NUCLEAR REGULATORY COMMISSION [NRC ] Revision Probabilistic Risk Assessment and Severe Accident. Evaluation for New Reactors

Similar documents
NUCLEAR REGULATORY COMMISSION [NRC ] Instrumentation and Controls Guidance

NUCLEAR REGULATORY COMMISSION [NRC ] Qualification of Safety-Related Lead Storage Batteries for Nuclear Power Plants

NUCLEAR REGULATORY COMMISSION [NRC ] Draft Letter to the Nuclear Energy Institute Regarding the Clarification of

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Southern Nuclear Operating Company,

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Southern Nuclear Operating Company, Inc.,

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ]

NUCLEAR REGULATORY COMMISSION. 10 CFR Part 72 [NRC ] RIN 3150-AK05. List of Approved Spent Fuel Storage Casks: TN Americas LLC,

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Exelon Generation Company, LLC

Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2. ACTION: Intent to conduct scoping process and prepare environmental impact

NUCLEAR REGULATORY COMMISSION. 10 CFR Part 72 [NRC ] RIN 3150-AJ47. List of Approved Spent Fuel Storage Casks:

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Southern Nuclear Operating Company, Inc.

NUCLEAR REGULATORY COMMISSION. [Docket Nos and EA ; NRC ] In the Matter of Energy Northwest; Columbia Generating Station

NUCLEAR REGULATORY COMMISSION. [Docket Nos , , , and ; NRC ] First Energy Corp. First Energy Solutions

ACTION: License amendment application; notice of opportunity to comment, request a

NUCLEAR REGULATORY COMMISSION. [Docket Nos , , , ; NRC ]

List of Approved Spent Fuel Storage Casks: NAC International, Inc., MAGNASTOR

======================================================================== Proposed Rules Federal Register

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION

Enclosure 6. NRC Pu~lic Outreach and Stakeholder Input. ADAMS Accession No: ML 13301A738

[NRC ] Mr. Joseph Quintanilla is a radiographer who was formerly employed by Quality

Closure of FCC Lockbox Used to File Fees, Tariffs, Petitions, and Applications for

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R05-OAR ; FRL Region 5] Air Plan Approval; Illinois; Volatile Organic Compounds

DEPARTMENT OF HOMELAND SECURITY. Office of the Secretary. 6 CFR Part 37 RIN 1601-AA74. [Docket No. DHS ]

Office of Surface Mining Reclamation and Enforcement. AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior.

September 3, 19. Sincerely, /s/ Chester Poslusny, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - I/Il

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION

29208 Federal Register / Vol. 64, No. 104 / Tuesday, June 1, 1999 / Rules and Regulations

AGENCY: Office of the Secretary, Department of Education. SUMMARY: In accordance with Executive Order 13777,

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R05-OAR ; FRL Region 5]

Office of Surface Mining Reclamation and Enforcement

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

DEPARTMENT OF TRANSPORTATION. National Highway Traffic Safety Administration. [Docket No. NHTSA ]

Agency Information Collection Activities; Revision of a Currently Approved Collection:

[BILLING CODE: U] [Docket No. TTB ; T.D. TTB 119A; Re: T.D. TTB 119]

Revision to the Manual of Regulations and Procedures for Federal Radio Frequency

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R05-OAR ; FRL Region 5] Air Plan Approval; Illinois; Volatile Organic Compounds

Proposed Agency Information Collection Activities; Comment Request

Review of Existing General Regulatory and Information Collection Requirements of the

DEPARTMENT OF HOMELAND SECURITY Billing Code Agency Information Collection Activities: Notice of Entry of Appearance as Attorney or

41 CFR Parts 300-3, 301-2, , , , and [FTR Amendment ; FTR Case ; Docket , Sequence 1]

SUMMARY: On March 24, 2016, the Bureau of Industry and Security (BIS) published

DEPARTMENT OF TRANSPORTATION X. AGENCY: Office of the Secretary (OST), U.S. Department of Transportation (DOT).

