SECTION I KEY CHANGES

Similar documents
SUPPLEMENTAL AGENDA BPV III Special Committee on Interpretations November 4, 2015

ASME CODE WEEK SUMMARY REPORT Feb. 5-10, Houston, Texas

Formal Interpretations/ Interprétation formelle

Formal Interpretations/ Interprétation formelle

Pipeline Transportation Systems for Liquids and Slurries

ASME Codes and Standards Committee Handbook for Pressure Technology C&S. Revision 2 (Generic)

MATERIAL AND EQUIPMENT STANDARD FOR HOOKS, SHACKLES, EYE BOLTS AND CHAINS FIRST EDITION FEBRUARY 2005

NC General Statutes - Chapter 95 Article 7A 1

An Urgent Bulletin from CSA Group

Formal Interpretations/ Interprétation formelle

The Boiler and Pressure Vessel Act

Design of Below-the-Hook Lifting Devices

Meeting of July 18th, 2016 Columbus, OH

MINUTES OF THE FIFTH BOILERS & PRESSURE VESSELS TECHNICAL COUNCIL MEETING OF 2013

MINUTES OF THE FIRST BOILERS & PRESSURE VESSELS TECHNICAL COUNCIL MEETING OF 2011

MINUTES OF THE FOURTH BOILERS & PRESSURE VESSELS TECHNICAL COUNCIL MEETING OF 2010

Enforcement and Compliance, International Trade Administration, Department of Commerce

API-AGA JOINT COMMITTEE ON OIL AND GAS PIPELINE FIELD WELDING PRACTICES 2018 ANNUAL MEETING MINUTES

ASME BPV XI NUCLEAR INSERVICE INSPECTION INTERPRETATIONS SESSION HANDOUT 1. RECORD # PG 3. Page 1

COMPETENCE IN PRECISION AND QUALITY STEP DRILLS

Step drills And, with higher dimensional precision the drills will last considerably longer while maintaining the precise process tolerances.

ORDINANCE NO. WHEREAS, Ordinances No and were approved by the Los Angeles City Council and became on effective December 30, 2016;

2019 Exploration & Production Winter Standards Meeting January 21-25, 2019 Hyatt Regency San Antonio San Antonio, Texas

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2017

Enforcement and Compliance, International Trade Administration, Department of Commerce.

OCCUPATIONAL HEALTH, SAFETY AND WELFARE (plant) AMENDMENT ACT 1993

Fuels Safety Program Oil and Gas Pipeline Systems Code Adoption Document - Amendment

Hot Work Permitting Program

Agenda Item 2.2 Accomplishment and Actions from the March Meeting NESCC Ms Robinson reviewed the action item list contained in NESCC

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL AN ACT

2018 Proposed Amendments: The Constitution

Sections where modification occurred during / after the November 10, 2015 BBRS meeting are shown in orange font..

These minutes are subject to approval and are for committee use only. They are not to be duplicated or quoted for other than committee use.

Economic and Social Council

CHAPTER 220 THE FACTORIES ACT. Arrangement of Sections.

Short Title: Building Code Reg. Reform. (Public) March 18, 2015

ORDINANCE NO

Design of Below-the-Hook Lifting Devices

Circuit Court, District of Columbia. Jan. Term, 1858.

Short Title: Building Code Reg. Reform. (Public) March 18, 2015

AGENCY: Enforcement and Compliance, International Trade Administration, Department of Commerce

HOT WORK PROGRAM OSHA

MINUTES OF THE FIRST PRESSURE EQUIPMENT SUB-COUNCIL MEETING OF 2016

CERTIFICATE OF ACCREDITATION

ORDINANCE # N:\WEB SITE UP DATE\Adoption of 2015 IBC_For Y Adoption_Final.docx Page 1 of 12

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

TITLE 12 BUILDING, UTILITY, ETC. CODES CHAPTER 1 BUILDING CODE 1

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

MINUTES OF THE THIRD BOILERS & PRESSURE VESSELS TECHNICAL COUNCIL MEETING OF 2010

Schedule of Accreditation Issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

A Bill Regular Session, 2013 HOUSE BILL 1414

BID RESPONSE LABEL THIS LABEL FOR USE WITH UNITED STATES POSTAL SERVICE DELIVERY RECONDITION MUFFIN MONSTER ELECTRIC (DATE): DEC.

Chapter: 56 BOILERS AND PRESSURE VESSELS ORDINANCE Gazette Number Version Date. Long title 30/06/1997

2019 Exploration & Production Winter Standards Meeting FINAL PROGRAM January 21-25, 2019 Hyatt Regency San Antonio San Antonio, Texas

JAMAICA THE FACTORIES ACT ARRANGEMENT OF SECTIONS. PART I. Preliminary

FLORIDA BUILDING CODE

JAMAICA THE FACTORIES ACT ARRANGEMENT OF SECTIONS. PART I. Preliminary

The President. Part IV. Friday, July 20, Executive Order Establishing an Interagency Working Group on Import Safety

Bone-Fixation-Set and Pin-Set

SUPERIOR COURT OF CALIFORNIA COUNTY OF SAN MATEO

These minutes are subject to approval and are for committee use only. They are not to be duplicated or quoted for other than committee use.

