MEMORANDUM TO THE EXECUTIVE DIRECTORS OF INTERNATIONAL DEVELOPMENT ASSOCIATION

Similar documents
W Panel IBRD IDA I WORLDBANKGROUP

NOTICE OF REGISTRATION. Re: Request for Inspection Red Sea - Dead Sea Water Conveyance Study Program

THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA

Governing Body 334th Session, Geneva, 25 October 8 November 2018

TENTATIVE CHAIR S NOTE POST-MDGS CONTACT GROUP -SUMMARY & FRAMING QUESTIONS- SEPTEMBER 2012

Bank Procedure. Bank Grievance Redress Service (GRS) Bank Access to Information Policy Designation Public

Project Information Document (PID)

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM between ICELAND, THE PRINCIPALITY OF LIECHTENSTEIN,

Comments on the World Bank s Draft Guidance Note for the Environmental and Social Standard 7 Indigenous Peoples

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:PIDC

MARKET PARTICIPANT SERVICE AGREEMENT. This MARKET PARTICIPANT SERVICE AGREEMENT is dated this day of, 2013 and is entered into by and between:

Indonesia: Enhanced Water Security Investment Project

COMPILED RECOMMENDATIONS FROM INDIGENOUS PEOPLES IN THE VARIOUS COMMUNICATIONS TO THE WORLD BANK 1

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name Parent Project Name. Region Country Sector(s) Theme(s)

Multilateral Memorandum of Understanding on. Cooperation Arrangements and Exchange of Information

KAKAMEGA COUNTY GAZETTE SUPPLEMENT

Three-Pronged Strategy to Address Refugee Urban Health: Advocate, Support and Monitor

Lazer Communications CC

RULE ON THE RESOLUTION OF COMPLAINTS AND DISPUTES IN ENERGY SECTOR

By Prof Edwin Kaseke and Mildred Mushunje International Workshop on Indigenous Social Security Systems 7-9 March 2016, Johannesburg

Guatemala Diaspora Development Efforts and Lessons From the Israel-Jewish Diaspora

Photo Credit Zambia Civil Society Organization Scaling Up Nutrition (CSO-SUN) Alliance - Global Day of Action 2014

Chapter 6 Findings 97

Police Reference Check Program - Establishment of Criminal Record and Judicial Matters Checks Process and Proposed Fee

16 February Dear Mr. Rahman,

Streamlined Arbitration Rules and Procedures

PROTECTION FOR PERSONS IN CARE ACT

BYLAWS OF OCEAN BEACH MERCHANT S ASSOCIATION a California Nonprofit Mutual Benefit Corporation ARTICLE I. OFFICES ARTICLE II.

NOTICE 725 OF The closing date for submissions is 26 July Submissions and enquiries must be directed to

AAA Commercial Arbitration Rules and Mediation Procedures (Including Procedures for Large, Complex, Commercial Disputes)

Pierce County Ethics Commission Administrative Procedures (Promulgated pursuant to Pierce County Code Ch. 3.12) Revised December 13, 2017

Discus the various Ways in which the World Bank Inspection Panel assists the Bank in Mainstreaming Human Rights: Cases, IMUTP, HLAP, AICZMP

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection)

THE MILLENNIUM DEVELOPMENT AUTHORITY ACT,

Enabling Environments for Civic Engagement in PRSP Countries

BY-LAWS OF USA RUGBY CHARITABLE FOUNDATION A PENNSYLVANIA NONPROFIT CORPORATION. Updated: August 23, 2012

THE WORLD BANK IBRD IDA I WORLD BANK GROUP

Amnesty International Submission to the World Bank Safeguards Policies Review and Update. 30 April 2013

Terms of Reference (TOR): Stocktaking of the Trade Facilitation Support Program (TFSP)

NOTICE 912 OF INDEPENDENT COMMUNICATIONS AUTHORiTY OF SOUTH AFRICA

Final report. 30 May 2017 ESMA

IC Chapter Gas Pipeline Safety

JUNTOS Y UNIDOS POR PUERTO RICO INC. ARTICLE I Name of the Corporation

Compliance & Enforcement Manual

Pursuant to Section 34 of the Ontario Water Resources Act, R.S.O this Permit To Take Water is hereby issued to:

Trust Fund Grant Agreement. (Second Palestinian NGO Project) between

Oxfam believes the following principles should underpin social protection policy:

BYLAWS of JOHN JAY COLLEGE OF CRIMINAL JUSTICE AUXILIARY SERVICES CORPORATION, INC. * * * ARTICLE I - ORGANIZATION

POLICY SEA: CONCEPTUAL MODEL AND OPERATIONAL GUIDANCE FOR APPLYING STRATEGIC ENVIRONMENTAL ASSESSMENT IN SECTOR REFORM EXECUTIVE SUMMARY

Re: Request for Inspection Republic of Kosovo: Kosovo Power Project (proposed)

EIGHTY-SIXTH SESSION WORKSHOPS FOR POLICY MAKERS: REPORT CAPACITY-BUILDING IN MIGRATION MANAGEMENT

Commercial Arbitration Rules and Mediation Procedures (Including Procedures for Large, Complex Commercial Disputes)

Role and Influence of Civil Society in Malawi s Trade Policy Making Process: The Case of the Malawi Economic Justice Network

Pro-poor REDD+ International negotiations and national REDD+ programmes: the current state of play

The Home Office response to the Independent Chief Inspectors of Borders and Immigration s report: An Inspection of the Right to Rent scheme

National Commission for Certifying Agencies Policy Manual

THE ACADEMIC MAGNET FOUNDATION BYLAWS ARTICLE I. Name and Offices

Pacific Climate Treaty Country Consultations ----January March

WHISTLEBLOWING POLICY

Annex II. The Benefits of Integrating Human Rights Risk Information into the World Bank s Due Diligence

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1065 Project Name. JM Inner City Basic Services for the Poor Region

Appendix 1 Data Processing Agreement

DISTRICT OF COLUMBIA LEVEL 1 INTERCONNECTION APPLICATION & AGREEMENT

Draft Regulation. Regulation to amend the Regulation respecting hot mix asphalt plants. Environment Quality Act

2011 IOM Civil Society Organizations Consultations 60 Years Advancing Migration through Partnership

Ekspertmøte om helsepersonellkrisen, Soria Moria, 24 February 2005.

Carequality Steering Committee Operating Policy and Procedure

RULES OF PROCEDURE OF THE DISCIPLINE COMMITTEE OF THECOLLEGE OF PHYSICIANS AND SURGEONS OF ONTARIO INDEX

The WTO Trade Facilitation Agreement

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM between ICELAND, THE PRINCIPALITY OF LIECHTENSTEIN,

AAA Healthcare. Payor Provider Arbitration Rules and Mediation Procedures. Available online at adr.org/healthcare

Swedish Grant Agreement. (Social Insurance Reform Project) between REPUBLIC OF LATVIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Response to the Consultations on the New Voter Identification Requirements

Ombudsman Assessment Report. Complaint Regarding the Lukoil Overseas Project (Kazakhstan - Karachaganak/03) Western Kazakhstan Oblast, Kazakhstan

SUBMISSION TO THE UNITED NATIONS OFFICE OF HIGH COMMISSIONER FOR HUMAN RIGHTS

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY

Access to remedy for business-related human rights abuses

MOZAMBIQUE EU & PARTNERS' COUNTRY ROADMAP FOR ENGAGEMENT WITH CIVIL SOCIETY

CPR PROCEDURES & CLAUSES. Non-Administered. Arbitration Rules. Effective March 1, tel fax

KATZIE INDIAN BAND - SERVICING AGREEMENT. THIS AGREEMENT is dated for reference the day of, 200_.

