REPUBLIC OF SOUTH AFRICA IN THE HIGH COURT OF SOUTH AFRICA GAUTENG DIVISION, PRETORIA JUDGMENT

Similar documents
THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG JUDGMENT. Reportable Case No J1869/15 In the matter between: NATIONAL UNION OF METALWORKERS OF SA

IN THE LABOUR COURT OF SOUTH AFRICA JOHANNESBURG JUDGMENT BARBERTON MINES (PTY) LTD

IN THE HIGH COURT OF SOUTH AFRICA FREE STATE DIVISION, BLOEMFONTEIN ENSEMBLE TRADING 535 (PTY) LTD

REPUBLIC OF SOUTH AFRICA IN THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG JUDGMENT KHULULEKILE LAWRENCE MCHUBA PASSENGER RAIL AGENCY OF SOUTH AFRICA

IN THE HIGH COURT OF SOUTH AFRICA. P. A. PEARSON (PTY) LTD Applicant

AXTON MATRIX CONSTRUCTION CC...Applicant METSIMAHOLO LOCAL MUNICIPALITY

IN THE GAUTENG DIVISION HIGH COURT, PRETORIA (REPUBLIC OF SOUTH AFRICA)

JUDGMENT THE HIGH COURT OF SOUTH AFRICA GAUTENG LOCAL DIVISION, JOHANNESBURG CASE NO: 31739/2015. In the matter between: And

FREE STATE HIGH COURT, BLOEMFONTEIN REPUBLIC OF SOUTH AFRICA KRAMER WEIHMANN AND JOUBERT INC.

THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG JUDGMENT

THE LABOUR COURT OF SOUTH AFRICA JOHANNESBURG SASOL MINING (PTY) LTD

MEC: EDUCATION - WESTERN CAPE v STRAUSS JUDGMENT

IN THE HIGH COURT OF SOUTH AFRICA (EASTERN CAPE CIRCUIT COURT, EAST LONDON) BLUE NIGHTINGALE TRADING 397 (PTY) LTD t/a SIYENZA GROUP

/SG IN THE HIGH COURT OF SOUTH AFRICA (NORTH AND SOUTH GAUTENG HIGH COURT, PRETORIA)

[1] In this case, the defendant applied for absolution from the

THE SUPREME COURT OF APPEAL OF SOUTH AFRICA JUDGMENT SOUTH AFRICAN LOCAL AUTHORITIES PENSION FUND

IN THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG

FIDIC Conditions of Contract for Construction

THE HIGH COURT OF SOUTH AFRICA GAUTENG DIVISION, PRETORIA

Republic of South Africa IN THE HIGH COURT OF SOUTH AFRICA (WESTERN CAPE HIGH COURT, CAPE TOWN) JUDGMENT DELIVERED : 3 NOVEMBER 2009

IN THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG

IN THE HIGH COURT OF SOUTH AFRICA. FIRSTRAND BANK LIMITED Plaintiff. ANDRé ALROY FILLIS First Defendant. MARILYN ELSA FILLIS Second Defendant JUDGMENT

IN THE SOUTH GAUTENG HIGH COURT, JOHANNESBURG (REPUBLIC OF SOUTH AFRICA) APPEAL CASE NO : A5044/09 DATE: 18/08/2010 In the matter between:

[1] In this matter the Court is called upon to decide two issues. They both

IN THE HIGH COURT OF SOUTH AFRICA GAUTENG DIVISION, PRETORIA JUDGMENT

IN THE HIGH COURT OF SOUTH AFRICA KWAZULU-NATAL DIVISION, PIETERMARITZBURG

VECO MA-BATHO EPPY BODIA

FREE STATE HIGH COURT, BLOEMFONTEIN REPUBLIC OF SOUTH AFRICA

IN THE HIGH COURT OF SOUTH AFRICA (WESTERN CAPE DIVISION, CAPE TOWN) MICHAEL ANDREW VAN AS JUDGMENT DELIVERED ON 26 AUGUST 2016

HIGH COURT OF SOUTH AFRICA (GAUTENG LOCAL DIVISION, JOHANNESBURG)

In re: Request for Consideration of Intermediate Merger between. Mr Dumisani Victor Ngcaweni and Others

REPUBLIC OF SOUTH AFRICA THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG JUDGMENT

