PUTNAM COUNTY PUBLIC WORKS DEPARTMENT RIGHT-OF-WAY USE PERMIT APPLICATION

Similar documents
ORDINANCE NO. 906 AN ORDINANCE AMENDING THE ATHENS MUNICIPAL CODE BY REVISING CHAPTER 2 OF TITLE 16 IN ITS ENTIRETY.

RIGHT-OF-WAY PERMIT SUBMITTAL REQUIREMENTS CHECKLIST

INSTRUCTIONS FOR APPLICATION FOR FIBER OPTIC CABLE LICENSE

CITY OF LYNN In City Council

Chapter 132 STREETS AND SIDEWALKS. ARTICLE I Street Openings and Excavations

LAKE COUNTY ROAD DEPARTMENT P.O. BOX 908 LAKEVIEW, OREGON APPLICATION FOR RIGHT-OF-WAY PERMIT

BE IT ORDAINED, that the Revised General Ordinances of the City of Syracuse, as

STATE OF ILLINOIS COUNTY OF BUREAU GENERAL CONSTRUC TION HIGHWAY PERMIT. Whereas, I (we),, hereinafter termed the

The Board of Supervisors of the County of Riverside, State of California, do ordain as follows:

STREET OPENING AND CULVERT ORDINANCE

ORDINANCE 499 (AS AMENDED THROUGH ) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO

Town of Ashland RIGHT-OF-WAY PERMIT APPLICATION

(Space for sketch on back - Submit detailed plan if available)

ORDINANCE NO. The Board of Supervisors of the County of Alameda ordains as follows: SECTION I

CITY OF CHICAGO PUBLIC WAY USE PERMIT APPLICATION

MUNICIPAL DRIVEWAY PERMIT ISSUANCE AGREEMENT

CITY OF NORTH LAS VEGAS 2250 Las Vegas Boulevard North, Suite 200, North Las Vegas, Nevada (702) Fax(702) TDD(800)

APPLICATION FOR PIPELINE PUBLIC ROAD CROSSING PERMIT

ARTICLE 905 Street Excavations. EDITOR S NOTE: Resolution , passed February 3, 2009, established street excavation fees.

PERMIT AGREEMENT FOR THE ACCOMODATION OF UTILITY FACILITIES AND RELOCATION ON PUBLIC CITY RIGHT-OF-WAY

ARLINGTON COUNTY CODE. Chapter 55 UNDERGROUND UTILITY PROTECTION

RIGHT OF WAY / STREET OPENING PERMIT

ROAD USE AGREEMENT. WHEREAS, Operator intends to engage in Natural Gas Activities at various locations in the Municipality; and

FINAL AGREEMENT FOR LAND DIVISION IMPROVEMENTS IN ACCORDANCE WITH THE TOWN OF WESTPORT CODE FOR TOWN OF WESTPORT, DANE COUNTY, WISCONSIN

2. A final Subdivision Plat with the County Clerk s stamp and Filed Map number.

RESOLUTION NO. REGULATIONS GOVERNING THE USE OF THE COUNTY RIGHT-OF-WAY

TOWN OF HERNDON, VIRGINIA FRANCHISE AGREEMENT TERMS AND CONDITIONS FOR USE OF TOWN'S RIGHTS OF WAY

Township of SLIPPERY ROCK BUTLER COUNTY

Engineering Permit Application

Right-of-way Work Permit Application (Ordinance through )

For a permit to work within the County Highway Right-of-way (ROW), please provide the following:

METHOD OF PERFORMING UTILITY WORK WTIHIN THE TOWN OF ERWIN RIGHT-OF-WAY

Chapter 21. Streets and Sidewalks

BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COMMERCE, TEXAS:

EXCAVATION PERMIT Application Packet

In this Chapter the following words shall have the following meanings: Applicant means any person who makes application for a permit.

Members of the City Council of the City of Gulfport, Mississippi, held on the day ORDINANCE NO.

Title 30: Public Service

COMMONWEALTH OF PENNSYLVANIA POSTING AUTHORITY EXCESS MAINTENANCE AGREEMENT

Application to Work on County Right-of-Way

ORDINANCE NO THE CITY COUNCIL OF THE CITY OF ISSAQUAH, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Definitions.