Negotiated Rulemaking Committee; Public Hearings. AGENCY: Office of Postsecondary Education, Department of

Determination of Full Program Adequacy of Washington s Municipal Solid Waste Landfill

40 CFR Parts 110, 112, 116, 117, 122, 230, 232, 300, 302, and 401. Definition of Waters of the United States Amendment of Effective Date of 2015 Clean

DEPARTMENT OF TRANSPORTATION. National Highway Traffic Safety Administration. 49 CFR Part 571. Docket No. NHTSA

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. 24 CFR Part 100. [Docket No. FR-6111-A-01] RIN 2529-ZA01

SUMMARY: Pursuant to Executive Order Enforcing the Regulatory Reform

Rules of Practice and Procedures to Formulate or Amend a Marketing Agreement, a

Rescinding Department of Homeland Security Acquisition Regulation (HSAR) Clause

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD. Before Administrative Judges:

DEPARTMENT OF TRANSPORTATION

OSHA-7 Form ( Notice of Alleged Safety and Health Hazard ); Extension of. the Office of Management and Budget s Approval of Information Collection

Agency Information Collection Activities; Revision of a Currently Approved Collection:

Regulatory Requirements for Hearing Aid Devices and Personal Sound Amplification Products;

Aviation Rulemaking Advisory Committee - New Task (Part 145 Working Group) SUMMARY: The FAA has assigned the Aviation Rulemaking Advisory Committee

SUMMARY: This notice provides an update of the Department of Health and Human Services

DEPARTMENT OF TRANSPORTATION

SUMMARY: The Food and Drug Administration (FDA) is issuing a final rule that adopts,

Office of Surface Mining Reclamation and Enforcement

REPORT OF THE NUCLEAR REGULATION SUBCOMMITTEE

Cranberries Grown in the States of Massachusetts, Rhode. Island, Connecticut, New Jersey, Wisconsin, Michigan,

Criteria Used to Order Administrative Detention of Food for Human or Animal

Agency Information Collection Activities; Submission for OMB Review; Comment

AGENCY: United States Patent and Trademark Office, Commerce. SUMMARY: The United States Patent and Trademark Office (USPTO) has modified

Amendments to Regulations on Citizen Petitions, Petitions for Stay of Action, and Submission of

AGENCY: Enforcement and Compliance, International Trade Administration, Department of

SUMMARY: We propose to revise our regulations to allow applicants for a Social

Subpart A ( General Provisions ) and Subpart B ( Confined and Enclosed Spaces

Maximal Usage Trials for Topical Active Ingredients Being Considered for Inclusion in an Overthe-Counter

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

CORPORATION FOR NATIONAL AND COMMUNITY SERVICE. Annual Civil Monetary Penalties Inflation Adjustment

Ensuring Program Uniformity at the Hearing and Appeals Council Levels of the Administrative

SUMMARY: The Commission is noticing a recent Postal Service filing seeking

DEPARTMENT OF HOMELAND SECURITY U.S. Customs and Border Protection DEPARTMENT OF THE TREASURY. 19 CFR Parts 142 and 143 USCBP RIN 1515-AD96

Defense Federal Acquisition Regulation Supplement: State. Sponsor of Terrorism North Korea (DFARS Case 2018-D004)

Fees for Submitting Corrected Electronic Title Appendices. AGENCY: U.S. Copyright Office, Library of Congress.

Specific Requirements Pertaining to Fingerprinting and Criminal History Records Checks

Laser Products--Conformance with IEC Ed. 3 and IEC Ed. 3.1 (Laser

Wool Products Labeling; Fur Products Labeling; Textile Fiber Products Identification

SUMMARY: This document finalizes a minor technical change to the. Bureau of Prisons (Bureau) regulations on sentence commutation which

[Docket No. FWS R7 SM ; FXFR FF07J00000; FBMS

SUMMARY: The Food and Drug Administration (FDA) is proposing to amend its regulations

Unfair Labor Practice Proceedings; Negotiability Proceedings; Review of Arbitration

NRC Formal Documents and Their Uses (NUREG/BR-0070), Requested date: 2017

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. [Docket No. FR-6030-N-01]

Review of Foreign Ownership Policies for Broadcast, Common Carrier and Aeronautical

Refurbishing, Reconditioning, Rebuilding, Remarketing, Remanufacturing, and Servicing of

SUMMARY: The Food and Drug Administration (FDA or Agency) is announcing the

DEPARTMENT OF TRANSPORTATION. Hours of Service of Drivers: Application for Exemption; SikhsPAC and the North American Punjabiz Trucker Association

Cranes and Derricks in Construction: Operator Qualification. AGENCY: Occupational Safety and Health Administration (OSHA), Labor.

