Call for Tenders for Positive Load Flow Commitments for the time period to

Similar documents
Terms and conditions for the initiation, execution and invoicing of load flow commitments at entry and exit points of Gastransport Nord GmbH ('GBLFZ')

Storage Services Agreement for Biogas astora-pack / astora-add

Offshore Wind Energy Act (WindSeeG 2017)

Operating Agreement. to the Haidach Natural Gas Storage Facility GSA LLC Moscow, Russian Federation

General Terms and Conditions Day Ahead. of innogy Gas Storage NWE GmbH, Flamingoweg 1, Dortmund (hereinafter, "igsnwe")

General Terms and Conditions. of innogy Gas Storage NWE GmbH, Flamingoweg 1, Dortmund (hereinafter, "igsnwe")

Jawne TAJEMNICA OGP GAZ-SYSTEM S.A.

General Terms and Conditions of Purchase medi GmbH & Co. KG

General Terms and Conditions of Sale and Delivery of ERC Emissions-Reduzierungs-Concepte GmbH ( ERC )

GENERAL PURCHASING TERMS AND CONDITIONS. Strama-MPS Maschinenbau GmbH & Co. KG

These terms shall apply to all future agreements with Supplier, even if IPROTec GmbH does not refer to these terms again.

EFTEC Engineering GmbH General Terms and Conditions of Purchase

General Terms and Conditions of WellStar GmbH & Co. KG

International Purchasing Conditions for Suppliers not Resident in Germany

General Terms and Conditions of Sale and Delivery of ECKART GmbH

Standard Terms and Conditions of Lufthansa Technik Logistik GmbH and of Lufthansa Technik Logistik Services GmbH (Version 11/11)

REVISION SHEET FOR STORAGE SERVICE RULES

GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY OF AOA APPARATEBAU GAUTING GMBH

QUALITY ASSURANCE AGREEMENT Production of packaging and/or services for the pharmaceutical industry

General Terms and Conditions of Purchase. (dated as of March 2017)

SHORT-TERM REGASIFICATION AGREEMENT

Terms and Conditions for Delivery and Payment

DUBAI INTERNATIONAL ARBITRATION CENTRE RULES 2007 AS OF 22 ND FEBRUARY Introductory Provisions. Article (1) Definitions

Standard terms and conditions

CUSTODY AGREEMENT Member State Member States Representative ECC Party Parties Effective Date Contracting Member States Service Contract Whereas

General Terms and Conditions

Israel Railways Ltd. Procurement & Contracting Division

Network Enforcement Act Regulatory Fining Guidelines

CONTRACT REGULATIONS OF THE EUROCONTROL ORGANISATION

GENERAL TERMS AND CONDITIONS for Online Parking at Mazur Parkplatz

REGULATION ON SUBCONCESSIONS

GEBERIT PIPING SYSTEMS INTERNATIONAL SALES AND DELIVERY CONDITIONS

1 Application. Contrary conditions of the orderer, which Holmer hereby expressly objects to, shall not become part of the contract.

Gas Storage Agreement the Inverse Storage (hereinafter referred to as the Agreement )

BALMER LAWRIE & CO. LTD. TECHNICAL / COMMERCIAL BID

SCHOTT Purchasing Terms and Conditions

MAHARASHTRA RAJYA SAHAKARI DUDH MAHASANGH MARYADIT, MUMBAI MAHANAND DAIRY, GOREGAON (EAST), MUMBAI

1. Scope of application, general provisions 3. Prices, payment, delays in payment 2. Offers, samples, guarantees, contracts

GOVT. OF NCT OF DELHI

Special Provisions. Special Instructions to Bidders. Instructions to Bidders. General Conditions

Bank Note Paper Mill India Private Limited, Mysore. For any query, you may contact at Tel , Fax

Eurex Liquidity Provider Agreement (LPA) v.1.1

Enquiry for Non coking Coal of Indian origin for supply to Thermal Power Plants of WBPDCL

ARTICLES OF ASSOCIATION SILTRONIC AG. I. General Provisions. Name, Registered Office, Financial Year And Announcements. Siltronic AG.

