UNITED STATES OF AMERICA 118 FERC 62,159 FEDERAL ENERGY REGULATORY COMMISSION

Similar documents
UNITED STATES OF AMERICA 118 FERC 62,141 FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA 118 FERC 62,144 FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA 134 FERC 62,197 FEDERAL ENERGY REGULATORY COMMISSION. Clean River Power 15, LLC Project No

129 FERC 62,208 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. KW Sackheim Development Project No

Admiralty Inlet Pilot Tidal Project FERC No Appendix H. Adaptive Management Framework

CUSHMAN PROJECT FERC Project No Settlement Agreement for the Cushman Project

National Oceanic and Atmospheric Administration. Resource Agency Procedures for Conditions and Prescriptions in Hydropower

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION STATE OF WASHINGTON DEPARTMENT OF FISH & WILDLIFE S MOTION TO INTERVENE

APPENDIX 4: "Template" Implementing Agreement

Conservation Congress v. U.S. Forest Service

TITLE II--DEVELOPMENT OF SOLAR AND WIND ENERGY ON PUBLIC LAND

MEMORANDUM OF AGREEMENT between the Environmental Protection Agency, the Department of the Interior, and the Department of Commerce

Subject: Opinion on Whether Trinity River Record of Decision is a Rule

SETTLEMENT AGREEMENT CONCERNING THE RELICENSING OF THE PELTON ROUND BUTTE HYDROELECTRIC PROJECT FERC PROJECT NO AMONG

DOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters

EPA-Funded What s Upstream? Advocacy Campaign Did Not Violate Lobbying Prohibitions

MEMORANDUM OF AGREEMENT. between. the Environmental Protection Agency, the Department of the Interior, and the Department of Commerce

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT

RECENT DEVELOPMENTS IN HYDROELECTRIC REGULATION. David R. Poe and Seth T. Lucia

Endangered and Threatened Wildlife and Plants; Revision of the Regulations for

3.2 Assignments and Assumptions of Responsibilities to Comply with Federal Environmental laws Other Than NEPA

U.S. ARMY CORPS OF ENGINEERS REGULATORY DIVISION WILMINGTON DISTRICT

33 CFR Part 320 General Regulatory Policies

Independent Scientific Advisory Board

136 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING TARIFF REVISIONS. (Issued July 1, 2011)

MEMORANDUM OF UNDERSTANDING. Among

Routing the Alaska Pipeline Project through the Tetlin National Wildlife Refuge What responsibilities do agencies have under ANILCA?

Riparian Ecosystems, Volume 2: Management Recommendations Futurewise Comments

Case 2:07-cv RSL Document 51 Filed 11/09/17 Page 1 of 12

Re: Clearwater Creek Hydroelectric Project, FERC Project No

Water Resources Committee/Board of Directors. Frances Mizuno, Interim Executive Director

OFF-LICENSE SETTLEMENT AGREEMENT BETWEEN PUBLIC UTILITY DISTRICT NO. 1 OF PEND OREILLE COUNTY, WASHINGTON, AND THE KALISPEL TRIBE OF INDIANS

104 FERC 61,108 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 2. (Docket No. PL ; Order No.

165 FERC 61,016 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING TARIFF REVISIONS. (Issued October 12, 2018)

Notice No Closing Date: June 30, 2016

SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT NO. 1

No UNITED STATES COURT OF APPEALS FOR THE NINTH CIRCUIT

131 FERC 61,039 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

By the authority vested in me as President by the Constitution and the laws of the United States of America, I hereby direct the following:

Case 2:10-cv TSZ Document 174 Filed 08/13/14 Page 1 of 14 THE HONORABLE THOMAS S. ZILLY

One Hundred Fourteenth Congress of the United States of America

No. 174 Page 1 of No An act relating to improving the siting of energy projects. (S.260)

133 FERC 61,214 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation

CRS Issue Brief for Congress

SUBCHAPTER A SUBCHAPTER B [RESERVED] SUBCHAPTER C ENDANGERED SPECIES EXEMPTION PROCESS

Karuk Tribe of California v. United States Forest Service

NOTE IN RE AMERICAN RIVERS AND IDAHO RIVERS UNITED

160 FERC 61,058 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF CALIFORNIA

Federal Power Act as Amended By the Energy Policy Act of 2005

Public Notice ISSUED:

Power Marketing Administrations: Background and Current Issues

RECLAMATION PROJECTS AUTHORIZATION AND ADJUSTMENT ACT OF 1992 TITLE XVIII -- GRAND CANYON PROTECTION SECTION SHORT TITLE.