ECHOCARDIOGRAPHY QUALITY IMPROVEMENT PROGRAM FACILITY AGREEMENT

BYLAWS OF SAMMAMISH ROTARY FOUNDATION (Adopted by the Board of Trustees , Amended )

/q: ~:-/ ~,. 1 /. '- H, \ f \!,... :';"~ GOVERNMENT NOTICE DEPARTMENT OF TRADE AND INDUSTRY

Rules of Procedure of the Complaints and Dispute Mechanism of the Agreement Sustainable Garment and Textile

Laikipia County. The Wards Development Fund Bill, 2014 LAIKIPIA COUNTY THE WARDS DEVELOPMENT FUND BILL, 2014 ARRANGEMENT OF SECTIONS

Issues, Threats and responses Vanessa Tobin UNICEF Representative Philippines

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

MEMORANDUM OF UNDERSTANDING

Forum Syd s Policy Platform

CALL A RIDE SERVICE, INC.

Proposed Children and Families (Wales) Measure

CITY OF FROM: Chelsea Petersen, Assistant City Manager CHANHASSEN

The USDA Discrimination Complaint Process

CONSTITUTION CAPE TOWN TOURISM

Amended proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Employment Guarantee in South Africa: a case study of the CWP in Munsieville, Johannesburg

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Sri Lanka: Puttalam Housing Project

MEMORANDUM OF UNDERSTANDING. between THE INTER-AMERICAN DEVELOPMENT BANK. and THE INTERNATIONAL LABOUR ORGANIZATION.

The National Energy Board s Enforcement Policy

REGULATIONS RELATING TO GOVERNING BODES OF PUBLIC SCHOOLS (EXCLUDING SPECIAL SCHOOLS, INDUSTRIAL AND REFORM SCHOOLS)

Transcription:

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCI A TJON THE JNSPECfiON PANEL IRI81~Stn:et, N.W. Washirl gt<.w1, D.C. 20433 U.S.A. Telephone: (202) 4S8-S200 Fax: (202) 522-09 16 F.mail: ip.anel@worldbank. ltg Eimi Watanabe Chairperson lpn REQUEST RQ 13/04 July 12,2013 MEMORANDUM TO THE EXECUTIVE DIRECTORS OF INTERNATIONAL DEVELOPMENT ASSOCIATION Request for Inspection Malawi: Second National Water Development Project (P124486) Notice of Receipt of a Request for Inspection and Decision Not to Register the Request Introduction In accordance with paragraph 17 of the Resolution' establishing the Inspection Panel, I hereby inform you that on May 22, 2013, the Inspection Panel (the "Panel") received a Request for Inspection related to the Malawi: Second National Water Development Project - Additional Financing (PI24486). The Request for Inspection is included as i\ttaclunent I. The Request The Request was submitted by Citizens for Justice (CJJ) 2 ("the Requesters") on behalf of other Malawian organizations and "on behalf of a number of concerned, potential and affected residents" in areas where the Northern Region Water Board (NR WB) has and will install prepaid water meters in Mzuzu. The Requesters state that some of the signatories "would prefer to be kepi anonymous in fear of reprisal." 1 The World Bank Inspection Panel, International Bank for Reconstruction and Development and International Development Association, Resolution No. IBRD 93 1 0 and Resolution No. IDA 93-6, dated Seplernber 22, 1993. 1 The Citizens for Justice non-governmental organization d clinc.~t itself as "a J\1/alm 'ian based orgtmization, employing a human rights based approach to ensure that development furthers the realizmion and principles of equity. participmion. empowermem, non-discrimination. accountability, transparenc.y, rule of law and environmental sustainability.''