Memorandum and Articles of Association

c. We shall be entitled to make deliveries in installments.

General Terms and Conditions (GTCs) Valid as of: 1 October 2016

SCHEDULE 2 - EXHIBIT 4 DATED [ ] 200[ ] NATIONAL GRID ELECTRICTY TRANSMISSION COMPANY PLC (1) and THE CONNECTION AND USE OF SYSTEM CODE

This Letter of Intent (hereinafter: LoI) is made and entered into on the. 2009

CHAPTER I. 1. Applicable rules. Article 1

Millennium has reached agreement with four Anchor Shippers that provide sufficient market support to move forward with the Expansion Facilities.

German construction contract procedures (VOB) - Part A: General provisions relating to the award of construction contracts

GENERAL CONTRACT OF USE FOR WAGONS GCU

DATED 20 NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) FIRM FREQUENCY RESPONSE AGREEMENT (BALANCING MECHANISM PARTICIPANT (DYNAMIC))

General guidance on EFSA procurements

Bank Note Paper Mill India Private Limited, Mysore. For any query, you may contact at Tel , Fax

Tender No For the Supply of LED lights for Various Types of Rolling Stock for Israel Railways Ltd. ( Tender ) General Terms and Conditions

International Conditions of Sale for Customers not Resident in Germany

Aurubis AG. Articles of Association. (Status: 2 March 2017) I. General Conditions. Aurubis AG

OEM Supply Agreement

Fisyon Trade General Business / Delivery and Payment Conditions

International Conditions of Sale

Tender. for. Supply & Installation of the Xenon-Arc Lamp. Indian Institute of Technology Jodhpur

CITY OF HOPKINSVILLE

Anglo American Procurement Solutions Site

FAQs on Implementation of CEF Actions. CEF Transport/Energy

ON INTRODUCTION OF AMENDMENTS TO THE LAW OF THE REPUBLIC OF TAJIKISTAN ON PUBLIC PROCUREMENT OF GOODS, WORKS AND SERVICES

Types and procedures of public procurement

THE MUNICIPAL CO-OP. BANK LTD. MUMBAI TENDER NOTICE. Tender Document for 2 years Support of Routers and Manageable Switch

SLOT CAPACITY AGREEMENT FOR THE REGASIFICATION AND STORAGE BUNDLED SERVICE

General Terms and Conditions of Purchase

Re-Tender. for. Supply & Installation of the Water Chiller. Indian Institute of Technology Jodhpur

PROVISION OF GAS TRANSMISSION SERVICES THROUGH THE POLISH SECTION OF THE TRANSIT GAS PIPELINE SYSTEM YAMAL-EUROPE ON AN INTERRUPTIBLE SERVICE BASIS

International Purchasing Conditions for Suppliers Not Resident in Germany

Tender. for. Supply and Installation of. Indian Institute of Technology Jodhpur

Israel Railways Ltd. Procurement & Contracting Division

Terms and Conditions of Purchase of Goods and Services by Hyundai Motor Manufacturing Czech s.r.o. (hereinafter referred to as "Terms and Conditions")

Tender Enquiry No: BCL/PUR/ CO2 Gas/SS/CW/VW/18-19/Rehab Dated:

ICDR INTERNATIONAL CENTRE FOR DISPUTE RESOLUTION ARBITRATION RULES

FOR HOSTESS SERVICES DURING ITB 2018, BERLIN, GERMANY FROM 7 TO 11 MARCH 2018

WIPO WORLD INTELLECTUAL PROPERTY ORGANISATION ARBITRATION RULES

PRESENTATION ON TENDERING AND PROCUREMENT PROCEDURES

Courtesy English Translation (not binding only the Italian version is binding)

