Dolakha Chainage: (O )

Similar documents
Earthquake Emergency Assistance Project

Garma-Nele-Bogal Subproject, Solukhumbu Chainage: (O )

Earthquake Emergency Assistance Project

Nepal: Rural Reconstruction and Rehabilitation Sector Development Project

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

Nepal: Rural Reconstruction and Rehabilitation Sector Development Project

NEP: Road Connectivity Sector I Project

Semi-annual Social Safeguards Monitoring Report (January to June 2012)

Inter-Agency Common Feedback Project COMMUNITY PERCEPTION REPORT RECONSTRUCTION, FOOD SECURITY & LIVELIHOOD AND PROTECTION

Nepal Earthquake 2015: A Socio-Demographic Impact Study

Gender Equality and Development

Creating Employment for Rural Women Through ADB Loan 2143-NEPAL: Gender Equality and Empowerment of Women Project

Dimensions of rural urban migration

India: Delhi Meerut Regional Rapid Transit System Project

The Short- and Long-term Effects of Rainfall on Migration: A Case Study of Chitwan, Nepal Introduction Setting

Policy Brief on Migration and Urbanization

Manamaya Pangeni (Bhattarai) Ministry of Women, Children and Social Welfare Department of Women and Children Nepal

AN ANALYSIS OF SOCIO-ECONOMIC STATUS OF SCHEDULED CASTES: A STUDY OF BORDER AREAS OF JAMMU DISTRICT

Inter-Agency Common Feedback Project COMMUNITY PERCEPTION REPORT RECONSTRUCTION, FOOD SECURITY & LIVELIHOOD AND PROTECTION

People s Republic of China: Jilin Yanji Low-Carbon Climate-Resilient Urban Development Project

Engaging Women, and Involving Civil society and Media

Bangladesh: Urban Public and Environmental Health Sector Development Program

Gender, labour and a just transition towards environmentally sustainable economies and societies for all

GLOBALIZATION, DEVELOPMENT AND POVERTY REDUCTION: THEIR SOCIAL AND GENDER DIMENSIONS

Department of Agricultural Economics and Extension Abia State University, Umuahia Campus, P. M. B., 7010, Umuahia, Abia state, Nigeria.

Youth labour market overview

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

SUMMARY POVERTY REDUCTION AND SOCIAL STRATEGY

PROGRESS Anti Trafficking

UNDAF Results Matrix Sri Lanka

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents

Indigenous Peoples Development Planning Document. IND: Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program

International Journal of Pure and Applied Sciences and Technology

Analyzing Reservation Policies in Civil Service of Nepal. Deepak Dhakal MPP/IP ( ) The University of Tokyo

Belize. (21 session) (a) Introduction by the State party

Rapid HEA Assessment Report Save the Children, Nepal

Towards a World Bank Group Gender Strategy Consultation Meeting 9 July 2015 Feedback Summary Kingston, Jamaica

KEY FINDINGS. Assessment Report Gorkha 18 June 2015

CEDAW/PSWG/2005/I/CRP.1/Add.5

MINISTRY OF COMMERCE AND INDUSTRY

Understanding Employment Situation of Women: A District Level Analysis

KEY MESSAGES AND STRATEGIES FOR CSW61

Global Employment Trends for Women

POVERTY TRENDS IN NEPAL ( and )

WHAT I WANT IS FOR THE GOVERNMENT TO HELP

Written contribution of FIAN Nepal to the Universal Periodic Review of Nepal - The Situation of the Right to Food and Nutrition in Nepal

Role of Cooperatives in Poverty Reduction. Shankar Sharma National Cooperatives Workshop January 5, 2017

Recognizing Community Contributions for Achieving SDGs in Nepal Federation of Community Forestry Users Nepal (FECOFUN)

11. Demographic Transition in Rural China:

Gender Mainstreaming in Rural Transport Projects in Nepal: Transformative Changes at Household and Community Levels

Resolution 2008/1 Population distribution, urbanization, internal migration and development

HAITI PROGRAMME PLAN 2014

Case Study on Youth Issues: Philippines

Committee on the Elimination of Discrimination against Women Thirtieth session January 2004 Excerpted from: Supplement No.