The Project The Second National Water Development Project (the "SNWDP") was approved by the Board of Executive Director of International Development Association (IDA) on May 24, 2007, and supported by an IDA Credit in the amount of $50 million equivalent. The Board approved Additional Financing for it in November 2011, through an IDA Credit in the amount of $120 million equivalent, to cover unanticipated cost ovcrnms and scaling up of the impacts. The Republic of Malawi is the Recipient of the IDA funds. IDA then entered into five separate Project Agreements with five different Regional Water Boards (Blantyre, Central Region, Lilongwe, Northern Region, and Southern Region), as Project Implementing Agencies. The objectives of SNWDP are to: (a) increase access to sustainable water supply and sanitation services for persons living in cities, towns, villages, and market centers; and (b) improve water resources management at the national level. The closing date ofsnwdp is October 31, 2015. The SNWDP includes piloting of prepaid water meters in Northern Region, including in Mzuzu, implemented by the Northcm Region Water Board. Concerns raised in the Request The Request concerns the piloting of prepaid water meters in Mzuzu by the Northern Region Water Board (NRWD), through the replacement or currently installed household meters with the prepaid water meters (PWMs) under the SNWDP. The Requesters are concerned with the Ji:1llowing aspects, or impacts, of the pilot. Absence of prior consultations and/or disclosut e of information. The Requesters claim that no consultations or disclosure of information were undet1aken in accordance with accepted procedures of the Bank safeguards, prior to the installation of prepaid water meters in affected households. Impact on the poor and on children. The Requesters state that Dank's failure to conduct due diligence in accordance with its policies will cause hann by denying access to water to poor households and increasing water borne diseases. The Requesters also state that Malawi has a high rate of child-headed households and orphans who have no source of stable income, and thus will have serious challenges adapting to the system. Street children going to several public schools might sufler negative impacts as the new system may not support the water and sanitation structures found in most public schools. Increase in water tariffs. The Requesters claim that the pilot has increased the water tariff through two ways: (I) they believe that they are paying an additional daily fee (of MK53.00 covering meter cost and not water consumption); and, (2) the residents who used to pay an average of about $10 a month arc now paying an increased tariff, of about $15 a month. They state that this contravenes the water tariffs which have been set and accepted by the Government of Malawi. 2

Lack of prior assessment of impacts. The Requesters claim that the Bank team has suggested that they think the potential issues could be resolved through an update of an older Poverty and Social Impact Assessment (PSIA). The Requesters consider this to be an inadequate response to serious concerns, and believe that due diligence would have required an ex-ante approach. Human Rights implications. The Requesters claim two issues of Hwnan Rights are ignored. First, their right to participation and free and prior informed consent was not respected when the Water 13oard did not consult let alone seck resident's consent in piloting the prepaid water meters, thus not allowing residents to decide whether they want to participate in the pilot or not. Secondly, the Requesters argue that their right to water was not respected, as the Requesters consider that the pilot stands against the entitlements contained in the right to water, and deprives people of the equal opportunity to enjoy their right to water. Other claims of harms. The Requesters also list as possible impacts from the installation of prepaid water meters: i) the disruption of the social fabri c; ii) the increase in the incidence of communicable diseases; iii) the emergence of conflicts over natural resources; and, iv) the creation of social conflict and/or inequity. The Requesters slate that they believe that the pilot violates tbe Bank's own screening policies and its "safeguard credence of Do No Harm"'. They also state that specific provisions of some Bank Policies have been violated: these include OP 1.00 on Poverty Reduction, OP 4.01 on Envirorunental Assessment, OP 4.02 on Environmental Action Plans, OP 4.07 on Water Resources Management, and OP 4.20 on Gender and Development. The Requesters conclude that they trust that the "lmpection Panel, the World Bank project team, the Mini.Wy and the Water Board5 will continue the engagement with residents, other stakeholders and CFJ in order to.find best possible solutions." Panel's Determination Following the receipt of the Request for Inspection, and because of the insufficient infonuation concerning the pilot in SNWDP-related documents, the Inspection Panel has had several interactions, both verbal and written with Citizens for Justice, as representative of the Requesters, and Bank Management, to seek factual clarification concerning the pilot. The Panel is grateful for the full cooperation that both parties have extended to it during this period. The Panel notes that the Requesters and Management share similar concerns about distributional impact of the installation of prepaid water meters to poor communities and expressed the need for monitoring and assessment of the pilot. Both Requesters and Management conf1rmed that the pilot of installing prepaid water meters, currently being implemented under the SNWJJP, covers tniddlc and high income households in communities with existing post-paid water meters. The Request raises three key issues namely: i) the voluntary nature, or lack thereof, of participation in the pilot (i.e., procedures of opting-in and possibilities of opting-out); ii) the 3