STATE OF MASSACHUSETTS CHAPTER 82

CERTIFICATE. Final. Upon. Instructions: letterhead. Page 1 of 3. CDC Documents. Revised 1/22/2018

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. Consent Workshop I. EXECUTIVE BRIEF

City of Waverly Building & Zoning Department Mail to: P.O. Box Lancashire Waverly, NE

CHAPTER 14 FRANCHISES ARTICLE I ELECTRIC TRANSMISSION COMPANY, LLC

CHAPTER FOURTEEN FRANCHISE

POLE ATTACHMENT LICENSE AGREEMENT SKAMANIA COUNTY PUD

ARTICLE VII ADMINISTRATION AND ENFORCEMENT

Request For Proposals Hwy 124 E ADA Door Opener Hallsville City Hall

City of North Port Neighborhood Development Services 4970 City Hall Boulevard North Port, Fl

CHAPTER 11. Streets, Sidewalks and Public Property

COMMERCIAL DRIVEWAYS AND PRIVATE STREET ENTRANCES ON COUNTY ROADS

RIGHT-OF-WAY PERMIT REQUIREMENTS

MUNICIPAL UTILITY PERMIT ISSUANCE AGREEMENT

HIGHWAY VEGETATION MANAGEMENT AGREEMENT

Section, Township N, Range E. Is project in MWRDGC combined sewer area Yes No. Basic Information (Required in all cases)...schedule A (Page 4 of 8)

CITY OF RUSTON. Inspection Department Fax: OFF-PREMISE SIGN PERMIT APPLICATION SITE PLAN MUST BE INCLUDED WITH APPLICATION

CHAPTER IV. BUILDINGS AND CONSTRUCTION

ACCESS MANAGEMENT RULES AND FORMS

OFFICIAL TOWNSHIP OF LEET ORDINANCE NO

WATER RATES. An Ordinance Establishing Water Rates and Connection Charges for Water Districts of the Town of Kirkwood, New York. Adopted April 6, 1965

BY-LAW NUMBER THE REGIONAL MUNICIPALITY OF WATERLOO. A By-law to Regulate Work on Regional Roads

PALM BEACH COUNTY DEPARTMENT OF ENGINEERING & PUBLIC WORKS LAND DEVELOPMENT DIVISION. TO: All Division Personnel PPM NUMBER: EL-O-3606

CITY OF ENID RIGHT-OF-WAY AGREEMENT

UPPER CHICHESTER TOWNSHIP ZONING HEARING BOARD P.O. BOX 2187 UPPER CHICHESTER, PA (610)

ORDINANCE NO BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF LAWRENCE, KANSAS:

ORDINANCE NO

ORDINANCE NO WHEREAS, the Board of County Commissioners (Board) of Manatee County, Florida, is

ATHENS-CLARKE COUNTY BUILDING RELOCATION PERMIT APPLICATION

School. party of the second part; and Town of Jamestown, NC party of the third part,

BOND FOR FAITHFUL PERFORMANCE

APPLICATION FOR PERMIT: STREET OPENING AND / OR EXCAVATING IN THE RIGHT OF WAY

ORDINANCE NO BE IT FURTHER ENACTED AND ORDAINED by the Mayor and City Council of Laurel, Maryland that

Revocable Annual Valet Parking Permit Application

TRENCH PERMIT PETITION Lawrence, Massachusetts [Ord. Secs and 12.30

CHAPTER 9 BUILDING REGULATIONS

BOND FOR FAITHFUL PERFORMANCE

Garfield County Road & Bridge 0298 CR 333A Rifle, CO Phone: Fax:

Driveway Crossings Bylaw No. 3748, 1992

Chapter 10 COMMUNITY ANTENNA TELEVISION SYSTEMS Last updated October 2007

SECTION 1 - TITLE SECTION 2 - PREAMBLE SECTION 3 - DEFINITIONS

Chapter 10 BUILDINGS AND BUILDING REGULATIONS*

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 687

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND BOARD OF TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND OF THE STATE OF FLORIDA

SPECIAL EVENT PERMIT APPLICATION

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY LIGHTING, MAINTENANCE, AND COMPENSATION AGREEMENT

SUBDIVISION IMPROVEMENT AGREEMENT. (Date of Subdivision Map Recordation: )

CITY OF RENTON and KING COUNTY WATER DISTRICT NO. 90 INTERLOCAL AGREEMENT FOR PROVISION OF WATER SERVICE BY DISTRICT WITHIN CITY

ARTICLE 1 BASIC PROVISIONS SECTION BASIC PROVISIONS REGULATIONS

APPENDIX C EXCESS MAINTENANCE AGREEMENT EXCESS MAINTENCE AGREEMENT (SINGLE USER), 20. Phone Number(s):