DID THE HUMANITARIAN RESPONSE TO THE NEPAL EARTHQUAKE ENSURE NO ONE WAS LEFT BEHIND?

Development Strategy for Gender Equality and Women s Empowerment

Social, Psychological and Cultural Factors Implications for Disaster Preparedness and Rebuilding

Challenges in Creating Employment Opportunities for Youths in Nepal

INTER AGENCY COMMON FEEDBACK PROJECT

Session 5: Gender-sensitive analysis and use of data in the context of women s economic empowerment at the national level

GENDER FACTS AND FIGURES URBAN NORTH WEST SOMALIA JUNE 2011

DANFE REPORT ( JULY MAY

(A version of the article forthcoming in Nepali Times and Kantipur Daily. Please do not circulate without the permission of the authors.

Kakuma Refugee Camp: Household Vulnerability Study

Policy, Advocacy and Communication

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT

Republic of Korea. (19 session)

TOPICS Unity in Diversity

Service Provision Mapping Tool: Urban Refugee Response

Initial report. Republic of Moldova

STRATEGIC FRAMEWORK ( )

% of Total Population

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

EMPLOYMENT AND QUALITY OF LIFE IN THE MISSISSIPPI DELTA. A Summary Report from the 2003 Delta Rural Poll

MIGRATION AND DEVELOPMENT: THE KERALA EXPERIENCE. S Irudaya Rajan K C Zachariah

DISPLACEMENT TRACKING MATRIX (DTM) AFAR REGION, ETHIOPIA ROUND III: JANUARY FEBRUARY 2017 AFAR REGION - KEY FINDINGS.

Poverty profile and social protection strategy for the mountainous regions of Western Nepal

Towards a World Bank Group Gender Strategy Consultation Meeting, 22 July 2015 Feedback Summary Colombo, Sri Lanka

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

National Assessments on Gender and Science, Technology and Innovation (STI) Overall Results, Phase One September 2012

Wage and income differentials on the basis of gender in Indian agriculture

SOCIAL EXCLUSION AND POVERTY IN BANGLADESH

Mongolia: Gender gaps in the agricultural and rural sector

Findings of the Khotang Household Survey: A background paper for the Mid-term review of Swiss Country Strategy ( )

Problems encountered by ageing population in rural Nepal due to foreign migration. Abstract

Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold

SOCIAL INCLUSION AND RURAL DEVELOPMENT THROUGH MGNREGA

5. RECOVERY AND PEACE

E/ESCAP/FSD(3)/INF/6. Economic and Social Commission for Asia and the Pacific Asia-Pacific Forum on Sustainable Development 2016

Women Workers in Informal Sector in India

Case studies of Cash Transfer Programs (CTP) Sri Lanka, Lebanon and Nepal

United Nations Human Rights Website - Treaty Bodies Database - Document - Concludin...

Pathways to graduation: is graduation from social safety net support possible and why? Evidence from sub-saharan Africa

Nature And Reasons For Migration: A Case Study Of Migrated Unskilled Labour To Hyderabad City

Causes and Impact of Labour Migration: A Case Study of Punjab Agriculture

STUDY OF SECTOR WISE GROWTH AND TRENDS IN EMPLOYMENT IN MAHARASHTRA By HeenaThakkar

Case Study. Women s participation in stabilization and conflict prevention in North Kivu. SDGs addressed CHAPTERS. More info:

Role of NGOs in the Empowerment of Marginalized Communities in Rural Nepal

EBRD Performance Requirement 5

Transcription:

Government of Nepal Ministry of Federal Affairs and Local Development Central Level Project Implementation Unit Earthquake Emergency Assistance Project Lalitpur, Nepal (ADB Loan 3260-NEP) Gender Equality and Social Inclusion Action Plan (GESI-AP) Sunkhani-Sangwa Sub -project Dolakha Chainage: (O+000-27+373) May, 2017