potential negative impact of prepaid water meters on poor households and children; and, iii) how lessons from the pilot will infonn decisions on any potential further roll-out. The Requesters note the need for studies/assessments that look at potential risks for poor and vulnerable households should the prepaid water meters be introduced beyond middle and high income households. A future roll-out may potentially include communal standpipes and public institutions such as primary schools and health centers. The Requesters are criticall y concerned with the potential impact at the roll-out stage. They are specifically concerned that a poorly designed and executed program of' installing the prepaid water meters may deprive low-income households of their right to safe, clean, accessible and affordable drinking water. The Requesters arc concerned that negative impacts such as repotted to have occurred in Soweto, South Africa, and in the United Kingdom, would occur in Malawi. On July I 0, 2013, Bank Management provided to the Panel additional clarifications regarding the prepaid metering pilot in Mzuzu City under the SNWDP (See Attachment 2). Management note includes infonnation and clarification regarding the voluntary nature of the pilot, its evaluation and monitoring, and water tariffs. Regarding the voluntary nature of the installation of PWM, Management sought and received confim1ation from the NR WB on May 29, 2013, "that customers are being advised of the pilot's voluntmy character and can opt for either a pre-paid or post-paid meier. Participation is equally voluntmy.for any schools or hospitals in the pilot area." Management relayed to the Panel that infom1ative leaflets and installation agreements currently reflect the voluntary nature of the operation. Regarding the monitoring and evaluation of the impacts from the installation of prepaid water meters, Management relayed NRWB's commitment to engage with relevant stakeholders (affected households, community groups and CSOs) to seek their inputs and feedback, before it considers the pilot for a broader area. Management states that NRWB will establish a monitoring system, which will assess customer feedback (satisfaction, adverse impacts, tccltllology employed, impact on the linance of the utility and the potential for scale up). According to Management, the pilot operation will undergo a review and analysis throughout the process, and the information collected will inform subsequent decisions on any futther roll-out of the prepaid water meter scheme. In addition, Management notes its commitment to make additional cffotis to assess related potential risks to low-income households if it is decided to expand the pilot scheme to high density/low-income areas. Management infom1ed the Panel that the Water and Sanitation Program (a multi-donor partnership administered by the World Bank) is undertaking a separate study on the impact of prepaid water meters on low-income households in Africa, which wi ll infom1 the pilot. In its note, Management also clari lies that there are no increases in tari fls charged. Management confirms that postpaid water bills and prepaid water credits use the same tariff structure, which is based on a unit rate (MK/m3 consumed) set nationally through a Government gazette. Management confirms that no installation, cottllection, or other additional charges related to the pilot are included in the tariffs. The difference is actually in the method of payment. 4

As outlined above, the Panel notes the measures being taken by Management and NRWB to address the issues raised by the Requesters, as they relate to the pilot and potential roll-out of the prepaid water meters to poor communities. The Panel notes that the pilot installation of PWM is voluntary and that the issue of potential adverse impacts on low income households will be assessed prior to any possible roll-out based on the monitoring and evaluation of the pilot, with the engagement of relevant stakeholders (affected households, community groups and CSOs). The Panel notes that the Requesters' remaining concerns or harn1 relate to any possible roll-out of the prepaid water meters, rather than the current installation of prepaid meters under the pilot. The possibility of harm at the roll-out stage is predicated on a decision to expand the installation of prepaid water meters to low-income communities, which is yet to be made. In light of the foregoing, the Inspection Panel is not registering the Request for Inspection at this time. The Panel notes that the Requesters have the right to submit a new Request for Inspection, if they believe that, in a subsequent roll-out, their rights and interests are, or would likely be, directly affected by the Bank's own actions or omissions in relation to compliance with its operational policies and procedures. Yours sincerely, Attaclunents Emi Watanabe Chairperson Mr. Jim Yong Kim, President International Development Association The Executive Directors and Alternates International Development Association Mr. Reinford Mwangondc Citizens for Justice, Lilongwe, Malawi Mr. O.K. Rotha Mzuzu, Malawi 5