N O T I F I C A T I O N

of 22 July 2009 Part 1 General provisions Section 1 Scope

FOR TRANSPORT SERVICES DURING ITB 2017, BERLIN, GERMANY FROM 8 TH TO 12 TH MARCH 2017

UV-Visible Spectrophotometer

THE TECHNICAL UNIVERSITY OF KENYA TENDER DOCUMENT FOR

Irish Residential Properties REIT plc (the Company ) Audit Committee ( Committee ) Terms of Reference

DATED [ ] 201[ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) FIRM FREQUENCY RESPONSE AGREEMENT

CREDIT FACILITY AGREEMENT. Made and entered into by and between:-

Bank Note Paper Mill India Private Limited, Mysore. Invites sealed quotations for Sale of Plastic Scrap & Empty Bobbins at BNPM, Mysore.

Amendments to Capacity Allocations Mechanisms to comply with EU Capacity Regulations

Instructions to Bidders Page 1 of 8

International Conditions of Sale for Customers not Resident in Germany

Hiring of Courier Agency for delivery of Provisional Degree Certificate and Transcripts to Students

International Conditions of Sale for Customers not Resident in Germany

Notice inviting e-bids for Printing and Supply of IEC Material

PART C: REQUEST FOR PROPOSAL (RFP)

Articles of Association of the. International Non Profit Association (AISBL) European Network of Transmission System Operators for Gas ENTSOG

Transcription:

Call for Tenders for Positive Load Flow Commitments for the time period 01.03.2018 to 09.03.2018 Preamble: terranets bw GmbH (terranets bw) conducts a call for tenders based on 9 Section 3 Sentence 2 No. 1 of the Gas Network Access Regulation (German: GasNZV) for positive load flow commitments for the time period 01.03.2018 09.03.2018, the purpose of which being to ensure or increase the bid resp. the designation of existing freely allocable entry and exit capacity in the market area of NetConnect Germany. With submission of its bid, the bidder accepts the terms and conditions of this call for tenders. The call for tenders for positive load flow commitments is available in German and English. Only the original German version is legally binding. 1. Description and general requirements 1.1 Positive load flow commitments include the reduction of exit and the (part) nonutilisation of exit capacities or the ensuring/increase in entries with respective effect on the grid of terranets bw. 1.2 The bidder must hold entry and/or exit capacity rights for the positive load flow commitments at the relevant point. 1.3 A group of bidders is permitted, providing that one bidder is designated as the responsible contact and contract partner. 1.4 Bidders undertake to ensure that they can be reached daily, 24 hours a day. 1.5 terranets bw alone can decide whether bids correspond to the stipulations set out herein. 1.6 In their bid, bidders shall name the balancing group manager including contact details for the balancing group in which the respective capacities at the agreed entry or exit points are included. If there is no balancing group manager available, the bidder undertakes to conclude a balancing group contract with NetConnect Germany GmbH & Co. KG (www.net-connect-germany.de) for the respective points, or in the event that a contract is already in place, said contract shall be extended correspondingly. Evidence that the requirements set out above are met, shall be submitted to terranets bw without an explicit request on the part of terranets bw prior to the acceptance of the load flow commitments and is a precondition for the conclusion of the contract. Seite 1/5

