Annex M Underground Transformers & Network Protectors Subcommittee

Similar documents
Annex C Distribution Subcommittee Chair: Stephen Shull

Meeting Time: 3:00pm, Wednesday, October 23, Future Meetings. New Members Transformer Standards Activity

Subcommittee Meeting Wednesday March 16, 2005 at 3:00pm 33 Members 12 Guests 1 Guest Requesting Membership 45 TOTAL

Annex C Distribution Subcommittee Chair: Stephen Shull

Annex M Subsurface Transformers & Network Protectors Subcommittee

Dry Type Transformers Subcommittee Unapproved Meeting Minutes October 17, 2007 Minneapolis, Minnesota

Insulation Life Subcommittee - Unapproved Meeting Minutes November 2, 2011 Boston, MA

Dry Type Transformers Subcommittee Unapproved Meeting Minutes March 22, 2006 Costa Mesa, California

Dry Type Transformers Subcommittee Unapproved Meeting Minutes March 14, 2007 Dallas, Texas

The attendees introduced themselves and reported affiliations.

MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE Nashville, TN March 14, 2012

Annex C Distribution Subcommittee Chair: Stephen Shull

Annex C Distribution Subcommittee Chair: Stephen Shull

The following guests requested membership. Since the document is in ballot, no new WG members will be accepted.

MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE-PES TRANSFORMER COMMITTEE Munich, DE - March 31, 2013

The minutes from the Pittsburgh meeting were approved before the various working groups and task forces reported.

Revision to Emerald Book IEEE Std May 6, IEEE P1100 Working Group Minutes Page - 1

API-AGA JOINT COMMITTEE ON OIL AND GAS PIPELINE FIELD WELDING PRACTICES 2018 ANNUAL MEETING MINUTES

An Urgent Bulletin from CSA Group

The Power Transformers Subcommittee met on Wednesday, March 20 th, 2013 at 1:30 p.m. with sufficient attendance to reach a quorum.

Elevator and escalator electrical equipment CSA B / ASME A

Called to order: The Administrative Subcommittee was called to order by Don Fallon at 2:07PM

Operating Procedures for Accredited Standards Committee C63 Electromagnetic Compatibility (EMC) Date of Preparation: 3 March 2016

ORDINANCE NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF MEADOWS PLACE, TEXAS:

Lead Acid Battery Maintenance and Testing

General Session December 8th

2017 Fall Meeting; October 29-30, 2017, Louisville, Kentucky, USA Spring Meeting; March 25-29, 2018, Pittsburgh, Pennsylvania, USA

C37.59 Working Group MINUTES OF THE FALL 2017 MEETING. Marriott Sable Oaks, Portland, ME 2:00PM 6:00PM, October 10, 2017

IEEE PES STATIONARY BATTERY COMMITTEE

University of Arizona AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2012 EDITION

InterNational Electrical Testing Association Operating Principles and Procedures

Six new members were added to the roster and introduced to the SC.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

IEEE PES STATIONARY BATTERY COMMITTEE

CITY OF WHITE HOUSE REQUEST FOR BID FOR PORTLAND ROAD LIFT STATION DRY PIT SUBMERSIBLE PUMP. August 22, 2017

COMPETENCE IN PRECISION AND QUALITY STEP DRILLS

D.T.D Ministry of Defence Defence Procurement Agency, ADRP2 Abbey Wood Bristol BS34 8JH OBSOLESCENCE NOTICE

Closing date of voting Secretariat SAC

The Therma Gauge Type H - FDEP EQ 730

AMERICAN IRON AND STEEL INSTITUTE PROCEDURES FOR ANSI-APPROVED STANDARDS FOR COLD-FORMED STEEL DESIGN AND CONSTRUCTION

SECTION DETENTION DOOR HARDWARE

Regulations Governing Consensus Development of the Uniform Solar, Hydronics & Geothermal and Swimming Pool, Spa & Hot Tub Codes

Insulation Life Subcommittee

Agenda (Rev 1) of Meeting of API SUBCOMMITTEE ON DRILLING STRUCTURES & EQUIPMENT (CSOEM/SC8)

Revision to Emerald Book IEEE Std October 7, IEEE P1100 Working Group Minutes Page - 1

Jemena Electricity Networks

IEEE PES STATIONARY BATTERY COMMITTEE

Step drills And, with higher dimensional precision the drills will last considerably longer while maintaining the precise process tolerances.

