the following month, failed to submit a report to their respective Regional Reliability Organizations Survey Contact describing the nature and the cause of the dispute as well as a process for correcting the discrepancy. N/A Interchange. N/A 5

E. Regional Differences 1. Inadvertent Interchange Accounting Waiver approved by the Operating Committee on March 25, 2004includes SPP effective May 1, 2006. Version History Version Date Action Change Tracking 0 April 1, 2005 Effective Date New 0 August 8, 2005 Removed Proposed from Effective Date Errata 1 April 6, 2006 Added following to Effective Date: This standard will expire for one year beyond the effective date or when replaced by a new version of BAL-006, whichever comes first. 2 November 5, 2009 Added approved VRFs and VSLs to document. Removed MISO from list of entities with an Inadvertent Interchange Accounting Waiver (Project 2009-18). Errata Revision 2 November 5, 2009 Approved by the Board of Trustees 2 January 6, 2011 Approved by FERC 6