Key Words: Song Hinh Multipurpose Project, Resettlement, Project Management Board

Similar documents
Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Mekong Youth Assembly and International Rivers submission to John Knox, United Nations Special Rapporteur on Human Rights and the Environment

ELECTRICITY OF VIETNAM TRUNG SON HYDROPOWER PROJECT MANAGEMENT BOARD CONSULTATION GENERAL REPORT

RESETTLEMENT ACTION PLAN

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction.

Reconstruction of the Livelihood of Resettlers from the Nam Theun 2 Hydropower Project in Laos. Bounsouk Souksavath & Mikiyasu Nakayama

Evaluation Study of Japanese ODA for Vietnam Summary

Social Impact of Trade and Investment of China in Cambodia

DOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters

Involuntary Resettlement Due Diligence Report

NAM THEUN 2: HAS THE ADB LEARNED THE LESSONS? Bruce Shoemaker Independent Researcher

VIE: Northern Power Transmission Expansion Sector Project

VIETNAM ELECTRICITY TRUNGSON HYDROPOWER COMPANY LIMITED RESETTLEMENT AND ETHNIC MINORITY DEVELOPMENT PLAN

Subproject: Hai Lang Province: Quang Tri

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Building Capacity to Make Transport Work for Women and Men in Vietnam

THE HILL TRIBES OF NORTHERN THAILAND: DEVELOPMENT IN CONFLICT WITH HUMAN RIGHTS - REPORT OF A VISIT IN SEPTEMBER 1996

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

Resettlement in Action

Gender Equality and Development

Analysis of current economic and trade relations between China and Vietnam. Dr. Chen Bingxian Guangxi University for Nationalities

Ethnic Minorities Development Framework. PRC: Guiyang Integrated Water Resources Management Sector Project

Involuntary Resettlement Due Diligence Report

VIE: Northern Power Transmission Expansion Sector Project

Social and economic survey and assessment report

Ethiopia : the Gilgel Gibe Resettlement Project

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

ASCI-NRCR JOINT CERTIFICATION COURSE ON IMPROVED MANAGEMENT OF LAND ACQUISITION, RESETTLEMENT & REHABILITATION (LARR) APRIL 16-29, 2018

Re: Submission for carbon credits of the Kamchay Hydroelectric BOT Project

Household income in present day Vietnam

New Mandala New perspectives on Southeast Asia The silenced river

JBIC ODA Loan Project Mid-Term Review

Follow-up Study on Impacts of Resettlement of Son La Hydropower Plant

VIE: Yen Vien-Lao Cai Railway Upgrading Project

Vietnam: Typhoon Kammuri

Vietnam: Flash floods

Pigs & Food Security. A case study by Meas Viphou. Performed at Koh Preah Village, Koh Preah Island, Stung Treng Province

HYDROPOWER DAM DEVELOPMENT AND LOCAL COMMUNITIES LIVELIHOODS: A CASE OF YALI HYDROPOWER PROJECT, VIETNAM

USJI Seminar Washington, DC (19 February 2013) Toward a New Paradigm for Resettlement Policy. Mikiyasu Nakayama

VIE: Song Bung 4 Hydropower Project

Involuntary Resettlement Due Diligence Report

Present by Mr. Manothong VONGSAY Deputy Director General of Investment Promotion Department Ministry of Planning and Investment Seoul, 20 June 2012

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN. VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE

SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom Happiness

Executive Board of the United Nations Development Programme, of the United Nations Population Fund

Indira Sagar Dam. Rs crore but expected to be nearly Rs. 5,000 crore Loss

VIETNAM: TYPHOON DAMREY

With a Warm Welcome from the Kingdom of Cambodia Vasu Poshyanandana

Involuntary Resettlement Due Diligence Report

Policy Brief on Migration and Urbanization

Involuntary Resettlement Due Diligence Report

Resettlement Plan (Tranche-1- Moragolla Hydro Power Plant)

SOIL REMOVAL AND DEPOSITION BYLAW

Internal Migration in Vietnam: The Current Situation

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

Planned relocation as an adaptation strategy. Marine FRANCK UNFCCC, Bonn 4 June 2014

Nepal. Poverty alleviation is the largest common agenda

Social Monitoring Report

CONSERVATION AND RECLAMATION REGULATION

Bui Power Authority Act, 2007 Act 740

EASES Discussion Paper Series SUCCESSFUL RESERVOIR RESETTLEMENT IN CHINA SHUIKOU HYDROELECTRIC PROJECT

Income and Livelihood Restoration Plan. Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development