June Regulations Governing Consensus Development of the Water Efficiency and Sanitation Standard

REGULATIONS GOVERNING ASTM TECHNICAL COMMITTEES

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

IPC/WHMA-A-620B TRAINING AND CERTIFICATION PROGRAM FOR CERTIFIED IPC TRAINERS (CIT)

Chemical Resistance Properties

MEMORANDUM. Technical Committee on Liquefied Petroleum Gases. Subject: NFPA 58 Proposed Tentative Interim Amendment (TIA) No. 1153

Dick Titus called the meeting to order at 1:35 p.m. The meeting was held upstairs in the Magnolia Point Clubhouse.

Formal Interpretations/ Interprétation formelle

CITY OF KINGSTON. Ontario. By-Law Number A By-Law To Regulate Fences. By-Law Number: Date Passed: September 9, 2014

RESNA Policies and Procedures for the Development of RESNA Assistive Technology Standards February 17, 2016

Standard pumps. Dimensions, weights Wilo-CronoLine-IL

Electricity Act, 1998 Loi de 1998 sur l électricité

Capacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2018 Joint Technical Committee Meeting Minutes Jacksonville, Florida

GARFIELD COUNTY ORDINANCE NO.

Technical Committee on Electrical Equipment of Industrial Machinery (EEI-AAA)

Pipeline Transportation Systems for Liquids and Slurries

Emergency Management Accreditation Program

Fort Collins Amendments to the 2009 International Mechanical Code

ACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016

American Water Works Association (AWWA) Standards Program Operating Procedures

SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016)

SDI PROCEDURES FOR ANSI-APPROVED STANDARDS FOR STEEL DECK

NBIMS-US PROJECT COMMITTEE RULES OF GOVERNANCE

SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018

ICC CONSENSUS PROCEDURES

BICSI Standards Program Regulations

Capacitor Subcommittee of the Transmission and Distribution Committee 2014 IEEE PES General Meeting Minutes National Harbor, MD

SSPC STANDARDS DEVELOPMENT MANUAL th Street, 6th Floor Pittsburgh PA

ANSI-Accredited Standards Committee C63 Electromagnetic Compatibility

Expansion Vessels & Separators

ASTM INTERNATIONAL Helping our world work better. Regulations Governing ASTM Technical Committees

Formal Interpretations/ Interprétation formelle

Minutes of T&D ADCOM Meeting

RCSC Executive Committee Meeting Wednesday, June 4th, 2014 Stanley Hotel, Estes Park, CO 2:00 pm to 6:00 pm local time.

IEEE Power and Energy Society Entity Annual Report

IEEE PES Insulated Conductors Committee Policies and Procedures for Working Groups Lauri J. Hiivala

MIG/MAG Welding Torch MB 401 D / MB 501 D. liquid cooled. BINZEL. The right welding torch for every job! For welding and cutting come to the point.

Enforcement and Compliance, International Trade Administration, Department of Commerce.

Ref No: N Date: May 25, 2005

IEEE P Recommended Practice for Motor Protection in Industrial and Commercial Power Systems

IEEE Power and Energy Society (PES) Power System Relaying Committee. Policies and Procedures for: Working Groups. Date of Approval: 28 March 2014

PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT)

M E M O R A N D U M. NFPA Technical Committee on Explosion Protection Systems

Approved Revisions to UL s Accredited Procedures Effective November 1, 2009

7.0 SECRETARY S REPORT BRUCE FORSYTH

HVL Tests on a 0,6/1 kv LV cable, 4x300 mm 2, Al/XLPE/PVC

Policies and Procedures for Standards Development for the Industrial Electronics Society (IES) Standards Committee. Date of Submittal: August

MIG/MAG Welding Torch MB 401 D / MB 501 D. liquid-cooled. ABICOR BINZEL. The right welding torch for every job!

ANSI Essential Requirements: Due process requirements for American National Standards

Capacitor Subcommittee of the IEEE PES Transmission and Distribution Committee 2017 Joint Technical Committee Meeting Minutes New Orleans, Louisiana

LEONARDO ACADEMY INC.