Case 2:05-sp RSM Document 193 Filed 10/25/12 Page 1 of 11

Columbia River Treaty Review

Case 2:17-cv MJP Document 21 Filed 01/17/18 Page 1 of 10

Case 9:17-cv DLC Document 251 Filed 08/30/18 Page 1 of 6 UNITED STATES DISTRICT COURT DISTRICT OF MONTANA, MISSOULA DIVISION

Michael B. Wigmore Direct Phone: Direct Fax: January 14, 2009 VIA HAND DELIVERY

Appendix L Authorization

Scott Bulgrin, Pueblo of Sandia

Amended Settlement Agreement. Box Canyon Hydroelectric Project FERC No. 2042

I. SPECIAL CONDITIONS:

Case 2:07-cv RSL Document 50 Filed 05/21/14 Page 1 of 7 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE

Case 2:17-sp RSM Document 69 Filed 11/13/18 Page 1 of 8 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE NO.

documented and communicated to the respective Agencies' incident command systems and firstline supervisors as soon as possible.

CHAPTER 25B. Change of Owner, Operator, or Guarantor for Certain Oil and Gas Facilities

Camp Far West Hydroelectric Project

BEFORE THE UNITED STATES FEDERAL ENERGY REGULATORY COMMISSION

Informational Report 1 March 2015

Escondido Mutual Water Co. v. La Jolla Band of Mission Indians, 466 U.S. 765 (1984)

Appeal No UNITED STATES COURT OF APPEALS FOR THE NINTH CIRCUIT MUCKLESHOOT INDIAN TRIBE, TULALIP TRIBES, et al.,

Cascadia Wildlands v. Bureau of Indian Affairs

UNITED STATES OF AMERICA105 FERC 63, 016 FEDERAL ENERGY REGULATORY COMMISSION

DOCKET NO. D CP-4 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters

UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF FLORIDA MIAMI DIVISION No GOLD (and consolidated cases)

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. United Water Conservation District Project No.

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF OREGON

Case 2:10-cv JES-SPC Document 48 Filed 07/14/10 Page 1 of 6 UNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA FORT MYERS DIVISION

Department of the Army Regional General Permit

US ARMY CORPS Reply To: Public Notice No. OF ENGINEERS U.S. Army Corps of Engineers P-3104

PPL Montana, LLC ) Project No. P NorthWestern Corporation)

David Nickum Executive Director Colorado Trout Unlimited

130 FERC 61,051 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING RELIABILITY STANDARD. (Issued January 21, 2010)

Karuk Tribe of California v. United States Forest Service

Citizen s Guide to the Permitting and Approval Process for Land Development in Pennsylvania

Title 19 Environmental Protection Chapter 5 Land Clearing

8-7. Communications and Legislation Committee. Board of Directors. 4/9/2019 Board Meeting. Subject. Executive Summary. Details

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

Public Notice. Notice No. CELRP-OP 15-LOP1 Expiration Date: March 11, 2020

Case 3:16-cv SI Document 74 Filed 03/21/18 Page 1 of 22

FERC INTRODUCTION

THE AMERICAN LAW INSTITUTE Continuing Legal Education Environmental Law 2017

WaterWatch of Oregon v. Water Resources Department ( Cottage Grove Case )

Case 9:08-cv DMM Document 65 Entered on FLSD Docket 11/18/2008 Page 1 of 6

The Endangered Species Act and Take. Rollie White Oregon Field Office US Fish and Wildlife Service

IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF NORTH CAROLINA. No.

Case No. CV DWM

Clean Water Act Section 401: Background and Issues

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF MONTANA MISSOULA DIVISION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

NO UNITED STATES COURT OF APPEALS FOR THE NINTH CIRCUIT. UNITED STATES OF AMERICA, et al,

Transcription:

UNITED STATES OF AMERICA 118 FERC 62,159 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Snohomish County, Project No. 12687-000 Washington Washington Tidal Energy Company Project No. 12663-000 ORDER ISSUING PRELIMINARY PERMIT AND DENYING COMPETING APPLICATION (Issued March 1, 2007) The Public Utility District No. 1 of Snohomish County, Washington (Snohomish) and Washington Tidal Energy Company (WTEC) filed competing applications, pursuant to section 4(f) of the Federal Power Act (FPA), 1 to study the feasibility of the proposed Deception Pass Tidal Energy Project. The project would be located in Deception Pass in the Puget Sound, in Island and Skagit Counties, Washington. The project proposed by Snohomish in its June 14, 2006 application would consist of 4 Tidal In Stream Energy Conversion (TISEC) devices having a total installed capacity of 2.8 megawatts (MW), a proposed underwater transmission line, and appurtenant facilities. The project is estimated to have an annual generation of 20.7 gigawatt-hours annually, which would be sold to a local utility. The project proposed by WTEC in its March 31, 2006 application would consist of 100 to 300 TISEC devices having a total installed capacity of 150 MW, a proposed underwater transmission line, and appurtenant facilities. Each TISEC unit is expected to have an annual generation of 8.76 gigawatt-hours annually, which would be sold to a local utility. Since neither applicant has presented a plan based on detailed studies, there is no basis for concluding that either applicant's plan would be superior to the other. Because Snohomish is a municipality entitled to preference under Section 7(a) of the FPA, 16 U.S.C. 800(a), and there are no significant substantive differences between the two applications, this permit is issued to Snohomish for Project No. 12687. Background The Commission issued public notice of Snohomish s application on June 22, 2006. Timely motions to intervene were filed by the Whidbey Environmental Action Network (WEAN), the Washington Department of Fish and Wildlife (WDFW), the Washington Parks 1 16 U.S.C. 797(f) (2000).

Projects Nos. 12687-000 and 12663-000 2 and Recreation Commission (WPRC), the Washington Department of Natural Resources (WDNR), the Swinomish Indian Tribal Community (Swinomish Tribe), and the Sauk-Suiattle Indian Tribe (Sauk-Suiattle Tribe). 2 Late motions to intervene were filed by the Tulalip Tribes of Washington (Tulalip Tribes) and the Washington Department of Ecology (WDE) on July 27, 2006, and were granted by Commission notice on August 16, 2006. Island County, Washington (Island County), filed a late motion to intervene on January 30, 2007, that was granted on February 26, 2007. Comments were filed by the U.S. Department of the Interior (Interior), the U.S. Army Corps of Engineers (Corps), Skagit County Planning and Development Services (Skagit), Senator Jay Inslee, and Senator Rick Larsen. None of the commenters or intervenors opposes issuance of a permit to Snohomish. 3 The WDFW, WDNR, WPRC, and Island County intervened to be parties to the proceeding. The WDE states that only it can represent its interests in this proceeding, and that issuance of a preliminary permit for the project may impact water quality (therefore requiring a water quality certification) if test units are installed. The WEAN states that the proposed project may adversely affect or degrade the environmental and aesthetic resources of the project area, which will result in degradation of the opportunities afforded by those resources to WEAN members. The Sauk-Suiattle Tribe, Tulalip Tribes, and Swinomish Tribe state that they are not adequately represented by any other party, and that the proposed project has the potential to affect marine mammals, anadromous fish, cultural resources, and their rights under federal treaties. Interior, while not raising any specific issues, notes generally that, while it is supportive of the development of environmentally sound alternative energy technologies, the project has the potential to adversely impact resources of interest to Interior. Interior requests that the permittee be required to consult with the U.S. Fish and Wildlife Service (FWS) and other relevant agencies during the permit term, that the Commission issue the permit for the 2 Because these motions were timely and unopposed, they were granted 15 days after they were filed. See 18 C.F.R. 385.214(c) (2006). 3 Public notice of WTEC s application was issued on May 2, 2006. In response, the National Marine Fisheries Service (NMFS) intervened on June 20, 2006, to be party to the proceeding and commented that two federally listed endangered species and their critical habitat need to be considered. Verdant Power, LLC (Verdant), intervened on July 3, 2006, in protest this and numerous other projects proposed by the parent company of WTEC, Oceana Energy. Comments in support of the application were filed by Mr. George T. Frampton, Jr., and Senator Orrin Hatch on July 18 and October 5, 2006, respectively. Comments were filed by Mr. Robert Cinq-Mars on July 3 and 20, 2006, and October 20, 2006, questioning WTEC s suitability as an applicant, and responding to comments by Oceana Energy and Senator Orrin Hatch. Oceana Energy responded on July 18, 2006. None of these parties intervened or commented on Snohomish s application.