UNITED STATES OF AMERICA 134 FERC 62,197 FEDERAL ENERGY REGULATORY COMMISSION. Clean River Power 15, LLC Project No

The Asian Development Bank. Transportation Infrastructure in Asia and the Pacific

Ethnic Minority Development Plan

Palitha Bandara. Sriyani Jayasundara. Ranjan Jayawardana

Viet Nam: Secondary Cities Development Project. Package TK-02: Dien Bien Phu Road, Tam Ky City, Quang Nam Province

Ethnic Minority Plan Dong Chum 2 Hydropower Subproject

THE DAM SAFETY BILL, 2010

SFG1095 V4 SUBPROJECT: Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

LANDSLIDE PREVENTION LAW

Ethnic Minorities in Northern Mountains of Vietnam: Poverty, Income and Assets

Indochina. Chapter 1. Asia 2. Long-term Measures Indispensable for War-Weary Economies. Part II. Chapter 1 Asia JICA

UNDERSTANDING TRADE, DEVELOPMENT, AND POVERTY REDUCTION

M I N U T E S BOARD OF DIRECTORS PLACER COUNTY WATER AGENCY. Thursday, October 18, :00 p.m. Regular Meeting

VIE: Hanoi Metro Rail System Project Line 3: Nhon-Hanoi Station Section

Test Paper Set II Subject : Social Science - II

Viet Nam: Flood and typhoon

DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= RESETTLEMENT PLAN

Large Hydropower Projects in Ethnic Areas in Myanmar: Placing Community Participation and Gender Central to Decision-Making

Involuntary Resettlement Due Diligence Report

Standard Environmental and Social Obligations

13 LC S A BILL TO BE ENTITLED AN ACT

VIE: Yen Vien-Lao Cai Railway Upgrading Project

Indonesia: Enhanced Water Security Investment Project

SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 182/2013/ND-CP Hanoi, November 14, 2013 DECREE

VIE: Development of the Northern Chu and Southern Ma Rivers Irrigation System Project

Resettlement Plan. Stage of the document: Final Project number: June 2017

RESETTLEMENT PLAN (RP) Type of document: Resettlement plan (RP) COC SAN HYDROPOWER PLANT INVESTMENT & CONSTRUCTION PROJECT

Vulnerability of livelihoods in flood-prone areas: A case study in Kandal of Cambodia and An Giang of Vietnam

Involuntary Resettlement Due Diligence Report

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4547 Project Name

Resettlement Due Diligence Report

RISK ZONING 1 LOW TO MEDIUM RISK 2 MEDIUM RISK 3 MEDIUM TO HIGH RISK 4 HIGH RISK PA PRIORITY AREA 21 SEPTEMBER 2004 PROJECT MANAGEMENT UNIT 1

Exercise: Using the ISACS AT to Support Border Control and Law Enforcement Cooperation

Since the Vietnam War ended in 1975, the

DECEMBER 13, 2005 GREAT LAKES ST. LAWRENCE RIVER BASIN SUSTAINABLE WATER RESOURCES AGREEMENT

ARTICLE 4 APPLICATION REVIEW PROCEDURES AND APPROVAL CRITERIA 3

Transcription:

IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 07-02: Resettlement Song Hinh Multipurpose Project, Vietnam Key Issues: 7-Resettlement 13-Improvement of Infrastructure Climate Zone: Af: Tropical humid Subjects: - Socio - economic and health survey for evaluation of resettlement issues Effects: - The resettlement in Song Hinh has been successful. - The consolidation of infrastructure, the compensation was only over what mitigation measures provided but apparently has enhanced the living standards of the ressettlers. Project Name: Country: Song Hinh Multipurpose Project Vietnam (Asia) Implementing Party & Period - Project: Electricity of Vietnam 1996 - - Good Practice: Electricity of Vietnam 1996 - Key Words: Song Hinh Multipurpose Project, Resettlement, Project Management Board Abstract: Song Hinh Multipurpose Dam Project has improved the quality of life of the people emigrating from the reservoir area and resettling elsewhere. The government took mitigation measures that included various compensation options and was characterized by public involvement, presenting the resettled people with sufficient information and opportunities to participate in decision making. 1. Outline of the Project Song Hinh Multipurpose Project is a part of Vietnam's strategic plan of power development for the nation and of the socio-economic development plan for the central part of the country. The Government of Vietnam officially approved the Song Hinh Project in November 1993. Construction started in November 1995. In January 1996, Hinh River was diverted for the construction of the main dam. The Song Hinh Power Plan started electricity generation from April 2000 and contributes to the surrounding area about 370 GWh per year. Key features of Song Hinh Project are summarized in Table 1. The basic components are the main dam on Hinh River, a number of cofferdams, and a diversion tunnel which diverts water from Hinh River to Con River. This creates a designed head of 141 m for power generation.