SCOPE OF ACCREDITATION

Transcription:

Underground Transformers & Network Protectors Subcommittee March 23, 201 Atlanta, Georgia Chair: Dan Mulkey Vice Chair: George Payerle M.1 Meeting Administration Introductions The meeting was called to order at 11:00 AM in the Atlanta 4-5 rooms of the Sheraton Hotel in Atlanta, Georgia. Introductions were made and sign-in sheets were routed. Quorum The members were listed on the screen and by a show of hands, it was determined that there was a quorum with 16 of the 18 members in attendance. Approval of Minutes The minutes from the Fall 2015 meeting in Memphis, Tennessee were approved with the changes noted in the working group reports below. They were motioned for approval by Said Hachichi and seconded by Bill Wimmer. The subcommittee approved these without opposition. Members and Guests --There were 16 members and 20 guests in attendance. Their names can be found in the AM system. Six guests requested membership, and post meeting John Crotty, Robert Stinson, Joshua Verdell, Mike Thibault, David Walker, and David Blew were approved as members. The chairman, Dan Mulkey, mentioned that work is continuing on the RFID meeting check in system. He also said that he had attended all of the working group meetings in the UTNP subcommittee and that all seem to be functioning very well. M.2 Working Group and Task Force Reports M.2.1 C57.12.23 Working Group Report Single-Phase Submersible Transformer Alan Traut, Chairman, Adam Bromley, vice-chair. Revision due date: 3/19/2019 PAR Approval Date: 8/21/2014 PAR Expiration Date: 12/31/2018 Introductions The meeting was called to order and everyone was asked to introduce themselves. Rosters were sent around. Quorum We had 49 attendees, 27 members (out of 32), 22 guests with 8 of those requesting membership (we will check attendance records), which gave us enough members to establish a quorum. Approval of Agenda Motion: Said Hachichi, Second: Mike Shannon, unanimous Approval of Minutes Motion: Justin Pezzin, Second: Fred Friend, unanimous Chair Report Al talked about when the PAR expires and how long we have to complete our work. PAR expires December 31, 2018. 10-year life cycle of the standard is December 31, 2019. Al mentioned that we should be fine to meet that deadline. We would like to send to ballot in the fall meeting of 2017. Page 1 of 9

Old Business Al reviewed the results from the survey regarding the tank dimensions for various kva sizes. Survey questions and results are as follows: Are these overall diameters appropriate for the manhole sizes in use? What minimum clearance is required to lower a unit through a 36" manhole? Are there differences if a unit is loop feed vs. radial feed? Should the dimensions be based on kva and/or voltage (BIL)? If so, please provide suggestions. If you have the equivalent requirements in your user specifications, eg, clause, table, drawings, please provide in your response to this survey. 14 responses received with 4 abstaining Manufacturer response that 36 max overall diameter is achievable with 250kVA but height would be 60. Also suggest a table of max dimensions by kva Manufacturer response that 39 max overall diameter is achievable. User response that 35 should be limit on 250kVA to fit 36 manhole. Also suggest overall height limit of 66 User response supports 36 max (42 manhole) for 250kVA and 58 height limit. User response by kva range: 25-100kVA, 29 max diameter, 46 max height 101-167kVA, 31 max diameter, 47 max height 250kVA, 35 max diameter User response that there should be one max diameter and height for all units, not by kva or voltage. User response that 250kVA units are installed in a 48 enclosure and 36 limit is ok. Max dimensions should be based on kva alone. Tom Holifield brought up the fact that 39 is the maximum number; why would we go less when a lot of utilities have manholes at 39-40. Giuseppe, Taz, Dan, and Brian all discussed why we would specify 35 vs. 39 for 250 kva units. Giuseppe Termini made a motion to make the maximum diameter 36, Alex Macias seconded. 7 approve. 9 opposed. 4 abstentions. Motion fails. Tom Holifield made a motion to change maximum dimensions 36 to 39 for 250 kva units. Jermaine Clonts seconded. 15 approve. 3 oppose. 4 abstentions. Motion is approved. Giuseppe mentioned utilities challenges with existing infrastructure and asked why we have a maximum diameter that is different for 167 kva and 250 kva. Dan Mulkey made a motion to add language to first sentence that states 36 max diameter for enclosure opening is only for 167 kva and below and to add maximum of 42 for 250 kva. Ron Stahara seconded. 19 approve. 0 opposed. Motion approved. New language from approved motions is as follows: Construction of the units shall be such that they can be lifted and lowered into place in a suitably designed and constructed enclosure having a minimum diameter of 910 mm (36 in) for 167kVA and below, or 1067 mm (42 in) for 250kVA To allow for cabling space and proper air flow for cooling, the transformers covered by this standard shall not have overall diameters in excess of 760 mm (30 in) for sizes 100 kva and smaller, or overall diameters in excess of 840 mm (33 in) for 167 kva, or overall diameters in excess of 990 mm (39 in) for 250 kva. Low Voltage terminals task force (section 7.2.2). Jermaine discussed the recommendations made by the task force including the addition of voltage ratings. We could add a note to the table that tells the user the Page 2 of 9