Table of Contents 1.Background... 2 Occupation... 3 Cast ethnic, indigenous, Dalit and minorities of the sub-project.... 4 2.1 Demographic Information of the Project Area... 5 3.Situation Analysis of Women... 6 4.Proposed Activities of GESI-AP for this sub-project... 9 4.1 Expected objectives of GESI-AP for this sub-project:... 9 5. Estimated budget for conducting GESI-AP for Sunkhani Sangwa Lamidanda- Kalinchowk sub project....10 6. Details cost breakdown....11 List of table Table 1: Population of the Project Area ( Kalinchok Rural Municipality )... 5 Table 8: Demographic Features of Influence ward no.( then VDCs)... 5 Table 2: Current Occupation Pattern of Women compared with men.... 6 Table 4: Cost Estimate of Awareness Raising Training on disaster preparedness, risk management and gender sensitization.... 10 Annex 1: GENDER EQUALITY AND SOCIAL INCLUSION ACTION PLAN (GESI ACTION PLAN)

1.Background The proposed sub-project Sunkhani-Kanpa section Sunkhani-Sangwa-Jiri sub- project is of 27.373 km length. The road width is 8 m, 4 m each from the centerline. The proposed road is a part of the Sunkhani-Sangwa with total length 27.373 km. The sub-project Sunkhani- Sangwa lies in Northen part of Dolakha district in the Janakpur Zone of the Eastern Development Region of Nepal. The district is nationally and internationally famous because of Mt.Gaurishankar, Chhorolpa mt. lake, kalinchwok Bhagawoti, Sailungshwori, Jiri and dolkha Bhimsen which lies in this district. The district borders with Ramechap district in south, Ramechap & Solukhumbu District in East, Sindhupalchok District in West and Tibet ( China ) in North. The Lamosangu Jiri road is connected to Araniko highway at Khadichaur of sindhupalchok connecting Dolakha to Kathmandu. The sub-project starts from Sisagolai ( Bhadaure ) of Kalinchowk Rural Municipality ward no 7 ( then Sunkhani VDC-9 ) along Dolakha-Singati Road and end at Damba of Kalinchowk Rural Municipality ward no 2 ( then Babare VDC-1) passing via about 21 settelement along the alignment. The major settlements along the road alignment are Sisa Golai (Bhadaure), Dudhpokhari, Liptun, Pilkhepa, Gujarpa, Godun, Kurathali, Thanmaru, Lakaigau, Lapilang, Gumu, Hilepani, Bojeni, Ghyan, Karmathali, Sinkhu, Babare, Sisneri, Kusawati, Kotisyau and Damba. The DDC Dolakha had made it trafficable under RRRSDP few years ago. The road connects north-western part of Dolakha district with the district headquarter in Charikot and rest of the country through Araniko Highway through all-weather connectivity. 1.1 Starting point ending point and Passes zone The road section starts from Sisagolai (Bhadaure Bazaar) of kalinchok Rural Municipality-7 ( then Sunkhani VDC-9) along Dolakha Singati and ends at Damba of Kalinchok Rural Municipality-2( then Babare VDC-1 ) passing via more than 21 settlements along the alignment. The major settlements along the road alignment are Sisa Golai (Bhadaure), Dudhpokhari, Liptun, Pilkhepa, Gujarpa, Godun, Kurathali, Thanmaru, Lakaigau, Lapilang, Gumu, Hilepani, Bojeni, Ghyan, Karmathali, Sinkhu, Babare, Sisneri, Kusawati, Kotisyau and Damba. The DDC Dolakha had made it trafficable under RRRSDP few years ago. The road connects north-western part of Dolakha district with the district headquarter in Charikot and rest of the country through Araniko Highway through all-weather connectivity.

