GNSS Performance Monitoring IGMA-IGS Joint Trial Project

Similar documents
IGS Strategic Implementation Plan 2014 Compiled from 2013 Component Reports February 19, 2014

IGS is a service of: For more information: IGS Central Bureau. Jet Propulsion Laboratory. M/S Oak Grove Drive Pasadena, CA USA

International GNSS Service (IGS)

Overview. International GNSS Service (IGS) Chair of the Governing Board: Gary Johnston (Australia)

International DORIS Service (IDS)

International Global Navigations Satellite System Service (IGS)

The International GNSS Service (IGS): The Secrets of a Success and the Challenges of the Future

Economic and Social Council 13 July 2017

SUMMARY RECOMMENDATIONS IGS 2012 WORKSHOP OLSZTYN, POLAND JULY 2012

IGS Tropospheric Products and Services at a Crossroad

Working with the IGS: The ESA/ESOC experience

Information Service of the International Association of Geodesy

International Cooperation Mechanisms on Space Activities: Perspectives on

How did North Carolina get its shape?

Resolution adopted by the General Assembly. [on the report of the Fifth Committee (A/56/737)] 56/242. Pattern of conferences

RESOLUTION ITU-R 1-7

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 172 thereof,

Celebrating 20 Years of Service

AERONAUTICAL MOBILE COMMUNICATIONS PANEL (AMCP) EIGHTH MEETING. Montreal, 4 to 13 February 2003 AGENDA ITEM 5

STATUTORY INSTRUMENTS. S.I. No. 333 of 2011 EUROPEAN COMMUNITIES (ELECTRONIC COMMUNICATIONS NETWORKS AND SERVICES) (FRAMEWORK) REGULATIONS 2011

Wireless Facility Siting: Model Chapter Implementing Section 6409(a)

Telit Jupiter MT33xx Host EPO Application Note NT11385A r

CCTF/01-07a IGS/BIPM PILOT PROJECT TO STUDY TIME AND FREQUENCY COMPARISONS USING GPS PHASE AND CODE MEASUREMENTS. Interim Report

TREATY SERIES 2015 Nº 4

RESOLUTION ADOPTED BY THE GENERAL ASSEMBLY. [on the report of the Fifth Committee (A/52/734)]

Key Considerations for Implementing Bodies and Oversight Actors

BYLAWS Amended June 2013

FIG XXV Congress Kuala Lumpur, Malaysia, June 2014

General Assembly. United Nations A/AC.105/1080/Add.1

BELIZE TELECOMMUNICATIONS ACT CHAPTER 229 REVISED EDITION 2000 SHOWING THE LAW AS AT 31ST DECEMBER, 2000

Small Satellites: Legal and Regulatory Issues and Discussions in UNCOPUOS

Questions and Answers on the EU common immigration policy

CHAPTER III BOARD OF DIRECTORS

FCCC/PA/CMA/2018/3/Add.1

Ownership of Site; Agreement to Terms of Use

Title 1: Recitals, background and context

UNCLASSIFIED INSTRUCTION

SADC -Implementation of WRC-15 Outcomes

INTERNAL AUDIT DIVISION REPORT 2018/143

Resolution adopted by the General Assembly. [on the report of the Fifth Committee (A/63/638)] 63/248. Pattern of conferences

Policy Development Process in RIPE

IAG Bylaws adopted by the IAG Council

Information Service of the International Association of Geodesy

General Assembly. United Nations A/AC.105/1080

Economic and Social Council 2 July 2015

Introduction. Standard Processes Manual VERSION 3.0: Effective: June 26,

Resolution adopted by the General Assembly. [on the report of the Fifth Committee (A/60/831)]

In Re SRBA ) ) Case No ) )

Council 2017 Geneva, May 2017

CONVENTION ESTABLISHING THE EUROPEAN TELECOMMUNICATIONS SATELLITE ORGANIZATION EUTELSAT

Wireless Facility Siting: Model Chapter Implementing Section 6409(a) and. Wireless Facility Siting: Section 6409(a) Checklist

Update on UNHCR Structural and Management Reform

Russia s involvement in the Ukraine crisis

Article IX of the Outer Space Treaty

GOVERNMENT of ROMANIA

Rules of Procedure. Effective: May 4, 2016

Policy Development Process in RIPE

DECLARATION OF PRINCIPLES FOR INTERNATIONAL ELECTION OBSERVATION CODE OF CONDUCT FOR INTERNATIONAL ELECTION OBSERVERS

General Assembly. Advance edited version. United Nations A/AC.105/L.292. Annotated provisional agenda * I. Provisional agenda