ÀA À ÃAiÀÄ ªÀåªÀºÁgÀUÀ¼ÀÄ ªÀÄvÀÄÛ ±Á À À gàzà É ÀaªÁ AiÀÄ

2015 SOM Ballot Number 1. No/No Vote. Sponsored by Technical Section 3a

Enforcement and Compliance, International Trade Administration, Department of Commerce.

Record of Letter Ballot Review by TC Chapter for Procedural Review

International Labour Organization C177. Home Work Convention, 1996 (No. 177) R184. Home Work Recommendation, 1996 (No. 184)

Design of Below-the-Hook Lifting Devices

Proposed Rules of Tennessee Department of Labor and Workforce Development Division of Boiler and Elevator Inspection Elevator Safety Board

ORDINANCE NO

3 Enforcement Regulation of the Nuclear Safety Act

BALOCHISTAN PROVINCIAL ASSEMBLY SECRETARIAT THE BALOCHISTAN BOILERS AND PRESSURE VESSELS ACT, 2015 (ACT NO. XVI OF 2015)

VILLAGE OF KEREMEOS. BYLAW NO. 586, 1998 Revised May CONSOLIDATED FOR CONVENIENCE WITH AMENDMENT BYLAW NOS. 680, 2004, 795, 2012 and 818

3. Trials for Correction

NOTICE TO ALL CONSULTING ENGINEERING FIRMS

Regulations TITLE 34. LABOR AND INDUSTRY PART XIV. UNIFORM CONSTRUCTION CODE

MINUTES OF THE SECOND BOILERS & PRESSURE VESSELS TECHNICAL COUNCIL MEETING OF 2010

Utilities. (Amended as of 1/16/13) CHICKASAW NATION CODE TITLE 20 "20. UTILITIES" CHAPTER 1 TRIBAL UTILITY SERVICES

Independent System Operator in Bosnia and Herzegovina

Technical Committee on Tank Leakage and Repair Safeguards. SUBJECT: NFPA 329 Second Draft TC Final Ballot Results (F2014)

I am transmitting to you herewith the following decision of the IAPMO Standards Council.

Technical Information

Constitution of the Associated Students of Madison

NUCLEAR REGULATORY COMMISSION. 10 CFR Part 72 [NRC ] RIN 3150-AJ47. List of Approved Spent Fuel Storage Casks:

NEW YORK CITY DEPARTMENT OF BUILDINGS. Notice of Public Hearing and Opportunity to Comment on Proposed Rules

What You Need to Know About the National PTA Bylaws Revision: Articles VIII, IX, and XI. Presented by: National PTA Bylaws and Policy Committee

Ritmo meets all your welding needs in your jobsite

SUPERIOR COURT OF CALIFORNIA COUNTY OF SAN MATEO LOCAL COURT RULES

IEEE INDUSTRY APPLICATIONS SOCIETY CONSTITUTION

A CONFEDERATION Confederation

Villanova University Department of Environmental Health and Safety Policy and Procedure Manual

JOINT COMMITTEE ON AGENCY RULE REVIEW Agenda - 2/14/2011-1:30 P.M. Statehouse Hearing Room 121(William McKinley Room) Consent

Ritmo meets all your welding needs in your jobsite

INFORMATION CIRCULAR. International Atomic Energy Agency. July 1983 GENERAL Distr. ENGLISH Original: SPANISH

AGENCY: Enforcement and Compliance, International Trade Administration, Department of Commerce.

Manual of Practical Holography. Graham Saxby

Govt. of Bihar Labour Resources Department (LRD) Help File

Revised Zoning Ordinance to Permit Marijuana Cultivation in the Newburyport Business Park

DUPLIN COUNTY AN ORDINANCE REGULATING THE SITING, OPERATION AND MAINTENANCE OF SOLAR ENERGY GENERATING FACILITES

HOUSE BILL No AN ACT concerning health care; enacting the health care compact.

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

Transcription:

SECTION I Section I, Parts Fabrication Certificate Program Addition of Part PFE - Requirements for Feedwater Economizers Section I, Part PL Requirements for Locomotive Boilers Section I, Alternate Rules in Section I for the Design of Electric Immersion Heater Element Support Plates PWT-12, Construction of Box Headers and Waterlegs Preamble, Section I, Addition of Solar Heated Steam Generator - Added Part PFE on Requirements for Feedwater Economizers - Added Part PL on Requirements for Locomotive Boilers - Added a new paragraph PEB-8.3 allowing the use of Section VIII rules for the design of electric immersion heater element support plates (unstayed flat heads) SECTION II Revised Appendix 5 in Section II, Part D. A number of testing requirements were added to Appendix 5 in Section II, Part D that are intended to apply to advanced alloys like the CSEF steels. Over 25 ferrous specifications were adopted or revised in Section II, Part A More than 10 nonferrous specifications were adopted or revised in Section II, Part B