H spade can be used for any of the kva sizes, when specified. Al suggested that we put this into the draft so that we can review and vote on it at the next meeting. The table as presented is shown below: Low- Voltage Secondary terminals 2/0 AWG Copper Cable Ratings (V) 120/240, 240/120, 240 240/480, 480/240, 480 kva Ratings 25-37.5 25-75 120-4/0 AWG Copper Cable 500 kcmil copper H Spade 277, 347 25-50 600 25-100 120/240, 240/120, 240 240/480, 480/240, 480 50 100 120 25 277-347 75 600-120/240, 240/120, 240, 277 240/480, 480/240,480 120 75-100 167 37.5 50 240, 277 75-100 347 100 600 167-250 120/240, 240/120, 240, 277, 347 240/480, 480/240, 480 167-250 250 120 75-167 600 - *The connection between the secondary bushings and the cable shall be fully insulated and sealed to prevent the entrance of moisture. Tank materials we wanted to look at requirements added to 12.24 and see if we want to include similar language in 12.23. Dan Mulkey suggested that we can t make a tank with copper bearing steel with Page 3 of 9

sufficient thickness to survive in the submersible environment. Dan made a motion to adopt the three conditions included in 12.24 but that we change copper bearing steel minimum requirement to 409 SS. Second Alex Macias. Mike Hardin suggested that we add as a minimum to the first sentence. Brian asked if that is clear. Discussion led to an amended motion for material requirements: add other steel materials to first sentence and make all vault environments part of the same paragraph. Amendments to the motion and the motion approved unanimously. This motion puts the following language into the draft: Material requirements The transformer tank, including walls, cover, bottom, and auxiliary coolers shall be constructed of 409, 304L or 316L stainless steel. For transformers continuously submerged, it is recommended the user installs cathodic protection or specifies 304L or 316L stainless steel. For transformers subjected to cycling between wet and dry conditions, or subject to highly corrosive mineral content, it is recommended the user installs cathodic protection or specifies 316L stainless steel. The group ran out of time and had to table the remaining agenda items. Adjourned at 10:45 am. We will meet at the Fall 2016 meeting in Vancouver, Canada. M.2.2 C57.12.24 Working Group Report Three-Phase Submersible Transformers Giuseppe Termini, Chairman; George Payerle secretary Revision due date: 6/17/2019 PAR Approval Date: 11/9/2011 PAR Expiration Date: 12/31/2017 The meeting was called to order at 9:30 AM, March 21, 2016 in the Georgia 2,3 Room of the Sheraton Atlanta Hotel in Atlanta, GA. Introductions were made and an agenda was presented. The meeting was attended by 24 members and 41 guests. Membership stands at 25, and with 24 members present, there was a quorum. Six (6) guests requested membership. The Chairman stated that attendance at 3 consecutive meetings was necessary for membership. Any member missing 2 meetings in a row would be dropped unless the Chairman was notified with a valid justification for missing the meetings. George Payerle acted as recording secretary. Minutes from the previous meeting in Memphis, TN were presented. Al Traut a motion to approve the minutes, Brian Klaponski seconded it, and the motion was approved unanimously. The Chairman stated that the PAR has been extended to two (2) years and it will expire on December 31, 2017. However, the Chairman would like to complete the standard revision work within one year. The results of the balloting process were discussed. There were 89 interested individuals in the ballot group of which 81 casted a vote; this represents 91% participation. We received 75 affirmative votes, 4 negative votes with comments and 2 abstentions. This represents 94% approval rate. Fifty-two (52) comments received of which 16 must be satisfied. Prior to this meeting, Corey Morgan led the effort to incorporate the comments received from the balloting process into Draft D6. Matt Ceglia stated that when Draft 6 is submitted for re-circulation, it will not require another Mandatory Editorial Coordination (MEC) review. The editorial changes will be reviewed by the IEEE editorial review board prior to publishing the final approved standard. The rest of the meeting was dedicated in reviewing the comments incorporated in Draft 6 with the following results: Page 4 of 9