CAPE TOWN IRON & STEEL

IN THE KWAZULU-NATAL HIGH COURT, DURBAN REPUBLIC OF SOUTH AFRICA

IN THE NORTH GAUTENG HIGH COURT, PRETORIA (REPUBLIC OF SOUTH AFRICA) MOGALE, DAISY DIBUSENG PAULINAH...First Applicant

REPUBLIC OF SOUTH AFRICA IN THE HIGH COURT OF SOUTH AFRICA GAUTENG LOCAL DIVISION, JOHANNESBURG

JUDGMENT. 1 I am required to decide the disputes disclosed by the defendant's. special plea of prescription raised in defence to the plaintiffs claim.

In the Labour Court of South Africa Held in Johannesburg. Northern Training Trust. Third Respondent. Judgment

In the matter between: UNIVERSITY OF PRETORIA JUDGMENT. [1] This is an application in terms of which applicant seeks the following declaratory orders:

OBO RICHARD CHARLES MATOLA MBOMBELA LOCAL MUNICIPALITY

IN THE KWAZULU-NATAL HIGH COURT, DURBAN REPUBLIC OF SOUTH AFRICA. Lampac CC t/a Packaging World. John Henry Hawkey N.O.

BUFFALO CITY METROPOLITAN MUNICIPALITY

IN THE HIGH COURT OF SOUTH AFRICA GAUTENG LOCAL DIVISION, JOHANNESBURG THE SPAR GROUP LIMITED

REPUBLIC OF SOUTH AFRICA ... \ l ' IN THE HIGH COURT OF SOUTH AFRICA (GAUTENG DIVISION, PRETORIA)

IN THE HIGH COURT OF SOUTH AFRICA (WESTERN CAPE DIVISION, CAPE TOWN) THE CITY OF CAPE TOWN CORNELIS ANDRONIKUS AUGOUSTIDES N.O.

OFFICE OF THE CHIEF JUSTICE REPUBLIC OF SOUTH AFRICA

certificate of occupancy- Building Standard Act, 103 of IN THE HIGH COURT OF SOUTH AFRICA GAUTENG DIVISION, PRETORIA CASE NO: 2016/12186

IN THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG JUDGMENT Case no. JR1005/13. SOUTH AFRICAN MUNICIPAL WORKERS UNION (SAMWU) obo SD MOLLO & PE NAILE

THE SOUTH AFRICAN POSITION ON STRIKES: VIEWED FROM THE. South Africa included in within its Constitution a detailed provision governing

IN THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG NUPSAW OBO NOLUTHANDO LENGS

IN THE NORTH GAUTENG HIGH COURT, PRETORIA (REPUBLIC OF SOUTH AFRICA)

THE LABOUR COURT OF SOUTH AFRICA, HELD AT JOHANNESBURG

PIK-IT UP JOHANNESBURG (PTY) LTD. Third Respondent JUDGMENT. [1] This is an application in terms of which the applicant seeks to have the

JUDGMENT. Belet Industries CC t/a Belet Cellular. MTN Service Provider (Pty) Ltd

REPUBLIC OF SOUTH AFRICA IN THE GAUTENG DIVISION OF THE HIGH COURT, PRETORIA

27626/13-MLS 1 JUDGMENT (GAUTENG LOCAL DIVISION, JOHANNESBURG)

IN THE COMPANIES TRIBUNAL OF SOUTH AFRICA, PRETORIA. Triumph International Aktiengesellschaft. Trimph Holdings (Pty) Ltd. Decision

THE LABOUR COURT OF SOUTH AFRICA JOHANNESBURG

IN THE HIGH COURT OF SOUTH AFRICA KWAZULU-NATAL DIVISION, PIETERMARITZBURG

IBHUBHEZI POWERLINES CC

IN THE LABOUR COURT OF SOUTH AFRICA HELD AT JOHANNESBURG

IN THE HIGH COURT OF SOUTH AFRICA (NORTHERN CAPE DIVISION, KIMBERLEY)

Public offerings of company securities: a closer look at certain aspects of chapter 4 of the Companies Act 71 of 2008 JACQUELINE YEATS*

REPUBLIC OF SOUTH AFRICA IN THE HIGH COURT OF SOUTH AFRICA GAUTENG LOCAL DIVISION, JOHANNESBURG

The first plaintiff is a businessman who was acting as an agent of the. terms of the laws of the Republic of South Africa.