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. United Water Conservation District Project No.

DEPARTMENT OF VETERANS AFFAIRS SUMMARY: This document amends the Department of Veterans Affairs (VA) loan

Drawbridge Operation Regulation; Sabine River, near Ruliff, drawbridge operation regulation for the Kansas City

Request for Notification from Industry Organizations Interested in Participating in the

Exemptions To Permit Circumvention of Access Controls on Copyrighted Works: Notice of Public Hearings

SUMMARY: This proposed rule provides various changes and updates to the. Department of State passport rules. The proposed rule incorporates statutory

Visas: Visa Information Update Requirements under the Electronic Visa Update. SUMMARY: The Department of State is coordinating with the Department of

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. 18 CFR Part 33. [Docket No. RM ]

Transcription:

This document is scheduled to be published in the Federal Register on 02/09/2016 and available online at http://federalregister.gov/a/2016-02564, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION [NRC-2012-0232] Revision Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan-final section revision; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a final revision to the following section in Chapter 19 of NUREG-0800, Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, Section 19.0, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors. DATES: The effective date of this Standard Review Plan update is [INSERT DATE 30 DAYS AFTER PUBLICATION IN THE FEDERAL REGISTER]. ADDRESSES: Please refer to Docket ID NRC-2012-0232 when contacting the NRC about the availability of information regarding this document. You may access publicly-available information related to this document using any of the following methods: Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2012-0232. Address questions about NRC dockets to Carol Gallagher; telephone: 301-415-3463; e-mail: Carol.Gallagher@nrc.gov. For technical questions, contact the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section of this document.

NRC s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRC s Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it available in ADAMS) is provided the first time that a document is referenced. The final revision for the SRP, Section 19.0, Revision 3, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors, is available in ADAMS under Accession No. ML15089A068. A redline strikeout comparing the proposed revision to the final revision can be found in ADAMS under Accession No. ML15089A115. The responses to public comments can be found in ADAMS under Accession No. ML15086A472. NRC s PDR: You may examine and purchase copies of public documents at the NRC s PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The NRC posts its issued staff guidance on the NRC s external Web page: http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/. FOR FURTHER INFORMATION CONTACT: Mark Notich, telephone: 301-415-3053, e-mail: Mark.Notich@nrc.gov or Nishka Devaser, telephone: 301-415-5196, e-mail: Nishka.Devaser@nrc.gov, both are staff of the Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. - 2 -

SUPPLEMENTARY INFORMATION: I. Background. On December 8, 2014 (79 FR 72709), the NRC published for public comment a proposed revision to this section of the SRP. The staff made changes to the proposed revision after consideration of comments received. A summary of the comments and the staff s disposition of the comments are available in a separate document, Response to Public Comments on Draft SRP Section 19.0 (ADAMS Accession No. ML15086A472). The changes to this SRP section reflect current staff review methods and practices based on lessons learned from NRC reviews of design certification (DC) and combined license (COL) applications completed since the last revision of this chapter. Changes include: (1) incorporation of guidance previously published in Interim Staff Guidance (ISG) DC/COL-ISG-003 (ADAMS Accession No. ML081430087) concerning the review of probabilistic risk assessment (PRA) information and severe accident assessments submitted to support DC and COL applications, (2) incorporation of guidance for DC and COL applicants previously published in ISG DC/COL-ISG-020 (ADAMS Accession No. ML100491233) concerning review of information from PRA-based seismic margin analyses submitted in support of DC and COL applications, (3) incorporation of guidance previously published in ISG Digital Instrumentation and Controls (DI&C)/COL-ISG-003 (ADAMS Accession No. ML080570048) concerning review of DI&C system PRAs, including treatment of common cause failure (CCFs) in PRAs and uncertainty analysis associated with new reactor digital systems, (4) incorporation of additional procedures for review of PRA information and severe accident assessments developed during NRC reviews of DC and COL applications completed after Revision 2 of SRP Section 19.0 was issued, (5) additional proposed acceptance criteria and review procedures for - 3 -