FENCE PERMIT APPLICATION

Key Largo Wastewater Treatment District Board of Commissioners Meeting Agenda Item Summary

TUNKHANNOCK BOROUGH WYOMING COUNTY, PENNSYLVANIA

CITY OF LIBERTY RIGHT-OF-WAY ORDINANCE SECTION I

ARTICLE CURB CUTS*

Wisconsin Alliance of CitiesModel Right-of-Way

CITY OF SACRAMENTO BUILDING MOVE ORDINANCE REVISIONS

CHAPTER 4 BUILDING REGULATION

REGULATIONS FOR THE VILLAGE OF NORTH CHEVY CHASE

Transcription:

DATE: PUTNAM COUNTY PUBLIC WORKS DEPARTMENT RIGHT-OF-WAY USE PERMIT APPLICATION Phone: (386)329-0346 Fax:(386)329-0340 R/W PERMIT No.: DISTRICT: ROAD No. ROAD NAME: (To be completed by Public Works Department) THE INTENT FOR THE RIGHT-OF-WAY USE PERMIT The Florida Statutes, Chapter 316.006, gives Putnam County jurisdiction over all streets and highways located within the boundaries: except all state roads and those streets and highways that are controlled by town and cities or special districts. The Department of Public Works is the designated organization responsible for the care and keeping of public right-of-way under the jurisdiction of Putnam County. A permit is established to regulate the location, installation, adjustment, pavement cuts and maintenance of all activities within these right-of-ways. 1. Applicant s Name Mailing Address Telephone Contact Name (Print only) Project Number (Utility Use Only) Contractor License Number: 2. Proposed construction (Check the appropriate box and provide the required information). A. Commercial Driveway: Check One: Permanent Temporary Paver Construction B. Residential Driveway: Check One: Repair/Replace Temporary 911 address connecting to county road: Description of Work Proposed: C. Utilities Type/Description Location D. Other Description Location 3. I HEREBY CERTIFY THAT I HAVE MADE APPLICATION FOR THE PERMIT DESCRIBED ABOVE, THAT I HAVE PROPER AUTHORITY TO APPLY FOR SUCH PERMIT AND WILL ABIDE WITH ALL OF THE CONDITIONS ATTACHED TO THE PERMIT, INCLUDING THE STATED SPECIAL AND GENERAL CONDITIONS ATTACHEDHERETO. Date: Signature of Applicant: (Required) FOR PUTNAM COUNTY OFFICE USE ONLY Permission for the above-described construction is granted subject to the conditions below: CALL 386-329-0346 for FINAL INSPECTION after completion of all work. (Refer to Note 9) EFFECTIVE DATE OF PERMIT: EXPIRATION DATE OF PERMIT: Final Inspection: Permit Fee: $ Extension Fee: $ REVIEWER APPROVAL: Engineer / Inspector / Road EXTENSION DATE OF PERMIT: SPECIAL CONDITIONS (Applicant Responsiblity): 1. Call Sunshine 48 hours before you dig at 1-800-432-4770. It s the Law in Florida 2. Approval of this permit does not exclude the applicant from obtaining other approvals or exclude requirements based on PUD s, DRI s, Building Department, NPDES, etc. Note 14 of the attached General Conditions becomes an integral part of this permit when signed by the applicant. 3. Page 1 Effective 10/01/16