Projects Nos. 12687-000 and 12663-000 3 proposed studies for no more than 4 test units, that the Commission initiate consultation with the FWS pursuant to the Endangered Species Act (ESA) because activities under the permit could affect threatened or endangered species, and that Snohomish conduct a cumulative impact analysis for all seven of its proposed projects. Skagit comments that the proposed project has the potential to affect environmental, aesthetic and recreation resources in the project area, and requests to be included on the service list. The Corps requests that Snohomish consult with them throughout the term of the permit. Both Senator Inslee and Senator Larsen supported the application. On February 1, 2007, staff requested that Snohomish provide additional information pertaining to the technology considered for use at the project. Snohomish provided the additional information on February 5, 2007. Discussion Section 4(f) of the FPA authorizes the Commission to issue preliminary permits for the purpose of enabling prospective applicants for a hydropower license to secure the data and perform the acts required by FPA section 9, 4 which in turn sets forth the material that must accompany an application for license. The purpose of a preliminary permit is to preserve the right of the permit holder to have the first priority in applying for a license for the project that is being studied. 5 Because a permit is issued only to allow the permit holder to investigate the feasibility of a project while the permittee conducts investigations and secures necessary data to determine the feasibility of the proposed project and to prepare a license application, it grants no land-disturbing or other property rights. 6 7 As noted, a preliminary permit does not authorize a permittee to undertake any construction or to enter onto lands owned by others. Therefore, Interior s impression that the 4 16 U.S.C. 802 (2000). 5 See, e.g., Mt. Hope Waterpower Project LLP, 116 FERC 61,232 at P 4 (2006) ( The purpose of a preliminary permit is to encourage hydroelectric development by affording its holder priority of application (i.e., guaranteed first-to-file status) with respect to the filing of development applications for the affected site. ) 6 Thus, a permit holder can only enter lands it does not own with the permission of the landholder, and is required to obtain whatever environmental permits federal, state, and local authorities may require before conducting any studies. See, e.g., Three Mile Falls Hydro, LLC, 102 FERC 61,301 at P 6 (2003); see also Town of Summersville, W.Va. v. FERC, 780 F.2d 1034 (D.C. Cir. 1986) (discussing nature of preliminary permits). 7 Issuance of this preliminary permit is thus not a major federal action significantly affecting the quality of the human environment.

Projects Nos. 12687-000 and 12663-000 4 Commission might allow the placement of test units under the preliminary permit is misplaced. Placement of test units is not authorized by the issuance of a permit pursuant to the FPA; however, such activities would be subject to other federal and state laws. As discussed below, the Commission expects the permittee to engage in prefiling consultation, including consultation with FWS during the permit term. While the Commission expects the permittee to investigate whether endangered species might be affected by the proposed project and to discuss such matters in its prefiling consultation, it would be premature for the Commission to begin ESA consultation with FWS prior to a development application being filed. Before that time, there would be no proposed federal action regarding which to consult. On February 15, 2007, the Commission issued a notice of inquiry seeking comments on how it should treat applications for preliminary permits to study hydropower projects involving proposals to utilize wave, current, and instream new technology methods. 8 In the notice of inquiry, the Commission poses three possible alternatives and states that, pending the outcome of the notice of inquiry proceeding, it is adopting in the interim a strict scrutiny approach. Under that approach, the Commission will process new technology preliminary permit applications with a view toward limiting the boundaries of the permits to prevent sitebanking and to promote competition. Further, to ensure that permit holders are actively pursuing project exploration, the Commission will carefully scrutinize the reports that permit holders are required to file on a semi-annual basis, 9 and would, where sufficient progress was not shown, consider canceling the permit. Stricter scrutiny could entail requirements such as reports on public outreach and agency consultation, development of study plans, and deadlines for filing a Notice of Intent to file a license application and a Pre-Application Document. During the course of the permit, the Commission expects that the permittee will carry out prefiling consultation and study development leading to the possible development of a license application. The prefiling process begins with preparation of a Notice of Intent (NOI) and Pre-Application Document (PAD) pursuant to Sections 5.5 and 5.6 of the Commission s Regulations. 10 The permittee must use the Integrated Licensing Process unless the Commission grants a request to use an alternative process (Alternative or Traditional Licensing Process). Such a request must accompany the NOI and PAD and set forth specific 8 See Preliminary Permits for Wave, Current, and Instream New Technology Hydropower Projects, Notice of Inquiry and Interim Statement of Policy, 118 FERC 61,112 (2007). 9 As a standard condition in all preliminary permits, the Commission requires the permit holder to file progress reports every six months. 10 18 C.F.R. 5.5 and 5.6 (2006).