The revision year of the referenced standards will be removed except for C57.12.00 since specific sections of this standard are referenced. Section 5.2 - Rick Marek stated that C57.154, in addition to provide the requirements for transformers operating at elevated temperatures, it also provides the insulation classes for distribution transformers and it is the only standard where insulating classes are actually defined. It was agreed to retain the changes in this sections as incorporated. Section 6.2 Reference Temperature - Al Traut made a motion to reverse the technical change that had been made and revert back to state that the reference temperature shall be corrected to 85 degrees C. Cory seconded the motion and it was approved unanimously. Figures 1 and 2 -- The metric and English symbols are not shown in the header of the table in Figure 2 as shown in Figure 1. Also, there was a discussion on whether the metric values in the header of the table in Figure 1 should be in millimeters instead of meters. Matt Ceglia stated that it was acceptable under the IEEE metrification rules to show these values in meters. It was agreed to retain the values in meters as shown in Figure 1 and add the metric and English values in millimeters and inches respectively, in the header of the table in Figure 2. Section 7.5.4 - Mike Thibault made a motion to exclude aluminum material by adding the words: Aluminum is not acceptable between the first and second sentences of this section. Dan Mulkey seconded the motion and it was approved unanimously. Section 7.1 Brian Klaponski stated that although the changes from mineral oil to insulating fluids throughout the document were acceptable, however, the intent of this standard was to use mineral oil as the basis for insulating fluid. The Chairman suggested to add the words Unless otherwise specified, insulated liquid shall be mineral oil at the end of the first paragraph of Section 7.1 to satisfy Brian s comment. A motion was made by Dan Mulkey to add the suggested words. Kent Miller seconded the motion and it was approved unanimously. Said Hachichi made a motion to approve all the changes in Draft 6 as discussed at the meeting, and as modified above. Cory seconded the motion and it was approved unanimously. The Chairman stated that Draft D6, as modified at this meeting, will be submitted for recirculation and reballoted. The meeting was adjourned at 10:45 AM. The next meeting will be on October 2016 in Vancouver, BC, Canada. M.2.3 C57.12.40 Working Group Report Secondary Network Transformers Brian Klaponski, Chairman; Giuseppe Termini, Secretary Revision due date: 12/31/2021 PAR Approval Date: 8/30/2012 PAR Expiration Date: 12/31/2016 The WG met on Tuesday, March 22, 2016 at 11:00 am with 18 members and 28 guests. One (1) guest requested membership. An agenda was presented and approved; and introductions were made. Page 5 of 9

The minutes of the November 3, 2015, meeting in Memphis, TN were reviewed. George Payerle made a motion to approve the Meeting Minutes. Tas Taousakis seconded the motion and the minutes were approved unanimously. The Chair briefly summarized the items in the Meeting Minutes from Memphis. Three individuals requested membership at the last meeting but only Will Elliott was added to the membership since he meet the criteria for membership. The Chair stated that because of the addition of: a) Figure 2 and b) the mathematical equation in Annex B, the balloting of the draft was postponed pending the approval of the addition of these two technical items by this WG. The Chair also stated that because the draft was not submitted for balloting, a request for a PAR extension will be submitted to allow time to ballot the standard and resolve any comments received from the balloting process. Larry Dix expanded on the derivation of the equation in Annex B. He stated that the equation is informative for the end users, and is an approximation of the melting point of the bus bar. It was suggested to provide the reference/source of the equation in the text of Annex B. Larry stated that he will provide the reference to the Chair. Jeremy Sewell made a motion to approve the addition of the equation in Annex B. Mark Faulkner seconded and the motion was approved unanimously. The Chair explained the rational for adding Figure 2 to the standard. The Figure adds details on the preferred and alternative location of the primary bushings. Cory Morgan made a motion to approve the addition of Figure 2. Tas Taousakis seconded the motion and was approved unanimously. Bob Kinner made a presentation on the difference between 304L and 316L stainless steel. The presentation is summarized below: The difference between 304L and 316L is 2% of the chromium content is upgraded to molybdenum. Molybdenum is a chromium group metal with lower susceptibility to forming water soluble chlorides. In turn, it has an improved resistance to saltwater. In terms of welding and stress cracks, there is no advantage of one alloy over the other. To protect against welding errors, look at the welding process. Low carbon alloys mitigate carbide precipitation. Carbide precipitation removes chromium from the alloy chromium is what makes these steels stainless. Austenite tends to have a large grain size, which causes a lot of internal stresses along the welds. Annealing is another way reduce internal stresses, which later lead to cracking, but this may be impractical. Welding with a filler metal containing ferrite forming alloying agents can reduce stresses along the weld lines. Ferritic grains fill the gaps between austenitic grains. Stainless 321 contains 0.4% titanium which will help with this. 309Cb contains 0.8% columbium. Please check with weld wire suppliers for material compatibility. The meeting was adjourned at 12:10 pm with the next meeting set for Vancouver, Canada in October 2016. Page 6 of 9