GENERAL CONDITIONS (Applicant Responsibility): 1. All authorized work shall be completed in accordance with this approved application, the provisions of the Putnam County Land Development Code, applicable Putnam County Ordinances, and requirements of all other federal, state and local agencies having jurisdiction over the project. In addition, all construction must meet standards as set forth in the Americans With Disabilities Act of 1990, Title II. 2. Public safety shall be maintained at all times during construction in accordance with the Provisions of Part VI, Work Zone Traffic Control, of the Manual on Uniform Traffic Control Devices. Maintenance of Traffic plans are required with the application submittal package prior to approval. 3. When excavation is included in this permit, all gas companies must be consulted for information as to existing gas pipelines and appurtenances, pursuant to the provision of Chapter 553.851 Florida Statutes. All other utilities likewise shall be consulted, for location on all existing underground construction. 4. Private driveways, public utilities, and other such improvements permitted herewith which are not available for immediate use by the general public are considered as remaining in private ownership and accommodated within the public right-of-way or other public areas. The owners of such facilities, or their successors or assigns, shall be responsible for maintaining such facilities in good and safe repair. 5. This application shall become a permit with signature of authorization, and number assigned. Applicant is responsible for supplying the approved permit to their contractor or subcontractor who must have it on site during construction at all times. Failure to present the approved permit upon demand may result in immediate shutdown of any and all construction activities as determined by the Putnam County Inspector. 6. The construction and maintenance of such utility shall not interfere with the property and rights of a prior permitee. 7. It is expressly stipulated that this permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or vest any property rights to said holder. 8. Whenever necessary for the construction, repair, improvement, maintenance, safe and efficient operation, the alteration or relocation of all, or any portion of said road or highway as determined by Putnam County, any or all of said poles, wires, pipes, cables or other facilities and appurtenances authorized herein under shall be immediately removed from said road, highway and rights-of-ways for reset or relocation thereon as required by Putnam County, and at the expense of the permittee unless reimbursement was preauthorized in writing. 9. All materials, equipment and workmanship shall be subject to inspection by Putnam County Public Works, phone (386) 329-0346 for all inspections. 10. All Putnam County right-of-ways shall be restored to their original or better condition, in keeping with Putnam County specifications, and in a manner satisfactory to the Department of Public Works and/or the Department of Planning and Development Services. See also General Conditions, Note#20 for other important requirements. 11. All installations shall conform where applicable, to the Utility Accommodation Guide, FDOT, and latest edition. 12. Attached drawings covering details of this installation shall be made a part of this permit. Final sketches or drawings showing installation as built shall be filed with the Department of Public Works within Thirty (30) days of completion. All changes made during construction shall be recorded on the as built drawings. Drawings shall give accurate dimensions of concealed and underground construction with vertical and horizontal locations of work from easily identified fixed reference points. A set of stamped drawings signed and sealed by a Florida Registered Professional Engineer may be required with the submittal drawings as determined by the Public Works Director, or his designee. Page 2 Effective 10/01/16

GENERAL CONDITIONS: (con t) 13. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of Putnam County s right, title and interest in the land to be entered upon and used by the holder, and the holder, will at all times, assume all risk and indemnify, defend and save harmless Putnam County and all of its Departments from and against any and all loss, damage, cost or expense arising in any manner on account of the exercises or attempted exercises by said holder of the aforesaid rights and privileges. (FS 125.42(1)c) 14. In case of noncompliance with any Putnam County requirements, this permit is void and the facility will have to be brought into compliance or removed from the right-of-way immediately at no cost to Putnam County. 15. Putnam County reserves the right to withhold issuance of current and future permits to the applicant for failing to comply with Putnam County or the Department of Public Work s requests, General Conditions, Ordinances, permit request, Resolutions, or ANY part of the Putnam County s Land Development Code. 16. Applicant/Licensee agrees to indemnify, hold harmless, defend from, and release the County, its Board of County Commissioners, and members thereof, from any loss, damage, suit, judgment, action, cost, or expense incurred, or brought against Putnam County, its Board of County Commissioners, and members thereof, including personal injury, damage to vehicles, and damage to property, resulting from or arising out of the exercise of the rights and privileges granted by this permit. 17. Pavers are allowed within the Putnam County right-of-ways for use as driveways. If there is a new or existing sidewalk within any portion of the new or replacement section of the permitted driveway, no modifications or alterations may be made to the sidewalk in any way without prior written authorization. ADA (Americans with Disabilities Act) standards must be strictly followed and those standards will be noted on your approved permit. Should any portion of the permitted DRIVEWAY be determined to be out of compliance with County standards and/or ADA standards, the applicant or the applicant s contractor will be required to remove this non-conforming section and replace it within 48 (forty-eight) hours of written notice by Putnam County. This requirement will be enforced even if the existing sidewalk or modifications to the sidewalk are not shown on the drawings as submitted with the Driveway Permit Application. See also Note 14 of the GENERAL CONDITIONS. 18. IMPORTANT WARRANTY INFORMATION: All work performed within Putnam County right-of-ways under an approved Department of Public Works right-of-way permit will be warranted for a period not less than (12) twelve months from the expiration date as shown on the permit. However, in the event the project includes open road cuts, roadway cuts, roadway patches, directional drilling or any type of activities conducted under roadways as issued with the approved right-of-way permit, the warranty period shall be indefinite unless compaction test reports, asphalt test reports, reports showing depth of bores and as-builts are provided to the Putnam County inspector prior to final inspection. 19. Jetting of utilities under roadways is PROHIBITED within any and all right-of-ways of Putnam County. 20. It is the sole responsibility of the applicant to video and/or provide detailed digital photographs of the proposed construction site prior to commencing any and all work in order to protect the applicants interest in the event of disputes between residents, subcontractors, Putnam County inspectors, etc. In the event of a dispute the applicant will provide Putnam County a copy of the original video / digital photographs for review. All rights-of-ways must be restored to existing or better conditions. 21. Applicant must assure that any and all work as permitted is performed within the County owned right-of-way only and DOES NOT encroaching in whole or in part onto private property by means of conducting a survey, survey staking, asbuilts, etc. It is not the responsibility of the Department of Public Works to ensure the exact location of any proposed work. In the event of a conflict, it will be the responsibility of the permitee to resolve the issue. Page 3 Effective 10/01/16