2. Object of call for tenders 2.1 The call for tenders is for positive load flow commitments for the grid of terranets bw or in connected grids with effect on said grid of terranets bw. Positive load flow commitments shall be contracted and called up in units (lots) of 10,000 kwh/h respectively. Utilisation occurs per lot (piece). Utilisation of single lots can comprise a minimum of one hour or a maximum of a whole month. terranets bw is not obliged to make use of bids. The utilisation of load flow commitments takes place at the entry or exit points mentioned below by terranets bw in this call for tender (entry and exit points in the network area of terranets bw can be seen on the network map at: www.terranets-bw.de). Bidders shall indicate in their bids to what amount they submit positive load flow commitments (v. Bidding form for positive load flow commitments for the time period 01.03.2018 to 09.03.2018 ), based on a combination of commodity and capacity charges (commodity or capacity charges can thus also amount to 0.00 ). 2.2 Concrete load flow commitments should be offered at the following entry or exit points: - Wallbach (TENP), Exit and Entry - Lampertheim IV (LAW), Entry - RC Basel, Exit - RC Lindau, Exit - bayrische Speicher (especially Inzenham & Wolfersberg) The need for load flow commitments (Entry and Exit) is up to 200 lots a 10.000 kwh/h (in total 2 Mio. kwh/h). For each entry or exit point, a respective bidding form should be submitted for positive load flow commitments for the time period 01.03.2018 to 09.03.2018; on acceptance of the bid by terranets bw, this bidding form shall become an integral part of the contract. 2.3 The contract term for positive load flow commitments starts on the 01.03.2018, 06:00 h and ends on the 09.03.2018, 06:00 h. 2.4 Offers are only possible for the whole contract term. 2.5 The call of load flow commitments by terranets bw or by a third party instructed by terranets bw shall occur predominantly via EDIGAS, alternatively in another agreed format or by telephone. terranets bw shall define the necessary amount and time period of the load flow commitment. The amount requested can be smaller than that of the bid or equal to the maximum amount. The request means that throughout the whole time period an obligation exists at the entry point indicated in the appendix bidding form for positive load flow commitments for the time period 01.03.2018 to 09.03.2018 to make use (by nomination) of the affected entry capacity (increase entry) or for exit points indicated in the appendix bidding form for positive load flow commitments for the time period 01.03.2018 to 09.03.2018 the request means a ban on using (by nomination) the relevant exit capacity (reduction of exit). The bidder shall send confirmation of the request without undue delay on receipt of said request for the load flow commitment predominantly via EDIGAS or alternatively in another agreed format to the Dispatching Unit of terranets bw or to a third party designated by terranets bw. 2.6 A message shall be sent by terranets bw or a third party authorised by terranets bw to the Page 2/5

bidder regarding the call of the positive load flow commitment no later than 15:00 h of the previous day (day ahead process). 2.7 The bidder is bound by his bid/bids until the 26.02.2018. 3. Product price 3.1 The bidder can submit bids for each lot based on a combination of capacity and commodity charges (commodity or capacity charges can therefore also amount to 0.00 ). Commodity charges that are calculated with a formula are permissible. The reference to common gas price indexes is admitted as well. 3.2 If bids provide for a capacity charge, said capacity charge will be paid by terranets bw monthly on conclusion of the contract for the offered and accepted respective amounts independent of the actual utilisation of load flow commitments. 3.3 For bids that contain a commodity charge, the obligation for terranets to pay comes into force after call and after the corresponding service has been rendered. 4. Award procedure 4.1 All admissible tenders duly submitted in time for the tender period shall be taken into consideration during the evaluation phase. 4.2 For the contract award all complete bids received in due time shall be listed in the order of ascending prices and according to their weighting in a merit order list. The contract shall be awarded based on the merit order list beginning with the lowest weighted price. The weighting criteria for commodity or capacity charges or a combination takes into consideration an expected probability for the call of load flow commitments of 70 % of the hours in a month. If a commodity charge is calculated by reference to a common gas price index, terranets bw takes into account the average value of the used gas price index during the last 365 days before the 21.02.2018 in the weighting. 4.3 Where the same price has been quoted in more than one tender, contracts will be granted in all cases in the order the tenders were received (the contract is awarded to the earlier tender). 4.4 The contract award can be rejected in the case of obviously unrealistic tenders, in the case of the obvious or unproven capability of the bidder or in the case of uneconomical bids which would lead to an unproportional burden on the grid user or terranets bw or tenders which in the estimation of terranets bw are irrelevant for the capacity situation. 4.5 The awarding of a contract can also comprise parts of the offered quantities. On award of the contract, the signed contract for positive load flow commitments and its annexes shall be sent back to the respective bidders. The contract shall come into force and be binding for both parties on receipt. In the event that the contract comprises only part of the offered quantities, the annexes to the contract will be amended by terranets bw accordingly. The contract in its amended version is then binding for both parties. 4.6 The call of load flow commitments shall then occur according to the order of the merit Page 3/5