Projects Nos. 12687-000 and 12663-000 5 information justifying the request. 11 Should the permittee file a development application, notice of the application will be published, and interested persons and agencies will have an opportunity to intervene and to present their views concerning the project and the effects of its construction and operation. Under the interim policy, this permit will include conditions to closely monitor the progress of the permittee s activities. In addition to the six-month progress reports required of permittees, this permit will also require the permittee to file, within 45 days of the effective date, a schedule of activities to be carried out under the permit and target dates for completion of these activities. At a minimum, this should include the filing of the NOI and PAD within one year of permit issuance, along with any request to use the traditional or alternative licensing process. The PAD must also include the time frame for consulting with federal, state, and local agencies, tribes, non-governmental organizations, and any other interested entities; and a preliminary list of issues identified and necessary studies related to these issues. If the periodic progress reports required by Article 4 of this permit do not show significant progress, or if the permittee fails to comply with any other conditions, the permit may be cancelled. A preliminary permit is not transferable. The named permittee is the only party entitled to the priority of the application for license afforded by this preliminary permit. In order to invoke permit-based priority in any subsequent licensing competition, the named permittee must file an application for license as the sole applicant, thereby evidencing its intent to be the sole licensee and to hold all proprietary rights necessary to construct, operate, and maintain the proposed project. Should any other parties intend to hold during the term of any license issued any of these proprietary rights necessary for project purposes, they must be included as joint applicants in any application for license filed. In such an instance, where parties other than the permittee are added as joint applicants for license, the joint application will not be eligible for any permit-based priority. 12 The Director orders: (A) A preliminary permit is issued for the Deception Pass Tidal Energy Project to the Public Utility District No. 1 of Snohomish County, Washington, for a period effective the first day of the month in which this permit is issued, and ending either 36 months from the effective date or on the date that a development application submitted by the permittee has been accepted for filing, whichever occurs first. 11 See 18 C.F.R. 5.3 (2006). 12 See City of Fayetteville, 16 FERC 61,209 (1981).

Projects Nos. 12687-000 and 12663-000 6 (B) The competing application for preliminary permit for Project No. 12663, filed by Washington Tidal Energy Company on March 31, 2006, is denied. (C) This preliminary permit is subject to the terms and conditions of Part I of the Federal Power Act and related regulations. The permit is also subject to Articles 1 through 4, set forth in the attached standard form P-1. (D) The permittee, in addition to the six-month progress reports required under Article 4, shall file the following: Within 45 days of the issuance date of the permit, a schedule of activities proposed by the permittee during the three-year permit term, leading to the filing of a development application. At a minimum, this shall include filing, within one year of the effective date of this permit, a notice of intent to file a license application (NOI) and pre-application document (PAD), accompanied by, if desired, a request to use the Traditional Licensing Process or Alternative Licensing Process. The PAD shall include a time frame for consulting with federal, state, and local agencies, tribes, non-governmental organizations, and any other interested entities; and for developing and filing a preliminary list of issues identified and studies related to these issues needed to develop a license application. (E) This order is issued under authority delegated to the Director and constitutes final agency action. Requests for rehearing by the Commission may be filed within 30 days from the date of issuance of this order, pursuant to 18 C.F.R. 385.713. William Guey-Lee Chief, Engineering and Jurisdiction Branch Division of Hydropower Administration and Compliance

Projects Nos. 12687-000 and 12663-000 7 Form P-1 (Revised March 2000) FEDERAL ENERGY REGULATORY COMMISSION TERMS AND CONDITIONS OF PRELIMINARY PERMIT Article 1. The purpose of the permit is to maintain priority of application for a license during the term of the permit while the Permittee conducts investigations and secures data necessary to determine the feasibility of the proposed project and, if said project is found to be feasible, prepares an acceptable application for license. In the course of whatever field studies the Permittee undertakes, the Permittee shall at the all times exercise appropriate measures to prevent irreparable damage to the environment of the proposed project. All test sites shall be restored as closely as possible to their original condition and to the satisfaction of the Commission s authorized representative or, where federal lands are affected, to the satisfaction of the agency administering such lands. Article 2. The permit is not transferable and may, after notice and opportunity for hearing, be canceled by order of the Commission upon failure of the Permittee to prosecute diligently the activities for which a permit is issued, or for any other good cause shown. Article 3. The priority granted under the permit shall be lost if the permit is canceled pursuant to Article 2 of this permit, or if the Permittee fails, on or before the expiration date of the permit, to file with the Commission an application for license for the proposed project in conformity with the Commission s rules and regulations then in effect. Article 4. At the close of each six-month period from the effective date of this permit, the Permittee shall file four copies of a progress report with the Secretary, Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426; and shall serve a copy on the interveners in this proceeding. The report shall describe, for that report period, the nature and timing of what the Permittee has done under the pre-filing requirements of 18 CFR sections 4.38 and 5 and other applicable regulations; and, where studies require access to and use of land not owned by the Permittee, the status of the Permittee s efforts to obtain permission.