2.Socio-economic status of Sub-project. Population, Household and Settlement. The road passes ward 7 of Kalinchok Rural Municipality (then sunkhani vdc, wards 1-9 )of ware no. 5 and 6 ( then lapilang, wards 1,4,8 & 9) of ward no.4 and 5 ( then lamaidanda VDC and wards 1,2,3,4,5,7 & 9) of ward no. 2 (then Babare VDCs ) of Dolakha District. there are more than 21 major settlements along the alignment that Sisa Golai (Bhadaure), Dudhpokhari, Liptun, Pilkhepa, Gujarpa, Godun, Kurathali, Thanmaru, Lakaigau, Lapilang, Gumu, Hilepani, Bojeni, Ghyan, Karmathali, Sinkhu, Babare, Sisneri, Kusawati, Kotisyau and Damba. Around 8671 persons with 4148 male and 4523 female live in 2085 households in the ZoI of the sub-project. Language Majority of the people of the project area speak Nepali language 70.1 % while another widely spoken language is thami by a significant population 26.6% owing to their second dominancy. Remaining people speak other languages like tamang, newari,sherpa,majhi and others likes that tamang,newari, Sherpa,majhi. But almost all can also speak Nepali language. Occupation The people here have major occupation as agriculture, horticulture and livestock farming. People depend on subsistence agriculture, however more than three quarter of the population in the area cannot meet their subsistence requirements for their small size of land holdings. They rear goat, pig, poultry and buffaloes for household use. They visit out of their village for wage labour and some of them, like all other castes, have been in foreign land for better earning. Occupational caste households are distributed in almost all the settlements. They have the lowest status in all sectors, i.e. they lack land resources, livestock, education, sufficient income, access to all services and facilities. The major cereal crops grown here are maize, wheat and millet. The cash crops grown are potato and oil seed. Land holding Pattren Land holding pattern within the ZoI of the road project reveals that majority of the HHs 71% hold 5-20 ropanis of land. About one fifth 20 % HHs own 1-5 ropanis of land and few HHs 3% have less than 1 ropani. Very few HHs 0.26% are landless. Remaning 5.74% has land holding larger than 20 ropanis.

Food Sufficiency The data on food sufficiency in the settlements along the road alignment shows that 50%HHs have food sufficient for less than three month, 20% HHs for 3-6 months 12% HHs for 6-9 months and 15% HHs for 9-12 months (FGD,2016 ). Cast ethnic, indigenous, Dalit and minorities of the sub-project. The population of the project area is dominated by Chhetri (45.3%) followed by Thami (29.7%) and Hill-Brahmin (11.7%). Other castes include Newar, Damai/Dholi, Kami, Tamang, Sarki, Majhi, Sherpa, etc. The area is a home to diverse ethinic or indigeneous communities like Thami, Newar, Tamang, Majhi, Sherpa, Gharti/Bhujel and Magar and occupational casetes like Damai/Dholi, Kami, Sarki. Thami indigeneous people (IPs) were found to have settled in entrie four influenced ward no. (then VDCs) along the Sunkani Kanpa Road corridor.

2.1 Demographic Information of the Project Area According to the Population Census 2011 of Nepal, the total population of the Dolakha district is 1,86,557 consisting of 87,003 male and 99,554 female. The average household size is 4.08 person. The combined population of the affected Rural municipality ( then VDCs ) is 17382 with an average family size of 4.20. The percentage of male and female population of is 47.84 and 52.16 respectively of ZOI. Table 1 shows the population composition of affected Rural municipality (then VDCs) and settlement. Table 1: Population of the Project Area ( Kalinchok Rural Municipality ) Table 2: Demographic Features of Influence ward no.( then VDCs) Influenced Total Male Female S.n Municipality/VDC s Household s No. % No. % Total Population 1 Sunkhani-7,8 1194 2131 46 2544 54 4675 2 Lapilang-5,6 1206 2383 48 2559 52 4942 3 Lamidanda-3,4 1405 2063 49 2169 51 4232 4 Babare-2 794 1638 46 1895 54 3533 Total 4599 8215 47 9167 53 17382 Source: Census 2011, Central Bureau of Statistics, Nepal The mentioned table shows that population in market Centre is higher as comparison to adjoining VDCs. Male population has dominated by female population which indicates the national scenario of gender disparities and socio-cultural pattern of the sub-project area. Mainly the women who residences near the market center of any VDCs may take advantage from the sub-project so it could be lesion learned to other women and disadvantage communities.

