BEFORE THE FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES IN SOUTHERN POWER DISTRIBUTION COMPANY OF A.P LIMITED TIRUPATI

Similar documents
CONSUMER GRIEVANCES REDRESSAL FORUM-I OF SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED

NORTHERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED WARANGAL

Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur Case No.

CONSUMER GRIEVANCES REDRESSAL FORUM; MSEDCL NAGPUR (RURAL) ZONE NAGPUR COMPLAINT NO.7 /2015

Sri. Alex Soharab. V.F, M/s. Southern Engineering Corporation, V/830-A, Development Area, Edayar, Muppathadom , Aluva.

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED

CONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 352/2011

No:- CGRF/AZ/AUR/U/ 446 / 2013 /30 Date :-

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH. Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh, Member

M/s. Heer Enterprises - Applicant

REGISTERED CONSUMERS GRIEVANCES REDRESSAL FORUM AT KASUMPTI SHIMLA-9 No. CGRF/Comp. No. 1453/1/17/005

CONSUMER GRIEVANCE REDRESSAl FORUM,

Sangeeta Verma Secretary. No. Secy/ UPERC/Supply Code/ Lucknow: Dated Sir,

CASE No. 337 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member ORDER

Date of Admission : Date of Decision :

THE TAMIL NADU ELECTRICITY REGULATORY COMMISSION

IN THE MATTER OF GRIEVANCE NO. K/DOS/001/482 OF OF MRS.

BEFORE THE CONSUMER GRIEVANCES REDRESSAL FORUM O R D E R

Consumer Grievance Redressal Forum and Ombudsman

Case No. 2 of Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member

Consumer Grievance Redressal Forum and Ombudsman

Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) Ph: & Ext: - 122

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION. PETITION No. CP 02/17

Grievances No.K/DOS/015/874 of and No. K/DOS/016/875 of

ORDER Dated: 11 th August, 2004

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA

SEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004

NOTICE. MPERC (Establishment of Forum and Electricity Ombudsman for redressal of grievances of the consumers) Regulations, 2004

Case No. DH/CGRF-1595/2017 Date of Institution: Date of Hearing: Date of Order: 25/01/2017

Case No. 135 of Shri Vijay L. Sonavane, Member Smt. Chandra Iyengar, Member. (1) M/s B.S.Channabasappa & Sons...Petitioner 1

INDEX. Sr. No. Particulars Page No.

SEVENTEENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004.

The complaint dated regarding to give AG connection in dark zone scheme.

V/s. Maharashtra State Electricity Distribution Company Limited Through it s Nodal Officer/Addl.EE... (Hereinafter referred as Licensee)

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Notice dated U/s130 of Electricity Act2003.

Shri P J Patel, Gandhinagar Independent Member Harsha S Chauhan, Vadodara Technical Member Smt M M Marathe, MGVCL

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

GOVERNMENT OF ANDHRA PRADESH GENERAL ADMINISTRATION (ELECTIONS) DEPARTMENT

THE ASSAM GAZETTE, EXTRAORDINARY, MAY 7,

Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur. Case No.

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012)

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/ ) QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member.

Case No. 295 of Coram. Anand B. Kulkarni, Chairperson Mukesh Khullar, Member. Adani Power Maharashtra Limited (APML)

ORISSA ELECTRICITY REGULATORY COMMISSION (GRIEVANCES REDRESSAL FORUM AND OMBUDSMAN) REGULATIONS, 2004

Case No. 99 of Smt. Chandra Iyengar, Chairperson Shri Vijay. L. Sonavane, Member Shri. Azeez M. Khan, Member

NEPRA Office Building, G-511, Attaturk Avenue (East), Islamabad "

Brihan Mumbai Electric Supply & Transport Undertaking (Of the Municipal Corporation of Greater Mumbai)

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX

Case No.139 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member

ORDER (Date of hearing 24 th November, 2012) (Date of order 10 th December, 2012)

Case No.25/2016 Date of Grievance : Date of Order :