Phu Yen province E AST SE A Ch in a M yan mar Laos 〇 H an oi Son g Hin h P. P. Thailand Viet Nam Ph ilip pin es Cambod ia 〇 H o Ch i M in h Photo 1: The Song Hinh Power Plant Figure 1: Location of Power Plant Table 1: Key features of Song Hinh Multipurpose Project Parameter Value Reservoir High water level (HWL) 209 m amsl Low water level (LWL) 196 m amsl Surface area at HWL 4,100 ha Gross storage capacity 357 millions m 3 Main dam Crest elevation 215 m amsl Length 880 m Height above foundation 42 m Saddle dam Crest elevation 215 m amsl Total crest length 6,190 m Height above foundation 19 m Others Installed power capacity 70 MW Mean annual energy 370 GWh Designed head 141.00 m Plant Discharge 55.50 m 3 /s 110 kv transmission line length 20 km 2

Tailrace Channel Penstock Powerhouse Figure 2: Plan of Waterway 2. Features of the Project Area Song Hinh flow is a branch of Ba River, located in the west of Phu Yen province. The area s co-ordinates are about at latitude 12 o 35-12 o 55 north and 108 o 45-109 o 07 east. Both sides of river have a slope of 5-10 degrees into eastern direction. In the south and west there are greater slopes. The mean height is 580m. The Vegetation of the basin is mainly thin forests. In downstream, however, it is mostly bare hills or grasses. The river system in the area is quite dense. The main flow rises from Truong Son Mountains, flowing along the direction of SE-NW and meets with Ba River. Song Hinh hydropower works are located in a big area raging over two districts: Song Hinh and Tuy Hoa. The distance from the conjunction dam area to the hydropower station is 10km. The total area of reservoir is 43.3km 2 and the norm-raised water level is 208-210m as designed and approved. This reservoir is of medium scale, and located in the mountainous area, so the flooded area will create not so big losses. When it was finished, however, there were 10 villages belonging to two communes: Song Hinh and Eatrol were going to be under water and the people had to move. The socio-economic development in these villages has been very slow, programme of resettling and resettled agriculture have been carried out in these areas. Investigation records show that the society in the area of the hydropower reservoir to be flooded consisted of different ethnic groups such as Cham, Hroi, Bana, and Ede. Ede group was the biggest group, 46% of the total population. Shifting cultivation and wandering hill were very popular with these groups. Although the area of cultivated lands was quite large, it mainly was in mountainous fields. Population was very scattered and earned their living from agriculture of self-provision characteristics. The area was very backward in science and technique with insufficient food and low quality of life. In 3

the whole area, there are 13 hand trucks, 208 bikes, 1 plough machine, and 3 motorbikes. The main traditional crafts were textiles. The mean quantity of food per capita in the whole area had reached 300-350 kg/person/year, and was mainly from maize and cassava. So, poverty was the dominant situation. Tradition of making alcohol mainly from rice and maize is very popular; mean quantity of food used for making alcohol per household was about 50 kg/year. As the area maintained self-sufficient economy, mean income per capita was only 20000 VND/year. This figure does not express the real quality of life in the area, because in the area the economy was still based on barter exchanges, it means that quantity of goods sold in markets was still not considerable. River Ba Main Dam and Spillway River Con The Song Hinh P.P. Photo 2: Reservoir water surface area River Hinh Catchment Area =772km 2 10 km Figure 3: Topographical map Photo 3: Area affected by reservoir 3. Major Impacts Total area inundated by the reservoir is about 4,100 ha. The approximately about 470 families with 2,000 people have resettled in the new area (Table- 2). When the dam construction was completed and the water level reached to the norm level, these construction works did not make so much land flooded. Flood in district centres and commune centres has not happened. The flooded area only consisted of 10 villages of 2 communes: Eatrol and Song Hinh. The rest is wild lands, bare hills, grass fields and young and poor forests. In the flooded area, there is no industrial works. 4