the staff s review of an applicant s assessment of risk from accidents that could affect multiple modules in facilities with small modular integral pressurized water reactors (ipwrs), (6) additional review procedures for the staff s review of the results of the PRA for non-power modes of operation, and (7) several editorial changes to ensure that there is no confusion between text in this SRP section and text in the ASME/ANS PRA Standard currently endorsed by the NRC and referenced in this SRP section. The ISG DC/COL-ISG-003 and ISG DI&C/COL-ISG-003 have now been superseded by SRP 19.0, Revision 3 and should no longer be used. The ISG DC/COL-ISG-020 contains guidance for COL holders which has not been superseded by SRP 19.0, Revision 3 and should still be used by COL holders. II. Backfitting and Issue Finality. Issuance of this final SRP does not constitute backfitting as defined in 10 CFR 50.109 (the Backfit Rule) or otherwise be inconsistent with the issue finality provisions in 10 CFR part 52. The NRC s position is based upon the following considerations: 1. The SRP positions, does not constitute backfitting, inasmuch as the SRP is internal guidance to NRC staff. The SRP provides internal guidance to the NRC staff on how to review an application for NRC regulatory approval in the form of licensing. Changes in internal staff guidance are not matters for which either nuclear power plant applicants or licensees are protected under either the Backfit Rule or the issue finality provisions of 10 CFR part 52. 2. The NRC staff has no intention to impose the SRP positions on existing licensees either now or in the future. - 4 -

The NRC staff does not intend to impose or apply the positions described in the draft SRP to existing licenses and regulatory approvals. Hence, the issuance of a final SRP - even if considered guidance within the purview of the issue finality provisions in 10 CFR part 52 need not be evaluated as if it were a backfit or inconsistent with issue finality provisions. If, in the future, the NRC staff seeks to impose a position in the SRP on holders of already issued licenses in a manner that does not provide issue finality as described in the applicable issue finality provision, then the staff must make the showing as set forth in the Backfit Rule or address the criteria for avoiding issue finality as described in the applicable issue finality provision. 3. Backfitting and issue finality do not with limited exceptions not applicable here protect current or future applicants. Applicants and potential applicants are not, with certain exceptions, protected by either the Backfit Rule or any issue finality provisions under 10 CFR part 52. Neither the Backfit Rule nor the issue finality provisions under 10 CFR part 52, with certain exclusions, were intended to apply to every NRC action that substantially changes the expectations of current and future applicants. The exceptions to the general principle are applicable whenever an applicant references a 10 CFR part 52 license (e.g., an early site permit) and/or NRC regulatory approval (e.g., a design certification rule) with specified issue finality provisions. The exceptions to the general principle are applicable whenever an applicant references a 10 CFR part 52 license (e.g., an early site permit) and/or NRC regulatory approval (e.g., a design certification rule) with specified issue finality provisions. The NRC staff does not, at this time, intend to impose the positions represented in the draft SRP in a manner that is inconsistent with any issue finality provisions. If, in the future, the staff seeks to impose a position in the draft SRP in a manner that does not provide issue finality as described in the - 5 -

applicable issue finality provision, then the staff must address the criteria for avoiding issue finality as described in the applicable issue finality provision. III. Congressional Review Act. In accordance with the Congressional Review Act, the NRC has determined that this action is not a major rule and has verified this determination with the Office of Information and Regulatory Affairs of the Office of Management and Budget. Dated at Rockville, Maryland, this 21 st day of January, 2016. For the Nuclear Regulatory Commission. Tanya Smith, Chief New Reactor Rulemaking and Guidance Branch Division of Advanced Reactors and Rulemaking Office of New Reactors [FR Doc. 2016-02564 Filed: 2/8/2016 8:45 am; Publication Date: 2/9/2016] - 6 -