order list. Deviations from the merit order list are only permissible on technical grounds connected to the physical gas flow or comparable decisions made by terranets bw - Dispatching Unit or by a third party authorised by terranets bw. In the event of deviations, terranets bw undertakes to specify and document the reasons in writing. Otherwise no change in the order shall be made. In the case of a call of positive load flow commitments at concrete entry or exit points or at other agreed points, grid safety, security and integrity issues shall be taken into consideration. 5. Service provision Calls for load flow commitments oblige the bidder when submitting his nomination not to exceed the maximum exit nomination or fall below the minimum entry nomination throughout the whole time period at the designated point given by terranets as an absolute value. 6. Deadlines The call for tenders begins on 21.02.2018 with the publication of the call for the tender documents on the terranets bw website and ends on 23.02.2018, 12:00 h. Bidders shall be informed in writing about the acceptance or rejection of their bids by 26.02.2018, 24:00 h at the latest. An email message shall be sufficient. 7. Recording of telephone calls 7.1 All telephone calls made with the Dispatching Unit of terranets bw including connection data shall be recorded and saved for the sake of evidence in the interests of both contract parties. 7.2 Recordings shall be used solely in the event of disputes. No obligation exists to send information thereon to the bidder. 7.3 The bidder and terranets bw agree that in the case of disputes, the recorded and saved calls and connection data shall be evaluated by a court of arbitration or ordinary court of law. 7.4 The bidder shall inform his employees, assistants and vicarious agents about the recording in the above sense and shall obtain their consent thereto. 8. Formalities, AOB 8.1 In order to be valid, bids shall be submitted as a pdf copy of the legally-binding signed contract for positive load flow commitments including a signed pdf copy of the bidding form for positive load flow commitments for the time period from 01.03.2018 to 09.03.2018. 8.2 On submission of the bid, the bidder declares that consent is given to the documents in accordance with the contract for positive load flow commitments and that said documents are accepted in this form. Only the personal, technical and economic Page 4/5

parameters still have to be added at a later time. Sections 4.4 shall remain unaffected. 8.3 Incomplete bids according to the previous sections shall be regarded as invalid. The same shall apply for bids that are received by terranets bw after the deadline set out in Section 7 or contradict in any other way with these tender conditions or with the contract for the positive load flow commitments. 8.4 Participation in the call for tenders assumes the economic and technical capability of the bidders with regard to actually guaranteeing the load flow commitments. The bidder assures terranets bw that this is the case on submission of his tender. 8.5 On request by terranets bw, bidders shall undergo a communication test insofar as this has not already been conducted in the past. An unsuccessful test shall be repeated once and if unsuccessful again, said bid shall be deemed invalid. 8.6 The costs for participation in this tendering procedure shall be assumed by the bidder. 8.7 terranets bw shall assume no liability for damages resulting from a bidder taking part in the call for tenders procedure, unless mandatory by law or otherwise regulated within the framework of this call for tenders. 8.8 Irrespective of whether a contract is concluded, Sections 7, 12 and 14 of the contract for load flow commitments shall apply accordingly also within the framework of this call for tenders. 9.9 Binding bids shall be sent by email to the following address lfz@terranets-bw.de and should be received by terranets no later than 23.02.2018, 12.00 h. Tenders received too late shall not be taken into consideration. Stuttgart, 21.02.2018 terranets bw GmbH Integral parts of the call for tenders Contract for positive load flow commitments Attachment bidding form for positive load flow commitments for the time period 01.03.2018 to 09.03.2018 Page 5/5