NATIONAL POLICY GUIDANCE FOR PROXY ADVISORY FIRMS

CHAPTER 3 PROPOSED CONTENTS AND FEATURES OF A REGIONAL ARRANGEMENT

CHAPTER III BOARD OF DIRECTORS

BUCKEYE GP LLC. CHARTER of the COMPENSATION COMMITTEE

I. INTRODUCTION 2 II. WHAT IS LEED? 4 III. HOW IS LEED DEVELOPED? 7

TELEVISION LICENCE REGULATIONS

AMERICAN COLLEGE HEALTH ASSOCIATION Bylaws

STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION DIVISION OF FLORIDA LAND SALES, CONDOMINIUMS, AND MOBILE HOMES

III. Status and application of the five United Nations treaties on outer space

AUTOMATED AND ELECTRIC VEHICLES BILL DELEGATED POWERS MEMORANDUM BY THE DEPARTMENT FOR TRANSPORT

OSM WP 1.0 Open Source MANO Working Procedures V1.0

2011/6 Mainstreaming a gender perspective into all policies and programmes in the United Nations system. The Economic and Social Council,

RESOLUTION ADOPTED BY THE GENERAL ASSEMBLY. [on the report of the Fifth Committee (A/54/690)] 54/248. Pattern of conferences

MARYLAND STATE RETIREMENT AND PENSION SYSTEM GOVERNANCE POLICIES. Adopted by the Board of Trustees

IGS Ionosphere WG Status Report: Performance of IGS. Ionosphere TEC Maps -Position Paper-

Meeting of the INSARAG Regional Group Africa/Europe/Middle East Moscow, Russia September 2012

A/AC.105/C.2/2015/CRP.15

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY

DECLARATION OF THE SIXTH HIGH LEVEL MEETING ON DISASTER RISK REDUCTION, TUNIS, TUNISIA: 13 OCTOBER 2018

NOMINATING AND CORPORATE GOVERNANCE COMMITTEE CHARTER

DECREE OF THE MINISTER OF COMMUNICATION AND INFORMATION TECHNOLOGY OF THE REPUBLIC OF INDONESIA NUMBER : 27/PER/M.KOMINFO/12/2010

Standards and Certification Training

LAND USE AND ENVIRONMENTAL WORKSHOP ACREL SPRING, 1997 MEETING SCOTTSDALE, ARIZONA

COMPENSATION COMMITTEE CHARTER

REGULATIONS GOVERNING ASTM TECHNICAL COMMITTEES

LAW ON ELECTRONIC COMMUNICATIONS

OMAN TELECOMMUNICATIONS COMPANY S.A.O.C (OMANTEL)

ORDINANCE NO BE IT FURTHER ENACTED AND ORDAINED by the Mayor and City Council of Laurel, Maryland that

Differences between the 1988 and 2012 ITRs INTERNATIONAL TELECOMMUNICATION REGULATIONS ARTICLE 1 PREAMBLE. Purpose and scope of the Regulations

North American Electric Reliability Corporation (NERC) Rules of Procedure Effective in Manitoba April 1, 2012

( 3 ) Report of the Group of Governmental Experts on Transparency and Confidence-Building Measures in Outer Space Activities

2.1 In the Licence, unless the context otherwise requires: "Authority" means the Telecommunications Authority.

Annual Tripartite Consultations on Resettlement Geneva, 6-8 July UNHCR Position Paper on the Strategic Use of Resettlement

Australia PROPOSALS FOR THE WORK OF THE CONFERENCE

Background information on the Regular Process

PRINCIPLES GOVERNING IPCC WORK

CONCEPT NOTE Criminal Justice Sector in Afghanistan Time Frame: June 2010 July 2012

DIRECTLY EDIT THIS PAGE IN THE ONLINE WIKI

LEGAL TERMS OF USE. Ownership of Terms of Use

3.13. Settlement and Integration Services for Newcomers. Chapter 3 Section. 1.0 Summary. Ministry of Citizenship and Immigration

INTERNATIONAL PARTNERSHIP AGAINST CORRUPTION IN SPORT ( IPACS )

Transcription:

International Global Navigation Satellite Systems Service www.igs.org GNSS Performance Monitoring IGMA-IGS Joint Trial Project Call for Participation Document prepared by: International Committee on GNSS (ICG), International Monitoring and Assessment Task Force (IGMA) co-chairs (Urs Hugentobler, Satoshi Kogure, Xurong Dong) with support from the International Global Navigation Satellite System Service Central Bureau Outline of this Call for Participation 1. Rationale and Schedule 1.1 Background 1.2 Objectives 1.3 Schedule 1.4 Organizational Aspects 2. Call for Participation 2.1 Observing Sites 2.2 Data Centers 2.3 Monitoring Analysis Center 2.4 Monitoring Analysis Center Coordinator 3. Instructions for Submitting a Proposal 1. RATIONALE and SCHEDULE 1.1 Background The IGS was officially established in 1994 as a Service of the International Association of Geodesy. Originally based on a pure GPS tracking network, the Service developed into a GNSS service with the inclusion of GLONASS in 1998. In 2012 the Multi-GNSS Experiment (MGEX) was launched with the goal to prepare the transition of the IGS to a Multi-GNSS Service. In 2015 MGEX was phased up into a Pilot Project. In 2013 the IGS Real-time Service was launched providing open real-time data and products. Today the IGS operates a global tracking network of more than 495 stations equipped with a variety of different geodetic receivers and antennas, with about 180 stations providing tracking data in real time and more GNSS Performance Monitoring IGMA-IGS Joint Trial Project Call for Participation, August 2016, p. 1

than 149 stations providing Multi-GNSS tracking data from the new GNSS such as Galileo, BeiDou, QZSS. Pooling resources and expertise contributed by more than 200 organizations and individuals in more than 100 countries, the IGS has generated world standard GNSS products for more than 20 years. The IGS data and products are openly available to all users. The International Committee on GNSS (ICG) was established under the United Nations in 2005 to discuss how a harmonized multiple GNSS constellation would provide social benefit to the world. Performance monitoring and assessment of system service parameters based on equal algorithms and procedures for all GNSS is one of the important tasks that will benefit the user community. The International GNSS Monitoring and Assessment (IGMA) Task Force was formed to establish a framework to realize a performance monitoring and assessment function for multiple GNSS constellations. During the 10 th meeting of the ICG (November 2015 in Boulder CO, USA), the IGMA Task Force recommended that a Joint Trial Project be established with IGS to monitor the performance of all the GNSSs, The GNSS Performance Monitoring IGMA-IGS Joint Trial Project is devised to authoritatively monitor GNSS performance benchmarks with cooperation between the GNSS providers and the IGS. 1.2 Objectives The purpose of the GNSS Performance Monitoring IGMA-IGS Joint Trial Project is to implement an authoritative performance monitoring system for all participating GNSSs. In the first phase of the Trial Project, a limited number of parameters will be monitored utilizing existing IGS monitoring infrastructure supplemented by the GNSS providers. During this phase, further requirements will be developed for monitoring the GNSSs over a longer term. Through the Trial Project, user benefits of consolidated monitoring system products and combined use of multi-constellations are to be demonstrated. The Trial Project shall promote trust in GNSS via an ICG endorsed monitoring system. 1.3 IGMA-IGS Joint Trial Project Schedule The GNSS Performance Monitoring IGMA-IGS Joint Trial Project will be implemented in phases. In the initial phase, a limited set of service parameters such as broadcast ephemeris accuracy shall be monitored. Subsequent phases would expand the monitoring/assessment capabilities based on the Trial Project progress and ICG and IGS review. August 2016: End of September 2016: October/November 2016: December 2016: December 2017: December 2017: Distribute Call for Participation Proposals due (entities may propose and join at any time) Evaluation of proposals Launch Trial Project End 1st phase of Trial Project 2nd Phase of Project begins GNSS Performance Monitoring IGMA-IGS Joint Trial Project Call for Participation, August 2016, p. 2