M.2.4 C57.12.44 Working Group Report Secondary Network Protectors Bill Wimmer, Chairman, Mark Faulkner, Secretary Revision due date: 12/31/2024 PAR Approval Date: 3/26/2015 PAR Expiration Date: 12/31/2019 The meeting was called to order at 1:45 PM, on Monday, March 21, 2016 in the Georgia 2, 3 Room of the Sheraton Hotel. ( * )A total of 20 individuals attended the meeting. Membership stands at 9 members; a quorum was met on people in attendance (numerous late arrivals) Mark Faulkner presented the meeting agenda to the WG for review and acceptance. Ed Bertolini motioned to approve the meeting agenda as presented, Dan Mulkey, seconded the motion, the motion was approved unanimously. New Business Continued review of comments from Lee Welch: Discussion on external sand filled fuses / referred to Table B.4 pictures Discussion held on including external fuses and housing Three member users are currently specifying external fusing o George Power (Lee Welch) o CenterPoint Energy (Alex Macias) o Eversource (Cory Morgan) Individual housing vs one housing for all three fuses o Decision to specify individual housings only Mounting provisions Placement fuses Spades exiting the housing Clearance requirements between for individual housing, external spades, and fuse within the housing o Mulkey made reference to Table B.3 / clearances shall be reviewed Noted that a number of end users are utilizing external fusing o Eaton (Mark F) and Richards (Edward B)will get together to find min. dimensional requirements for publishing in the standard o Also questioned other type of external fusing available o Lead alloy, copper, KPR, Bussman, 5000A, 4000A, etc... Pressurizing the fuse enclosure was discussed and deemed necessary. o External fusing housing pressurized independent of network or o External fusing housing pressurized thru vent hole Table 4 AC voltage ratings: o Why have the 500 rating? o Eaton (Mark F) stated they test all at 600 o Richards to verify what voltage they test o Results will determine the elimination of 250 and 500 Remote Racking - Lee (GP) indicated that an inspection window or some means be included in the standard o To verify visible break of contacts Page 7 of 9

o Design in place that do not require the door to be open Sections: 10.5.4.6. / 10.5.4.7 / 105.4.8 / 10.5.4.8 / 10.5.4.9 o A discussion was held concerning the door hinges placement o Submersible vs. non submersible o Is the operating handle the determining factor o It was decided to not change any section 10.5.14 Spare auxiliary contacts o - Request made to define dry contact o - include a means to provide contact status o - Include a means to provide SCADA features in relation with remote racking Note: It was suggested that a new section be created specific to remote racking Under a) Eaton (Mark) to review and the determine the need to remove or keep in standard as part of the high voltage interlock transformer provisions Under b) one contact to be closed, as known as an a (, remove comma) contact when the network protector is open. This is to be an available dry contact. Under c) one contact to be closed, as known as an b (, remove comma) contact when the network protector is open. This is to be an available dry contact. Next meeting: Vancouver, Canada M.3 Old Business M.3.1 SC Scope The subcommittee voted between meetings to change the scope of this group to: Underground Transformers and Secondary Network Equipment Subcommittee (UGTSN) The Underground Transformers and Secondary Network Equipment Subcommittee shall be responsible for the following: a) Studying and reviewing the engineering aspects of: Secondary network protectors Liquid filled and dry-type secondary network transformers including pad-mount distribution transformers that incorporate or provide for a network protector or a network grounding switch Underground distribution transformers, except for pad-mount transformers. This includes vault, submersible, and subway type distribution transformers. b) Developing and maintaining related standards, recommended practices, and guides for such products c) Coordinating with other technical committees, groups, societies, and associations as required However, the change has not been approved yet. Hopefully it will be by the next meeting. At the last meeting, Dan stated that we requested the PAR to be extended to 5 years and have heard nothing. The standards board s last meeting of the year typically has a deadline for submission that occurs before the fall Transformers Committee meeting so we lose a half year automatically. It is a given that every ballot will need a recirculation. Balloting and recirculation takes a year or longer. So you really have 3 years at most, or 6 meetings to get your work done. Currently there are 4 projects that are asking for PAR extensions that would not need them if PARs lasted 5 years. Page 8 of 9

M.4 New Business M.4.1 none M.5 Adjournment The meeting was adjourned at 12:30 PM with the next meeting set for Vancouver, BC, Canada on October 26, 2016. Page 9 of 9