JUDGMENT THE HIGH COURT OF SOUTH AFRICA GAUTENG LOCAL DIVISION, JOHANNESBURG CASE NO: 30400/2015. In the matter between: And

IN THE HIGH COURT OF SOUTH AFRICA (GAUTENG DIVISION, PRETORIA) THE REGISTRAR OF THE HEAL TH PROFESSIONS COUNCIL

CAPE POINT VINEYARDS (PTY) LTD v PINNACLE POINT GROUP LTD AND ANOTHER (ADVANTAGE PROJECTS MANAGERS (PTY) LTD INTERVENING) 2011 (5) SA 600 (WCC) A

IN THE HIGH COURT OF SOUTH AFRICA (Northern Cape High Court, Kimberley)

THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG DEPARTMENT OF HOME AFFAIRS

IN THE HIGH COURT OF SOUTH AFRICA GAUTENG LOCAL DIVISION, JOHANNESBURG

IN THE HIGH COURT OF SOUTH AFRICA, FREE STATE DIVISION, BLOEMFONTEIN

±?.M*»t /MM/*- IN THE NORTH GAUTENG HIGH COURT, PRETORIA (REPUBLIC OF SOUTH AFRICA) DATE CASE NO: 35343/3063. In the matter between:

of a rule nisi, sought by the Applicants and granted by

IN THE HIGH COURT OF SOUTH AFRICA NORTH WEST HIGH COURT, MAHIKENG

FREE STATE HIGH COURT, BLOEMFONTEIN REPUBLIC OF SOUTH AFRICA KRAMER WEIHMANN & JOUBERT INC

IN THE LABOUR COURT OF SOUTH AFRICA 3659/98. In the matter between: NATIONAL UNION OF METALWORKERS OF SOUTH AFRICA. Applicant. and

REPUBLIC OF SOUTH AFRICA HIGH COURT OF SOUTH AFRICA GAUTENG LOCAL DIVISION, JOHANNESBURG

FREE STATE HIGH COURT, BLOEMFONTEIN REPUBLIC OF SOUTH AFRICA WHITELEYS CONSTRUCTION

Case No.: 2708/2014 Date heard: 09 October 2014 Date delivered: 10 October In the matter between: Second Applicant. and.

GENERAL TERMS AND CONDITIONS OF TENDER

(2) OF INTEREST TO OTHER JUDGES: ES/ NO [lf};jj_ JUDGMENT. 1 SSG Security Solutions (Pty) Limited (SSG) and the second

JUDGMENT THE HIGH COURT OF SOUTH AFRICA GAUTENG LOCAL DIVISION, JOHANNESBURG CASE NO: 07897/2016. In the matter between: SAPOR RENTALS (PTY) LIMITED

GAUTENG HIGH COURT, PRETORIA UBLIC OF SOUTH AFRICA) JUDGMENT. [1] On 13 April 2006 the Director-General of Public Works' (or his delegate) entered

In the matter between: -

IN THE NORTH GAUTENG HIGH COURT, PRETORIA /ES (REPUBLIC OF SOUTH AFRICA) D F S FLEMINGO SA (PTY) LTD AIRPORTS COMPANY SOUTH AFRICA LTD JUDGMENT

LAURITZEN BULKERS A/S PLAINTIFF THE MV CHENEBOURG DEFENDANT

HELD AT BRAAMFONTEIN

IN THE HIGH COURT OF SOUTH AFRICA (EASTERN CAPE PORT ELIZABETH) Case No.: 1661/2012 Date heard: 15 November 2012 Date delivered: 15 January 2013

IN THE SOUTH GAUTENG HIGH COURT, JOHANNESBURG (REPUBLIC OF SOUTH AFRICA)