3.Situation Analysis of Women Socio-economic status of women is similar with national stream in sampled households. During the feasibility study of Sunkhani - Sangwa sub-project focus group discussion were held and analyzed. Lack of education is the main problem of women in subproject area, the total literacy of the project VDCs is 63.29% with male literacy rate 72.98% and female literacy rate 54.68%. The literacy of project VDCs is comparable with that of the whole district. Property Right: - According to cadastral survey 2016, out of 1102 plots of owner verified land only 65 (5.89 %) of land owner are women. It shows that women lack access to property right which has limited their economic independence. Current Occupation Pattern of Women: - Many women are engaged in agriculture and livestock for their living cost but facing lack of labour even in their routine agriculture production period. The main causes are labour shifting to foreign countries. Some women are employed in government and non-government organization. Some women from sampled household found to engage in foreign countries such as Malaysia, Qatar and UAE. Table 3: Current Occupation Pattern of Women compared with men. Occupation Total Total Male Percentage Female Percentage Percentage Agriculture (own Land) 3200 71.86 4070 75.76 7270 73.99 Agriculture Labor 300 6.73 420 7.81 720 7.32 Govt. Job 300 6.73 190 3.53 490 4.98 Private Job 115 2.58 95 1.76 210 2.13 Business 238 5.34 140 2.60 378 3.84 Foreign Employment 200 4.49 190 3.53 390 3.96 Unemployed 100 2.24 267 4.97 367 3.73 Total 4453 100 5372 100 9825 100 Foreign employment is second dominant sector after agriculture in terms of living cost. Unemployment rate presents the scenario of nation but they are helping hand of agriculture production so semi unemployment rate is major issue of sub-project area. Many school and college students were found to involve in domestic work as well as support in livestock management for the family expenses. Where women are playing double role in domestic

work as well as outside work such agriculture, community participation and decision making process in village level. Most of women belong to Indigenous communities such as Sherpa, Tamang and Magar found that they are enjoying in decision power of family and facing less violence by male as comparison to other communities. 3.1 Impact on Women headed household by sub-project. Some women own lands are affected in road corridor of Sunkhani Sangwa roads. Due to affected lands they are worried, but they are happy because of getting travel facilities and transportation from market to villages. Due to the facilities of road they can make their houses near the road in the rest land and run the some business too. Therefore, the value of lands increasing day by day. After earthquake the road has played important roles to bring construction materials. The land affected of road corridor site there was not sufficient for running household for us. We should have done daliy wages for livelihood. Instead of land we have got many facilities. 3.2 Situation of Dalit s, vulnerable communities and minorities. The Dalit s, vulnerable communities and minorities are in this sub-project area. Any way they are in moderate level. They are participated to Govt and Non govt programe. Due to this programme they are awarded in every field. Nowadays, they are involved in mothers group, saving group, social work and users committee. But still, there is bad system of marriage in Thami communities. they do their daughter marriage in younger age. After all, these communities are in moderate level. 3.4 Socially excluded groups and their linkage in service centers (health and education etc) Considering the population above 5 years of age, the total literacy of the project VDCs is 63.29% with male literacy rate 72.98% and female literacy rate 54.68%. The literacy of project VDCs is comparable with that of the whole district. Project area has people with all levels of academic achievements. Recently, the district has been declared completely literate district and District Education Office (DEO) has been implementing informal education programmes to achieve cent percent literacy rate. Local people have realized the importance

of education in their life and most of them send their children to school. However, dropout rate of female students is still higher than male students. Health care service is being delivered by three Sub-Health Posts along the road alignment. A community hospital has been established in Singati of Lamidada VDC. A district level government facility, Jiri Hospital is located at Jiri of Jiri Municipality. Similarly there are four other private hospitals in Charikot of Bhimeshwor Municipality providing general and specialized services. According to the District Health Office (2072), the major health problems of the area are pulmonary obstructions/respiratory tract infection, skin diseases, diarrhea, gastritis, ear infection, helmenthiasis, typhoid and others. The health status of people has improved because of increased awareness towards health and sanitation. Tentatively land and structure affected people/family belongs to women, dalits and socially excluded groups. According to community peoples are hypothetical of Affected peoples plots of owner land only ( 5.89 %) of land owner are women. The affected people plots of ( 4 %) of land owner are dalits.