1. The Chief Engineer (OP).

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 119/MP/2013. Date of Hearing: Date of Order :

Case No.06/2016 Date of Grievance : Date of Order :

HARYANA ELECTRICITY REGULATORY COMMISSION. Notification. The 10th August, Electricity Supply Code. (1) recovery of electricity charges,

Karnataka Power... vs Ashok Iron Works Pvt. Ltd on 9 February, Karnataka Power... vs Ashok Iron Works Pvt. Ltd on 9 February, 2009

Divisional Engineer, DIGITAL TRANSMISSION CENTER Southern Telecom Sub Region, 3 rd Floor, Telephone Bhavan, Saifabad, Hyderabad ,

OFFICE OF THE COMMISSIONER OF HEALTH AND FAMILY WELFARE A.P. HYDERABAD

Memo No. Ch- 43/GM/Comml./ R-16/139/04 Dated:

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

CASE No. 173 of Coram. Shri Anand B. Kulkarni, Chairperson Shri Mukesh Khullar, Member

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004

AGREEMENT FOR SUPPLY OF HT ENERGY

THE NATIONAL SMALL INDUSTRIES CORPORATION LIMITED.

ORDER (passed on 02/07/2015)

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : ELECTRICITY MATTER. Date of Decision : January 16, 2007 W.P.(C) 344/2007

M.P. POORV KSHETRA VIDYUT VITRAN COMPANY LIMITD Block No. 7 Shakti Bhawan, Rampur, Jabalpur Phone No , Fax No.

IN THE HIGH COURT OF KARNATAKA, BENGALURU PRESENT THE HON'BLE MR. JUSTICE VINEET SARAN AND THE HON BLE MR. JUSTICE ARAVIND KUMAR C.S.T.A.NO.

Bhopal dated 6th August, 2004

Case No. 68 of Coram. Shri. I. M. Bohari, Member Shri. Mukesh Khullar, Member. M/s RattanIndia Nasik Power Ltd.

CONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 365/2012

Suo-Motu Petition No. 2/2018

Appointment of Internal Ombudsman (IO) For Redressal of Customer Grievance

ASSAM ELECTRICITY REGULATORY COMMISSION

Shri P J Patel, Gandhinagar Independent Member Harsha S Chauhan, Vadodara Technical Member Medha M Marathe, MGVCL

CASE No. 156 of In the matter of

Case No. CGRF(NZ)/91/2018

IN THE HIGH COURT OF JHARKHAND AT RANCHI

TAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)

* IN THE HIGH COURT OF DELHI AT NEW DELHI

Agreement for H.V./ L.V. Consumer.

No. 1/5/2016-IR Govt. of India Mlnistrty of Personnel, Public Grievances & Pensions Department of Personnel & Training

[TO BE PUBLISHED IN GAZETTE OF INDIA, EXTRAORDINARY, PART II, SECTION 3, SUB-SECTION (i)]

Memorandum of understanding (MOU)

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)

MAHARASTRA STATE ELECTRICITY DISTRIBUTION CO. LtD. KONKAN ZONE RATNAGIRI CONSUMER GREVANCE REDRASSAL FORUM Consumer case No. 37/2009 Date: 08/04/2009

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI. Case No. 21 & 23 of 2010 ORDER

BOSCH REXROTH (INDIA) LIMITED

2. Chief Engineer (PPA) UP Power Corporation Limited 14 th Floor, Shakti Bhawan Ext. 14 Ashok Marg, Lucknow.Respondent

The Orissa Electricity (Duty) Act, 1961.

Before the Appellate Board National Electric Power Regulatory Authority (NEPRA) Islamic Republic of Pakistan

IN THE HIGH COURT OF KARNATAKA, DHARWAD BENCH DATED THIS THE 4 TH DAY OF AUGUST, 2015 BEFORE THE HON BLE MR. JUSTICE K.N.