Area Name Table 2: resettling people Families Inhabitants Houses Compensated Houses Duc Binh Dong Commune 163 555 105 99 Ea Bia Commune 6 Ea Trol Commune 170 671 142 142 Duc Village 63 254 54 54 Mui A&B Village 88 363 69 69 No.2 kinh Te Village 19 54 19 19 Song Hinh Commune 134 704 123 123 NO.1 Village 19 100 16 16 NO.2 Village 28 165 28 28 NO.3 Village 33 135 27 27 Suoi Dua Village 23 139 22 22 Kit Village 31 165 30 30 Total 473 1,930 370 364 The losses from reservoir fill as latest investigation (April 1998) are: 10 km of earth road 18500 m 2 of houses in 10 villages The numbers of households to have to move is 412, up 113 households compared with that in 1992. Total people to have to move are 2020 persons, up 228 persons compared with that in 1992. Total area of land: 887.6 ha Cultivated land area flooded: 446.7 ha Resident land area flooded: 440.9 ha In the area, the dominance was shifting cultivation of wandering hill tribes. So although statistics shows total flooded area was large, almost all area was shifting cultivation mountainous fields (446.7 ha / 412 households, means 1 household has 1.1 ha). According to the district investigation, the size of resident lands and that of mountainous field land are equal; there is nearly no land for fruit and industrial trees. 4. Mitigation Measures The Song Hinh Project Management Board (PMB) has made a great contribution to the general issue of mitigation. Thus the PMB has agreed not only to replace what is lost but also to improve the general living standard of the affected people. This has contributed greatly to the generally good housing condition and infrastructure. It disserves attention and should be applied in other projects dealing with resettlement and compensation. When it was known that each household would receive a certain sum of money, the resettlers expressed concern how to handle the money and how to ensure that houses of good quality and of their taste were constructed. The district and the Local Fixed cultivation Office met this demand by engaging the local bank and by contracting reliable constructors. This innovation should be regarded as a great contribution to the management of compensation and should be followed by other resettlement and compensation 5

schemes both in Vietnam and abroad. Main mitigations measures that were applied in the resettlement program are: - Defining and announcing of stop day for compensation During the first resettlement mission 1996, this issue was brought up. The stop day was announced very early in the resettlement process in order to avoid manipulations of registration cards, land specification, and "invasion" from outsiders - Due and timely information to the resettled people The resettled people have been relatively well informed and have been invited to take part in decisions (making meeting) directly related to the resettlement (choice of resettlement area, choice of location inside resettlement area, day of relocation etc.) and compensation (level of needs for reimbursement, decision etc.) - Choice of resettlement areas It is clear that giving rights to decide and/or choose (among given alternatives) their future area for habitation (and cultivation), encourage people to take a greater responsibility in all aspects of not only resettlement but also development issues. In the case of Song Hinh, when villagers changed their mind, it caused some delay in the general process. But this was a minor cause of the delay. As a lesson for the future the planning of resettlement should take such delay into account. "Participation" certainly takes time but proves to contribute to a more stable development. - Compensation Housing: people have chosen what type of house they prefer: traditional wooden house (tile roof) or Kinh style house in bricks. Among 338 houses, some 20 houses are Kinh style. Most houses are in good quality. People decided for themselves for other investments such as purchasing motorbikes, using compensation money to buy rice for their first 6 month of relocation, etc. - Safe water is supplied through the construction of wells (72 in total). - Roads were constructed to enable the access to local communes. - School and health stations are generally sufficient and in good quality. 5. Results of the Mitigation Measures Generally, it should be said that the resettlement in Song Hinh is successful. Especially when it comes to housing and infrastructure, the compensation was more than what mitigation measures provided and has raised the living standard of the resettlers. 6. Reasons for Success - Good investigation on the current situation of the group of affected people as well as on the possible areas for resettlement; - Active involvement of affected people; 6

- Involvement of other related parties such as local people committee, fixed cultivation and resettlement office, Song Hinh Project Management Board, etc.; - Good design and sufficient fund for resettlement program. 7. Outside Comments 1) Vietnam Economic News No.5 1999 8. Further Information 8.1 Inquiries International Cooperation Department Ministry of Industry (MOI) Address: 54 Hai Ba Trung Street, Hanoi, Vietnam TEL: +84-4-8267988 FAX: +84-4-8265303 This case history of hydropower good practice is published for educational and informational purposes only and may not be used for any other purpose. Duplication for commercial purposes is prohibited. The author(s) of this publication make no express or implied warranties concerning this case history, including no warranty of accuracy or fitness for a particular purpose. 7 C New Energy Foundation, Japan, 2006