4.Proposed Activities of GESI-AP for this sub-project For addressing the gender and social inclusion issues of this sub-project following are proposed activities which are based on GESI-AP stated in PAM page 28-29. Disaster preparedness working session: which session will be organized in subproject area in active participation of women, ethnic communities, dalits and poor marginalized. As we know EEAP is the relief program for earthquake affected district so this kind of activities could be effective to face such kinds of disaster in near future. Visual documentary show on disaster and risk management: - This session is the imbedded program of awareness raising training and orientation. Some visuals and documentary will be showed in sub-project area which leads to project affected women and children for risk management in disastrous period. Well appreciated Videos and documentary will be collected from the organizations like NSET, NRA which are already workout similar nature of training. Campaign program on CLS, STI, human trafficking and sexual/gender violence: - These sessions are directly based on GESI-AP of EEAP in B output 2 and C. general (applicable for outputs 1 and 2). Such as ensure the bidding documents reflect GESI provisions and practitioners, disaggregate indicators, core labor standard (safety and security of worker), road safety measures, women participation and representation etc. And this orientation will be organized in sub-project area with the key participation of local project affected women, contractors and local communities. 4.1 Expected objectives of GESI-AP for this sub-project: After implementation of this proposed GESI-AP following will be the expected objectives, Project affected women, ethnic communities, Dalits and minorities will be aware of disaster and its impact and challenges and they could gain some basic ideas to face the disaster and management skills/techniques. Local communities will be aware of women representation and participation and its positive impact on society. Local people, contractor, project affected people will be aware and conscious about CLS, STI and sexual/gender based violence. Local people will aware of road safety features like signage, speed breakers, safety barriers etc especially to women, child and elderly friendly. Moreover, this GESI-AP will lead to establish the monitoring system for collection and analysis of sex, caste and ethnicity so we can develop the disaggregated data collection center. Local communities will be aware of nursery management and preventive measure for landslide and soil erosion etc. by gaining the knowledge for nursery management and bio engineering techniques. They can also be able to produce some milk product as income generating source.

5. Estimated budget for conducting GESI-AP for Sunkhani Sangwa Lamidanda-Kalinchowk sub project. Following table presents the estimated cost for conducting training and orientation program for Sunkhani Sangwa Lamidanda Kalinchowk sub-project regarding GESI-AP. The outcomes of this training and orientation program will address the issues of project affected women, ethnic minorities, dalits and poor communities. The participants will be based on project affected household, women headed household, ethnic minorities, dalits and minorities but it doesn t mean to discriminate of any caste and communities within sub-project area. Table 4: Cost Estimate of Awareness Raising Training on disaster preparedness, risk management and gender sensitization. S.N. Description Target No of Participant Awareness Raising Training/Orientation Program Duration (days) Budget Responsible Remarks (Rs.) A. Project Related 1. Disaster preparedness working session. Visual/ documentary show on disaster and risk management. At least 40% participants are women. 100 persons 1/2 50,000.00 CISC/CLPIU\DISC /DLPIU 2. Campaign program on CLS, human trafficking, STI and sexual/gender based violence prevention programs and women empowerment. ** At least 40% participants are women. 100 persons 1/2 50,000.00 CISC/CLPIU\DISC /DLPIU Sub Total 200 persons 100,000.00 Total estimated cost for awareness raising activities (in words) :- NRS One hundred thousand only. Note: - number of participants and budget slightly change according to requirement. **CLE: Core labor standard, STI: sexual Transmitted Infection.