IN THE HIGH COURT OF SOUTH AFRICA EASTERN CAPE DIVISION, GRAHAMSTOWN CASE NO. CA 107/2017 APPEAL JUDGMENT

REPUBLIC OF SOUTH AFRICA THE LABOUR COURT OF SOUTH AFRICA, DURBAN JUDGMENT

REPUBLIC OF SOUTH AFRICA IN THE HIGH COURT OF SOUTH AFRICA, GAUTENG DIVISION, PRETORIA

THE LABOUR COURT OF SOUTH AFRICA, JOHANNESBURG JUDGMENT

IN THE GAUTENG DIVISION OF THE HIGH COURT, PRETORIA SERVAAS DANIEL DE KOCK

MEC FOR THE DEPARTMENT OF PUBLIC WORKS

IN THE HIGH COURT OF SOUTH AFRICA, FREE ST ATE DIVISION, BLOEMFONTEIN HEARD ON: 2 FEBRUARY 2017

1. This matter came before me as an application in terms of section 165 of the Labour

IN THE LABOUR COURT OF SOUTH AFRICA HELD AT DURBAN

JUDGMENT DELIVERED 08 SEPTEMBER 2017

Transcription:

REPUBLIC OF SOUTH AFRICA IN THE HIGH COURT OF SOUTH AFRICA GAUTENG DIVISION, PRETORIA (1) REPORTABLE: YES r~ (2) OF INTEREST TO 0~ JUDGES: Y~ (3) ~- -9-- d\, \11~/s.. ~... DATE CASE NO: 46599/2015 :;iq /11 /JoJv In the matter between: SUPERWAY CONSTRUCTION (PTY) LTD APPLICANT and THE CITY OF TSHWANE METROPOLITAN RESPONDENT MUNICIPALITY JUDGMENT MALIJ [1) The applicant being a company duly registered and incorporated as such in accordance with the relevant laws of the Republic of South Africa, seeks a declaratory order confirming its entitlement to the

2 extension of time to the contract completion date and an adjustment to contract value consequent upon labour disruption. [2] The respondent is a municipality established as such in accordance with Section 2 of the Local Government Municipal Systems Act 32 of 2000. [3] It is common cause that on 13 September 2011 the parties concluded a written contract ("the contract") wherein the applicant had to attend to certain detailed works, comprising of the upgrading of Maunde Street between Quagga and Khoza Roads in Pretoria. [4] The contract obligations were contained in the following documents: [4.1] General Conditions of Contract ("GCC"); [4.2] Contract Data; [4.3] Pricing Data; [4.4] Scope of Work and [4.5] Site Information. [5] Some of the clauses of the GCC are as follows:

3 [5.1 J The employment of conventional and labour intensive construction methods to complete the work. [5.2] The crucial clause forming the subject matter of this application is clause 42 reading "42 EXTENSION OF TIME FOR COMPLETION' "42. 1 Subject to any requirement in the Scope of Work as to the completion of any portion of the Permanent Works before completion of the whole, the whole of the Works shall be completed within the time stated in the Contract Data calculated from the Commencement Date. 42.2 If circumstances of any kind whatsoever which may occur be such as fairly to entitle the Contractor to an extension of time for the completion of the Works or any portion thereof, the Engineer shall grant the Contractor, on a claim in accordance with Clause 48, such extension of time as is appropriate. Such extension of time shall take into account any special non-working days and all relevant circumstances, including concurrent delays or savings of time which might apply in respect of such claim. 42.3 Without limiting the generality of Clause 42.2, the circumstances referred to in that Clause include:

4 42.3.1 The amount and nature of additional work, 42.3.2 Abnormal climatic conditions, 42. 3. 3 Any failure or delay on the part of the Employer or his agents, employees or other contractors (not being employed by the Contractor) in due performance of any obligations as are reasonably necessary to enable the Works to proceed, 42.3.4 Any provision of these Conditions which allows for an extension of time, and 42.3.SAny disruption of labour which is entirely beyond the Contractor's control." [6] It is not in dispute that from 2 October until 20 October 2012 in respect of the Maunde Street Project the community members embarked on a protest relating to the labour rates. The said labour rates were being paid to members of the community, who have been employed by the applicant. The local labour and/ or employees of the applicant joined the protest action and embarked on a strike action, resulting to the applicant's inability to perform within the contract period during the standing time. [7] On 3 October 2012 the applicant duly notified the respondent through the Engineer of the strike action. The notification reads as follows:

s "Dear Sir/ Madam [It] has been discussed in previous meetings and we are now facing a problem regarding the labour on the Maunde Street Project. The workers started an illegal strike on Tuesday the 2nd October 2012. The local labour are insisting on being paid rates that are higher than the agreed SPWP rates as allowed in the contract document, Clause C.3.3.33.1.1.1.-1.2 When they started throwing rocks and becoming more violent I was forced to call the police to escort my people off site safely. I then returned to the site today to negotiate with them but was told in no uncertain terms that the strike will continue until the issue is resolved. I therefore urge you to consider moving the planned meeting of 09 October 2012 to an earlier date. As long as this strike continues we are unable to do any work as it is impossible to guarantee the safety of our people, and other resources. Wdh reference to the above, and in accordance with Clause 48 of General Conditions of Contract for Construction Works (2004) (First Edition), we hereby notify you of our intention to claim standing time until the issue is resolved, as contemplated in Clause 42, and specifically 42.3.5. 42.3.5 'Any disruption of labour which is entirely beyond the contractor's control'. Yours Sincerely"

6 [8] Pursuant to the above and further exchanges of correspondence between the Engineer contractually appointed by the respondent and the applicant; on 30 November 2012 the Engineer rejected the applicant's claim. The basis of rejection was that the Employer (Respondent) did not delay or interrupt the works. The Engineer further confirmed that the strike was a result of the Contractor not remunerating the labourers according to the minimum wage rates as promulgated. [9) Finally the matter was taken for adjudication. There are two issues which served before the Adjudicator (Claim 1 ): extension of time and costs due to delays caused by the protest and strike action. (Claim 2): extension of time for increased scope of works). [1 OJ The adjudicator dismissed the applicant's claim for extension of time. According to the adjudicator the clauses of the contract were unambiguous that the whole of the Works, without exceptions, was to be construed by conventional methods; therefore the workers had to be remunerated as such. The local labour force was paid a wage of R100.00 per day which equates to R12.50 per hour for eight (8) hours. [11) The decision by the Adjudicator at page 160 of the paginated pages paragraph 2.1.28-2.1.29 reads as follows:

7 "The contractor confirmed at the hearing that it was paying the local labour at less than the minimum wage rate for conventional work. Having regard to the fact that the strike was settled at a wage rate equivalent to R17.00 per hour, which was less than the prescribed minimum wage for conventional work at the time of R20.50 per hour, the strike would have been averted had the Contractor complied with the Contract. ISSUE [12] The matter turns on the interpretation of clause 42 of the Contract, in particular clause 42.3.5 (see supra) dealing with the disruption of labour. The ensuing question is whether the adjudicator was correct to dismiss the applicant's claim of extension of time because the applicant could have avoided or averted the strike action, had it complied with the contractual rates for payment of the local labour. LAW [13] In TRANSNET LTD TIA NATIONAL PORTS AUTHORITY v OWNER OF MV SNOW CRYSTAL 1 Scott JA stated: "[28]... As a general rule impossibility of performance brought about by vis major or casus fortuitus will excuse performance of a contract. But it will not always do so. In each case it is necessary to 'look to the nature of the contract, the relation of the parties, the circumstances of 1 2008 (4) SA 111 (SCA)

8 the case, and the nature of the impossibility invoked by the defendant, to see whether the general rule ought, in the particular circumstances of the case, to be applied'. 2 The rule will not avail a defendant if the impossibility is se/f-created; 3 nor will it avail the defendant if the impossibility is due to his or her fault. 4 Save possibly in circumstances where a plaintiff seeks specific performance, the onus of proving the impossibility will lie upon the defendant. 5n (14] In KING SABATA DALINDYEBO MUNICIPALITY v LANDMARK MTHATHA (PTY) LTD & ANOTHER 6 ("KSD") the following is stated at page 18: "[28]... That has become unnecessary in view of the finding that the impossibility was self-created. It follows that the general rule that impossibility of performance brought about by vis major or casus fortuitous will excuse performance of a contract does not avail the Municipality in this case. The appeal against the finding of the court below relating to the defence of supervening impossibility must accordingly fail." (15] In NATAL JOINT MUNICIPAL PENSION FUND v ENDUMENI MUNICIPALITY 7 ("Endumeni") at paragraphs [18]-(19], it was held 2 Per Stratford J in Herman v Shapiro & Co 1926 TPD 367 at 373 quoted with approval in Nuclear Fuels Corporation of SA (Pty) Ltd v Orda AG 1996 (4) SA 1190 (SCA) at 1206D-E. 3 South African Forestry Co Ltd v York Timbers Ltd 2005 (3) SA 323 (SCA) paras 23-25). 4 MacDuff & Co Ltd (In Liquidation) v Johannesburg Consolidated Investment Co Ltd 1924 AD 573 at 601. 5 Tamarillo (Pty) Ltd v B N Aitken (Pty) Ltd 1982(1) SA 398 (A) at 442B-443F. 8 (136/11) 2013 ZA SCA 91 7 2012 (4) SA 593 SCA