No.MePDCL/D(D)/T-383(B)/ /6 Dated 6 th December 2016 OFFICE ORDER

HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED MANUAL OF PRACTICES FOR HANDLING CONSUMERS COMPLAINTS NOTIFICATON

Uttar Pradesh Electricity Regulatory Commission

Transcription:

BEFORE THE FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES IN SOUTHERN POWER DISTRIBUTION COMPANY OF A.P LIMITED TIRUPATI On this the ----------- day of July 2014 In C.G.No: 201/2013-14/ Kadapa Circle Present Sri K. Paul Sri A. Venugopal Sri T. Rajeswara Rao Sri A. Satish Kumar Chairperson Member (Accounts) Member (Legal) Member (C.A) Between Sri. B.Subramanyam Prop of OM Maruthi Rice Mill, Opp Pattabhirama Mandadi Complex, Mydakur Road, Mydakur- Post, Proddatur Mandal, Kadapa-Dist-516360 Complainant And 1. Assistant Accounts Officer/ERO/ Proddatur 2. Assistant Engineer/Operation/South/Proddatur 3. Assistant Divisional Engineer/Operation/Proddatur Respondents 4. Divisional Engineer/Operation/Proddatur 5. Senior Accounts Officer/Operation/Kadapa 6. Superintending Engineer/Operation/Kadapa * * * Sri. B.Subramanyam, Prop of OM Maruthi Rice Mill, Opp. Pattabhirama Mandadi Complex, Mydakur Road, Mydakur- Post, Proddatur Mandal, Kadapa- Dist-516360 herein called the complainant, in his complaint dt:20-02-2014 filed in the Forum on dt:20-02-2014 under clause 5 ( 7 ) of APERC regulation 1/2004 read with section 42 ( 5 ) of I.E.Act 2003 had stated that Page 1 of 8

1. He is a consumer utilizing supply for his rice mill at Proddatur with ScNo:18258 South Section, Proddatur. 2. His service above was billed under category III (B) since 6 years and the category was changed from III (B ) to III (A) during 01/2013 in response to his letter dt::22-12-2012. 3. The DISCOM in its circular dt:28-10-2011 stated that the maximum load for rice mills shall be considered under LT-III (A) upto 100 HP instead of 75HP until further orders. 4. But the same DISCOM in its circular dt:09-07-2012 stated that conversion of LT-III (B) to category III (A) having a contracted load upto 100HP can be effected and recategorised under LT-III (A) and billed accordingly as per the tariff order 2012-13. 5. He, on 14-06-2013 in this matter had represented the local authorities to refund the excess amount billed under category-iii (B) as per the guidelines and his service also in LT-III (A) from 28-10-2011,but in response the category was changed during 01/2013. 6. Requested to do justice duly revising the bills from 28-10-2011 billed under LT-III (B) instead of LT-III (A). Notices were served upon the respondents duly enclosing a copy of complaint. The respondent-5 i.e. the Senior Accounts Officer/Operation/Kadapa in his written submission dt:03-03-2014 received in the Forum on 10-03-2014 stated that: 1. ScNo:CDP 1045, M/s OM Maruthi Rice Mill Billed under category III (B) upto 12/2012 and on request of the consumer the service was transferred to ERO in Memo No:SE/O/CDP/SAO/JAO/HT/DNo.759/13, Page 2 of 8