6. Details cost breakdown. 1. Orientation/training on EEAP modality, disaster preparedness, Visual/ documentary show on disaster and risk management for 100 participants*1/2 day (Non-Residential) S.N. Activities Unit Quantity Rate Total Cost (Rs.) 1. Training logistics Hall with other accessories day 1 2,000.00 2,000.00 2. Multimedia with accessories day 1 2,000.00 2,000.00 3. Resource person allowance not less than 1.5 hrs. a session MD 3 1600.00 4800.00 4. Stationery for participants sets 100 50.00 5,000.00 5. Orientation materials-handouts, board marker, chart paper etc. LS 1 1200.00 1200.00 6. Tea and snacks/khajja day time PP 100 200.00 20,000.000 7 Khaja closing Sets 100 150 15000 Total 50,000.00 2. Campaign program on CLS, human trafficking, STI and sexual/gender based violence prevention programs and women empowerment for 100 person * 1/2 day (Non-Residential). S.N. Activities Unit Quantity Rate Total Cost (Rs.) 1. Training logistics-hall with accessories. day 1 2,000.00 2,000.00 2. Multimedia with accessories day 1 2,000.00 2,000.00 4. Stationery for participants sets 100 50.00 5,000.00 5. Resource person allowance not less than 1.5 hrs a session. Class 3 1600.00 4800.00 6. Orientation materials-hand out, board marker, chart paper etc. LS 1 1200.00 1200.00 7. Tea and snacks/khaja day time Sets 100 200.00 20,000.00 8. Khaja closing Sets 100 150.00 15,000.00 Total 50,000.00

Annex 1: GENDER EQUALITY AND SOCIAL INCLUSION ACTION PLAN (GESI ACTION PLAN) Activities/Measures Target and Indicators Time Frame Responsible A.Output 2:- Roads and Bridges are rehabilitated and reconstructed. Engage women in rehabilitation and reconstruction of affected infrastructure. Install Road Safety Features Women employed in construction of district road ( prefer 20 per cent women should be into sub-project road alignment area Priority will be given to women in compensatory tree plantation for afforestation and slope protection works through bio engineering esp. for hill roads (prefer 20 percent women engagement in bio engineering activities) Signage,, safety barriers, and road shoulders constructed and slope protection, esp. Women, Children, Elderly and differently-abled. March 2017 April 2017 CLPIU, DLPIU,CISC and DISC with support of GESI expert, Social safeguard officers and social mobilizers. Ensure women s representation in project teams Social Mobilization Teams for community-outreach (Target: 40 % Women) Ensure that negative impact on vulnerable FHHs due to road construction is mitigated. Affected FHHs directly benefit from appropriate provision and mitigation measures provided as mentioned in the Resettlement Plan. February 2017 B.General (Applicable for outputs 1 and 2). Provide GESI orientation to project staff at Central Level Formal meeting held by the EEAP GESI Expert with relevant EAs/IAs and project staff-as needed- to raise awareness on the need to ensure women s equitable representation in the CLPIU, DLPIU, CISC and District implementation Monitoring Units (DIMUs) in line with global and GON supported practices February 2017 Same as above Provide GESI Orientation to project staff at district level Training sessions carried out targeting specific needs and constraints faced by EEAP IAs (DOLIDAR) in GESI concepts and activities during EEAP project implementation. March 2017 Ensure that bidding and contractual documents reflect GESI Provisions and practices. Carry out human Sexual/ gender-based violence prevention campaigns in affected districts. All EEAP bidding documents include clauses on promoting equitable access to labor opportunities for women and DAGs. All EEAP contracts will include specific clauses on: Incl. equal pay for work of equal value and the prohibition of child labor. Project affected communities and all contractors and local communities participate in the awareness-raising campaigns. All district-based field personnel, contractors and local communities participate in the awareness-raising campaign (Target: equitable participation from men and women from communities) Ensured and will be promoted. May 2017 Same as above Appoint a team of GESI experts at central and district level to support implementation of EEAP GESI activities. Include sex, caste and ethnicity disaggregated indicators in monitoring system and collect data. GESI Expert based in Kathmandu, to support IA Social Development Officers January 2017 System established for collection and analysis of sex, caste and ethnicity disaggregated data and information at center and district levels and relevant information/data included in report (incl. Semi-Annual Progress Reports) This plan has been prepared as per PAM page 28-29 for EEAP rural roads implemented by MoFALD. System established.