9 that, in interpreting a contract, the court must have regard to the language of the clause as well as the purpose for which it was agreed. The SCA further stated: "[26] In between these two extremes, in most cases the court is faced with two or more possible meanings that are to a greater or lesser degree available on the language used. 8 Here it is usually said that the language is ambiguous although the only ambiguity lies in selecting the proper meaning (on which views may legitimately differ). In resolving the problem the apparent purpose (own emphasis) of the provision and the context in which it occurs will be important guides to the correct interpretation An interpretation will not be given that leads to impractical, unbusinesslike or oppressive consequences or that will stultify the broader operation of the legislation or contract under consideration." ANALYSIS [16] There is no quarrel as to the purpose of clause 42.2 of the GCC that it was to grant extension of time to the applicant in the event that the delay was caused by something beyond the control of the applicant. The question is whether the strike was beyond the applicant's control as submitted by the applicant. 8 That they must be available on the language used is clear. S v Zuma and others 1995 (2) SA 642 (CC) paras 17 and 18. As Kentridge AJ pointed out any other approach is divination rather than interpretation.

10 [17] According to the applicant's notice of 3 October 2012 the applicant stated that the local labour force are insisting on being paid rates that are higher that the agreed rates, and that the strike was illegal. [18] From the adjudicator's report it appears that the issue of payment of incorrect wage rate was as a result of misinterpretation of the contract between the parties. At paragraph 2.1.27 of the adjudicator's report the following is stated: "From the aforegoing I conclude that, notwithstanding the cover page of the tender Document and the extensive provisions in the contract document relating to the use of labour intensive methods on this contract, which may have mislead the reader as it apparently mislead both the Employer and the Contractor, the contract de facto provides that the whole of the Works without exception, was to be construed by conventional methods". [19) At page 159 of the paginated bundle in the adjudicator's report the following is stated: "2.1.21 Notwithstanding the content of the front cover page to the tender bid ("EXPANDED PUBLIC WORKS PROGRAMME CONTRIBUTING TO A NATION AT WORK") OWN INSERTION the provisions of the contract which regulate the use of local labour intensive construction work are set out in the following:

11 2.1.21.1 Clause C3.1.1 which states; The employer's objective are to deliver public infrastructure using labour intensive methods. The works in this contract are to be executed by using both conventional construction and labour intensive construction methods according to the Special Public Works programme (SPWP). Works earmarked for Labour Intensive construction methods will be numbered with a prefix "LI' in the bill of quantities to distinguish them from conventional construction works. Such work shall be constructed using local workers who are temporarily employed in terms of the project specifications. (Emphasis added). 2.1.21.2 Clause C3.1.2 which states, inter alia; Conventional and labour intensive construction methods (L/C) will be employed to complete the work, with the Engineer ruling on the method to be used (Emphasis added). 2.1.23 The parties confirmed that no items in the Price Schedule were numbered with the prefix LI. (Appendix A - question 3.3) and it was not suggested that the Engineer had instructed that labour intensive methods were to be used on any works.

12 2.1.24 On the contrary, the Employer/Engineer, in answer to question 4. 1 (Appendix A) replied, inter alia, The Contract is clear that work earmarked for the Maunde Street contract to be executed on a labour intensive construction method is numbered with a pref,x "LI" in the Price Schedule, to distinguish them from conventional construction works. The "LI" numbered items shall be constructed accordingly. The Contractor has failed to adhere to this requirement in its submission as it refers in its submission to EPWP related works, which is not applicable to this Contract. Annexure 21 The Employer confirms that no particular item was labelled as "LI" in the price schedule, hence conventional construction methods are applicable to the entire works. The Contractor has disregarded this clear directive 2.1.25 To the extent that the contract could be considered to be ambiguous in regard to what work, if any, was to be contructed using labour intensive methods clause 3. 1 of the Genersl Conditions of Contract provides that; If an ambiguity or discrepancy between the documents is found the Engineer shall issue any necessary clarification or instruction.