dt:21-01-2013. In this connection it is submit that as per the instructions issued in Memo.No. CGM/O/DE/Comml/F.Circular/ DNo.587/11, Dt:28-10-2011 and Memo No:CGM/Fin/GM-R/AO/AAO/ HT/DNo.3/12, Dt:4-1-2012 action was taken to transfer the certain rice mills including III B ScNo:1045 M/s Maruthi Rice Mill from III B to III A tariff upto a RMS of 93KV in this office Memo.No:SE/O/KDP/ SAO/JAO/HT/D.No:220/12/ Dt:03-04-2012. 2. In Endt No:SE/O/KDP/JAO/HT/DNo:239/12/dt:19-04-2012 the master updation form i.e. to bills stop the III B services in respect of Rice Mill upto 93KVA (100HP) sent to GM/R/APSPDCL/Tirupati. But in Memo.No:CGM/Fin/GM/R/SAO/AAO/JAO/HT/DNo:442/12,dt:24-04- 2012 it was informed that instructions were already issued very clearly stating that the instructions apply to those services which are already under LT-Category-III (A) only but not other services. 3. Hence all the test reports agreements transferred to ERO in-respect of Rice mills services upto 93 KVA obtained from the EROs and billed in central office only under III (B). 4. In Memo No:CGM/O/DE/Comml/D.No:546/12 dt:09-07-2012 informed by the CMD that conversion of LT category-iii B to III A having contracted load up to 100HP can be effected and re-categorize under LT category-iii B to III A having contracted load upto 100 HP can be effected and re-categorize under LT category III A and billed as per the tariff order 2012-13. Clarification was sought from CGM/Fin/APSPDCL/Tirupati in this office Lr.No:SE/O/KDP/ SAO/JAO/ HT/ DNo.519/12, dt:14512 in this regard. Page 3 of 8

5. In Memo No:CGM/Fin/GM/R/Senior Accounts Officer/AAO/JAO/HT/ FLCL/D.No.1335/12 dt:16-11-2012 approval was accorded for transfer of billing LT category III B services which are having contracted load of less than or equal to 100HP from HT billing system to LT billing system upon request of the consumer only. 6. The DE/O/PDR/Comml in LrNo:F.35/D.No.1021/12/dt:20-11-2012 has submitted 13 Nos representations received from category-iii B consumer i.e. Rice Mills pertaining to operation Sub-Divisions, Proddatur opting their services from III B to III A including the representation of the said above consumer. 7. In Memo No. SE/O/KDP/SAO/JAO/HT/D.No.759/13, Dt:21-2013 above 15 cases transferred to concern ERO s along with test report /agreement who have requested for transfer their services to ERO including said above consumer case. Further consumer representation dt:22-12-2012 received through Memo No:CGM/Fin/GM/R/SAO/AAO/ JAO/DNo:03/2013 dt:02-01-2013 to take necessary action as per rules in vogue. 8. The consumer represented first in his representation dt:07-11-2012 which was received in DE s letter on 20-11-2012. Thus the CC.bill issued under III B in 12/12 will have to be revised under III A and the difference amount will be sent to ERO through TCA during this month. The respondent-3 i.e. the Assistant Divisional Engineer/Operation/ Proddatur in his written submission dt:11-03-2014 received in the Forum on 13-03-2014 stated that: Page 4 of 8

1. The readings of M/s OM Maruthi Rice Mill, HT SC.No:1045 KDP, present ISC.No:18258, South Proddatur was taken under category-iii- B till billing month of January 2013. 2. The guidelines were issued vide Memo:Dt:28-10-2011 to bill the Rice Mills under category III A having contracted load of below 100HP. 3. Further, it is to submit that, the Senior Accounts Officer, Central Office, Kadapa has transferred the ISC.No:18258 from category-iii A with effect from 20-12-2012. Findings of the Forum 1. The complainant is running a rice mill with a contracted load of 99.5HP. The service was billed under III (B) since 6 years and was changed to III (A) during 01/2013 at his request, but the authorities without considering his request for effecting the billing in category- III (A) from 28-10-2011 itself had effected from 01/2013 and till such time the service was billed under LT-III (B) contra to the provisions given by the licensee as well as the tariff order. Requested to refund the amount by revising the bills with effect from 28-10-2011 treating the service under LT-III (A) and do justice. 2. The respondent-5 i.e. the SAO/Opn/Kadapa in his reply stated that there were 13 numbers consumers represented for opting their services from LT-III (B) to LT-III (A) which includes the present complainant s service also. In about 15 number cases of such with the instructions of the SE/Opn/Kadapa dt:21-01-2013 were transferred to ERO s along with test reports and agreements converting the services into LT-III (A) with effect from 20-12-2012. Page 5 of 8