SECTION III Definitions of Local Primary Membrane Stress Intensity and Local Thin Areas Incorporate Code Case N-755 into Section III 12-8, 12-372, 12-374, 12-375: Update Appendix W Section III updated Design by Analysis rules for reversing Dynamic Loads Stress Indices for Branch Connections for r/r 0.5

SECTION IV Section IV; Parts Fabrication Certificate Program Section IV - HG-401.1, Safety Valve Sizing Section IV - Manufacturers with Multiple Locations Section IV - HG-530 Marking of Boilers BPV IV - Mandatory Appendix 2 SECTION V Section V: APR Technology. Section V: Adoption of New Article 18 on Guided Wave UT Section V: Mandatory Appendix to Article 4 for the Examination of HDPE 10-1576, 11-1196, 11-1197, 11-1198, 11-1199, 11-1975, 12-1986, 12-189, 12-1995, 12-1996, 12-1997, 12-1998, 12-1999, 12-2042, 13-1981, 13-904, 13-905, 13-906: 15 ASTM specifications related to nondestructive examination and referenced in Section V were adopted or revised.

SECTION VIII, DIVISION 1 Section VIII, Division 1; Incorporation of Code Case 2560 Section VIII, Division 1; U-2(b) and U-2(e); Clarifying Inspector Responsibility for Review of Calculations

SECTION VIII, DIVISION 2 Section VIII, Division 2; Review Environmental Factor for Structural Stress Method in Division 2 Section VIII, Division 2; Equations for Calculating Forming Strains in Table 6.1 and Code Case 2804

SECTION VIII, DIVISIONS 1 and 2 Section VIII, Division 1; Intent interpretation with revision to UCL-11; and revision to VIII-2; Part 3.3.6.2. Section VIII, Division 1 UHA-51/Div.2 3.11.4 revisions and interpretations Section VIII, Division 1; UG-40(e) and Section VIII, Division 2, 4.5.2 Section VIII, Division 1; UW-3(a) and UW-11(a) and Section VIII, Division 2; Table 4.2.1 and Table 7.2 Section VIII, Division 2; Paragraph 3.11.2.2(b) and Section VIII, Division 1; Paragraph UCS-66(f)

SECTION VIII, DIVISION 3 Section VIII, Division 3; Moving KD-240 Linear Elastic Analysis into a New Mandatory Appendix Section VIII, Division 3; Incorporation of final revisions to Code Case 2579, Incorporation to Sec VIII Division 3 (related to 10-811) Section VIII, Division 3; Revisions to KM-211.2 (a), (b), and (d) for the Manufacture of Large Vessels from Single Piece Forgings Section VIII, Division 3; Rupture Disk Devices

SECTION IX SC IX; Friction Stir Welding Procedure Qualification SC IX; Part QF Electrofusing SC IX; New Nonmandatory Appendix on Qualification of Welders under ISO rules Section II, Part C, Adoption of AWS A5.16/A5.16M:2013 as SFA-5.16/SFA- 5.16M This is a revision to an existing specification. Section II, Part C, Adoption of AWS A5.11/A5.11M:2010 as SFA-5.11/SFA- 5.11M This is a revision to an existing specification. Section II, Part C, Adoption of AWS A5.34/A5.34M:2013 as SFA-5.34/SFA- 5.34M This is a revision to an existing specification. Section II, Part C, Adoption of AWS A5.01/A5.01M:2013 as SFA-5.01/SFA- 5.01M This is a revision to an existing specification. Section II, Part C, Adoption of AWS A5.1/A5.1M:2012 as SFA-5.1/SFA-5.1M This is a revision to an existing specification. Section II, Part C, Adoption of AWS A5.4/A5.4M:2012 as SFA-5.4/SFA-5.4M This is a revision to an existing specification. Section II, Part C, Adoption of AWS A5.9/A5.9M:2012 as SFA-5.9/SFA-5.9M This is a revision to an existing specification. Section II, Part C, Adoption of AWS A5.22/A5.22M:2012 as SFA-5.22/SFA- 5.22M This is a revision to an existing specification. Section II, Part C, Adoption of AWS A5.5/A5.5M:2014 as SFA-5.5/SFA-5.5M This is a revision to an existing specification.

SECTION X BPVC Section X, Code Case 2820Composite Pressure Vessels for High Pressure Fluids

SECTION XI Section XI - Revision to Appendix D. Revision to Article A-3000 for K Calculation Methods for Surface and Subsurface Flaws. Acceptance of Through-Wall or Through-Weld Leakage in Class 1 Components. New Code Case to Replace N-629 and Revision to Appendix A, A-4200 for KIa Fracture Toughness Determination. SECTION XII Revise Paragraphs in Part PR of Section XII - Revised Paragraphs in Part PR concerning requirements for pressure relief devices - Revised 1-1.4(a), revised 1-1.4(c)(3) and deleted 1-1.4(d)(11). Add a definition of "Material Test Report" to Mandatory Appendix III, III2. Also the definition for "Dynamic Load Condition is revised in 1-1.4(c)(3). Section XII, Modal Appendix 1 Allowable Stress Criteria