EXEMPTIONS 1. Utilities performing emergency maintenance or emergency repair work do not require a right-of-way permit. However, the Utility must set up a safe work zone in accordance with the latest edition of the Manuel on Uniform Traffic Control Devices, (MUTCD) and call (386) 329-0346 to inform the Putnam County inspector of the unscheduled work and its location. Scheduled work IS NOT considered an emergency. In addition should any damage occur to the roadway system, drainage system, etc. due to the maintenance or emergency repair work a Right-of-Way permit will be required and a fee will be accessed. 2. Developments with approved construction plans by the Department of Planning and Development are exempt from obtaining a separate right of way permit providing ALL on-site and off-site utility work within the right-of-way are shown on the approved engineering plans and constructed prior to final acceptance by Putnam County. Page 4 Effective 10/01/16

FEE SHEET FOR RIGHT-OF-WAY PERMITING A) COMMERICAL DRIVE WAY CONNECTION PERMIT $150.00 X = $ RESIDENTIAL DRIVE WAY CONNECTION PERMIT $ 35.00 X = $ B) NEW POLE/STRUCTURE INSTALLATIONS $ 27.00 X = $ INVOLVING NO MORE THAN THREE STRUCTURES SUBJECT TO: ANY EXTENSION TO AN EXISTING OVERHEAD ALIGNMENT INSTALLATIONS WITHIN RIGHT-OF-WAY WHICH ARE OUTSIDE OF EXISTING ALIGNMENT C) CONDUIT SERVICE LATERAL INSTALLATIONS $ 35.00 X = $ WHICH DO NOT CROSS A ROADWAY AND ARE PLACED PERPENDICULAR TO THE RIGHT-OF-WAY LINE D) ALL OTHER USES, INCLUDING UTILITIES REVIEW AND INSPECTION BASE REVIEW FEE $100.00 X = $ PER EACH BORE LOCATION $ 50.00 X = $ PER EACH ROADWAY CUT LOCATION $250.00 X = $ PER 1,000 LINEAR FT. OF OVERHEAD $16.00 / 1000 X = $ PER 1,000 LINEAR FT. OF UNDERGROUND $35.00 / 1000 X = $ E) LANDSCAPING (PLUS BASE FEE) $108.00 X = $ F) IRRIGATION $130.00 BASE = $20.00 / 1000 LINEAR FEET X = $ G) HOUSE MOVING (COST/HOUSE) $108.00 X = $ H) SIDEWALK CONSTRUCTION $75.00 / 100 X = $ I) ROADWAY/DRAINAGE CONSTRUCTION $150.00 / ¼ MILE (1,320 ) X = $ J) RIGHT-OF-WAY PERMIT TIME EXTENSION COST $ 54.00 $ (ONE YEAR MAXIMIUM FROM ORIGINAL APPROVAL DATE) K) PENALTY FOR WORK WITHOUT A PERMIT $ 1 st OFFENSE = DOUBLE THE APPLICABLE FEE + $250.00 2 nd OFFENSE* = DOUBLE THE APPLICATION FEE + $1,000.00 *WITHIN A ONE (1) YEAR PERIOD OF FIRST OFFENSE TOTAL COST: $ ADDITIONAL COST: $ Page 5 Effective 10/01/16

Instructions for submitting the form: Download, complete and sign the application. Hand-deliver a copy of the signed application along with a check for the application fee and appropriate plans to Public Works, 223 Putnam County Blvd in East Palatka, or mail to: Putnam County Public Works PO Box 310 East Palatka, FL 32131 Checks may be made out to Putnam County Public Works, or PCPW. Page 6 Effective 10/01/16