3. Based on the consumers representation dt:07-11-2012 received in DE s office on 20-11-2012 and hence the CC.bill issued under category III (B) in the month of 12/12 will have to be revised under category-(a) and the difference amount will be sent to ERO through TCA during this month. 4. The consumer represented for change of category of his service with effect from 28-10-2011, but the respondents effected the change of category from 01/2013 onwards which is contra to the request of the consumer and there by the consumer approached the Forum for redressal of his grievance. 5. As could be seen from the account copy of the service the service was released for a load of 99.5HP under the title M/s OM Maruthi Rice Mill and was in 99 from 05/2012 till 01/2013 and from there onwards there was consumption. 6. The highest MD recorded was 81KVA in the month of 04/2014, but the calculated HP corresponding to the RMD was 70.9HP 7. As such he request of the complainant for effecting for refunding the excess amount billed under category-iii (B) as per guide lines his service has to be billed under category-iii (A) from 28-10-2011. 8. The SE/Opn/Kadapa explained that the CGM/Finance/SPDCL/ Tirupati in his Memo dt:24-04-2012 informed that instructions were already issued very clearly stating that the instructions applied to those services which are already under category-iii (A), but not other services. 9. The contention of the CGM/Finance/APSPDCL/Tirupati is acceptable since there are no traces of representation by the Page 6 of 8

consumer in the earlier days of 10/2011 regarding option to go to LT-III (A) upto 100HP billing instead of HT. 10. The change of the service from HT billing to LT billing system for the loads less than or equal to 100HP in case of rice mills is to be done upon request of the consumer only as clarified by the CGM/Finance/SPDCL/Tirupati in his memo dt:16-11-2012 11. But here in this case though the complainant mentioned that he had represented that the matter to the respondents earlier on 22-12-2012, 12-03-2013 and 14-06-2013, he did not produce any evidence to that effect, but however the respondent-3 i.e. the ADE/Opn/Town/ Proddatur in his reply stated that the consumer made his representation on 22-12-2012 and hence the change of billing is effected from 20-12-2012 two days advance. 12. But the SAO/Opn/Kadapa in his reply accepted that the consumer made representation at first on 07-11-2012 which was received in the DE s office on 20-11-2012 and hence the bill issued under category-iii-(b) for the month of 12/2012 also to be revised considering the service under LT-III (A) and the difference amount will be adjusted under TCA at the ERO. 13. The Forum had conducted a personnel hearing with the respondents and the complainant in the main conference hall of Corporate Office of APSPDCL, Tirupati on 05-07-2014 at 11:00 hrs. 14. During the hearing above, it was accepted by the respondents that they have already communicated the instructions to all Superintending Engineers/Operation vide Memo No:CGM/Opn/DE/ Comml/F.Circulars/D.No:424/12, Dt:21-05-2012 to take necessary Page 7 of 8

action for adjustment of penal charges levied if any for exceeding 75HP from 28-10-2011 to 31-03-2012. 15. As such the Forum felt that it is genuine to implement the above instructions uniform to all the consumers of such class utilizing power for rice mill with effect from 28-10-2011 onwards. In view of the above, the Forum passed the following order. ORDER The respondents are directed that they shall effect the bill revision with effect from 28-10-2011 in-respect of the complainant s service No.18258 within 15 days from the date of this order with due intimation to the consumer and report compliance to the Forum within further 7 days provided that the service contracted load doesn t exceed 100HP. Accordingly the case is allowed in full and disposed off If aggrieved by this order, the complainant may represent to the Vidyut Ombudsman, 1 st Floor, 33/11KV Sub-Station, Hyderabad Boat Club Lane, Lumbini Park, Hyderabad-500063, within 30 days from the date of receipt of this order. Signed on this, the ----------- day of July 2014. Member (Legal) : Member (C.A) : Member (Accounts) : Chairperson : Page 8 of 8

To The Complainant The Respondents Copy to the General Manager/ CSC/ Corporate office/ Tirupati for pursuance in this matter. Page 9 of 8