1.4 Organizational Aspects The GNSS Performance Monitoring IGMA-IGS Joint Trial Project is a joint activity of GNSS Providers and the IGS. It is aimed at creating an authoritative international GNSS monitoring and assessment system with results trusted by all parties and worldwide. The Trial Project activities are coordinated through the ICG IGMA Task Force, which is composed of members from the GNSS Providers and IGS (through the ICG WG-D on Geodetic Reference Frames and Timing, which is co-chaired by IGS). The IGS participation within the Joint Trial Project is being solicited through this Call for Participation. GNSS Provider participation is solicited through a separate Call for Participation issued by IGMA Task Force. Providers are encouraged to contribute GNSS tracking data from select ground tracking stations as well as to participate in analysis of monitoring data. The GNSS Performance Monitoring Working Group is the organizing group within IGS consisting initially of a subset of Governing Board Members who also participate on the IGMA Task Force. Participation on this Working Group is to be supplemented in the future by IGS participants and other parties who respond to this Call. The GNSS Performance Monitoring Working Group supports the Trial Project implementation in cooperation with the IGMA Task Force and advises the Task Force on related matters. The GNSS Performance Monitoring Working Group, with assistance from the Central Bureau, will evaluate and respond to the proposals received in response to this Call for Participation. 2. CALL for PARTICIPATION The IGS is seeking participation in the GNSS Performance Monitoring IGMA-IGS Joint Trial Project through the following components: Multi-GNSS Observing Sites Data Centers Monitoring Analysis Centers Monitoring Analysis Coordination Centers 2.1 Observing Sites The IGS Multi-GNSS network will serve as backbone for the performance monitoring activities. This will presumably be supplemented by additional observing site data contributed by GNSS providers under a separate Call for Participation. Participation of additional Multi- GNSS stations and networks are welcome providing that station installations adhere to IGS Site Guidelines <http://kb.igs.org/hc/en-us/articles/202011433>, including public availability of tracking data. GNSS receivers should be capable of tracking GPS or GPS+GLONASS signals, and in parallel signals of further systems such as Galileo (IOV/FOC), BeiDou, QZSS and, if possible, IRNSS on at least two frequencies. The capability for real-time transmission of tracking data is desirable though not required for the first phase of the Joint Trial Project. GNSS Performance Monitoring IGMA-IGS Joint Trial Project Call for Participation, August 2016, p. 3

2.2 Data Centers Support is requested from organizations and data centers with the capability to expand their archives to include products from participants in this Trial Project. Interested parties should refer to the IGS Data Center Charter (http://kb.igs.org/hc/en-us/articles/202455478) for a list of requirements. Existing IGS data centers are encouraged to support the Trial Project. Product upload to the Data Center should be performed through ftp (anonymous or by user account/password). However, it will be the responsibility of the Trial Project Data Center(s) to coordinate the product upload with the IGS Associate Analysis Centers (AAC). The products should be available online within hours after reception from the AAC and for at least 3 months after the Trial Project. Offline availability upon request should be maintained for at least 2 years. Data Centers are expected to provide open access to IGS data and products provided through this Trial Project. 2.3 Monitoring Analysis Centers (MAC) The initial phase of the Trial Project is focussed on collecting and making publicly available observations and limited number of monitoring parameters calculated by post processing analysis. In the initial phase the desired GNSS constellations set to be monitored are - BDS - GALILEO - GLONASS - GPS - QZSS The list of monitored parameters for the initial phase is limited to the well-defined set of publicly accessible signals broadcast by the respective GNSSs. Parameters for monitoring in the initial phase are - Broadcast Ephemeris Accuracy (Orbits and Clocks) - SIS User Range Error - SIS UTC Offset Error - PDOP IGS operational products shall serve as reference for monitoring of the parameters. Analysis results of the IGS Monitoring Analysis Centers may be combined and submitted to ICG IGMA Task Force at later stages of the Trial Project and made available to the IGS and user community. The definition and methodology to calculate the initial monitoring parameters are defined in Terms of Reference for the IGMA/IGS Joint Trial Project. Standards for formats of products, latencies etc. are to be defined and agreed to in the initial phase of the project by the IGMA Task Force in close coordination with the IGS GNSS Performance Monitoring Working Group. GNSS Performance Monitoring IGMA-IGS Joint Trial Project Call for Participation, August 2016, p. 4

2.4 Monitoring Analysis Center Coordinator (MACC) Analysis results of whole IGS Monitoring Analysis Centers may be combined and submitted to ICG IGMA Task Force at later stages of the Trial Project and made available to the IGS. One Monitoring Analysis Center Coordinator may be selected among applicants of MAC. 3. INSTRUCTIONS for SUBMITTING a PROPOSAL Parties wishing to participate within this Trial Project should complete the online proposal form located at: https://connect.igs.org/cfp?formid=igma Any questions about this form can be directed to the IGS Central Bureau at support@igs.org. It is highly desirable that participating organizations consider continuing their activities after the end of the initial phase of the Trial Project. GNSS Performance Monitoring IGMA-IGS Joint Trial Project Call for Participation, August 2016, p. 5