13 2.1.28 The Contractor confirmed at the hearing that it was paying the labour at less than the minimum wage rate for conventional wort{. 2.1.29 Having regard to the fact that the strike was settled at a wage rate equivalent to R17-00 per hour, which was fess than the prescribed minimum wage for conventional wort{ at the time of R20.50 per hour, the strike would have been averted had the Contractor complied with the Contract." [20] It was submitted on behalf of the applicant that the amount of rates to be paid to local labour was not clear from the contract until the determination was made by the adjudicator. The applicant could not have known that it was paying the correct or incorrect rates. The applicant does not dispute that the strike terminated when it paid the local labour R17.00 per hour, a rate lower than R18.00 per hour allegedly agreed upon between the parties. [21] It was further submitted on behalf of the applicant that the strike was unprotected and was in the circumstances an unlawful and/or illegal strike, therefore an action beyond its control. It was argued that the applicant was not in a position to control unlawful conduct and that the workers would have approached the applicant to request an increase. [22] I cannot agree with the above. It is evident in reading together of all documents consisting the terms of contract that there was a stipulated

14 contractual amount which the applicant omitted to pay the local labour. It was not for the workers to beg the applicant for what was rightfully theirs; a regulated wage rate as at the time. Furthermore the Sectorial Determination 2: Civil Engineering Sector, published in the Government Gazette No: 35658 of 4 September 2012 clearly demonstrates that the applicant paid less than what is legally prescribed. [23) As alluded in Endumeni supra, in interpreting a contract, the court must have regard to the language of the clause as well as the purpose for which it was agreed. In the present matter the language of the contract makes it clear that the workers were engaged in labour intensive construction work. In this regard see Clause C3.1.1 in paragraph 19 supra. [24) Despite the applicant's argument that it was not clear about the payment provisions, it was the responsibility of the applicant to ensure that the correct wage rates were paid. The contract provided for the consultation of an Engineer in the case of ambiguity. There is nothing placed before the court that the applicant sought clarity from the Engineer. [25] As alluded above the applicant knew as early as on the first day of the strike that it was about disputed wage rates. In my view it was an opportunity for the applicant to seek clarity from the Engineer, instead

15 the applicant issued notification within a period of a day of the strike to claim for the standing time. (26] The important issue is whether the workers were correctly paid by the applicant; now it is known that the answer is in the negative. Even if both parties were under the impression that they were correct in their interpretation, as to how and why they missed the correct interpretation is irrelevant. The mystery that both parties didn't set the correct wage rates; and that the workers managed to find out the correct wage rates and then embarked on a strike is more than telling. The conclusion is that it was possible to discern the applicable rates from the contract and other documents pertaining to the agreement between the parties. [27] It is undisputed that the applicant was paying the correct wage rates in other sites to the workers who were undertaking the same responsibilities. This makes it clear that there was nothing mysterious about how the employees found out about the correct rates. Obviously the applicant knew the correct wage rates to pay. The applicant's counter argument to the above is that the issue of what is happening in another site is irrelevant. It is probable true that if the employees in all the sites were uniformly paid correct wage rates the strike would have been averted or if the strike occurred whilst the uniform payments were in place there would be some benefit of doubt towards the interpretation of the contract.

16 [28] The applicant's submission that the local labour force embarked on a strike because they were influenced by the community members who started the civil unrest is misplaced. It is common cause that the reason for the strike by the local labour force, whom was under the applicant's control was due to underpayment of wages. I am inclined to follow the KSD reasoning in paragraph 14 supra. I cannot help but to find that the impossibility to perform was self created on the part of the applicant. [29] Having regard to the above it has been overwhelmingly proven that the strike was within the control of the applicant and it could therefore have averted the strike by paying the correct wage rates from the onset. In the event I find that the Adjudicator was correct in dismissing the applicant's claim for the extension of time. [30] In the result the following order is made; [30.1] The application is dismissed with costs. N.P. MALI JUDGE OF THE HIGH COURT

17 Counsel for the Applicant: Instructed by: Adv. Daniels FRESE MOLL & PARTNERS Counsel for the Respondent: Instructed by: Adv. Motepe KUNENE RAMAPALA BOTHA ATTORNEYS Date of hearing : Date of Judgment: 27 July 2016 29 November 2016